S. No.क्र. सं. | Name of Workकार्य का नाम | Date of Startकार्य आरम्भ करने की तिथि | Date of Completionकार्य समाप्त करने की तिथि | Cost (In Lac) |
Expenditure (In Lac) |
Progress | Agency | Status | Viewदेखें |
---|---|---|---|---|---|---|---|---|---|
1 | Providing Fire Fighting Arrangement in Various Govt. School Building in Delhi under Circle M-15 | 2010.05.04 | 2012.02.28 | 74986380.00 | Royale Meridian (India ) Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
2 | Construction of New Block For Medicine, Maternity And Advanced Pediatric Centre ( Composite Steel plus RCC framed 2B plus G plus 22 Storyed building At LN Hospital including internal water supply, Sanitary installation, External Development works, Dr | 2020.11.04 | 2023.05.03 | 46552.58 | 14700.05 (Mar'23) | 0.00 (Mar'23) | Swadeshi Civil Infrastructure Pvt. Ltd., 302, DLF Tower B Jasola, New Delhi-110025 | In LN1 steel Col. erected upto 12 th floor, 15th floor slab casted in Pour-1 & 15th floor slab casted in Pour-3 and in pour-2 12th floor deck slab completed. In LN2, pour I, 4th floor slab has been casted. In Pour II, 7th floor slab is ready for casting and erection for 8th floor is in progress. The Pour-III, 3rd floor slab has been casted. |
Detail Report
Graph / Photo |
3 | Repairing of fire alarm system installed at Lawyers chamber block 3 | 2020.02.28 | 2020.03.27 | 27388.89 | Ekta Enterprises |
Detail Report
Graph / Photo |
|||
4 | Construction of Hospital at Madipur, New Delhi | 2020.11.11 | 2022.11.10 | 26970.58 | 7100.69 (Mar'23) | 0.00 (Mar'23) | Ramacivil India Construction Private Limited | RCC for water tank at terrace is in progress. Masonry at 9th and 10th floor is in progress. Finishing work such as tile work, Granite work, POP, putty etc is in progress at 1st to 8th floor level and service floor level. |
Detail Report
Graph / Photo |
5 | REWIRING/REPAIRING OF ELECTRICAL ACCESSORIES IN TOILETS AT VARIOUS DELHI GOVT. SCHOOL | 2017.08.09 | 2019.11.09 | 23127.43 | NKG Infrastructure Limited |
Detail Report
Graph / Photo |
|||
6 | Construction of Pucca School Buildings (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at GGSSS No. 2 Uttam Nagar, New Delhi (Package - 4). SH : Civil & Electrical work. | 2021.05.15 | 2022.05.14 | 7689.40 | 0.00 (Sep'22) | 67.00 % (Sep'22) | M/S B L Infrastructure Projects Pvt.Ltd | Work is in progress. |
Detail Report
Graph / Photo |
7 | Construction of Pucca School Building (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Kohat Enclave, New Delhi (Package - 4). SH : Civil & Electrical work. | 2021.05.15 | 2022.05.14 | 7689.40 | 4563.58 (Mar'23) | 0.00 (Mar'23) | B. L. INFRA PROJECTS PRIVATE LIMITED | Work is in progress. |
Detail Report
Graph / Photo |
8 | Construction of Pucca School Building (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and comprising with complete site development, RWHS, STP, Tubewell, Gen Set, PA System etc. at Ladpur Village, New Delhi (Package - 7) | 2021.07.18 | 2022.07.17 | 6988.57 | 626.50 (Mar'23) | 0.00 (Mar'23) | A. K. Mehta & Co. | Work is in progress. |
Detail Report
Graph / Photo |
9 | Construction of Pucca School Building (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and comprising with complete site development, RWHS, STP, Tubewell, Gen Set, PA System etc. at RPVV A6 Paschim Vihar, New Delhi (Package - 7). | 2021.07.18 | 2022.07.17 | 6988.57 | 1888.09 (Mar'23) | 0.00 (Mar'23) | A. K. Mehta & Co. | Work is in progress. |
Detail Report
Graph / Photo |
10 | Expansion remodeling of ASBGH Moti Nagar New Delhi | 2019.08.06 | 2020.10.28 | 6759.71 | 1328.53 (Feb'23) | 0.00 (Feb'23) | Abhilasha Enterprises | Present Progress of work is 95% upto 31.01.2023 |
Detail Report
Graph / Photo |
11 | Remodelling of 94Nos Delhi govt Disp to Polyclinic SH Remodelling of 23nos DGD at various places in constituencies of District SW of Delhi including Water supply Sanitary installations Elect installations AC Lifts Fire fighting system etc PackageII | 2019.01.17 | 2019.10.13 | 3751.40 | 288.52 (Mar'23) | 0.00 (Mar'23) | A. K. Builders | Hinderance due to lockdown of COVID-19. Work in progress 88% work done upto Jan'2023 |
Detail Report
Graph / Photo |
12 | Expansion and Remodelling of Aruna Asaf Ali Govt. Hospital at Rajpur Road, New Delhi. | 2019.08.10 | 2020.08.03 | 3730.52 | 318.18 (Mar'23) | 0.00 (Mar'23) | Labotek | work in progress by M/s Labotk |
Detail Report
Graph / Photo |
13 | E & M works relating to all day to day operation & maintenance, A/R & M/O Works & Special Repair Works etc | 2022.05.27 | 2024.05.26 | 3516.35 | 354.56 (Feb'23) | 0.00 (Feb'23) | Swastik Electrotech Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
14 | Providing Manpower services of Clericals, Drivers, Multitasking and Staff (Un-skilled, Semi – skilled, Clerical and Non- Technical Supervisory Staff) in various offices under the jurisdiction of office of Pr. Chief Engineer (Project), SE Health-I, SE Health-II, SE (Elect.) and all Divisions under Health Zone for the years of 2022-2023 & 2023-2024 | 2022.05.04 | 2024.05.02 | 3031.48 | 1320.23 (Mar'23) | 0.00 (Mar'23) | RAKSHAK SECURITAS PVT. LTD. | work completed |
Detail Report
Graph / Photo |
15 | Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Dariyapur Kalan, Delhi | 2020.05.30 | 2021.05.29 | 2936.58 | 4028.62 (Mar'23) | 0.00 (Mar'23) | Tewatia Construction Pvt. Ltd. | Cleaning and some minor rectification works are in progress. |
Detail Report
Graph / Photo |
16 | Construction of DTC Bus Depot in resettlement colony at Sawada Ghevra, Delhi | 2022.04.05 | 2022.12.04 | 2915.78 | 229.29 (Mar'23) | 0.00 (Mar'23) | SVK Infrastructures | RCC boundary wall work has been completed. The finishing work of the boundary wall will be started soon. Construction of Admin Building cum Rest Room, Workshop Building is in progress.. |
Detail Report
Graph / Photo |
17 | SITC and CAMC of CCTV System in Delhi Govt. Schools. SH- Providing and Maintenance of Internet lease line Connection. | 2019.08.17 | 2020.02.16 | 2691.32 | Reliance Jio Infocomm | 125 school sides made live in CCC. Internet lease line cabling has been completed in 121 schools. Work is in progress and shall be completed along with main work of installation of CCTV cameras in Delhi Government School. |
Detail Report
Graph / Photo |
||
18 | Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Libaspur, Delhi | 2020.05.30 | 2021.05.29 | 2653.59 | 4571.35 (Mar'23) | 0.00 (Mar'23) | Tewatia Construction Pvt. Ltd. | Cleaning and some minor rectification works are in progress. |
Detail Report
Graph / Photo |
19 | Renovation / Development work in Building for Education Department at Boulverd Road, Delhi | 2022.04.07 | 2022.08.04 | 1842.64 | 1294.25 (Mar'23) | 0.00 (Mar'23) | DND Infra Private Limited | Except Auditorium all works are completed. |
Detail Report
Graph / Photo |
20 | Providing Manpower services of Clericals, Drivers, Multitasking and Staff (Un-skilled, Semi -skilled, Clerical and Non- Technical Supervisory Staff) in various offices under the jurisdiction of Health Maintenance Zone, PWD | 2019.04.03 | 2021.04.02 | 1625.72 | RAKSHAK SECURITAS PVT. LTD. |
Detail Report
Graph / Photo |
|||
21 | Civil works relating to day to day maintenance, A/R & M/O Works & Special Repair Works | 2022.05.10 | 2024.05.08 | 1313.79 | 457.21 (Mar'23) | 0.00 (Mar'23) | Raghav Engineers | work completed |
Detail Report
Graph / Photo |
22 | C/o 44 nos. (G Plus 3) SPS equivalent classroom including 2 nos staircase, 4 toilet blocks, 1 lift & 3 nos stilt at Govt. Girls Sr. Sec School, West Jyoti Nagar, Delhi & 36 nos. (G Plus 3) SPS equivalent classroom including 3 nos staircase, 4 toilet blocks & 2 nos stilt at Govt. Co-Ed. Middle School, East Rohtash Nagar School, Delhi including internal & external water supply, sanitary installations, electrical installations, development of site, boundary wall, UGR, RWH & Fire Fighting system etc | 2022.03.07 | 2023.01.30 | 1246.96 | K. L. ARORA & SON | Work foreclosed. |
Detail Report
Graph / Photo |
||
23 | Comprehensive Maintenance of Civil works including day to day maintenance, Annual Repair works and Special Repair works under Maulana Azad Medical College & Guru Nanak Eye Centre New Delhi | 2022.05.25 | 2024.05.23 | 1184.23 | 232.90 (Mar'23) | 0.00 (Mar'23) | Swastik Electrotech Pvt. Ltd. | work completed |
Detail Report
Graph / Photo |
24 | Mechanised House Keeping and Security Services/Facility Management services (FMS) for Chandni Chowk Road and appurtenances/System installed from Lal Jain Mandir to Fatehpuri Mosque for the Period 2022-2023(1 Years) | 2022.08.26 | 2023.08.25 | 983.09 | 322.14 (Feb'23) | 0.00 (Feb'23) | Soni Management & Allied Services Pvt. Ltd. |
Detail Report
Graph / Photo |
|
25 | Running operation of lifts | 2021.05.06 | 2024.05.05 | 909.76 | Guruji Elevator |
Detail Report
Graph / Photo |
|||
26 | Video projection system | 2013.09.19 | 2013.12.18 | 908.00 | Saga Infosolution Pvt. Ltd | completed |
Detail Report
Graph / Photo |
||
27 | Construction of 144 Nos Temporary Courtroom in the existing court complexes of Saket Stilt plus G plus 3 Tis Hazari Stilt plus G plus 3 and Karkardooma G plus 4 Delhi Sub Head Providing and Placing Factory made Furniture | 2020.05.25 | 2020.07.23 | 905.33 | 124.22 (Feb'23) | 0.00 (Feb'23) | M/s Rajdhani Furnitures Pvt. Ltd. | Work provisionally completed additional work is in progress |
Detail Report
Graph / Photo |
28 | Operation & Maintenance of E.I, pumps, sub-station, DG Sets, firefighting & fire alarm system, HVAC & AC units & R.O. Plant etc | 2022.05.24 | 2024.05.23 | 754.12 | 15.00 (Feb'23) | 0.00 (Feb'23) | SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. |
Detail Report
Graph / Photo |
|
29 | Comprehensive Maintenance of Civil works relating Day to day Maintenance, Annual Repair, Special Repair and routine maintenance work etc. of Deep Chand Bandhu Hospital, Ashok Vihar, Phase-IV, Delhi, Babu Jagjivan Ram Hospital, Jahangirpuri, Delhi, Attar Sain Jain Eye Hospital, various dispensaries at Jahangirpuri, Delhi and Bhagwan Mahavir Hospital, Pitampura, Delhi during 2022-23 and 2023-24 | 2022.06.06 | 2024.06.05 | 741.51 | Dilshad Khan | Work in Progress (35% Progress) |
Detail Report
Graph / Photo |
||
30 | Comprehensive Consultancy Services for Planning, Designing and Development of New Campus of Ambedkar University Delhi (PHASE-I Works) at Dheerpur, Delhi-110009. | 2019.09.05 | 2025.09.04 | 720.00 | 0.00 (Sep'20) | 2.00 % (Sep'20) | ARCOP ASSOCIATES PVT. LTD. | EFC approved the proposal on 10.05.2022. Case to be put up in Cabinet. |
Detail Report
Graph / Photo |
31 | Comprehensive Consultancy Services for Planning, Designing and Development of New Campus of Ambedkar University Delhi at Sector 3, Rohini, Delhi 110085 | 2019.09.05 | 2025.09.04 | 720.00 | 0.00 (Sep'20) | 2.00 % (Sep'20) | SIKKA ASSOCIATES REGD. | P.E. for the work amounting to Rs. 1107.56 Crores submitted to Vice Chancellor, AUD on 03.03.2020 . A/A & E/S awaited till date. |
Detail Report
Graph / Photo |
32 | Comprehensive Consultancy Services for Designing and Development of Hospitals at Madipur, Sarita Vihar, Hastsal and Jwalapuri, Delhi. | 2018.11.17 | 2022.01.16 | 720.00 | 22.36 (Aug'22) | 0.00 (Aug'22) | ARCOP ASSOCIATES PVT. LTD. | Work is in progress.. |
Detail Report
Graph / Photo |
33 | Comprehensive maintenance of Civil services at Deen Dayal Upadhyaya Hospital & Residential Complex, Hari Nagar, Janakpuri Superspeciality Hospital C2B Janakpuri New Delhi, Shree Dada Dev Matri avum Shishu Chikitsalya, Dabri and DG at various places, P.W.D (GNCTD), New Delhi for 2 years i.e. 2022-2023, 2023-24 | 2022.05.27 | 2024.05.26 | 683.47 | 50.63 (Jan'23) | 0.00 (Jan'23) | Anand and Company | Work in Progress |
Detail Report
Graph / Photo |
34 | C/o East Delhi Campus of Guru Gobind Singh Indrasprastha University at Surajmal Vihar, Shahdara, Delhi. (SH: Supplying, Installation, Testing and Commissioning of Grid Interactive roof top solar photo voltaic power generation system). | 2020.08.28 | 2021.02.23 | 680.89 | 328.59 (Dec'22) | 0.00 (Dec'22) | Uneecops Technologies Ltd. | Solar Work in Girls Hostel & Sports Hall is 80% completed ,Connection of Sports Hall installation is in sub Station is partialy done. Cable Laying work & Installation of String invertor is in partially complete for A & B Block. Installation of solar PV module A, B, Auditorium is 80% completed. Main cabling work from sub-station to Auditorium Panel and Admin Block Panel is incomplete. |
Detail Report
Graph / Photo |
35 | Re laying of World Athletics approved 400 Mtr. synthetic athletic track at Chhatrasal Stadium, Delhi | 2022.03.26 | 2022.07.24 | 679.06 | 340.61 (Mar'23) | 0.00 (Mar'23) | ADVANCED SPORT TECHNOLOGIES LLP | Work in progress |
Detail Report
Graph / Photo |
36 | E & M works relating to day to day operation & maintenance, A/R & M/O Works & Special Repair Works | 2022.05.26 | 2024.05.25 | 619.38 | 182.46 (Mar'23) | 0.00 (Mar'23) | H. N. TRADERS & ENGINEERS | Work in progress |
Detail Report
Graph / Photo |
37 | Upgradation/Renovation of one staff room in each 951 schools, Civil and Electrical work (SH- Staff rooms 75 no. under south Building Maintenance Division). | 2019.03.14 | 2019.09.13 | 610.61 | 221.28 (Mar'21) | 0.00 (Mar'21) | S.M. Builders | work in progress |
Detail Report
Graph / Photo |
38 | RMO Electrical and Mechanical services installed at Delhi Sachivalya, New Delhi. (SH Maintenance and Operation of E and M services at Delhi Sachivalaya, New Delhi) | 2017.07.13 | 2020.07.12 | 540.00 | Swastik Electrotech Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
39 | Renovation / construction works at Rajiv Gandhi Stadium, Bawana | 2022.07.07 | 2022.11.04 | 535.01 | M/s Vinod Kumar & Company | Work in progress |
Detail Report
Graph / Photo |
||
40 | (SH: Providing Sub-station Equipments). | 2012.12.14 | 2013.10.13 | 525.00 | Reliance Elektrik works | WORK COMPLETED FINAL PAYMENT TO BE MADE |
Detail Report
Graph / Photo |
||
41 | Running and Maintenance of lifts installed in residential and non-residential buildings at GTB Hospital complex, Shahdara, Delhi Sub Head Running operation of lifts | 2019.01.17 | 2021.01.16 | 485.43 | Guruji Elevator | Work in progress 3RD RA 40220380 |
Detail Report
Graph / Photo |
||
42 | Operation & Maintenance of E.I., pumps, fire fighting& fire alarm system, DG Sets & Sub-station, Lifts, ETP/STP Plant and HVAC System & AC units etc. | 2022.06.04 | 2024.06.03 | 457.53 | M/s Jain Electric Works |
Detail Report
Graph / Photo |
|||
43 | Construction of Boundary Wall and other basic work for establishing of Driving training Institute in Village Malikpur Dist. South West, Delhi | 2022.01.25 | 2022.05.24 | 435.79 | 33.58 (Mar'23) | 0.00 (Mar'23) | M/s Satish Builders | Earthwork & RCC boundary wall is in progress. Progress of work was effected due to non availability of funds and NGT construction ban. |
Detail Report
Graph / Photo |
44 | Providing Manpower services of Clericals, Drivers, Multitasking and Housekeeping Staff (Unskilled, Semi skilled, Clerical and Non-Technical Supervisory Staff) in various offices under Higher Education Projects, PWD | 2021.11.21 | 2023.11.20 | 433.86 | 103.45 (Mar'23) | 0.00 (Mar'23) | Shri Krishna Constructions | Physical progress of the work is 56%. |
Detail Report
Graph / Photo |
45 | Comprehensive Maintenance of Civil works for Day-to-day Maintenance and A/R & M/o Work, Special Repair etc of Maharishi Valmiki Hospital Campus and DGD Dispensaries at Pooth Khurd Delhi, SRHC Hospital Complex and DGD Dispensaries at Narela Delhi during 2022-23 and 2023-24 | 2022.05.15 | 2024.05.14 | 416.87 | Mahavir Parsad Gupta & Sons | Work in Progress (50% progress) |
Detail Report
Graph / Photo |
||
46 | Operation of lifts | 2022.10.22 | 2024.10.21 | 389.63 | Akash enterprises | Work in progress |
Detail Report
Graph / Photo |
||
47 | Pdg A/C system | 2009.07.26 | 2009.12.25 | 382.52 | Voltas Ltd. | completed |
Detail Report
Graph / Photo |
||
48 | Operation & Maintenance of E.I, pumps, substation, DG Sets, fire fighting & fire alarm system, HVAC & ductable AC system, lift, Cold Room & solar water heating system etc. | 2022.05.10 | 2024.05.09 | 376.50 | M/s Vivek Associates |
Detail Report
Graph / Photo |
|||
49 | Consultancy Services for Comprehensive Architectural & Engineering Planning and Designing for Construction of MCH Block, Medical College, Boys Hostel, Girls Hostel, Nurse’s Hostel, Interns & Residents Hostel in Indira Gandhi Hospital, Sector-9 / 17, Dwarka, New Delhi | 2023.03.15 | 2026.03.14 | 356.40 | 1.16 (Mar'23) | 0.00 (Mar'23) | Sikka Associates | Technical Bid Stage-I & II has been processed, also Financial bid opened on 23.02.2023. Tender of H1 bidder submitted to competent authority for acceptance. |
Detail Report
Graph / Photo |
50 | Comprehensive Maintenance and Operation of Trauma Block, New Ward Block, OT, Gynae, Old Ward Block, Doctors and Nurses Hospital and Residential Complex Lifts at DDU Hospital, Hari Nagar, New Delhi (SH Operation of Lifts) | 2019.04.30 | 2021.04.29 | 355.16 | 46.14 (Oct'22) | 0.00 (Oct'22) | Guruji Elevator |
Detail Report
Graph / Photo |
|
51 | Comprehensive maintenance of Civil works at Guru Gobind Singh Govt. Hospital, Raghubir Nagar, Delhi and Rao Tula Ram Memorial Govt. Hospital, Jaffarpur Kalan, Delhi P.W.D. (GNCTD), New Delhi for 2 years 2021-22, 2022-23. | 2022.05.23 | 2024.05.21 | 343.73 | 0.00 (Jan'23) | 27.00 % (Jan'23) | Aliyan Constaruction Company | Work is under progress. |
Detail Report
Graph / Photo |
52 | comprehensive architetural consultancy services for construction of multistoried EWS Houses for Slum Dwellers at Bhalaswa, Jahangir Puri, Phase-I, New Delhi | 2021.04.04 | 2024.04.03 | 335.09 | 7.23 (Sep'22) | 0.00 (Sep'22) | Invalid Design Forum International | Presentation was made to Hon'ble Minister on 23.09.2021. Formal approval from ministry is awaited. DUSIB intimated vide File no. F/WC/4444/Bhalaswa/EEC-11/DUSIB/2022, Computer No. 204389371 that Hon'ble Chief Minister of Delhi desire to hold on the work till further orders. |
Detail Report
Graph / Photo |
53 | Up gradation of one staffroom in 86 Nos. Schools under South-East Building Maintenance Division, Hauz Khas, New Delhi during 2018-19. (Civil and Electrical work). | 2019.03.23 | 2019.09.22 | 329.84 | 160.77 (Jan'23) | 0.00 (Jan'23) | S. P. CONSTRUCTION COMPANY | Work in progress |
Detail Report
Graph / Photo |
54 | Comprehensive Maintenance of RO Filtration Units in Ortho Block Hostels LNRDH Various Location in LNH | 2023.01.02 | 2026.01.01 | 327.30 | 236.55 (Feb'23) | 0.00 (Feb'23) | M/s Vivek Associates | Work in progress |
Detail Report
Graph / Photo |
55 | Comprehensive Maintenance of RO Filtration Units in Ward Block , Gynae Block , OPD Block , Emergency and OT Block in LNH | 2022.10.21 | 2025.10.20 | 322.38 | M/s Vivek Associates | Work in progress |
Detail Report
Graph / Photo |
||
56 | 1. RMO of Central AC Plant at A BlockGIPMER2. RMOof Central AC Plant B BlockGIPMERSH Operation and Comprehensive maintenance of Blue Star Make Central AC Plant | 2019.09.11 | 2021.09.10 | 306.35 | 126.73 (Sep'22) | 0.00 (Sep'22) | Blue Star Limited | work in progress and 2nd R/A paid to M/s Blue Star Ltd. |
Detail Report
Graph / Photo |
57 | Comprehensive maintenance and operation of UPS and CVCF systems | 2022.01.26 | 2024.01.25 | 305.92 | 38.24 (Mar'23) | 0.00 (Mar'23) | ARECA TECHNOLOGIES |
Detail Report
Graph / Photo |
|
58 | Installation of target system, bullet proofing and Anti ricochet treatment, ventilation and acoustical works) (Composite work Civil and Electrical) | 2023.02.07 | 2023.06.06 | 298.45 |
Detail Report
Graph / Photo |
||||
59 | Running operation and comprehensive maintenance of online UPS, TVSS, APFF, PAC and Isolation transformer of different capacity installed at RGSS Hospital, Tahirpur, Delhi | 2022.01.26 | 2024.01.25 | 296.84 | 61.84 (Sep'22) | 0.00 (Sep'22) | ISSAR INDUSTRIES |
Detail Report
Graph / Photo |
|
60 | RMO of various Electrical and Mechanical services at District Court Rohini, Delhi. dg. 2021-22 | 2022.05.05 | 2023.05.04 | 293.17 | Swastik Construction Co. |
Detail Report
Graph / Photo |
|||
61 | Const. of 04 Nos. Column Structure New Classrooms, RCC Ramp with S.S. Railing, UPVC window/door, retrofitting/rehabilitation of school campus and stone work based on Delhi-6 theme). | 2022.12.07 | 2023.02.19 | 269.97 | KAMAAL CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|||
62 | Consultancy Services for Comprehensive Architectural and Engineering Planning and Designing for Construction of New Hospital at Siraspur, New Delhi (Recall) | 2019.09.04 | 2022.09.03 | 267.00 | 20.25 (Sep'22) | 0.00 (Sep'22) | Design Associates Inc. | work in progress |
Detail Report
Graph / Photo |
63 | Comprehensive maintenance of Civil works at Pt. Madan Mohan Malviya Hospital, Malviya Nagar, P.W.D. (GNCTD) and NHMC and BR Sur Hospital , Defence Colony and Moti Bagh and DGD at various places, New Delhi for 2 years i.e. 2021-22, 2022-23 | 2022.05.24 | 2024.05.23 | 227.67 | 74.15 (Mar'23) | 0.00 (Mar'23) | Anand and Company | Work in progress. |
Detail Report
Graph / Photo |
64 | Comprehensive architectural consultancy services for Construction of Pucca School of Specialized Excellence (SoSEs) Buildings (G Plus 3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Civil Lines, Global School INA & Library Building at Zeenat Mahal (Package-B) | 2022.07.29 | 2023.07.28 | 224.75 | Design Accord Consultant | Work is in process |
Detail Report
Graph / Photo |
||
65 | Providing Data Entry Operator/Computer Operator, Multitasking and office Staff in various offices under Chief Engineer (OP), PWD, GNCTD, New Delhi | 2021.11.02 | 2023.11.01 | 218.21 | 86.55 (Feb'23) | 0.00 (Feb'23) | M/s DA Construction Co. | The work is in progress |
Detail Report
Graph / Photo |
66 | Renovation of school building and Multipurpose hall (Composite work Civil & Electrical) | 2022.05.22 | 2023.01.21 | 217.86 | 186.74 (Jan'23) | 0.00 (Jan'23) | Nafees Ahmed |
Detail Report
Graph / Photo |
|
67 | Upgradation/Renovation of one staff room in each of 73 schools (Morning and Evening Shift) located at (NE) District of Delhi under the jurisdiction of PWD Building Maintenance Division M-222 | 2019.01.25 | 2019.04.24 | 209.29 | 192.52 (Jan'22) | 0.00 (Jan'22) | Shyam Sunder Tyagi | work completed |
Detail Report
Graph / Photo |
68 | Providing for installation of fixing of false ceiling and VRF System in New College Building OPD and IPD in Nehru Homeopathic Medical College and Hospital, B-Block, Defence Colony, New Delhi-110024 | 2019.03.15 | 2019.10.14 | 208.35 | HILLTOP REFRIGERATION |
Detail Report
Graph / Photo |
|||
69 | Operation and comprehensive maintenance of 4 x 400 TR AC Plant and Ductable Air conditioning unit at Delhi Sachivalaya, New Delhi | 2019.05.06 | 2021.05.05 | 188.87 | 244.87 (Jan'22) | 0.00 (Jan'22) | Blue Star Limited |
Detail Report
Graph / Photo |
|
70 | Comprehensive maintenance of Blue star make central AC Plant | 2022.06.14 | 2024.06.13 | 187.29 | Blue Star Limited | Work in progress |
Detail Report
Graph / Photo |
||
71 | C/o Extention of Maulana Azad Dental Institute of Dental Sciences, phase-II at Bahadur Shah Zafar Marg, New Delhi (SH: Providing Audio-Visual System & Stage Lighting System including 5 Years Comprehensive Maintenance) | 2019.07.27 | 2020.11.26 | 184.85 | HITECH AUDIO SYSTEMS PVT LTD | work in progress by agency |
Detail Report
Graph / Photo |
||
72 | RMO UPS system installed at 2nd floor 4th floor and 6th floor Casualty Block Gynae Block Ward 14 Genetic Lab OT Block and New OPD Block at L.N. Hospital New Delhi. SH Comprehensive annual maintenance of Schneider Electric APC Make UPS system install | 2019.06.15 | 2022.06.14 | 183.90 | 59.04 (Aug'22) | 0.00 (Aug'22) | Labotek | work in progress by M/s LABOTEK ( |
Detail Report
Graph / Photo |
73 | Construction of Additional 13 nos Class rooms over existing G plus 1 SPS structure with Prefabricated fibre reinforced sandwich panel including electrical installations at BCP SKV, Babarpur, Delhi | 2022.05.27 | 2022.08.24 | 183.58 | 267.63 (Mar'23) | 0.00 (Mar'23) | Ram Krishan Yudhister Prakash | Sanction received from DoE vide letter No. F.16/Estate/DoE/40 Rooms 13/BCP, SKV Babarpur/328-337 dated: 01.02.2023 amouting to Rs. 1,62,98,948/- and work has completed on 28.02.2023 |
Detail Report
Graph / Photo |
74 | Annual Comprehensive Maintenance of Online UPS and its accessories | 2021.10.23 | 2024.10.22 | 177.62 | 209.73 (Mar'23) | 0.00 (Mar'23) | power house |
Detail Report
Graph / Photo |
|
75 | Structural strengthening of RCC slab, Beam, Column and Fins of remaining portion of building (Phase-II part area) | 2021.09.25 | 2022.03.23 | 165.91 | 57.46 (Mar'23) | 0.00 (Mar'23) | Cembond Construction Pvt. Ltd | Work is under progress. |
Detail Report
Graph / Photo |
76 | Design, Supply, Installation, Testing and Commissioning of High-Mast type Sport lighting system for Athletic cum football Ground at East Vinod Nagar Sports Complex, East Delhi as per IAAF/FIFA standards) | 2018.08.06 | 2018.12.05 | 165.26 | Lighting Technologies Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
77 | Up-gradation of Public Address System i/c Replacement of defective component of the existing Bosch make PA System installed in Delhi Legislative Assembly | 2022.11.12 | 2022.12.26 | 163.40 | 178.68 (Feb'23) | 0.00 (Feb'23) | Havi Design India LLP |
Detail Report
Graph / Photo |
|
78 | Comprehensive Consultancy for Planning and Development of NSUT East Campus, Geeta Colony, New Delhi | 2022.10.12 | 2022.12.12 | 163.05 | Design Forum International | Conceptual drawing has been approved by local bodies and P.E. in progress. |
Detail Report
Graph / Photo |
||
79 | Replacement of old, SCI pipe doors and windows, floor and wall tiles, internal and external finishing work, sanitary and water supply fittings etc. | 2023.02.18 | 2024.02.17 | 159.90 | MOHD. WAJID |
Detail Report
Graph / Photo |
|||
80 | Comprehensive Consultancy Services (Balance Services) for Designing and Development of Buildings under Stage-1 of Phase-II of Delhi Technological Universityat Bawana Road, Delhi | 2018.05.05 | 2022.11.04 | 159.42 | 15.94 (Jul'22) | 0.00 (Jul'22) | Suresh Goel & Associates | Work is in progress. |
Detail Report
Graph / Photo |
81 | Comprehensive maintenance and operation and augmentation of existing LAN Communication System (Active and Passive) and Voice Communication System installed at RGSS Hospital Tahirpur, Delhi | 2022.01.07 | 2023.02.06 | 155.31 | 67.17 (Feb'23) | 0.00 (Feb'23) | Tracom Enterprises |
Detail Report
Graph / Photo |
|
82 | SITCofcentr.med.grade compr air sys semi dry suction sys with amalgam separ incl5yr Comp. maint | 2020.02.25 | 2020.05.24 | 154.81 | Villa India | work in progress by agency |
Detail Report
Graph / Photo |
||
83 | Supplying and replacement of existing passenger lifts at Tis Hazari Court Complex, Delhi. | 2017.04.22 | 2017.08.21 | 146.38 | 48.06 (Feb'23) | 0.00 (Feb'23) | Johnson Lifts Pvt. Ltd. | Court Authority has directed to work for replacement of one lift at a time |
Detail Report
Graph / Photo |
84 | Mechanized Cleaning of underground & Overhead RCC/PVC water storage tanks of Hospital Buildings DDU Hospital, SVBPH Patel Nagar, Janakpuri Super Specialty Hospital, Guru Govind Singh Govt. Hospital, NHMC Hospital Defence Colony, BR Sur Hospital, Pt. Madan Mohan Malviya Hospital, Malviya Nagar, RTRM Hospital Jaffarpur Kalan, DDMASC Dabri, Acharya Shree Bhikshu Govt. Hospital Moti Nagar | 2022.04.08 | 2023.04.07 | 144.31 | 0.00 (Feb'23) | 98.00 % (Feb'23) | Bharat Construction and Tank Cleaner | Work in progress. |
Detail Report
Graph / Photo |
85 | Renovation of Mud Houses, Open Dining Hall and Tin Sheds | 2018.07.15 | 2018.11.14 | 143.58 | 162.50 (Mar'21) | 0.00 (Mar'21) | Aliyan Constaruction Company | work completed |
Detail Report
Graph / Photo |
86 | Up-gradation / Modification of Zakhira Underpass Pump House, Inderlok, Delhi under PWD NWED Delhi | 2022.03.22 | 2022.07.21 | 142.36 | 223.19 (Sep'22) | 0.00 (Sep'22) | HST Enterprises |
Detail Report
Graph / Photo |
|
87 | RMO 2000/1600/1500 KVA capacity Andrew Yule make HT AVR installed at Sub-station No. 1 2 3 and 4 L.N. Hospital New Delhi. SH Comprehensive maintenance of 2000 KVA 1600 KVA and 1500 KVA HT AVR Andrew Yule make at sub station No. 1 2 3 and4 L.N. Hospit | 2020.01.28 | 2023.01.27 | 142.09 | 58.21 (Mar'23) | 0.00 (Mar'23) | Harsh India Enterprises | Work in progress by Harsh India Enterprises |
Detail Report
Graph / Photo |
88 | Operation and Maintenance of CCTV System installed at Casualty Block, Gynae Block and Special Ward Block at L.N. Hospital, New Delhi. SH Operation and Comprehensive Maintenance of Bosch CCTV System at Casualty Block, Special Ward Block and Gynae Bloc | 2017.03.12 | 2020.03.11 | 137.15 | 41.78 (Sep'19) | 0.00 (Sep'19) | HITECH AUDIO SYSTEMS PVT LTD | Work in Progress |
Detail Report
Graph / Photo |
89 | Civil: A/R & M/O and Special repair work | 2022.05.20 | 2023.05.19 | 136.23 | 42.04 (Oct'22) | 0.00 (Oct'22) | Gee International |
Detail Report
Graph / Photo |
|
90 | Construction of boundary wall at vacant lying land measuring 09 Bigha 15 Biswa(7000 sqm. Approx.) bearing khasra No. 1937/1307 to 1990/1307 situated in village-Fathepur Beri. | 2022.12.19 | 2023.06.01 | 129.24 | SIROHI CONSTRUCTION CO. | Work is in progress |
Detail Report
Graph / Photo |
||
91 | Repair of bathing ghats, manhole and chambers/sewerline providing shed and toilet block renovation at CPMF site. | 2018.08.17 | 2018.12.16 | 128.86 | 69.59 (Aug'20) | 0.00 (Aug'20) | Nafees Ahamed | work completed |
Detail Report
Graph / Photo |
92 | (1) Operation & Maintenance of OTIS make lifts installed at MRD Block, L.N. Hospital, New Delhi. (2) Operation & Maintenance of OTIS make lifts installed at B.L. Taneja Block, L.N. Hospital, New Delhi. (3) Operation & Maintenance of ECE & Olympus make lifts installed at MAIDS, New Delhi (4) Operation & Maintenance of Johnson make lifts installed at New Orthopedic Block of L.N Hospital, New Delhi.(SH - Operation of lift installed at various locations in hospital complex). | 2017.11.14 | 2019.11.13 | 128.68 | 148.24 (Oct'22) | 0.00 (Oct'22) | Akash Enterprises | work in progress. |
Detail Report
Graph / Photo |
93 | Comprehensive Consultancy for Planning and Development of NSUT East Campus, Geeta Colony, New Delhi | 2022.07.02 | 2025.07.01 | 124.93 | 6.25 (Dec'22) | 0.00 (Dec'22) | M/s Design Accord Consultants | Conceptual drawing has been approved by local bodies and P.E. in progress. |
Detail Report
Graph / Photo |
94 | Comprehensive maintenance of Civil Works at Acharya Shree Bhikshu Govt. Hospital and Residential Complex, Moti Nagar and SVBP Hospital and DGD at various places, P.W.D. (GNCTD), New Delhi for 2 years i.e. 2021-22, 2022-23. | 2022.05.24 | 2024.05.23 | 122.92 | 0.00 (Jan'23) | 33.00 % (Jan'23) | GLOBAL ENTERPRISES | Work in progress. |
Detail Report
Graph / Photo |
95 | Mechanized cleaning of underground and overhead RCC PVC water storage tanks at all locations in LN Hospital and Mirdard Lane campus, New Nurses Hostel ABCON, GNEC Hospital & 27 Nos. Delhi Govt. Hospital & 27 Nos. Delhi Govt. Dispensaries | 2022.03.06 | 2023.03.05 | 121.21 | 75.39 (Mar'23) | 0.00 (Mar'23) | Real Aqua Higinic solution | work completed |
Detail Report
Graph / Photo |
96 | Mechanized Cleaning of underground and overhead RCC PVC water storage tanks at all locations in GB Pant Hospital MAMC, AAAGH and Tibbia College New Delhi | 2022.03.21 | 2023.03.20 | 117.99 | 65.65 (Jan'23) | 0.00 (Jan'23) | ROYAL CONSTRUCTION | work completed |
Detail Report
Graph / Photo |
97 | Construction of 05 Nos. new classrooms, replacement of old damaged windows of classrooms, construction of new ramp for CWSN students & teachers, demolition of unserviceable stairs and shotcreting work in Sarvodaya Bal Vidyalaya No. 1 (Urdu Medium) at Jama Masjid, Delhi School ID-2127002 | 2022.02.14 | 2022.08.13 | 117.52 | 481.58 (Jan'23) | 0.00 (Jan'23) | KAMAAL CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
98 | C/o Extention of MADI of Dental Sciences,Ph-II at Bahadur Shah Zafar Marg,ND.SH SITCof Medical Gas Pipeline System including 3 Years Comprehensive Maintenance | 2019.08.12 | 2019.11.09 | 115.37 | Med Freshe Pvt. Ltd. | work in progress by Med Freshe Pvt. Ltd |
Detail Report
Graph / Photo |
||
99 | Construction of 5 Nos. AAMC Centres (4 Nos. in Badli Constituency and 1 No in Bawana Constituency including civil and electrical work). | 2022.10.01 | 2023.01.29 | 113.99 | Gaur Construction | Work in progress |
Detail Report
Graph / Photo |
||
100 | Routine Maintenance of EI and Fans including RMO Pumpset & DG Set | 2022.06.01 | 2023.05.31 | 113.64 | GLOBAL ENTERPRISES |
Detail Report
Graph / Photo |
|||
101 | Comprehensive maintenance of various roads under Sub-Division East Road-III (Section-I&II) of Division East Road during 2022-23. (SH: Repair of footpath & Central Verge & Misc. Repair work.) | 2022.11.02 | 2023.03.01 | 113.50 | Mohd Arif |
Detail Report
Graph / Photo |
|||
102 | RMO various electrical and mechanical services (internal and external) at Deep Chand Bandhu Hospital Kokiwala Bagh Ashok Vihar New Delhi SH Annual Comprehensive maintenance of 4 x 200KVA UPS | 2019.10.21 | 2022.10.20 | 111.48 | power house |
Detail Report
Graph / Photo |
|||
103 | C/o 144 Nos. temporary court room in the existing court complexes of Saket (stilt +G+3), Tis Hazari (Stilt + G +3) and Karkardooma (G+4) SITC of SFP Module in existing System | 2022.05.29 | 2022.06.27 | 110.03 | 288.97 (Feb'23) | 0.00 (Feb'23) | TRACOM ENTERPRISES | WORK IN PROGRESS |
Detail Report
Graph / Photo |
104 | Replacement of 13 passenger lifts installed at MSO Building, New Delhi | 2017.09.26 | 2018.05.25 | 107.28 | Johnson Lifts Pvt. Ltd. | work in progress |
Detail Report
Graph / Photo |
||
105 | Mechanized Cleaning of Underground & Overhead RCC/ PVC Water Storage Tanks of all Hospital DGD Buildings under Sub. Divn. HE-1, HE-2, HE-3, HE-4, HE-5 & HE-6, Civil Health Maintenance Division (East) | 2022.05.23 | 2023.05.22 | 103.43 | Real Aqua Hygiene Solution | Work in progress. |
Detail Report
Graph / Photo |
||
106 | Up-gradation and enhancement of old Sub Station equipments at JPCH, Shastri Park, Delhi | 2022.03.28 | 2022.07.27 | 100.63 | SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. |
Detail Report
Graph / Photo |
|||
107 | Comprehensive maintenance of carrier make central AC plant | 2021.11.28 | 2023.11.27 | 97.83 | 93.53 (Feb'23) | 0.00 (Feb'23) | G D Enterprises |
Detail Report
Graph / Photo |
|
108 | Replacement of wornout cooling System of Cummins India make Diesel Engine | 2022.06.04 | 2022.08.03 | 97.52 | M/s Shri Durga Electricals |
Detail Report
Graph / Photo |
|||
109 | Annual maintenance and servicing, repairing of 1000KVA DG Sets with Cummins make Engine | 2022.05.04 | 2023.05.03 | 96.12 | M/s Shri Durga Electricals |
Detail Report
Graph / Photo |
|||
110 | RMO of HT AVR in A-Block, B-Block C-Block & D Block at GIPMER New Delhi (Comprehensive maintenance of 1500 KVA 2000 KVA and 750 KVA HT AVR Andrew yule make at Sub station No. 1, 3 & 5) | 2021.12.18 | 2024.12.17 | 95.89 | 84.46 (Mar'23) | 0.00 (Mar'23) | Harsh India Enterprises |
Detail Report
Graph / Photo |
|
111 | Civil Work and Electrical Work in Mangolpuri, Sultanpuri, Kirari, Shakurbasti, Rohini, Rithala, Tri Nagar, Shalimar Bagh, Keshav Puram and Wazirpur Total 17 Nos. Schools of NWB (Remaining Work) (Composite Work Civil and Electrical) | 2022.04.08 | 2022.07.07 | 95.69 | 108.54 (Oct'22) | 0.00 (Oct'22) | Rohit Kumar |
Detail Report
Graph / Photo |
|
112 | EOR for SITC of Substation at Delhi Board OF School Education located at Sarvodaya Co-Ed IP extension Patparganj, Delhi | 2022.08.28 | 2022.10.27 | 95.51 | 30.12 (Feb'23) | 0.00 (Feb'23) | Dubey Electric Works |
Detail Report
Graph / Photo |
|
113 | Running operation and annual maintenance of the sub-station, DG Sets, E and M service, Fire Fighting and Fire Alarm, RO Plant and Pumps House at RGSS Hospital, Tahirpur, Delhi | 2019.07.06 | 2020.07.05 | 94.43 | GLOBAL ENTERPRISES | work in progress 6th RA 18182135 |
Detail Report
Graph / Photo |
||
114 | Comprehensive Maintenance to Residential and Non residential buildings under jurisdiction of North Building Division (Sub Division M 3221, 3222 and 3223), Delhi during 2022 23. | 2022.09.04 | 2023.05.03 | 94.40 | 94.29 (Mar'23) | 0.00 (Mar'23) | Jeetender Kumar Verma | Work in Progress |
Detail Report
Graph / Photo |
115 | Annual Comprehensive Maintenance of RO,Hot & Cold Water Dispensers of ATSIN make Under sub division-V HMED(C) | 2022.05.27 | 2025.05.26 | 93.66 | 81.57 (Mar'23) | 0.00 (Mar'23) | AADITYA ENVIRO INDIA PVT.LTD | Work in progress |
Detail Report
Graph / Photo |
116 | Providing consultancy services for comprehensive planning and designing of construction of school building at various locations in Delhi. Dwarka Sector-12 (2) Dwarka Sector-1, Pocket-5 (3) Dwarka Sector-18 (4) Dwarka Sector-19 (Phase-I) (5) Dwarka Secot-16 (6) Dwarka Sector-11 (Package-A) | 2017.11.29 | 2019.03.28 | 93.50 | Design Forum International | work in progress |
Detail Report
Graph / Photo |
||
117 | SITC of 2 Nos. 315 KVA Electrical Compact Substation at SCERT Building,Varun Marg Defence Colony, New Delhi) (Civil and Electrical Works) | 2022.05.02 | 2022.09.01 | 92.47 | 50.63 (Dec'22) | 0.00 (Dec'22) | KAUSHIK DIESEL GENERATOR |
Detail Report
Graph / Photo |
|
118 | Comprehensive maintenance of various roads under East Road Sub Division-II (Section-I &II) of Division East Road, PWD Delhi during 2022-23. (SH:- Repairing and improvement of footpath on road no.102, Road no. 108, Mahavir Swami Marg, Sameer Bhan Marg Road ,Dashmesh Road, Dharamshila road) | 2022.11.06 | 2023.03.05 | 92.37 | Ravinder Kumar |
Detail Report
Graph / Photo |
|||
119 | A/R and M/O to Residential Buildings & Non Residential Buildings under PWD, North-West Building Delhi during 2021-22 SH: Mechanized cleaning of underground /overhead RCC/PVC Water Storage tanks. | 2021.08.09 | 2022.08.08 | 91.40 | 77.15 (Mar'23) | 0.00 (Mar'23) | ROYAL CONSTRUCTION |
Detail Report
Graph / Photo |
|
120 | Enhancement of LT Supply to HT Supply with 630 KVA Substation at A&U Tibbia College and Hospital, Karol Bagh, New Delhi. | 2022.07.05 | 2022.10.04 | 91.10 | 76.91 (Jan'23) | 0.00 (Jan'23) | Jain Electric Works | Work in progress |
Detail Report
Graph / Photo |
121 | Providing Anti Smog Gun Mounted on mobile truck in the Assembly Constituency under Sub Division M-2134 North East Build & Road Division Delhi | 2022.08.05 | 2023.01.01 | 89.40 | 53.48 (Jan'23) | 0.00 (Jan'23) | Ramesh Chander |
Detail Report
Graph / Photo |
|
122 | Running Comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV RO Systems, Water Dispensers with Inbuilt RO Systems, RO Water Purifiers and Aquaguards | 2019.12.23 | 2020.12.22 | 87.51 | Aditi Enterprises | work in progress by Aditi Enterprises |
Detail Report
Graph / Photo |
||
123 | Epoxy Flooring in Workshop | 2022.12.09 | 2023.01.08 | 86.86 | Rohit Kumar |
Detail Report
Graph / Photo |
|||
124 | RMO UPS system installed at 2nd floor, 4th floor 6th floor Casualty BlockGynae Block, Ward 14 Genetic Lab OT Block and New OPD Block at L.N. Hospital New Delhi.SH Comprehensive annual maintenance of Emerson Make UPS system installed at Casualty Bl | 2019.08.26 | 2022.08.25 | 86.20 | Labotek | work in progress by Labotek |
Detail Report
Graph / Photo |
||
125 | Up-gradation of Substation at Shakti Nagar Pumphouse under C&ND Division Delhi. | 2023.02.27 | 2023.05.26 | 85.74 | S.L. Electromech Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
126 | Providing Services of Computer Operator, MTS etc. under various PWD Offices of North Building Division & office of SA North, Delhi during 2022-23. | 2023.04.01 | 2024.03.31 | 84.82 | placement security services |
Detail Report
Graph / Photo |
|||
127 | Replacement of Damaged Windows, Strengthening of Corridor, Toilet Slab, Waterproofing of Primary Wing Food Production, Renovation of Stage, Accessible CWSN and Other Misc. Works | 2022.10.23 | 2023.04.22 | 84.66 | Lavneesh Pal |
Detail Report
Graph / Photo |
|||
128 | Extend of storage capacity of Existing Bosch make CCTV System at Delhi Vidhan Sabha, Delhi. | 2023.02.25 | 2023.04.24 | 84.36 | 84.36 (Mar'23) | 0.00 (Mar'23) | Total Security Systems |
Detail Report
Graph / Photo |
|
129 | Construction of Extention of Maulana Azad Dental Institute of Dental Sciences, phaseII at Bahadur Shah Zafar Marg, New Delhi.SH Supplying, installation, testing and Commissioning of Modular Operation Theatre | 2019.08.12 | 2019.11.09 | 83.93 | 21.56 (Feb'22) | 0.00 (Feb'22) | MDD Medical System (INDIA) Pvt. Ltd | work in progress by MDD Medical System (I) Pvt.Ltd. |
Detail Report
Graph / Photo |
130 | Routine Maintenance, Operation of CNG Oil Fired 2.5 TPH B16 3Nos 600kg hr Autoclave Capacity Fire Tube IBR Boiler 01 Nos and Operation of Boilers and Water Softening plant | 2020.09.01 | 2022.08.31 | 83.64 | 44.25 (Mar'23) | 0.00 (Mar'23) | Boilermart | Work in progress by M/s Boilermart |
Detail Report
Graph / Photo |
131 | 1 RMO Elect and Mech Services in Lawyers chambers Blk DEFG and H. 2 In KKD Court (Court Block) ACI B and JKL DEFG and H. 3 At UTCS Bldg. SH- Operation and Routine Maint. of EI DG Set Sub Station Fire Fighting Fire Alarm System and Vrs type pump sets. | 2019.05.18 | 2020.05.17 | 83.16 | 103.48 (Sep'20) | 0.00 (Sep'20) | PARASAR Electrical & Refrigeration |
Detail Report
Graph / Photo |
|
132 | Aesthetic Improvement of Exterior Façade of Judicial Residential Officer’s Complex, Sector 26, Rohini, Delhi-110085. | 2023.01.16 | 2023.05.16 | 82.94 | S.I CONSTRUCTION | Work in progress |
Detail Report
Graph / Photo |
||
133 | Misc. Civil, Interior Finishing Work. | 2022.11.07 | 2022.12.06 | 82.22 | Sundriyal Construction |
Detail Report
Graph / Photo |
|||
134 | Operation & Comprehensive Maintenance of LED Video Wall & Sound System. | 2023.03.12 | 2025.03.11 | 81.50 | Electrorama |
Detail Report
Graph / Photo |
|||
135 | Waterproofing of Roof Main School Building Guard Room and Pump Room, Renovation of Toilets Recharge of Rain Water Pit and Other Misc Works | 2022.10.23 | 2023.02.22 | 80.38 | Sohan Lal Chhitoria and Sons |
Detail Report
Graph / Photo |
|||
136 | Running Comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UVRO Systems, Water Dispensers with Inbuilt RO Systems, RO Water Purifiers. | 2022.12.06 | 2024.12.05 | 80.01 | Real Value Systems & Services | Work in progress |
Detail Report
Graph / Photo |
||
137 | Construction of 5 nos Aam Aadmi Mohalla Clinic Primary Health Centres at various places in the jurisdiction of SRD1, PWD, Delhi | 2021.11.04 | 2022.02.05 | 79.88 | 33.40 (Jul'22) | 0.00 (Jul'22) | Y I INFRASTRUCTURE |
Detail Report
Graph / Photo |
|
138 | Providing CCTV Surveillance System in Judges Residence complex O Block at District Court Karkardooma Shahdara Delhi. | 2018.10.07 | 2019.02.06 | 79.60 | 21.54 (Dec'19) | 0.00 (Dec'19) | TECHNOSYS SECURITY SYSTEMS PVT. LTD |
Detail Report
Graph / Photo |
|
139 | RMO of HT AVR in A-Block, B-Block, C-Block D Block at GIPMER, ND Comprehensive maintenance of 1500 KVA HT AVR Andrew yule make at Sub station No. 2 | 2022.02.18 | 2025.02.17 | 78.70 | 33.47 (Feb'23) | 0.00 (Feb'23) | Harsh India Enterprises |
Detail Report
Graph / Photo |
|
140 | 1 RMO E and M Services in Lawyers chambers Block. 2 At KKD Court Court Block. 3 At UTCS Bldg. Vishwas Nagar Shahdara. SH-Routine Maintenance and Operation of various E and M services. | 2018.05.10 | 2019.05.09 | 78.60 | 30.59 (Sep'19) | 0.00 (Sep'19) | M I Enterprises |
Detail Report
Graph / Photo |
|
141 | Day to Day maintenance and Operation of E and M installations | 2022.03.03 | 2023.03.02 | 77.90 | M/s Krishna Electrical works |
Detail Report
Graph / Photo |
|||
142 | Operation and maintenance of lifts in court block & lawyers chamber blocks | 2014.02.04 | 2015.02.03 | 76.96 | A.G. Enterprises |
Detail Report
Graph / Photo |
|||
143 | Renovation of MP Hall and Repairing/Replacement of Electrical Installations Flood Light Fitting Air Conditioning PA System etc. at SKV Vivek Vihar Delhi. School ID-1001022 | 2018.09.27 | 2019.01.26 | 76.31 | 51.34 (Sep'20) | 0.00 (Sep'20) | Mars Engineers |
Detail Report
Graph / Photo |
|
144 | RMO of Lifts at Dr BSA Hospital Sec 6 Rohini Delhi SH Operation of Lifts | 2018.12.04 | 2020.12.03 | 75.44 | Guruji Elevator | Work in progress |
Detail Report
Graph / Photo |
||
145 | Comprehensive Maintenance and Operation of Bosch Make CCTV surveillance system installed at various locations | 2022.07.30 | 2025.07.29 | 75.13 | Pan Intellecom Ltd | Work in progress |
Detail Report
Graph / Photo |
||
146 | Comprehensive consultancy for construction of Additional Academic and Administrative Block at Campus of DPSRU, Sector-3, M.B. Road, Pushp Vihar, New Delhi-110017 | 2022.02.27 | 2023.10.26 | 75.02 | 6.22 (Feb'23) | 0.00 (Feb'23) | DESIGN ACCORD CONSULTANT | Consultancy Work in progress. |
Detail Report
Graph / Photo |
147 | Operation and Maintenance of EI, streets light, DG set, Substation , Lift , Fire Fighting , Fire Alarm System and Solar Water Heating System installed at Prison Complex Mandoli | 2022.11.20 | 2023.11.19 | 74.41 | GLOBAL ENTERPRISES | WORK IN PROGRESS |
Detail Report
Graph / Photo |
||
148 | SITC of retrofit kit for emission control equipment for diesel generators install in substation 4 at L.N. Hospital New Delhi | 2022.09.01 | 2022.12.31 | 74.35 | chakr innovation pvt ltd. | Work in progress |
Detail Report
Graph / Photo |
||
149 | Comprehensive Maintenance of OTIS Lifts and Escalators | 2022.05.08 | 2023.05.07 | 74.27 | 60.74 (Mar'23) | 0.00 (Mar'23) | Otis Elevator Company (India) Ltd. |
Detail Report
Graph / Photo |
|
150 | EOR to PTS, Dwarka, New Delhi during 2018-19.(SH- Development of the outer area police station for police training purpose). | 2018.05.23 | 2018.07.21 | 74.19 | 26.97 (Jul'18) | 60.00 % (Jul'18) | Aliyan Constaruction Company | work in progress |
Detail Report
Graph / Photo |
151 | For Addl work of ducting, grills, celing, diffusers, duct installation & allied items for Air conditioning | 2006.10.21 | 2007.09.30 | 74.17 | Aahram Engrs | Work completed |
Detail Report
Graph / Photo |
||
152 | Renovation for Urology and Renal Transplant Department at (Block 3, 2nd Floor) RGSS Hospital, Tahirpur, Delhi. Sub Head Providing Medical Instruments | 2019.08.17 | 2019.11.16 | 73.86 | MDD Medical System (INDIA) Pvt. Ltd | No Payment |
Detail Report
Graph / Photo |
||
153 | Providing Services of Computer Operator, MTS etc. under various PWD Offices of North Building Division and office of SA North | 2022.02.01 | 2023.01.26 | 73.51 | 80.26 (Mar'23) | 0.00 (Mar'23) | placement security services | Work in progress |
Detail Report
Graph / Photo |
154 | Construction of new rooms between old and new building (G+3) floor, C/o lift shaft and raising of boundary wall and fixing of MS grill with concertina coil | 2022.07.11 | 2022.10.09 | 72.99 | ARIF, Jahangirpuri, Delhi | Work in progress |
Detail Report
Graph / Photo |
||
155 | Mechanized Cleaning of over head tank and underground tank | 2021.08.07 | 2022.08.06 | 72.88 | 26.41 (Oct'22) | 0.00 (Oct'22) | UNITECH WATER SLOUTIONS |
Detail Report
Graph / Photo |
|
156 | 4250 | 2013.05.20 | 2013.08.19 | 72.78 | Varun Gupta & Co. | Work foreclosed |
Detail Report
Graph / Photo |
||
157 | Main Work | 2013.05.20 | 2013.08.19 | 72.78 | Varun Gupta & Co. | completed |
Detail Report
Graph / Photo |
||
158 | Mechanized Cleaning of over head and underground tank | 2022.08.31 | 2023.08.30 | 72.72 | 35.52 (Mar'23) | 0.00 (Mar'23) | UNITECH WATER SLOUTIONS |
Detail Report
Graph / Photo |
|
159 | Comprehensive Maintenance of Carrier make Central AC Plant | 2022.12.10 | 2023.12.09 | 72.16 | 12.00 (Mar'23) | 0.00 (Mar'23) | G D Enterprises | work in progress by M/s G.D. Enterprises |
Detail Report
Graph / Photo |
160 | Mechanized Cleaning of over head tank and underground tank | 2021.08.06 | 2022.08.05 | 71.82 | 31.72 (Aug'22) | 0.00 (Aug'22) | UNITECH WATER SLOUTIONS |
Detail Report
Graph / Photo |
|
161 | Comprehensive maintenance of carrier make central AC plant | 2021.12.10 | 2022.12.09 | 71.68 | 89.76 (Feb'23) | 0.00 (Feb'23) | G D Enterprises |
Detail Report
Graph / Photo |
|
162 | Name of work 1 to 6 MOEI Fans and RMO Air- Conditioner, pump set, DG set installed at registrar co-operative societies, old court building, parliament street, New Delhi | 2017.10.07 | 2018.10.06 | 71.64 | 22.75 (Mar'23) | 0.00 (Mar'23) | Parasar Electricals & Refrigeration |
Detail Report
Graph / Photo |
|
163 | Running Comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV/ RO Sys. Water Dispensers with Inbuilt RO Sys RO Water Purifiers | 2020.10.06 | 2022.10.05 | 71.14 | 39.10 (Apr'22) | 0.00 (Apr'22) | Aditi Enterprises | Work in progress by M/s Aditi Enterprises |
Detail Report
Graph / Photo |
164 | Repair & renovation work in various flats of Type-VI & V, D-II Flats Vasant Kunj, New Delhi | 2022.08.23 | 2023.04.22 | 71.08 | 4.38 (Mar'23) | 0.00 (Mar'23) | SHRI DATTA KRUPA ENTER PRISES |
Detail Report
Graph / Photo |
|
165 | Renovation of general toilets, gents & ladies at all the floors | 2022.05.28 | 2022.08.25 | 71.06 | 35.84 (Mar'23) | 0.00 (Mar'23) | Sohan Lal Chhitoria and Sons | Work is in progress. Work delayed by the agency. |
Detail Report
Graph / Photo |
166 | A/R & M/O to various Mohalla Clinics under Sub Division-I, South Building Maintenance (M-422), during 2022-23. | 2022.06.22 | 2023.06.21 | 70.37 | 33.94 (Jan'23) | 0.00 (Jan'23) | Afjal Construction |
Detail Report
Graph / Photo |
|
167 | Providing various Services for the office of Senior Architect Office, Chief Engineer (North), Superintendent Engineer and O/o Executive Engineer (North West Building) | 2022.03.01 | 2023.02.28 | 70.14 | 66.59 (Feb'23) | 0.00 (Feb'23) | DA Construction Co. |
Detail Report
Graph / Photo |
|
168 | Comprehensive maintenance of buildings including supply of materials and providing service of man power for day to day maint. work of UTCS Complex Employment exchange JJB Court. and others buildins under SD M2312 dg.2021 22 | 2022.02.05 | 2023.02.04 | 69.93 | 87.39 (Jan'23) | 0.00 (Jan'23) | RAman KUmar |
Detail Report
Graph / Photo |
|
169 | Renovation of MP Hall i/c Wooden Flooring, Wall Panelling, False Ceiling, up Liftmen of Stage Stepping in Flooring etc. and Electrical Renovation of MP Hall at SCERT Bhawan, New Delhi. (Civil and Electrical Works) | 2022.03.17 | 2022.05.16 | 69.80 | 1.52 (Feb'23) | 0.00 (Feb'23) | SHRI DATTA KRUPA ENTER PRISES |
Detail Report
Graph / Photo |
|
170 | Construction of Porta Cabin for security officers and outer force near Annexure -II building at Tis Hazari, Delhi (Civil Work) | 2022.07.30 | 2022.09.27 | 69.57 | Jabir Husain |
Detail Report
Graph / Photo |
|||
171 | Comprehensive maintenance Supply of materials and providing services of manpower for day to day maintenance work of KKD Court Main Buildings A B C I J K and L Blocks under SD M 2312 dg 2021 22 | 2022.01.28 | 2023.01.27 | 69.22 | 87.32 (Mar'23) | 0.00 (Mar'23) | Uma Shankar | In Progress. |
Detail Report
Graph / Photo |
172 | Renovation of 9,10,12,31A, Planning unit placement unit, N Block and water proofing work at roofs | 2022.04.30 | 2022.06.29 | 69.00 | 64.64 (Feb'23) | 0.00 (Feb'23) | Gyanchand |
Detail Report
Graph / Photo |
|
173 | Supplying, Installation, Testing & Commissioning of Storm Water Management System at RUB Madhubhan Pump House, New Delhi. | 2023.03.10 | 2023.05.09 | 68.77 | B.D. Electrocom Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
174 | Renovation of MP Hall i/c Wooden Flooring, Wall Panelling, False Ceiling, up Liftmen of Stage Stepping in Flooring etc. & Electrical Renovation of MP Hall at SCERT Bhawan, New Delhi). (Civil & Electrical Works).(Balance Work) | 2022.09.02 | 2022.11.01 | 68.53 | 1.93 (Sep'22) | 0.00 (Sep'22) | Jyoti Eelectricals |
Detail Report
Graph / Photo |
|
175 | Repair and day to day maintenance of DM North office building, SDM Alipur Office, SDM Narela Office, e-SR office Narela, BDO North Alipur office under District North, Delhi-36 during 2022-23 | 2022.09.25 | 2023.09.24 | 68.38 | 12.45 (Mar'23) | 0.00 (Mar'23) | Raju Kumar Singh | Work in progress |
Detail Report
Graph / Photo |
176 | Comprehensive maintenance, Supply of materials and providing services of manpower for day to day maintenance work of Judge’s Flat Residential Complex at KKD Court under SD M-2311, Delhi during 2021-22 | 2022.01.15 | 2023.01.14 | 68.34 | 67.87 (Jan'23) | 0.00 (Jan'23) | Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 |
Detail Report
Graph / Photo |
|
177 | Comprehensive Maintenance of RO/ Filtration Units | 2022.04.01 | 2022.09.30 | 68.24 | 129.53 (Feb'23) | 0.00 (Feb'23) | M/s Vivek Associates |
Detail Report
Graph / Photo |
|
178 | Sub Head Operation and routine maintenance of HVAC System 4x550TR capacity AC plant, Cold Storage Plant in Old and DEM Building | 2019.03.03 | 2021.03.02 | 68.17 | SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. | Work completed |
Detail Report
Graph / Photo |
||
179 | 1) RMO various Electrical & Mechanical services installed at Gomukh Tower Kaushambi Ghaziabad (Sub Head:- Operation of EI and fans i/c Compound light, Substation, DG Set, Pumps at Gomukh Tower) 2) MOEI & Fans i/c compound lighting for fire station at Mandawali and Kalyanwas Delhi & RMO pump sets for fire station at Mayur Vihar & Dallupura Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound light, Providing maintenance staff for Mayur Vihar & Dallupura) 3) MOEI & Fans i/c Compound lighting and RMO pump sets for police station at Mayur Vihar Ph-1 & Kalyanpuri Delhi. (Sub Head:- Provding maintenance staff for Mayur Vihar Ph-1 & Kalyanpuri) 4) MOEI & Fans i/c street light sewage & Drinking water pump sets for DA staff quarters at Kalyanvas Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound lightings) 5) MOEI & Fans i/c compound lighting for at VREC at Patpar Ganj Mandawali, Trilokpuri & Kondli Delhi. (Sub Head:- Day to Day Maintenance of EI & Fans and compound Lights). 6) MOEI & fans and RMO Pump sets i/c compound light High Mast lighting at East Vinod Nagar Sport Complex Delhi. During 2018-19(Sh:-Day to Day Maintenance of EI & Fans and compound lights Sports Complex East Vinod Nagar Delhi) | 2019.03.18 | 2020.03.17 | 67.80 | 86.50 (Jan'22) | 0.00 (Jan'22) | Krishna Electreical Works |
Detail Report
Graph / Photo |
|
180 | Structural Strengthening to slab beam and column | 2022.02.09 | 2022.05.09 | 67.79 | 43.21 (Oct'22) | 0.00 (Oct'22) | Cembond Construction Pvt. Ltd |
Detail Report
Graph / Photo |
|
181 | Comprehensive maintenance of KKD Court Main Buildings A B C I J K and L Blocks including supply of materials and engaging labour for day to day maintenance at Karkardooma Court Delhi during 2022 23 | 2023.01.06 | 2024.01.05 | 67.55 | Manish construction and co |
Detail Report
Graph / Photo |
|||
182 | RMO of Substation in A-Block and BBlock at GIPMER, New Delhi SH Comprehensive Maintenance of HT AVR | 2018.01.06 | 2020.01.05 | 67.10 | 69.65 (Sep'19) | 77.93 % (Sep'19) | Harsh India Enterprises | Work in progress. |
Detail Report
Graph / Photo |
183 | Repair and renovation work of quarters at Rakab ganj Fire station, New Delhi. | 2022.09.17 | 2023.03.16 | 66.62 | Singh Construction Co. |
Detail Report
Graph / Photo |
|||
184 | Repair and Maintenance of various AAMC and other buildings under North East B&R division dg. 2022-2023. | 2022.06.05 | 2023.06.04 | 66.46 | GEE Internationals |
Detail Report
Graph / Photo |
|||
185 | Mechanized Cleaning of over head tank and underground tank. | 2020.07.08 | 2021.07.07 | 65.99 | 46.89 (Aug'22) | 0.00 (Aug'22) | UNITECH WATER SLOUTIONS |
Detail Report
Graph / Photo |
|
186 | Renovation of Public Toilet of Rohini Court Complex, Sub Head- Renovation Work in 32 Nos. Public Toilet (16 Men and 16 Women) at all Four Ramp Side from Ground Floor to Third Floor. (Modified) | 2022.04.01 | 2022.09.30 | 65.77 | 49.02 (Jan'23) | 0.00 (Jan'23) | Jeetender Kumar Verma |
Detail Report
Graph / Photo |
|
187 | Augmentation of existing Sub Station and allied equipments at Delhi Archive Building, Qutub Institutional Area, New Delhi. | 2018.07.14 | 2019.01.13 | 65.58 | 67.81 (Jun'19) | 75.00 % (Jun'19) | Dubey Electric Works |
Detail Report
Graph / Photo |
|
188 | Internal and External Finishing Repair of Chajjas Re-Casting of Terrace Reconstruction of Balcony of Police Quarters Type-2 Block No.17 and 19 Other Misc Works (Composite Work Civiland Elect) | 2022.01.06 | 2022.07.05 | 65.41 | 22.42 (Jan'23) | 0.00 (Jan'23) | Jitender Singh |
Detail Report
Graph / Photo |
|
189 | SITC of air cooled air conditioning system in Fetal Medicine OT and Gynae OT at Lok Nayak Hospital, New Delhi. | 2023.03.01 | 2023.04.30 | 65.10 | A V Enterprises |
Detail Report
Graph / Photo |
|||
190 | Comprehensive maintenance of Labotek make UPS | 2022.07.31 | 2025.07.30 | 64.25 | power house | Work in progress |
Detail Report
Graph / Photo |
||
191 | 1 RMO Vrs E and M services installed at O Blk Rsdl Court complex KKD. 2 At Juvenile Justice Board Delhi. SH- Operation of EI and fans and water supply pump sets Lifts Fire Fighting and Fire Alarm System PA System DG Set and CCTV Surveillance System | 2018.10.01 | 2020.09.24 | 64.13 | 65.84 (Jun'21) | 0.00 (Jun'21) | A G ENTERPRISES |
Detail Report
Graph / Photo |
|
192 | Renovation of MP Hall i/c Wooden Flooring, Wall Panelling, False Ceiling, up Liftmen of Stage Stepping in Flooring etc. & Electrical Renovation of MP Hall at SCERT Bhawan, New Delhi). (Civil & Electrical Works) | 2022.06.16 | 2022.08.15 | 63.93 | 0.52 (Feb'23) | 0.00 (Feb'23) | M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 |
Detail Report
Graph / Photo |
|
193 | Construction of 4 nos. Aam Aadmi Mohalla Clinic (Primary Health Centres) at various places in the jurisdiction of SRD Project Division-2, PWD, Delhi. (Civil & Electrical Work) | 2022.06.01 | 2022.11.27 | 63.68 | R K Construction Co. |
Detail Report
Graph / Photo |
|||
194 | A/R M/O various Mohalla Clinics under jurisdiction of North West Building-II during 2021-22 SH: Carrying out various civil works arises during day to day maintenance | 2021.07.26 | 2022.07.25 | 63.23 | 11.30 (Nov'22) | 0.00 (Nov'22) | SUSHIL KUMAR |
Detail Report
Graph / Photo |
|
195 | Operation and routine maintenance of E.I, D.G. Set, Sub Station, Fire Fighting, Fire Alarm System and Various type Pump Sets during 2021-22 | 2021.10.22 | 2022.10.29 | 62.92 | 78.64 (Feb'23) | 0.00 (Feb'23) | Ele Mec Engineering Co. |
Detail Report
Graph / Photo |
|
196 | (Upgradation of existing building and other misc repair works) 2nd call | 2019.03.10 | 2019.06.09 | 62.80 | 77.96 (Nov'21) | 0.00 (Nov'21) | SUSHIL KUMAR | work completed |
Detail Report
Graph / Photo |
197 | Up-gradation/Renovation of 25 Qtrs. Block No. 1109 to 1516, 1577 to 1642 & 1643 to 2143 under sub-division, M-3222 at Gulabi Bagh, Delhi | 2022.04.30 | 2022.12.29 | 62.60 | 56.48 (Mar'23) | 0.00 (Mar'23) | Irshad Ahmed | Work in Progress |
Detail Report
Graph / Photo |
198 | Providing outsourced staff in Circle Office M 23 Division Office M 231 and in Sub Division Offices M 2311 M 2312 M 2313 M 2314 i.e.Computer Operator LDC Diary Dispatcher Office Clerk Messenger MTS and Peon dg. 2022 23. | 2023.12.12 | 2024.02.11 | 62.52 | Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 |
Detail Report
Graph / Photo |
|||
199 | Allied Work for Aam Aadmi Mohalla Clinic (Primary Health Centre)at various places under Sub Division North West Building 5 in Assembly Constituency Shalimar Bagh (AC14) Trinagar (AC16) Wazirpur (AC17) Rohini (AC13) Rithala (AC6) (Already Constructed) (Remaining Work) | 2021.10.18 | 2022.06.17 | 62.26 | 58.25 (Nov'22) | 0.00 (Nov'22) | SUSHIL KUMAR |
Detail Report
Graph / Photo |
|
200 | Running and maintenance of E.I. services in non-residential area at GTB Hospital, Complex, Shahdara, Delhi Sub Head Maintenance and operation of E and M services at non-residential area | 2018.08.25 | 2019.08.24 | 62.10 | 39.81 (Feb'19) | 70.00 % (Feb'19) | M/s Vivek Associates | work completed |
Detail Report
Graph / Photo |
201 | 3. Running and Maintenance of Fire Fighting and Wet Riser at GTB Hospital complex, Shahdara, Delhi. Sub Head Maintenance and operation of E and M services at residential and non-residential area | 2018.08.25 | 2019.08.24 | 61.90 | 61.00 (May'22) | 0.00 (May'22) | PARASAR Electrical & Refrigeration | Work in Progress (4TH RA bill paid) |
Detail Report
Graph / Photo |
202 | Repair of Grit Wash of New Building and Toilet Block, White Washing and Paint Work of Old & New Building, Making a New Stage and Making Pucca for Prayer Ground, Replacement of Damaged Paver Block as well as Red Stone, Replacement of Flooring Near Drinking Area and Filling of Some Portion of School at Govt. Boys Sr. Sec. School, Ladpur, Delhi | 2022.12.09 | 2023.04.08 | 61.44 | 25.84 (Mar'23) | 0.00 (Mar'23) | Sageer Ahmad |
Detail Report
Graph / Photo |
|
203 | Operation & Maintenance of Electrical & Mechanical Services | 2014.04.01 | 2015.03.31 | 61.32 | Shaka Electrical India |
Detail Report
Graph / Photo |
|||
204 | Construction of boundary wall on vacant land measuring 3093 Sq. Mtr. (approx 3700 Sq. Yard) bearing Khasra No.47 & 48/1 in Village- Ibrahimpur District North | 2022.06.16 | 2022.09.15 | 61.04 | 1.83 (Sep'22) | 0.00 (Sep'22) | P L Construction | Work is forclosed |
Detail Report
Graph / Photo |
205 | Repair and renovation work of the property No. 7 55, Church Road, Jwala Nagar, Shahdara Health Department for opening of Polyclinic. (Composite work of Civil and Electrical) | 2019.08.03 | 2020.02.04 | 60.92 | RP Electrical and Maintenance Works | Work in progress but work is affected due to Covid-19 |
Detail Report
Graph / Photo |
||
206 | Day to Day Maintenance of EI, Electrical Sub-Station, DG Set, Fire Fighting, Fire Alarm, Water Supply, Lift and RO Plant | 2023.01.16 | 2024.01.15 | 60.67 | Parmar Electrical |
Detail Report
Graph / Photo |
|||
207 | Providing Services of Computer Operators, Clerk and MTS (Multi Tasking Staff) in PWD North West Electrical Maintenance Division, Sub Divisions and other offices, Delhi | 2022.07.14 | 2023.07.13 | 60.63 | 10.22 (Nov'22) | 0.00 (Nov'22) | placement security services |
Detail Report
Graph / Photo |
|
208 | Regarding construction of MP hall, 02 Nos. of Labs and 01 Library at GGSSS, Bankner Delhi-40. Sch Id-1310049, EOR Id-20181894 Bldg. ID-13101408. | 2022.07.03 | 2022.12.30 | 60.31 | 35.94 (Jan'23) | 0.00 (Jan'23) | Sh. Devender Singh | Work in progress |
Detail Report
Graph / Photo |
209 | Operation and comprehensive maintenance of chiller Plant and Ductable Air conditioning unit. | 2022.12.08 | 2023.12.07 | 60.22 | Blue Star Limited |
Detail Report
Graph / Photo |
|||
210 | Construction of 4 Nos. Aam Aadmi Mohalla Clinic at various places under North West Building Division in Assembly Constituency Rohini (AC– 13), Wazirpur (AC–17) & Bawana (AC–07) (Civil & Electrical Composite Work) | 2022.06.18 | 2022.10.17 | 60.17 | 63.42 (Feb'23) | 0.00 (Feb'23) | Laxman |
Detail Report
Graph / Photo |
|
211 | Providing Services of Data Entry Computer Operators Messengers cum Peon, Work Assistant Enquiry Clerk Clerical Staff etc for the office of Central and New Delhi | 2022.05.01 | 2023.04.30 | 60.08 | 53.33 (Feb'23) | 0.00 (Feb'23) | TRENDY SECURITY SERVICES |
Detail Report
Graph / Photo |
|
212 | Comprehensive maintenance supply of materials and providing services of manpower for day to day maintenance work of Judges Flat and Residential Complex at KKD Court under Sub Division M 2311 Delhi during 2022 23 | 2023.01.13 | 2024.01.12 | 60.03 | Uma Shankar |
Detail Report
Graph / Photo |
|||
213 | Laying of RMC, laying interlocking paver blocks with drainage, Kerb stone along with road, construction of 2 Nos. Security guard room & fixing of granite in tree guard | 2022.05.22 | 2022.08.21 | 59.84 | ARIF, Jahangirpuri, Delhi | Work in Progress |
Detail Report
Graph / Photo |
||
214 | Annual Maintenance and Operation of Central Medical Gas Pipeline System at LokNayak Hospital and Sushruta Trauma Center, New Delhi. | 2023.02.11 | 2024.02.10 | 59.59 | Med Freshe Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
||
215 | Comprehensive maintenance of various roads under Sub-Division East Road-IV (Section-I&II) of Division East Road during 2022-23. (SH: Repairing of footpath, providing RCC drain cover at various roads under Sub-Division East Road-IV.) | 2022.11.02 | 2023.03.01 | 59.59 | Mohd Arif |
Detail Report
Graph / Photo |
|||
216 | Construction of Collapse/Tilted boundary wall at Govt. SKV Prahaladpur, Delhi-110042 (Sch ID-1310032) (Bldg ID 13101331) | 2022.06.30 | 2022.09.28 | 59.59 | Rajeev Kumar | Work in progress |
Detail Report
Graph / Photo |
||
217 | Pvdg. Ren./repair of Ramp, Railing, Tactile Tile, Signage etc. in school bldg and barrier free accessible for student (C) EOR to SK | 2022.09.08 | 2023.01.06 | 59.29 | 68.42 (Mar'23) | 0.00 (Mar'23) | Ankur Bhardwaj | Work in progress |
Detail Report
Graph / Photo |
218 | Providing for Augmentation of Sub Station in Nehru Homeopathic Medical Collage and Hospital, B-Block, Defence Colony, New Delhi - 110024 | 2019.04.30 | 2019.07.29 | 59.18 | AVON ELECTRICALS |
Detail Report
Graph / Photo |
|||
219 | Supplying, Installation, Testing and Commissioning of Biomedical treatment units near OT’s for pre treatment of yellow (f) category of Bio-Medical Waste at Lok Nayak Hospital, New Delhi | 2022.03.25 | 2022.04.24 | 59.06 | 41.34 (Aug'22) | 0.00 (Aug'22) | Texol Engineers |
Detail Report
Graph / Photo |
|
220 | Upgradation of reception area and other misc repair work | 2022.05.22 | 2022.08.21 | 59.03 | Jabir Husain | Work is forclosed |
Detail Report
Graph / Photo |
||
221 | Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block F at District Court Karkardooma Courts Delhi. | 2018.07.24 | 2019.03.23 | 58.95 | 9.50 (Feb'20) | 0.00 (Feb'20) | Johnson Lifts Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
222 | Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block G at District Court Karkardooma Courts Delhi. | 2018.07.24 | 2019.03.23 | 58.95 | 9.50 (Feb'20) | 0.00 (Feb'20) | Johnson Lifts Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
223 | Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block E at District Court Karkardooma Courts Delhi. | 2018.07.24 | 2019.03.23 | 58.95 | 9.50 (Feb'20) | 0.00 (Feb'20) | Johnson Lifts Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
224 | Comprehensive Annual Maintenance of C - Mos Make Servo Stablizers installed in lifts and other location. | 2023.03.10 | 2026.03.09 | 58.69 | C Mos Sytems |
Detail Report
Graph / Photo |
|||
225 | Replacement of 4 Nos, 10 passengers lifts installed in 62 nos Type V, Multi storey Delhi Govt. Flats at Motia Khan, New Delhi. | 2017.08.29 | 2018.04.28 | 58.64 | 9.00 (Mar'22) | 0.00 (Mar'22) | Johnson Lifts Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
226 | Supplying & Fixing of Phase Sequence Corrector Panel at Chacha Nehru Bal Chikitsalaya, Geeta Colony, Delhi | 2022.05.20 | 2022.07.19 | 58.45 | 18.89 (Oct'22) | 0.00 (Oct'22) | M/s Shri Durga Electricals |
Detail Report
Graph / Photo |
|
227 | SH Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units | 2018.08.03 | 2019.08.02 | 58.04 | 21.52 (Dec'19) | 0.00 (Dec'19) | LG Electronics |
Detail Report
Graph / Photo |
|
228 | A/R & M/O Old Saint Stephen’s College Building Kashmere Gate, C.P.O Building, Old Court Building, N.C.C Offices Buildings, Novelty Fire Station, Fire Station Jama Masjid, Disability Commissioner Office, I.T.I. Mori Gate and Lok Nayak Setu Office Complex, Delhi During 2022-23. | 2022.05.12 | 2023.05.11 | 57.76 | 22.42 (Oct'22) | 0.00 (Oct'22) | KAMAAL CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
229 | Aesthetic Improvement of Exterior Façade of Judicial Residential Officer’s Complex, Sector 26, Rohini, Delhi-110085 | 2022.10.01 | 2023.01.29 | 57.61 | Saeed Builders | Work is forfeited |
Detail Report
Graph / Photo |
||
230 | Regarding construction of MP hall 02 Nos. of Labs and 01 Library at GGSSS Bankner Delhi 40. Sch Id 1310049 EOR Id-20181894 Bldg. ID 13101408 | 2022.02.07 | 2022.08.07 | 57.37 | SANU CONSTRUCTION CO. | Work is forclose |
Detail Report
Graph / Photo |
||
231 | Replacement of old outlived lifts in Academic and NRDH in GIPMER New Delhi | 2020.09.22 | 2021.01.21 | 57.10 | Thyssenkrupp Elevator (India) Pvt. Ltd. | Work in progress by M/s THyssen Krupp Elevator |
Detail Report
Graph / Photo |
||
232 | Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block D at District Court Karkardooma Courts Delhi. | 2018.07.21 | 2019.04.20 | 56.86 | 5.72 (Mar'21) | 0.00 (Mar'21) | KONE ELEVATOR INDIA PRIVATE LIMITED | Work in progress |
Detail Report
Graph / Photo |
233 | Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units | 2021.07.31 | 2022.07.30 | 56.78 | 21.29 (Jun'22) | 0.00 (Jun'22) | LG ELECTRONICS INDIA PVT LTD. |
Detail Report
Graph / Photo |
|
234 | Constructing Shed with Profile Sheet and Providing and Laying Synthetic Grass | 2022.09.08 | 2022.11.07 | 56.57 | 18.59 (Mar'23) | 0.00 (Mar'23) | Nurul Hak |
Detail Report
Graph / Photo |
|
235 | Providing for Services Day to Day Maintenance | 2021.09.01 | 2022.05.30 | 56.56 | 51.20 (Aug'22) | 0.00 (Aug'22) | R.K. Jain& Sons Hospitality Servies (P) Ltd. | Work in progress |
Detail Report
Graph / Photo |
236 | Complete maintenance of garden features and potted plants at Delhi Sachivalya & Nursery. | 2022.11.11 | 2023.11.10 | 56.19 | 9.37 (Feb'23) | 0.00 (Feb'23) | RAVINDRA SINGH |
Detail Report
Graph / Photo |
|
237 | Construction of Two Guard Rooms with attached Toilets and Stainless Steel Railing for Ramps and Staircase, Fixing Acrylic Sheet in Window, I.R.C. Fabric Jali for Window, Fixing Wall Tiles in Class Room and Miscellaneous Work | 2022.02.07 | 2022.08.06 | 56.11 | 53.72 (Oct'22) | 0.00 (Oct'22) | Laxman |
Detail Report
Graph / Photo |
|
238 | Construction of building block G+1 porta cabin & renovation work at back side of AAP office, Stone work at wall near gate, Fixing of wall tiles and floor tiles in room & other Major Misc. works | 2022.09.04 | 2022.11.17 | 55.88 | Mool Chand |
Detail Report
Graph / Photo |
|||
239 | Providing and installation of Gym Equipments | 2022.12.08 | 2023.01.07 | 55.66 | 69.41 (Feb'23) | 0.00 (Feb'23) |
Detail Report
Graph / Photo |
||
240 | Comprehensive annual maintenance of Schneider Electric (APC) Make UPS system installed at Casualty Block, L.N. Hospital | 2022.08.26 | 2024.08.25 | 55.65 | ARECA TECHNOLOGIES | Work in progress |
Detail Report
Graph / Photo |
||
241 | Modification in ASBG hospital buildings to facilitate differently abled person under accessible India Campaign. (Recall) | 2022.07.16 | 2022.11.15 | 55.65 | 0.00 (Jan'23) | 77.00 % (Jan'23) | Azfaruddin | Work is in progress. |
Detail Report
Graph / Photo |
242 | Repairing/Replacement of Old worn out MGPS at Sushruta Trauma Centre-9, Metcalfe Road, Delhi | 2022.10.20 | 2022.12.19 | 55.53 | 38.87 (Mar'23) | 0.00 (Mar'23) | U. S. Engineering | Work in progress |
Detail Report
Graph / Photo |
243 | SITC of window/split type air-conditioning system at various locations in Lok Nayak Hospital, New Delhi | 2022.09.12 | 2022.11.11 | 55.47 | RCC Enterprises | Work in progress |
Detail Report
Graph / Photo |
||
244 | Comprehensive maintenance and operation of HVAC system | 2018.05.17 | 2020.05.16 | 55.43 | 19.35 (Feb'19) | 60.00 % (Feb'19) | COMFORT SYSTEM | Work in progress 8th RA 6146479 |
Detail Report
Graph / Photo |
245 | Construction of 06 Nos additional class rooms in Govt Girls Sr Sec School at Panama Building Jama Masjid, Delhi School ID2127023 | 2021.12.25 | 2022.06.22 | 55.43 | 81.35 (Oct'22) | 0.00 (Oct'22) | Intkhab Alam |
Detail Report
Graph / Photo |
|
246 | Replacement of all broken existing section windows in aluminium window with M.S. Grill, Providing and fixing FRP chajja, reconstruction of parapet wall and other miscellaneous work | 2022.03.04 | 2022.05.02 | 55.05 | 27.90 (Aug'22) | 0.00 (Aug'22) | TKN Developers |
Detail Report
Graph / Photo |
|
247 | Change of tenancy of Type-V and Type-VI flats | 2021.07.15 | 2022.07.14 | 54.73 | 17.26 (Oct'22) | 0.00 (Oct'22) | RAM AVTAR SHARMA |
Detail Report
Graph / Photo |
|
248 | RMO of UPS and Boiler at GIPMER, NDShComprehensive maintenance of Labotek make UPS | 2019.08.26 | 2020.08.25 | 54.61 | 18.96 (Feb'23) | 0.00 (Feb'23) | power house | work in progress by Power House |
Detail Report
Graph / Photo |
249 | RMO Electrical & Mechanical services installed at various buildings (East) under PWD EMD M-253, New Delhi. | 2019.01.14 | 2020.01.13 | 54.38 | 42.74 (Apr'21) | 0.00 (Apr'21) | Capital outsourcing management services pvt ltd |
Detail Report
Graph / Photo |
|
250 | Operation and Comprehensive Maintenance of 3 x 350 TR. Capacity Carrier Make water cooled Centrifugal Chilling Units with ancillaries of New O.P.D. Block at Lok Nayak Hospital, New Delhi | 2020.08.14 | 2022.08.13 | 54.27 | 59.47 (Feb'23) | 0.00 (Feb'23) | Royel Electricals | work in progress by M/s Royel Electrical |
Detail Report
Graph / Photo |
251 | Operation and Comprehensive Maintenance of 3 x 350 TR. Capacity Carrier Make water cooled Centrifugal Chilling Units with ancillaries of New O.P.D. Block at LNH ND | 2022.12.10 | 2023.12.09 | 54.20 | Royel Eletcricals | Work in progress |
Detail Report
Graph / Photo |
||
252 | Construction of Ramps, Railings, Toilets as per RPWD Act 2016. (Composite Work Civil and Electrical) | 2022.08.06 | 2022.11.05 | 54.04 | 48.87 (Mar'23) | 0.00 (Mar'23) | LT INFRABUILD |
Detail Report
Graph / Photo |
|
253 | Providing services of Skilled, semi-skilled, un-skilled labour etc | 2022.05.14 | 2023.05.13 | 53.77 | 25.90 (Mar'23) | 0.00 (Mar'23) | R.K. Jain& Sons Hospitality Servies (P) Ltd. |
Detail Report
Graph / Photo |
|
254 | Annual Comprehensive once of Commercial RO System, Water Cooler with inbuilt RO+UV and Water dispensers with inbuilt RO+UV water purification of Eureka Forbes make. | 2022.08.04 | 2024.08.03 | 53.69 | ADITI ENTERPRISES | Work in progress |
Detail Report
Graph / Photo |
||
255 | Comprehensive maintenance Supply of material and providing services of manpower for day to day maintenance work of lawyers chamber blocks i.e. D E F G and H blocks under jurisdiction of Sub Division M 2311 KKD Court PWD Delhi dg. 2022 23. | 2023.01.21 | 2024.01.20 | 53.28 | Mohd Azam |
Detail Report
Graph / Photo |
|||
256 | Renovation of Office Building of Sports Complex, Changing Room, Water Proofing Treatment and Providing and Installation of Office use Furniture and Other Misc. Civil Works | 2022.04.02 | 2022.07.01 | 53.22 | 46.80 (Oct'22) | 0.00 (Oct'22) | Irshad Ahmed |
Detail Report
Graph / Photo |
|
257 | Repair/Renovation work in office of Veterinary Hospital Tis Hazari in District Central.(Civil Work) | 2022.04.17 | 2022.07.15 | 53.01 | D.S. Construction Co |
Detail Report
Graph / Photo |
|||
258 | Providing services of computer operator, Skilled, semi-skilled, un-skilled labour etc | 2022.05.13 | 2023.05.12 | 52.95 | 42.40 (Mar'23) | 0.00 (Mar'23) | L.B. BONOFIED PRIVATE LIMITED |
Detail Report
Graph / Photo |
|
259 | Comprehensive maintenance of various roads under East Road Sub-Division-IV (Section-I & II) of Division East Road (M-212), PWD Delhi during 2022-23. (SH: Providing, running and maintaining Anti Smog Gun on hire basis at various locations). | 2022.10.16 | 2023.07.15 | 52.92 | Surender Singh |
Detail Report
Graph / Photo |
|||
260 | Finishing works at Lift-Lobby area of Block A and C, Water proofing of roof top and repair works at various location in premises,at D-II Flats,Vasant Kunj, New Delhi | 2022.03.18 | 2022.07.17 | 52.84 | 13.13 (Aug'22) | 0.00 (Aug'22) | Vision Constructions |
Detail Report
Graph / Photo |
|
261 | Construction of fountain opposite NH wall. | 2023.02.24 | 2023.03.23 | 52.75 | SP CONSTRUCTION |
Detail Report
Graph / Photo |
|||
262 | Annual Comprehensive Maintenance of 1250 KVA Capacity HT Automatic Voltage Regulator Andrew Yule make | 2022.01.03 | 2025.01.02 | 52.63 | 21.08 (Sep'22) | 0.00 (Sep'22) | Harsh India Enterprises |
Detail Report
Graph / Photo |
|
263 | SITC of three (03) numbers 20 passenger cum bed lift at JPCH Shastri Park Delhi | 2022.03.17 | 2022.09.16 | 52.54 | 31.52 (Oct'22) | 0.00 (Oct'22) | EVAAN ELEVATORS PVT LTD |
Detail Report
Graph / Photo |
|
264 | A/R & M/O Old Saint Stephen’s College Building Kashmere Gate, C.P.O Building, Old Court Building, N.C.C Offices Buildings, Disability Commissioner Office and Lok Nayak Setu Office Complex, Delhi During 2022-23 | 2022.12.07 | 2023.12.06 | 52.34 | Mohd Israil & Sons |
Detail Report
Graph / Photo |
|||
265 | Up gradation of computer labs Cal lab Library conversion of hall into meeting room laying of paver blocks raising of boundary wall and other miscellaneous maintenance work | 2022.10.16 | 2023.04.13 | 52.15 | 18.17 (Mar'23) | 0.00 (Mar'23) | N.M. CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
266 | Providing and installation of CCTV Surveillance System (Balance Work) in Lawyers Chambers Block at District Court Karkardooma Shahdara, Delhi | 2018.04.28 | 2018.07.27 | 52.07 | 2.63 (Aug'22) | 0.00 (Aug'22) | Sonal Enterprises |
Detail Report
Graph / Photo |
|
267 | Providing and Laying Water Proofing Treatment, Exterior Repair & Strengthening Beam, Chajja and Other Misc. Civil Works at Satyawati College | 2022.08.18 | 2022.11.17 | 51.87 | UR Construction |
Detail Report
Graph / Photo |
|||
268 | RMO UPS system installed at 2nd floor, 4th floor & 6th floor, Casualty Block, Gynae Block, Ward 14, Genetic Lab, OT Block and New OPD Block at L.N. Hospital, New Delhi | 2022.04.03 | 2024.04.02 | 51.85 | Labotek |
Detail Report
Graph / Photo |
|||
269 | Replacement of Addressable Type Fire Alarm System in place of Conventional type Fire Alarm System at Vikas Bhawan-II, Delhi-110054 | 2022.05.26 | 2022.07.25 | 51.83 | 37.69 (Aug'22) | 0.00 (Aug'22) | M/s Royale Meridian India Pvt Ltd |
Detail Report
Graph / Photo |
|
270 | SITC of Fire fighting system in Gynae ward Block at Lok Nayak Hospital, New Delhi | 2022.05.19 | 2022.07.18 | 51.58 | 45.53 (Oct'22) | 0.00 (Oct'22) | Swastik Electrotech Pvt. Ltd. |
Detail Report
Graph / Photo |
|
271 | Exterior work for repair of roof and replacement of exterior grit wash by plaster of Residential Complex and Girl's Hostel in the campus of DPSRU Complex, Pushp Vihar, Sector-III, M.B. Road, New Delhi | 2022.08.02 | 2022.12.01 | 51.57 | 20.04 (Jan'23) | 0.00 (Jan'23) | Subhash Enterprises |
Detail Report
Graph / Photo |
|
272 | Provision of Washed Stone Grit Plaster and Roof Water Proofing of A–Block, Provision of SS Main Gates and Shed at both Main Gates. Renovation of Classrooms (with Provision of Almirah), Labs, Library, Repairing of Toilet Blocks, Staircase and Corridor Plaster, Construction of Store Room, Replacement of Window and Damaged Water Tanks and Other Misc. Works | 2022.06.18 | 2022.12.17 | 51.57 | 41.84 (Nov'22) | 0.00 (Nov'22) | UR Construction |
Detail Report
Graph / Photo |
|
273 | Miscellaneous Repair Works such as Replacement of Kitchen Cabinet, Doors of WC and Toilet Repairing of Boundary Wall Behind Type-IV Quarters, | 2022.10.01 | 2023.03.30 | 51.47 | 18.61 (Mar'23) | 0.00 (Mar'23) | Anil Kumar Dahiya |
Detail Report
Graph / Photo |
|
274 | Construction of 100 Bedded Portable Hospital reserved for Covid 19 at A and U Tibbia College and Hospital, Karol Bagh, New Delhi (Electrical Works) | 2021.12.28 | 2022.02.20 | 51.44 | 52.14 (May'22) | 0.00 (May'22) | Jain Electric Works |
Detail Report
Graph / Photo |
|
275 | False Ceiling Granite and Wooden Flooring work and Electrical Installation work in court rooms of East district Karkardooma Court Complex Delhi Civil and Electrical Works. | 2023.03.16 | 2023.06.13 | 51.40 | Rakesh Kumar Rai |
Detail Report
Graph / Photo |
|||
276 | Day to Day Maintenance of Electrical Installation and Running Maintenance and Operation of Electrical Sub-Station, DG Set, Fire Fighting/Fire Alarm system, Water Supply pump sets and passenger Lift | 2021.12.11 | 2022.10.10 | 51.12 | 75.43 (Jan'23) | 0.00 (Jan'23) | Rama Electrical Co |
Detail Report
Graph / Photo |
|
277 | Construction of 4 Nos. Rooms at 2nd Floor and 3rd Floor) (Civil and Electrical Composite Work) | 2022.11.03 | 2023.02.02 | 50.98 | Pankaj Gureja |
Detail Report
Graph / Photo |
|||
278 | Supplying and Replacement of conventional light fittings with LED fittings in Delhi Secretariat for Energy conservation. | 2018.03.17 | 2018.07.16 | 50.80 | 9.42 (Nov'19) | 0.00 (Nov'19) | Electric India Control Devices |
Detail Report
Graph / Photo |
|
279 | Renovation of Girls Cottage 1 to 5, Boundary Wall of Park, Repairing of Ramps of Dormitory, Sewerline at Backside of Dormitory and Other Miscellaneous Work | 2022.08.06 | 2023.02.05 | 50.80 | 26.80 (Mar'23) | 0.00 (Mar'23) | sabur alam |
Detail Report
Graph / Photo |
|
280 | (A) Repairing/Maintenance of Roof of the school (B) Repairing/Grit wash on Boundary wall of the Govt. Co-Ed SSS Bhorgarh(Sch. ID- 1310022), (Bldg. Id-13101121), (EORId-20211543). | 2022.09.11 | 2023.01.11 | 50.80 | 36.74 (Mar'23) | 0.00 (Mar'23) | Raju Kumar Singh | Work in progress |
Detail Report
Graph / Photo |
281 | Replacement of old existing 3 Nos. 60 TR Central AC Plant at GNEC, New Delhi | 2022.01.01 | 2022.02.28 | 50.77 | SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. |
Detail Report
Graph / Photo |
|||
282 | Renovation/ Upgradation of Ward-5. | 2022.09.12 | 2022.12.11 | 50.72 | 0.80 (Mar'23) | 0.00 (Mar'23) | RAJESH KUMAR JAIN & SONS | Work delayed due to handing over of site by the client department. |
Detail Report
Graph / Photo |
283 | Renovation of Labour Room-1. | 2022.04.14 | 2022.08.12 | 50.64 | 0.00 (Jan'23) | 100.00 % (Jan'23) | Azfaruddin | Work completed. |
Detail Report
Graph / Photo |
284 | Providing and Fixing Stone Bench and Stone Planter at Dhaula Kuan to IGI airport, New Delhi. | 2023.01.30 | 2023.04.29 | 50.47 | Bhawani Constructions |
Detail Report
Graph / Photo |
|||
285 | Providing Electrical appliances in renovated 77 Nos. of staff rooms under NWED | 2022.06.14 | 2022.07.13 | 50.37 | 25.73 (Jul'22) | 0.00 (Jul'22) | M/s R S Electric Co. |
Detail Report
Graph / Photo |
|
286 | Re construction and Raising of boundary wall with grill and concertina coil fencing BldgID 13101080 Sch Id 1309267 EORID 20191734 | 2022.05.31 | 2022.08.31 | 50.37 | 65.81 (Feb'23) | 0.00 (Feb'23) | Saeed Builders | Work in Progress |
Detail Report
Graph / Photo |
287 | Comprehensive annual maintenance of Emerson Make UPS system installed at Casualty | 2022.10.08 | 2024.10.07 | 50.20 | POWER HOUSE | Work in progress |
Detail Report
Graph / Photo |
||
288 | SITC of Pump Set at Drain No. 1 | 2022.07.11 | 2022.10.10 | 49.89 | 58.97 (Sep'22) | 0.00 (Sep'22) | Krishna Electrical works |
Detail Report
Graph / Photo |
|
289 | Emergent Civil Revampment and Re-Strengthening of Duct, Columns, Basement Ceiling and Retaining Wall in Court Building | 2022.12.18 | 2023.04.17 | 49.76 | Cembond Construction Pvt. Ltd |
Detail Report
Graph / Photo |
|||
290 | Providing and Fixing Chairs for Classrooms | 2022.09.01 | 2022.10.31 | 49.74 | Delite Hi- Tech Furniture India Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
291 | Routine Maintenance of EI , Fans, compound light and Routine maintenance and operation of Electrical Sub Station, DG Set , Pump Set, Fire Alarm,Fire fighting, PA system | 2017.06.17 | 2018.06.16 | 49.72 | Krishna Electrical Works |
Detail Report
Graph / Photo |
|||
292 | Supplying and fixing of LED Lights in Saket Bar Association office and Toilets Rooms in Lawyers Chamber Block, Saket Court Complex ND- 17. (4) Supplying and Rep. of old lights in Basement 1 and 2 in Lawyers Chamber Block, at District Court Saket. | 2018.09.16 | 2018.11.14 | 49.71 | 54.34 (Feb'21) | 0.00 (Feb'21) | ACE Engineers Bureau |
Detail Report
Graph / Photo |
|
293 | 1. RMO of Carrier make central AC plant at D Block, GIPMER, New Delhi. SH Operation of Low side 3x390 TR capacity carrier make central AC plant EDP Block 2. RMO of Central AC Plant at C Block, GIPMER, New Delhi. SH.Operation of Low side 2x120 TR capa | 2017.12.21 | 2019.12.20 | 49.44 | G.D. Enterprises | Work in progress by M/s. G.D Enterprises. |
Detail Report
Graph / Photo |
||
294 | Comprehensive maintenance of buildings including supply of materials and providing service of man power for day to day maintenance work of ITI Vivek Vihar Fire Station Tahirpur and Shahdara under SD M 2314 during 2022 23 | 2023.01.22 | 2024.01.21 | 49.37 |
Detail Report
Graph / Photo |
||||
295 | Improvement and reparing of Road sided footpath and drainage system on Ranjeet Singh Marg & Mirdard Road and to make it accessible to all under Sub Division-II/SRD-1, PWD, New Delhi | 2022.09.30 | 2022.10.30 | 49.33 | Aadi Construction Co |
Detail Report
Graph / Photo |
|||
296 | Desilting of Sewer System, Repair and Renovation Work at Old Garage and Annual Maintenance Works | 2022.02.04 | 2023.02.03 | 49.33 | Hak Construction Co |
Detail Report
Graph / Photo |
|||
297 | Comprehensive maintenance, Supply of materials and providing services of manpower for day to day maintenance work of various buildings under SD M-2314 (I.T.I staff quarters Vivek Vihar, I.T.I old building Vivek Vihar, I.T.I Shahdara Vivek Vihar, Fire Station Tahirpur and Fire Station GT Shahdara) Delhi during 2021-22.(1st Recall) | 2022.02.09 | 2023.02.08 | 49.33 | 49.83 (Jan'23) | 0.00 (Jan'23) | Yatish Kumar Sharma |
Detail Report
Graph / Photo |
|
298 | Providing and Laying Water Proofing Treatment, Exterior Repair and Strengthening Beam, Chajja and Other Misc. Civil Works at Satyawati College (Balance Work). | 2023.01.01 | 2023.03.31 | 49.30 | 18.46 (Mar'23) | 0.00 (Mar'23) | Sh. Waseem Akram |
Detail Report
Graph / Photo |
|
299 | Improvement of footpath at Patparganj road Khureji red light to Sachedeva Chicken corner under Sub-Division East Road-I of PWD Division East Road/(M-212) Delhi. dg. 2022-23 | 2022.09.18 | 2022.12.16 | 49.23 | Uday Raj Pandey |
Detail Report
Graph / Photo |
|||
300 | Providing Service of Outsourcing Staff for the Office of Superintending Engineer, North West (M) Circle | 2022.09.10 | 2023.09.09 | 48.87 | 20.36 (Feb'23) | 0.00 (Feb'23) | DA Construction Co. |
Detail Report
Graph / Photo |
|
301 | Providing Services of Data Entry / Computer Operator, Messenger, MTS etc. for office of DOH and various office under Horticulture Division East. | 2023.02.27 | 2024.02.26 | 48.84 | 0.24 (Feb'23) | 0.00 (Feb'23) | Goodone Security Service Pvt Ltd |
Detail Report
Graph / Photo |
|
302 | Wiring of renovated office rooms i/c providing fan, fittings, street lights alongwith boundary wall, LED fittings on high masts & fabrication of main panels for high mast poles at Bharat Nagar Sports Complex, Ashok Vihar, Delhi | 2022.02.22 | 2022.06.21 | 48.69 | 42.04 (Mar'23) | 0.00 (Mar'23) | M/s R S Electric Co. |
Detail Report
Graph / Photo |
|
303 | Comprehensive maintenance of 310 DA staff qtrs Supply of materials and providing services of manpower for day to day maintenance work of 310 DA staff qtrs Karkardooma Delhi under jurisdiction of Sub Division M 2313 during 2022 23. | 2023.02.11 | 2024.02.10 | 48.48 | 3.59 (Feb'23) | 0.00 (Feb'23) | N.M. CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
304 | Repair/maintenance work in Raj Niwas, 1, Mahadev Road, 217 & Aap Party Office DDU Marg & Session House Delhi | 2022.09.18 | 2023.03.13 | 48.22 | 64.74 (Feb'23) | 0.00 (Feb'23) | Mool Chand |
Detail Report
Graph / Photo |
|
305 | Providing and Laying of Lumber Processor System ic operation and maintenance for 2 years after completion of work | 2022.08.31 | 2022.09.29 | 48.15 | 55.93 (Feb'23) | 0.00 (Feb'23) | LAXMAN |
Detail Report
Graph / Photo |
|
306 | Provision for Split AC and Window type AC for various locations at GTB Hospital, Complex, Shahdara, Delhi | 2019.04.06 | 2019.06.05 | 48.14 | RCC Enterprises | Work completed |
Detail Report
Graph / Photo |
||
307 | AR and MO Delhi High Court New Delhi during 2022 23 SH Renovation and modification of work stations overhead cabinets tables partition work and false ceiling at various places in Delhi High Court New Delhi | 2022.06.02 | 2023.06.01 | 48.10 | 56.58 (Mar'23) | 0.00 (Mar'23) | Shabbi Abbas | Work in progress |
Detail Report
Graph / Photo |
308 | Running and Operation of E and M Services and Comprehensive maintenance of DG Set at various locations | 2021.09.20 | 2022.09.19 | 48.09 | DHARAM ENTERPRISES |
Detail Report
Graph / Photo |
|||
309 | Providing Laying of Lumber processor system 1st Recall | 2022.02.12 | 2022.03.13 | 47.96 | 53.25 (Jul'22) | 0.00 (Jul'22) | Laxman | In Progress. |
Detail Report
Graph / Photo |
310 | Routine Maintenance, Operation of CNG/ Oil Fired 2.5 TPH BOILER (3 Nos.) 600kg/ hr (Autoclave) Capacity Fire Tube IBR Boiler (01 No.) and Operation of Boilers and Water Softening plant. | 2022.12.23 | 2023.12.22 | 47.84 | Boilermart | Work in progress |
Detail Report
Graph / Photo |
||
311 | AR and MO to Delhi High Court New Delhi dg 2022 23 SH Providing services of plumbing carpentry jobs etc | 2022.07.31 | 2023.07.31 | 47.61 | 28.12 (Mar'23) | 0.00 (Mar'23) | TRENDY SECURITY SERVICES | Work in progress |
Detail Report
Graph / Photo |
312 | AR and MO Various works under Delhi High Court Civil Division PWD New Delhi dg 2022 23 SH Providing Data Entry Computer Operators Messengers Clerical Staff Security Guard etc for Delhi High Court Division PWD Govt of Delhi | 2023.01.06 | 2024.01.05 | 47.50 | 7.79 (Mar'23) | 0.00 (Mar'23) | VINEET SINGH | Work in progress |
Detail Report
Graph / Photo |
313 | Repair and Maintenance of AAMCs under North Building Division (M 322), PWD, Delhi. | 2022.05.22 | 2023.05.21 | 47.49 | 19.77 (Feb'23) | 0.00 (Feb'23) | GEE Internationals | Work in Progress |
Detail Report
Graph / Photo |
314 | Day to day Maintenance & Operation of E.I & Fan, , Fire Fighting, Fire Alarm System, water supply system, Lifts, DG sets and Sub Station etc. | 2018.03.17 | 2019.03.16 | 47.40 | R K Enterprises |
Detail Report
Graph / Photo |
|||
315 | Maintenance of EI and Fans and RMO drinking water supply pump sets of Fire stations situated at sector 5 and 15, Rohin | 2021.10.26 | 2022.10.25 | 47.36 | Adhiraj Constructions |
Detail Report
Graph / Photo |
|||
316 | Replacement of Defective/ Burnt-out fittings with new LED fittings Power/light plug etc. in Lawyers Chambers Blocks at District Court Karkardooma, Delhi. | 2019.01.19 | 2019.04.18 | 46.93 | 21.98 (Jan'20) | 0.00 (Jan'20) | S K Engineers |
Detail Report
Graph / Photo |
|
317 | Regarding Barrier Free Access Features, RCC Ramp with Stainless Steel Railing Tactile, Toilet for Disability Challenged and Grit Wash Plaster at Govt. Co–Ed Sr. Sec. School A–6, Paschim Vihar, Delhi–110063 (ID: 1617032). (Composite Work Civil & Electrical) | 2022.06.01 | 2022.09.30 | 46.90 | 22.00 (Oct'22) | 0.00 (Oct'22) | Laxman |
Detail Report
Graph / Photo |
|
318 | Providing and Laying of Cellulose Set | 2022.11.10 | 2022.12.24 | 46.30 | 32.41 (Nov'22) | 0.00 (Nov'22) | Ever Green Enterprises |
Detail Report
Graph / Photo |
|
319 | Construction of Porta Cabin for AAMC including Construction of Shade and Provision of Water Tank at P–2, Block Near Barat Ghar, Sultanpuri & D–2 Community Centre, Opposite D–2/492, Sultanpuri, Delhi (SW:- Remaining Work) | 2022.07.28 | 2022.11.27 | 46.10 | 55.66 (Mar'23) | 0.00 (Mar'23) | N Y Construction |
Detail Report
Graph / Photo |
|
320 | Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System | 2020.09.28 | 2023.09.27 | 46.00 | DB Solx | Work in progress by M/s D.B. Solx |
Detail Report
Graph / Photo |
||
321 | (A) Construction of new septic tank (B) Providing and laying horticulture pipe line and sewer line for toilets in CH-I & II. | 2022.05.31 | 2022.08.30 | 45.54 | 41.93 (Mar'23) | 0.00 (Mar'23) | IZHAR AHMED | Work in Progress |
Detail Report
Graph / Photo |
322 | 1.MOEI,fans at GynB,Sk,2. M.O.E.Ifansat Spe.WB,T.B. cent3. M.OE.I,F at Casu B,OPD4. MOEI.,fan at Sur B,NOT,MS off5. RMOF F. Sys inst vari buil 6. RMO Fire AlaSys instat var.bui7 RMO Sub StatNo.1234 ,8. RMO Pumset at SHMaint,Operof EM ser. | 2019.07.18 | 2019.09.17 | 45.38 | 45.38 (Oct'19) | 0.00 (Oct'19) | M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 | work in progress by M/s Vivek Associates and 3rd RA paids |
Detail Report
Graph / Photo |
323 | Comprehensive Maintenance of C Mos Make Servo Stabilizers installed in lifts and other location | 2020.01.09 | 2023.01.08 | 45.10 | 11.28 (Mar'23) | 0.00 (Mar'23) | S.S. Sales and Services | work in progress by agency |
Detail Report
Graph / Photo |
324 | Reconstruction of Culvert & Development work at firni chowk Khichripur East Vinod Nagar Delhi. | 2023.01.29 | 2023.04.28 | 45.07 | AJ AND CO. |
Detail Report
Graph / Photo |
|||
325 | Repair and renovation work at bunglow no. 36 Ashoka Road and E-71 officers residence Minto Road, New Delhi | 2021.12.19 | 2022.03.18 | 44.96 | 67.47 (Feb'23) | 0.00 (Feb'23) | BRIJ GOPAL MANN |
Detail Report
Graph / Photo |
|
326 | Regarding Provision of Grit Wash on Exterior of Old SPS Structure with Granite upto Door Level, Mosaic Tiles in Exterior Block, Removal of Old Toilet Block, Repair of Old Stage, Provision of Shed and Ramp on Stage and Other Misc. Work at SKV Sector–1, Avantika, Rohini, Delhi–110085 | 2021.12.06 | 2022.08.05 | 44.87 | 38.66 (Oct'22) | 0.00 (Oct'22) | SABUR ALAM |
Detail Report
Graph / Photo |
|
327 | Comprehensive Maintenance of DBSOLX developed Complaint Tracker System at GNEC | 2019.11.03 | 2020.11.02 | 44.66 | 8.15 (Jul'22) | 0.00 (Jul'22) | DBSOLX | work in progress by DB SOLX |
Detail Report
Graph / Photo |
328 | Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System at GIPMER, New Delhi | 2020.04.28 | 2023.04.27 | 44.66 | 14.88 (Apr'22) | 0.00 (Apr'22) | DBSOLX | work in progress by M/s D.B. Solx |
Detail Report
Graph / Photo |
329 | Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System at Meerdard Lane, New Delhi | 2020.04.09 | 2023.04.08 | 44.65 | 7.11 (Jul'22) | 0.00 (Jul'22) | SCS Technologies | work in progress by SCS Technologies |
Detail Report
Graph / Photo |
330 | RMO Elect. and Mech. Services in Lawyers chambers Block D E F G and H at District Courts Karkardooma Delhi. SH-Operation of lifts in Lawyers chamber Blocks. | 2018.10.01 | 2019.09.11 | 44.60 | 37.15 (Mar'21) | 0.00 (Mar'21) | Guruji Elevator |
Detail Report
Graph / Photo |
|
331 | Day to day Running Maintenance & Operation of Electrical and Mechanical services of MAIDS Phase- II Building, New Delhi | 2022.07.01 | 2023.06.30 | 44.55 | 9.22 (Mar'23) | 0.00 (Mar'23) | GLOBAL ENTERPRISES | Work in progress |
Detail Report
Graph / Photo |
332 | SH Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units) | 2018.08.03 | 2019.08.02 | 44.40 | 16.47 (Dec'19) | 0.00 (Dec'19) | LG Electronics |
Detail Report
Graph / Photo |
|
333 | Comprehensive Maintenance of RO Filtration Units | 2021.10.30 | 2022.04.29 | 44.32 | 32.26 (Aug'22) | 0.00 (Aug'22) | M/s Vivek Associates |
Detail Report
Graph / Photo |
|
334 | RMO UPS system installed at 2nd floor, 4th floor and 6th floor Casualty Block, Gynae Block, Ward 14, Genetic Lab, OT Block and New OPD Block at L.NHSHComprehensive annual maintenance of Magna Flux Make UPS system installed at New OPD BlockL.N.H | 2019.08.31 | 2022.08.30 | 44.30 | 15.02 (Feb'23) | 0.00 (Feb'23) | power house | Work in progress by M/s Power House. |
Detail Report
Graph / Photo |
335 | EOR to Renovation of School classrooms and repair and grit washed of boundary wall at Govt. Co Ed S.S. Bhalaswa Village School Building ID 1309302 Building ID 13091885 | 2022.09.15 | 2022.12.14 | 44.29 | 21.46 (Mar'23) | 0.00 (Mar'23) | Jabir Hussain | Work is forclosed |
Detail Report
Graph / Photo |
336 | ComprMaint opera of DBSOLX devel Comp Tracker Sys at MAMC | 2020.01.01 | 2022.12.31 | 44.22 | SCS Technologies | work in progress by SCS Technologies |
Detail Report
Graph / Photo |
||
337 | Complete maintenance of garden Features at Delhi Vidhan Sabha. | 2023.02.04 | 2024.02.03 | 44.06 | Pioneer Horticulturist Pvt. Ltd |
Detail Report
Graph / Photo |
|||
338 | Providing services of office staff like Computer Operator, Messenger, Peon, Sweeper etc. at Division office & Sub-Division-II at PTS Malviya Nagar,New Delhi | 2022.02.12 | 2023.02.11 | 43.99 | 25.26 (Oct'22) | 0.00 (Oct'22) | TRENDY SECURITY SERVICES |
Detail Report
Graph / Photo |
|
339 | Providing Security Guard for various offices & Nursery’s under Horticulture Division East | 2022.06.18 | 2023.06.17 | 43.93 | 2.42 (Feb'23) | 0.00 (Feb'23) | Friends Detective Security Services |
Detail Report
Graph / Photo |
|
340 | Supplying, Installation, Testing and Commissioning of Centralized cooling and heating type AirConditioning System in ward 26 New Medical Block, CCU & RCU at L. N. Hospital, New Delhi. | 2022.05.15 | 2022.07.14 | 43.91 | Sai Aircon Engineers | Work in progress |
Detail Report
Graph / Photo |
||
341 | Providing and fixing Solar Hybrid street light system in existing light | 2022.05.21 | 2022.06.20 | 43.85 | 54.80 (Aug'22) | 0.00 (Aug'22) | SAFTY Engineers, PAN: AARPW4473E, Address: 1836/3F, Shp No. 8, Bhagirath Place, New Delhi-72 | Work in progress |
Detail Report
Graph / Photo |
342 | Renovation/Upgradation of Auditorium Hall in ABCON at LN Hospital, New Delhi | 2022.10.04 | 2022.12.03 | 43.81 | A V Enterprises | Work in progress |
Detail Report
Graph / Photo |
||
343 | Comprehensive maintenance, Supply of materials and providing services of manpower for day to day maintenance work of various buildings under SD M-2314 (I.T.I staff quarters VivekVihar, I.T.I old building VivekVihar, I.T.I ShahdaraVivekVihar, Fire Station Tahirpur and Fire Station GT Shahdara) Delhi during 2021-22 | 2022.01.10 | 2023.01.09 | 43.77 | JABIR HUSSAIN |
Detail Report
Graph / Photo |
|||
344 | Comprehensive Maintenance of Microprocessor based nurse call bell system | 2021.11.11 | 2023.11.10 | 43.61 | 18.60 (Apr'22) | 0.00 (Apr'22) | AKOUSTIK COMMUNICATIONS |
Detail Report
Graph / Photo |
|
345 | Construction of footpath at one side of Rao Laxmi Chand Marg from Ghummanhera to Jhuljhuli Morh and in front of Govt. School Ghummanhera facing towards road under Sub Division-23, New Delhi) | 2022.12.08 | 2023.03.07 | 43.58 | Sirohi Construction Co |
Detail Report
Graph / Photo |
|||
346 | Construction of Oxygen Generator plant Hall at GIPMER, New Delhi. (Electrical works) | 2021.12.06 | 2022.01.19 | 43.31 | 0.11 (Jul'22) | 0.00 (Jul'22) | Jain Electric Works |
Detail Report
Graph / Photo |
|
347 | Annual comprehensive Maintenance and Operation of LG make inverter VRV/VRF type Air Conditioning units | 2021.07.31 | 2022.07.30 | 43.28 | 34.27 (Oct'22) | 0.00 (Oct'22) | LG ELECTRONICS INDIA PVT LTD. |
Detail Report
Graph / Photo |
|
348 | Civil Work and Electrical Work (Composite Work). | 2020.09.05 | 2020.12.04 | 43.21 | 6.04 (Nov'20) | 0.00 (Nov'20) | SIDDHANSH ENGINEERING WORK | Work in progress (Under Clause-5 of the Agreement, the date of completion for the work is provisionally extended upto 31.03.2021) |
Detail Report
Graph / Photo |
349 | Running Comprehensive Maintenance of Eureka Forbs water treatment RO sys, water coolers with inbuilt UV/ RO sys water dispenser with inbuilt RO Sys | 2022.12.31 | 2024.12.30 | 43.13 | ADITI ENTERPRISES | Work in progress |
Detail Report
Graph / Photo |
||
350 | Replacement of old/defective Panel Board, rising mains & cable due to enhancement of electrical load in New Medical Block at LN Hospital, New Delhi | 2022.12.06 | 2023.02.05 | 43.05 | RCC Enterprises | Work in progress |
Detail Report
Graph / Photo |
||
351 | Regarding providing and fixing wall tiles, almirah, interlocking tiles and renovation of labs and MP hall at SKV A-Block, Plot No.5, Jahangir puri, Delhi - 110033 (Sch Id. 1309279) (Bldg. Id. 13091875) (EOR Id. 20211168) | 2022.04.18 | 2022.08.15 | 42.66 | 53.50 (Feb'23) | 0.00 (Feb'23) | Rang Lal Singh | Work in Progress |
Detail Report
Graph / Photo |
352 | Making arrangement of water through stainless steel water tankers | 2022.08.11 | 2023.02.10 | 42.53 | 41.39 (Mar'23) | 0.00 (Mar'23) | AMIT WATER SUPPLIYERS |
Detail Report
Graph / Photo |
|
353 | Repair of toilet block, Corridor, Varandah, Laundary area and other misc. works at Ashadeep, Narela, Delhi 110040 | 2022.06.30 | 2022.10.27 | 42.47 | 26.38 (Mar'23) | 0.00 (Mar'23) | MAHIDEEP SHARMA | Work in progress |
Detail Report
Graph / Photo |
354 | Rewiring /Repairing of existing point/power point /fixtures and providing additional power points & wiring etc in various Resdl. Flats as when as required | 2022.08.20 | 2023.02.19 | 42.41 | 36.84 (Mar'23) | 0.00 (Mar'23) | SEHRA ELECTRIC works |
Detail Report
Graph / Photo |
|
355 | Supply and replacement of 2 x 80 KVA Seamless power supply system critical load of NIC Servers at Delhi Sachivalya New Delhi. | 2019.01.07 | 2019.02.06 | 42.39 | 2.91 (Apr'21) | 0.00 (Apr'21) | Issar Industries |
Detail Report
Graph / Photo |
|
356 | Comprehensive maintenance of HVAC 752HP Daikin Make VRVAHU system installed at MAIDS Phase II NewDelhi | 2022.06.08 | 2023.06.07 | 42.25 | 20.57 (Mar'23) | 0.00 (Mar'23) | TF AIR SYSTEMS PRIVATE LIMITED | Work in progress |
Detail Report
Graph / Photo |
357 | A/R & M/O to Rouse Avenue Court Complex at DDU Marg, New Delhi During- 2021-22 & 2022-23. (SH : Providing Materials and Manpower for day to day maintenance including misc. repair and maintenance works in the Court Complex.) | 2021.12.30 | 2023.04.13 | 42.19 | 90.61 (Feb'23) | 0.00 (Feb'23) | R L WADHWA | Work is in progress |
Detail Report
Graph / Photo |
358 | Development of Area near Incubation Centre at IGDTUW Kashmere Gate Under Sub Division-II/SRDP-1 New Delhi. | 2023.01.15 | 2023.03.14 | 42.01 | Gyanchand |
Detail Report
Graph / Photo |
|||
359 | Mechanized Cleaning of over head tank and underground tank | 2021.08.17 | 2022.08.16 | 41.80 | 33.56 (Mar'23) | 0.00 (Mar'23) | UNITECH WATER SLOUTIONS |
Detail Report
Graph / Photo |
|
360 | Renovation of toilets with fittings, Fixing of New False ceiling, Installation of Granite in corridor and stack area, Changing of Door & windows & White wash of inner and outer building area at Delhi Archives Building | 2022.08.23 | 2023.02.22 | 41.33 | M T Builders |
Detail Report
Graph / Photo |
|||
361 | Renovation of Rooms at Ground Floor, 1st Floor and 2nd Floor at DTTE (HQ) | 2022.04.18 | 2022.06.17 | 41.07 | 13.84 (Mar'23) | 0.00 (Mar'23) | Sohan Lal Chhitoria and Sons |
Detail Report
Graph / Photo |
|
362 | Operation and Annual Comprehensive Maintenance of PA / Conference system at Committee Rooms, MLA Lounges and DIP & Ludlow castle wrestling venue | 2022.07.23 | 2024.07.22 | 41.06 | 10.22 (Jan'23) | 0.00 (Jan'23) | Ambica Electricals |
Detail Report
Graph / Photo |
|
363 | Replacement of out lived fire alarm system at Tis Hazari Courts Building, Delhi. | 2017.09.30 | 2017.12.29 | 40.96 | 34.00 (Oct'21) | 0.00 (Oct'21) | Royale Meridian (India ) Pvt. Ltd. |
Detail Report
Graph / Photo |
|
364 | Interior Renovation Work of Doctor’s Hostel Library at Deen Dayal Upadhyay Hospital, Hari Nagar, New Delhi. | 2023.02.05 | 2023.08.04 | 40.88 | Ravi Ranjan |
Detail Report
Graph / Photo |
|||
365 | Operation and Comprehensive maintenance of 500 KLD ETP having BMW and OLM | 2022.12.22 | 2024.12.21 | 40.77 | Wellkome engineers | work in progress by M/s Wellkome Engineers |
Detail Report
Graph / Photo |
||
366 | Supplying Outsourcing Staff for Day to Day Maintenance Work of DA Flats | 2022.12.19 | 2023.12.18 | 40.37 | R.K JAIN & SONS HOSPITALITY SERVICE PRIVATE LTD. |
Detail Report
Graph / Photo |
|||
367 | A/R & M/O Delhi Govt. Officers Flats at G.K.-1, New Delhi during 2021-22(SH:-Repair and Renovation of Various flats and misc. civil works.) | 2021.08.14 | 2022.02.13 | 40.37 | SHRI DATTA KRUPA ENTER PRISES |
Detail Report
Graph / Photo |
|||
368 | Providing / Repairing / Replacement / of existing Cisco Make LAN Switches and required equipment i/c cabling work | 2022.08.27 | 2022.10.26 | 40.35 | 60.00 (Jan'23) | 0.00 (Jan'23) | M/s Star Enterprises. |
Detail Report
Graph / Photo |
|
369 | Upgradation of 04 Nos Type V Qtrs in MV Hospital Pooth Khurd Delhi | 2022.10.14 | 2022.12.13 | 40.32 | Amit kumar | Work in Progress (60% Progress ) |
Detail Report
Graph / Photo |
||
370 | A/R and M/O to Various Buildings under NWB-3, Delhi during 2021-22 SH: Day to Day Maintenance of various Services at DA Flats Sector-XI, GND and SSCBS, Rohini Delhi | 2021.10.10 | 2022.10.09 | 40.31 | 35.98 (Mar'23) | 0.00 (Mar'23) | RAJIV RANJAN |
Detail Report
Graph / Photo |
|
371 | Enhancing accessibility of built up environment of ITI Nand Nagri, Delhi-110093 -2nd call | 2019.09.23 | 2019.12.22 | 40.22 | 43.67 (Sep'21) | 0.00 (Sep'21) | Jabir Hussain | work in progress |
Detail Report
Graph / Photo |
372 | Renovation of Toilet and Primary Wing with Repairing of all Leakage, Upgrade System and Other Misc. Work | 2022.02.27 | 2022.05.26 | 40.20 | Anshika Construction Co. |
Detail Report
Graph / Photo |
|||
373 | Rewiring of EI and fans and Replacement of old defective fittings, cable fans & air conditioning as when as required | 2022.05.28 | 2022.11.27 | 40.11 | 50.01 (Mar'23) | 0.00 (Mar'23) | Shri Bankey Bihari Electricals |
Detail Report
Graph / Photo |
|
374 | Modification and repairing of existing ETP plant of Capacity of 500 KLD at GNEC, New Delhi | 2023.01.12 | 2023.03.11 | 39.90 | 33.00 (Mar'23) | 0.00 (Mar'23) | Texol Engineers | Work in progress |
Detail Report
Graph / Photo |
375 | (1) RMO of Specialized Electrical & Mechanical works at A&U Tibbia College and Hospitals, Karol Bagh, New Delhi (2) RMO of specialized Electrical & Mechanical works at DR. NC Joshi Memorial Hospital, Karol Bagh, New Delhi | 2022.01.28 | 2024.01.27 | 39.86 | 12.19 (Jul'22) | 0.00 (Jul'22) | Sonal Enterpries Pvt. Ltd. |
Detail Report
Graph / Photo |
|
376 | AR and MO Delhi High Court New Delhi during 2022 23 SH Facade cleaning of New Court Block and Medical Health Centre Delhi High Court New Delhi | 2023.02.14 | 2023.04.13 | 39.84 | M/s Jamshed Ali & Sons | Work in progress |
Detail Report
Graph / Photo |
||
377 | Supplying of Materials & Manpower Services for Day to Day Maintenance. | 2023.01.19 | 2023.07.18 | 39.60 | Work in progress |
Detail Report
Graph / Photo |
|||
378 | Regarding Provision of Coba for Old Building, Guard Room with Wash Room, Overhead Tank, Counter Slab with Water Line in Chemistry, Physics and Biology Labs, Waiting Room with Covered Shed and all side Open for Parents, Shed on Assembly Stage, Replacement of Old Windows and Ventilators, P/F Grill for Protection of Green Plant of the School and Reconstruction of Broken Boundary Wall | 2022.06.18 | 2022.09.17 | 39.53 | 30.91 (Mar'23) | 0.00 (Mar'23) | LT INFRABUILD |
Detail Report
Graph / Photo |
|
379 | EOR to CPMF Site PTS Wazirabad to facilitate camping personnel Delhi | 2018.09.25 | 2018.11.24 | 39.50 | 14.01 (Feb'20) | 0.00 (Feb'20) | S K Engineers | Work in progress |
Detail Report
Graph / Photo |
380 | Comprehensive Maintenance of Extreme Entrays Make LAN System at various buildings at L.N. Hospital | 2022.02.28 | 2025.02.27 | 39.40 | 69.93 (Mar'23) | 0.00 (Mar'23) | TRACOM ENTERPRISES |
Detail Report
Graph / Photo |
|
381 | Operation and Routine Maintenance of E & M services | 2022.03.11 | 2022.09.10 | 39.37 | M/s R S Electricals |
Detail Report
Graph / Photo |
|||
382 | Misc. repair & renovation works and const. of bathroom in Paiwalan Fire Station at Jama Masjid, Delhi under SRD Project Sub-Division-III/Division-I, PWD, Delhi. | 2022.05.12 | 2023.11.11 | 39.36 | 58.96 (Jul'22) | 0.00 (Jul'22) | KAMAAL CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
383 | Repairing / Replacement of EI and Fans 17/3, 17/9, 33/24, 33/25, 33/11, 16/11 Rajpur Road and D-II/2 Court lane, 33-A/4 Sham Nath Marg and 5 Bela Road | 2022.05.07 | 2022.08.06 | 39.22 | 57.69 (Feb'23) | 0.00 (Feb'23) | Om Sai Electrical Co. |
Detail Report
Graph / Photo |
|
384 | Comprehensive maintenance and operation of 4 x 400 TR Central HVAC Plant. | 2019.05.20 | 2020.05.19 | 39.01 | Unique Engineers Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
385 | Providing Plinth Protection and Construction of Shed Near Canteen and Substation and Other Miscellaneous Works | 2022.08.16 | 2022.10.15 | 38.86 | 4.65 (Jan'23) | 0.00 (Jan'23) | A R CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
386 | Routine, operation and maintenance of Stacker and Puzzle car Parking system | 2022.06.20 | 2023.06.19 | 38.75 | Ram Ratna Infrastructure Pvt. | Work in progress |
Detail Report
Graph / Photo |
||
387 | Structural Strengthening Works | 2021.08.11 | 2021.11.08 | 38.75 | 41.82 (Jun'22) | 0.00 (Jun'22) | Cembond Construction Pvt. Ltd | In Progress. |
Detail Report
Graph / Photo |
388 | Rewiring / Repairing of existing point/ power point/ fixtures and providing additional power points and wiring etc in various Resdl. Flats/ Bunglow, as when as required | 2022.07.28 | 2023.01.27 | 38.73 | 57.11 (Feb'23) | 0.00 (Feb'23) | Rama Electrical Co |
Detail Report
Graph / Photo |
|
389 | Misc. Repair work (Balance Work) | 2022.04.28 | 2022.07.27 | 38.69 | 38.48 (Mar'23) | 0.00 (Mar'23) | Jabir Husain | Work is forclosed |
Detail Report
Graph / Photo |
390 | Maintenance and Operation of Pakage, Tower type AC units, water coolers and Pressurization & vetllation System. | 2023.02.27 | 2024.02.26 | 38.48 | M/s Naj Refrigeration & Air Conditioning Works |
Detail Report
Graph / Photo |
|||
391 | Comprehensive maintenance of microprocessor based nurse call bell system | 2019.10.28 | 2021.10.27 | 38.45 | AKOUSTIK COMMUNICATIONS | work in progress by Akoustik Communication |
Detail Report
Graph / Photo |
||
392 | Repair and Renovation of Workshop and Making Modification in room no. 9 of Women Wing | 2019.08.30 | 2019.12.29 | 38.26 | 15.93 (Oct'21) | 0.00 (Oct'21) | Saeeduddin | work in progress |
Detail Report
Graph / Photo |
393 | Repairing / Replacing of Roofing in Library Block at Dr.B.R. Ambedkar University During 2022-23. | 2023.01.22 | 2023.03.21 | 37.87 | Jamshed Ali and Sons |
Detail Report
Graph / Photo |
|||
394 | Water proofing of roof, Repairing of ceiling and stair case with SS rail, Granite stone work, Replacing of window, doors, damaged false ceiling and other misc. civil repair work in Sub Division-II, III, IV, SD-III electrical and Division Office--- | 2022.09.06 | 2023.01.05 | 37.85 | PURAN CHAND |
Detail Report
Graph / Photo |
|||
395 | RMO E and M Services in KKD Court Court Block ACI B JKL at District Court KKD Delhi. SH- Operation of lifts in Court Blocks | 2018.09.25 | 2019.09.24 | 37.84 | 33.43 (Nov'19) | 0.00 (Nov'19) | Royal Electrical Co. |
Detail Report
Graph / Photo |
|
396 | Replacement of Interlocking Paver block of internal path of Judges Residential Complex at Saket, New Delhi | 2022.02.08 | 2022.04.07 | 37.78 | 31.21 (Mar'23) | 0.00 (Mar'23) | Naveen Kumar Gupta |
Detail Report
Graph / Photo |
|
397 | Renovation of Principal office, providing SS railings in corridor, providing new main gate and other misc. works in GBSSS No.2 JJ Colony Bawana Delhi (School ID 1310460) | 2022.05.22 | 2022.07.21 | 37.75 | 14.74 (Nov'22) | 0.00 (Nov'22) | M/s Ravi Construction Co. | Work in Progress |
Detail Report
Graph / Photo |
398 | Modification in various Hospital buildings to facilitate differently abled person under accessible India Campaign. (SH: Balance Work). | 2022.09.17 | 2023.01.14 | 37.71 | 24.76 (Feb'23) | 0.00 (Feb'23) | RAM AVTAR SHARMA |
Detail Report
Graph / Photo |
|
399 | Making Building and Campus Barrier free for accessibility of disabled persons at Dr. BR Sur Homeopathic, Hospital, Nanakpura, New Delhi | 2022.09.17 | 2023.01.14 | 37.71 | 0.00 (Feb'23) | 75.00 % (Feb'23) | RAM AVTAR SHARMA | Work is in progress. |
Detail Report
Graph / Photo |
400 | Improvement of drainage system in front of DMRC Academy Shastri park on Eastern Approach Road. | 2023.01.15 | 2023.02.28 | 37.65 | CBC and Sons |
Detail Report
Graph / Photo |
|||
401 | RMO Pump Set & Fountain, SCADA at College building, various hostel and Type VI, Type V, Type I, Residential Quarters at MAMC, New Delhi. (SH:- Operation and comprehensive RDS make automation of water supply and SCADA system installed at various location) | 2020.03.07 | 2022.03.06 | 37.57 | RECKTRONIC DEVICES AND SYSTEMS | work in progress by M/s Recktronic Devices system |
Detail Report
Graph / Photo |
||
402 | Repairing and Rehabilitation of RCC Chajja in Kaveri Hostel and ECE Block at IGDTUW Campus, Kashmere Gate Delhi). Delhi During 2021-22 | 2021.12.19 | 2022.02.18 | 37.57 | 49.12 (Jan'23) | 0.00 (Jan'23) | MOHD AFTAB |
Detail Report
Graph / Photo |
|
403 | Finishing with Epoxy Paint on Floor Area of Workshop | 2022.08.16 | 2022.09.15 | 37.54 | Ikramuddin |
Detail Report
Graph / Photo |
|||
404 | Cleaning, mopping of common area, like lift lobby, staircase, basement, community centre, footpath area, terrace, servant qtr. etc. by mopping machine at Residential Complex Saket--- | 2022.12.14 | 2023.12.13 | 37.52 | R.K. Jain& Sons Hospitality Servies (P) Ltd. |
Detail Report
Graph / Photo |
|||
405 | Renovation of Microbiology Lab | 2021.10.24 | 2021.12.22 | 37.47 | 21.07 (Aug'22) | 0.00 (Aug'22) | RAJESH KUMAR JAIN & SONS | Work completed. |
Detail Report
Graph / Photo |
406 | Renovation of Zonal Office including Providing and Laying New Sewer Line and CC Pavement | 2022.05.20 | 2022.08.19 | 37.38 | 40.31 (Oct'22) | 0.00 (Oct'22) | Nurul Hak |
Detail Report
Graph / Photo |
|
407 | Comprehensive Maintenance of CMos Make Servo Voltage stabilizers installed at different locations | 2023.01.17 | 2026.01.16 | 37.23 | 0.06 (Feb'23) | 0.00 (Feb'23) | S S Sales and Services | Work in progress |
Detail Report
Graph / Photo |
408 | Annual comprehensive maintenance of 1.5 TPH capacity fire tube boilers (2 Nos.) operation of boilers and water softening plant | 2020.09.10 | 2022.09.09 | 37.08 | 23.16 (Oct'22) | 0.00 (Oct'22) | Boilermart |
Detail Report
Graph / Photo |
|
409 | Routine maintenance and operation of Lifts | 2018.05.16 | 2019.05.15 | 37.05 | 33.96 (Apr'19) | 94.00 % (Apr'19) | Swastik Electrotech Pvt. Ltd. | Work transferred and in progress |
Detail Report
Graph / Photo |
410 | Construction of Cold Storage Room in Forensic Science Laboratory, Rohini, Delhi | 2022.04.06 | 2022.06.05 | 36.96 | 45.13 (Oct'22) | 0.00 (Oct'22) | M/s Cascade |
Detail Report
Graph / Photo |
|
411 | Comprehensive maintenance of LAN and EPBAX System installed at Mandoli Prison Complex | 2022.03.29 | 2023.03.28 | 36.92 | 16.18 (Aug'22) | 0.00 (Aug'22) | TRACOM ENTERPRISES | Work in progress |
Detail Report
Graph / Photo |
412 | RMO of various Electrical & Mechanical services Mandoli Prison Complex Delhi. (SH: Comprehensive maintenance of LAN & EPBAX System installed at Mandoli Prison Complex). | 2022.03.29 | 2023.03.28 | 36.92 | 16.18 (Aug'22) | 0.00 (Aug'22) | TRACOM ENTERPRISES | Work in progress |
Detail Report
Graph / Photo |
413 | EOR to EI and Fans and PA System at Govt. GSSS No.1 Ghonda Delhi-110053 (School ID- 1104025). | 2019.01.14 | 2019.03.13 | 36.91 | 48.49 (Jan'20) | 0.00 (Jan'20) | V K Electrical Works | Work in progress |
Detail Report
Graph / Photo |
414 | Day to day Maintenance of Elect. and Mechanical Services | 2021.10.16 | 2023.10.15 | 36.82 | 29.36 (Feb'23) | 0.00 (Feb'23) | SEHRA ELECTRIC works |
Detail Report
Graph / Photo |
|
415 | A/R & M/O to various building under Division M-222 Delhi dg 2021-22 (SH: Providing Services of Data Entry/ Computer Operator, Messenger cum MTS and Clerk.). | 2021.08.31 | 2022.08.30 | 36.67 | 37.41 (Dec'22) | 0.00 (Dec'22) | TRENDY SECURITY SERVICES |
Detail Report
Graph / Photo |
|
416 | Comprehensive Maintenance and Operation of Lifts installed in Main Court Building, Lawyers Block and residential block at District Court, Saket, New Delhi. (SH- Comprehensive maintenance of Johnson make lift) | 2019.01.27 | 2020.01.26 | 36.66 | 56.90 (Jul'22) | 0.00 (Jul'22) | Johnson Lifts Pvt. Ltd. |
Detail Report
Graph / Photo |
|
417 | Providing EI Fans fire fighting systems Air conditioning unit | 2022.12.06 | 2023.02.05 | 36.61 | 23.94 (Mar'23) | 0.00 (Mar'23) | Jain Electric Works | Work in progress |
Detail Report
Graph / Photo |
418 | Water Proofing Treatment in Planters for Preventing Seepage in Basement Floor, Replacing the Damaged C.I./CPVC Pipes and Other Miscellaneous Works | 2022.02.04 | 2023.02.03 | 36.49 | 45.56 (Jan'23) | 0.00 (Jan'23) | BHUPESH KUMAR |
Detail Report
Graph / Photo |
|
419 | Renovation of office area of Pay and Accounts Office -IV and Pay and Accounts Office-VI in Treasury Building, Tis Hazari Court Complex, Delhi. (Civil Work) | 2022.04.16 | 2022.06.14 | 36.42 | D.S. Construction Co |
Detail Report
Graph / Photo |
|||
420 | Providing LAN System and All in One Desktop at Acharya Shree Bhikshu Govt. Hospital, Moti Nagar, New Delhi | 2018.11.30 | 2019.01.29 | 36.40 | DYNAMIC SYSTEMS |
Detail Report
Graph / Photo |
|||
421 | Operation and Comprehensive Maintenance of 500 KLD ETP having BMW and OLMS system | 2020.05.01 | 2022.04.30 | 36.30 | Wellkome engineers | Work in progress by M/s Wellkome Engineer |
Detail Report
Graph / Photo |
||
422 | Replacement of Defective/ Burnt-out fittings with new LED fittings ceiling fans fresh air fan power points etc. in Flats Type-II Type-III Type-IV Type-V Type-VI and Duplex in O block residential Complex at District Court Karkardooma Delhi | 2018.09.05 | 2018.12.04 | 36.23 | 35.80 (Oct'19) | 0.00 (Oct'19) | Krishna Electreical Works |
Detail Report
Graph / Photo |
|
423 | Providing and Installation of 500 KVA capacity Silent type DG Set for MSO Building, New Delhi. | 2017.09.12 | 2018.01.11 | 36.23 | Himalaya Generators |
Detail Report
Graph / Photo |
|||
424 | Repair, renovation and day to day maintenance of SDM Model Town office, Azadpur Flyover Delhi | 2022.09.29 | 2023.08.06 | 36.22 | 8.04 (Feb'23) | 0.00 (Feb'23) | SANJEEV KUMAR GUPTA | Work is forclosed |
Detail Report
Graph / Photo |
425 | Replacement of wooden damage Alimrah shutter, frames, sanitary fittings and others Misc. work in Judges flats | 2021.09.02 | 2022.06.01 | 36.21 | 51.77 (Sep'22) | 0.00 (Sep'22) | Bhawani Constructions |
Detail Report
Graph / Photo |
|
426 | Compr Maint of DBSOLX devel Compl Track Sys at L.N.H | 2019.10.12 | 2022.10.11 | 36.21 | DBSOLX | work in progress by DB SOLX |
Detail Report
Graph / Photo |
||
427 | M/o Hort. work in Non-residential Building under HSDM-East, HDM East, PWD GNCTD Delhi dg 2022-23. SH:- Providing and arranging of different type of cut flowers at Delhi Sachivalya and M.S.O Building. | 2022.05.08 | 2023.05.07 | 36.16 | 15.80 (Feb'23) | 0.00 (Feb'23) | R. S. contractor , |
Detail Report
Graph / Photo |
|
428 | Renovation and Up-gradation of Chemistry Lab 402, 408 and 409 at Fourth Floor in FSL Building | 2022.09.02 | 2022.10.16 | 36.13 | 23.43 (Feb'23) | 0.00 (Feb'23) | M P BHATIA |
Detail Report
Graph / Photo |
|
429 | Renovation work at 7th floor in New surgical block at L.N H SH S I T C of modular type Var. Refr. Flow/Var. Refr. Volume air cooled outdoor units | 2020.06.26 | 2020.08.25 | 36.12 | Royel Electricals | work in progress by M/s Royel Electrical. |
Detail Report
Graph / Photo |
||
430 | Providing and fixing MS window and aluminium cabins in workshop and Polycarbonate sheet and G.I gutter in north face truss workshop other misc. repair work | 2022.08.06 | 2022.11.05 | 36.07 | 13.00 (Feb'23) | 0.00 (Feb'23) | Samsad | Work in Progress |
Detail Report
Graph / Photo |
431 | Maintenance and operation of Panasonic CCTV Cameras System | 2022.03.11 | 2024.02.10 | 36.04 | Media Tele Communication |
Detail Report
Graph / Photo |
|||
432 | (i) SITC of CCTV Cameras in Admin Block and Various offices of Saket Court Complex New Delhi-110017 (ii) SITC of CCTV Surveillance system in the Residential Complex at District Court saket New Delhi-110017. | 2019.01.24 | 2019.04.23 | 35.83 | 65.01 (May'21) | 0.00 (May'21) | San Infotech Services |
Detail Report
Graph / Photo |
|
433 | Comprehensive annual maintenance of Magna Flux Make UPS system installed at New OPD Block, L.N. Hospital | 2022.12.06 | 2025.12.05 | 35.82 | power house | Work in progress |
Detail Report
Graph / Photo |
||
434 | RMO E&M services at New Delhi District Court Complex at Rouse Avenue, DDU Marg, New Delhi. (SH: Comprehensive Annual Maintenance of HVAC Plant). | 2022.12.18 | 2023.12.17 | 35.78 | Voltas Ltd. | Work in progress |
Detail Report
Graph / Photo |
||
435 | Strengthening of Beam, Slab and Repair of Tank (Remaining work- Renewing of Damaged Chajja and Windows) | 2022.03.20 | 2022.06.19 | 35.66 | 34.83 (Jan'23) | 0.00 (Jan'23) | BHUPESH KUMAR |
Detail Report
Graph / Photo |
|
436 | 1). RMO of Central AC Plant/ Package Unit at DDUH, Hari Nagar, ND for the yr 18-19, 2). RMO of Central AC Plant Screw Type at Trauma Block at DDUH, Hari Nagar, New Delhi for the year 2018-2019 (SH Operation and Maintenance of Central AC Plant) | 2018.06.17 | 2019.06.16 | 35.58 | PMG ENGINEERS |
Detail Report
Graph / Photo |
|||
437 | Providing and Installation Mono Block submerisble pump set | 2022.02.12 | 2024.02.11 | 35.54 | A.K. Machinery Tools | WORK COMPLETED |
Detail Report
Graph / Photo |
||
438 | Cleaning, mopping of common area, like lift lobby, staircase, basement, community centre, footpath area, terrace, servant qtr. etc. by mopping machine at Residential Complex Saket Court, New Delhi | 2021.10.07 | 2022.10.06 | 35.40 | 37.60 (Mar'23) | 0.00 (Mar'23) | R.K. Jain& Sons Hospitality Servies (P) Ltd. |
Detail Report
Graph / Photo |
|
439 | Routine Operation and Maintenance of Wellkome Make 1250 KLD ETP based on EBR Technology | 2022.05.22 | 2023.05.21 | 35.16 | 35.06 (Mar'23) | 0.00 (Mar'23) | Wellkome engineers | Work in progress |
Detail Report
Graph / Photo |
440 | Rewinding of wornout 2000/1600 KVA HT AVR Transformer of Andrew Yule Make and providing of protection accessories of HT AVR and HT Panel at Sub-Station No. 1, 3, and 4 L.N. Hospital | 2022.05.07 | 2022.08.06 | 35.03 | 26.13 (Aug'22) | 0.00 (Aug'22) | Harsh India Enterprises |
Detail Report
Graph / Photo |
|
441 | EOR to I.T.I Nand Nagri Delhi Dg. 2022-23 (SH:- Repair and Renovation of Workshop & Making Modification in room no. 9 of Women Wing ) (Balance Work) | 2022.08.31 | 2022.11.28 | 35.01 | S.I. Construction |
Detail Report
Graph / Photo |
|||
442 | To Cover the open space of the ‘B’ Block of school building for use of sports Activities/Cultural Activities of the students and Installation of lift/Elevator in the school ground floor to VIth Floor in Govt. Co-ed/ SSS, Bhorgarh Delhi. (Bldg. Id-13101121), (Sch. ID-1310022) & (EOR 20221154) | 2022.09.05 | 2022.11.04 | 35.00 | R.D. Constructions | Work in progress |
Detail Report
Graph / Photo |
||
443 | SH- (a) Day to Day Maintenance of D.A. Flats, Nimri Colony, Ashok Vihar, Delhi, (b) Day to Day Maintenance of Aryabhatt Enclave, Sawan Park Colony, Ashok Vihar, Delhi | 2022.11.03 | 2023.11.02 | 35.00 | 10.86 (Dec'22) | 0.00 (Dec'22) | Pankaj Gureja |
Detail Report
Graph / Photo |
|
444 | Renovation/Repair of Room No.112, 309, 316, 413-A, 104 and Replacement of Damaged/Deficient Fire Safety Requirements of Doors in FSL (Balance Work) | 2022.08.07 | 2022.11.06 | 34.89 | 29.67 (Feb'23) | 0.00 (Feb'23) | Rohit KUmar |
Detail Report
Graph / Photo |
|
445 | (A) Repair to damaged floor of classroom & corridor and fixing wall tiles & C-B in all rooms. (B) Providing/renovation/repair of ramps, railing, tactile tiles, signage etc. to make school building and environment barrier free & accessible. (Sch ID-1310031) (Bldg. ID-13101515) (EOR ID-20211054/20211032) | 2022.02.20 | 2022.06.26 | 34.80 | 28.42 (Mar'23) | 0.00 (Mar'23) | Aayan Construction Co. | Work in progress |
Detail Report
Graph / Photo |
446 | Renovation of Various Rooms and laboratories (Room No. 324 to 341) in the department of Forensic Medicine 3rd floor of the UCMS college Block, GTB Hospital, Shahdara, Delhi | 2021.12.27 | 2022.04.25 | 34.76 | Krishan Azad | Site not available. |
Detail Report
Graph / Photo |
||
447 | Renovation of Bathroom cum toilet blocks of RAC and Sikkim Police Officers | 2019.03.12 | 2019.05.11 | 34.66 | 32.69 (Jul'20) | 0.00 (Jul'20) | Saeed Builders | work completed |
Detail Report
Graph / Photo |
448 | E.O.R. to S.K.V. No. 1 (Hindi Medium) at Jama Masjid, Delhi. Dg. 2018-19 (School ID-2127024). (SH: Renovation of toilet, kota stone flooring in court yard and class rooms under SRD Division-I, Sub-Division-III). | 2018.09.07 | 2019.01.06 | 34.65 | 0.00 (Jan'19) | 43.28 % (Jan'19) | Kamal Construction Co. | wORK COMPLETED FINAL BILL PAID |
Detail Report
Graph / Photo |
449 | Providing Services of Carpenter, Plumber, Enquiry Clerk, Sewerman , Mason and Beldar at PWD Service Centre M-3212, Tis Hazari Court, Delhi. | 2023.01.31 | 2024.01.25 | 34.64 | M/s Sharma construction company |
Detail Report
Graph / Photo |
|||
450 | Civil and E and M Work | 2023.01.01 | 2023.03.01 | 34.48 | Dilshad Ahmed |
Detail Report
Graph / Photo |
|||
451 | Providing Services for Running the Computer, Messengers and Watch and Ward for Sub Division Office-1, 2, 3, 6 | 2022.04.01 | 2023.03.31 | 34.47 | 19.47 (Feb'23) | 0.00 (Feb'23) | V R INDIA SECURITY SERVICES PVT. LTD. |
Detail Report
Graph / Photo |
|
452 | Providing Cable Cover to Cover the haphazard wiring system at various places at DDU Hospital, Hari Nagar, New Delhi | 2019.04.18 | 2019.05.17 | 34.37 | M/s Kalsi Engineers |
Detail Report
Graph / Photo |
|||
453 | Renovation of Sick room, counselling room, Reception and Staircase in Ground floor and C/o superintended room, class room and toilet on First floor etc. and Electrical works | 2018.12.16 | 2019.04.15 | 34.29 | 17.78 (Aug'19) | 28.00 % (Aug'19) | Ikram Ali | Work in progress |
Detail Report
Graph / Photo |
454 | Construction of MID Level Floor for New Classroom in Library Composite Work (Civil & Electrical) | 2022.09.15 | 2022.12.14 | 34.10 | Nurul Hak |
Detail Report
Graph / Photo |
|||
455 | A/R and M/O to Various Buildings under NWB-3, Delhi during 2021-22 SH: Day to Day Maintenance of Rohini Court, Lawyers Chamber | 2021.10.07 | 2022.10.06 | 33.90 | 43.10 (Feb'23) | 0.00 (Feb'23) | S. KUMAR & CO. |
Detail Report
Graph / Photo |
|
456 | Running and maintenance of Air-conditioning System at GTB Hospital Complex, Shahdara, Delhi. Sub Head Operation, maintenance and charging of water softening plants for 4x550 and 4x300 TR capacity AC Plants | 2019.08.03 | 2021.08.02 | 33.88 | M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 | Cancelled |
Detail Report
Graph / Photo |
||
457 | Providing & Fabrication of Stage Shed, Lab Cupboards, Repair of Windows, Strengthening of Column, Beam and Other Misc. Work | 2022.09.11 | 2023.03.10 | 33.66 | 41.94 (Mar'23) | 0.00 (Mar'23) | MOHD. WAJID |
Detail Report
Graph / Photo |
|
458 | Construction of New Classrooms (02 Nos.) and Toilet Block for at Dr. B.R. Sur Homeopathic Hospital and Research Centre, Nanakpura, Motibagh, New Delhi. | 2023.03.09 | 2023.07.07 | 33.49 | Pulkit Dangi |
Detail Report
Graph / Photo |
|||
459 | Renovation of Ground floor offices, Replacement of Damaged window with Aluminium window at ground floor and 1st floor, Improvement of drainage system, replacement of damaged C.C. Pavement repair of boundary wall, fixing of rolling shutter and other miscellaneous work in Fire Station building. | 2023.03.12 | 2023.06.09 | 33.47 | Mohd Arif |
Detail Report
Graph / Photo |
|||
460 | Upgradation & Augmentation of existing Cisco Make LAN System | 2022.06.12 | 2022.08.11 | 33.46 | 50.17 (Aug'22) | 0.00 (Aug'22) | Star Enterprises |
Detail Report
Graph / Photo |
|
461 | Operation, routine maintenance of 4x420TR and 1x150TR capacity AC Plant installed at RGSS Hospital, Tahirpur, Delhi | 2022.03.17 | 2024.03.16 | 33.39 | Altone Aircon |
Detail Report
Graph / Photo |
|||
462 | Renovation of electrical installation of 2 nos. Courtrooms no. 315 and 316, 3rd floor at District Court, Rohini, Delhi. | 2022.05.12 | 2022.06.11 | 33.37 | 41.38 (Jan'23) | 0.00 (Jan'23) | R S ELECTRICALS |
Detail Report
Graph / Photo |
|
463 | Replacement of old out dated 380 KVA DG Set with silent type 500 KVA DG Set at DDUH Hari Nagar New Delhi | 2019.01.18 | 2019.04.17 | 33.31 | Himalaya Generators |
Detail Report
Graph / Photo |
|||
464 | Comprehensive Operation and Maintenance of Complaint Tracker System | 2021.10.09 | 2023.10.08 | 33.19 | DBSOLX |
Detail Report
Graph / Photo |
|||
465 | Restoration of Road cut or to be Cut by Various agencies for laying of water line, laying of OFC cable and repair of faults under Sub Div-M-2114 during 2022-23. (Recall) | 2022.10.30 | 2023.01.27 | 33.14 | Shashank Shekhar Singh |
Detail Report
Graph / Photo |
|||
466 | (SH- Operation of EI and Fans including compound light substation DG set Water supply and Dewatering system Fire Fighting and Sprinkler System Lifts Fire Alarm and PA System.) | 2019.01.21 | 2020.01.20 | 33.07 | 37.67 (Jun'21) | 0.00 (Jun'21) | M/s. A G ENTERPRISES |
Detail Report
Graph / Photo |
|
467 | Operation of EI and fans, lifts, fire fighting & fire alarm system, PA system, water supply pump set & D.G Set | 2014.04.21 | 2015.04.20 | 32.99 | A.G. Enterprises |
Detail Report
Graph / Photo |
|||
468 | Repair and renovation work in Flat No. A-12 Type-VI, Flat No. C-04, Type V and other various flats at D-II Flats, Vasant Kunj, New Delhi | 2022.06.07 | 2022.09.06 | 32.89 | 10.00 (Jan'23) | 0.00 (Jan'23) | Vision Constructions |
Detail Report
Graph / Photo |
|
469 | Replacement of Defective/Burnt-out Air-Conditioning Units installed in Hostel Block at UTCS Bldg. Vishwas Nagar, Shahdara Delhi. | 2019.02.25 | 2019.04.24 | 32.84 | 8.33 (Sep'19) | 0.00 (Sep'19) | S K Engineers |
Detail Report
Graph / Photo |
|
470 | Repair/Renovation of main Hall ceiling and misc. work at Thyagraj Stadium, INA, New Delhi | 2019.07.27 | 2019.09.26 | 32.83 | Paras Nath Singh |
Detail Report
Graph / Photo |
|||
471 | Running maintenance and Operation of Medical and Gas Manifold plant installed at RGSS Hospital Tahirpur, Delhi-110093 during the remaining financial year of 2021-22 and complete financial year of 2022-23 | 2022.04.16 | 2023.04.15 | 32.73 | MDD Medical System (INDIA) Pvt. Ltd |
Detail Report
Graph / Photo |
|||
472 | Beautification of surroundings of old and new doctors Hostel and renovation of kitchen at RTRM Hospital, Jaffarpur Kalan, New Delhi. | 2023.01.08 | 2023.05.07 | 32.62 | 18.87 (Mar'23) | 0.00 (Mar'23) | C P SINGH | Work is under progress. |
Detail Report
Graph / Photo |
473 | C O Police Housing Complex at Mandoli Delhi. (SH Annual Comprehensive Maintenance Contract of Johnson Make lift installed at Police Housing Complex, Mandoli Delhi) | 2023.01.14 | 2024.01.13 | 32.49 | Johnson Lifts Pvt. Ltd. | work in progress |
Detail Report
Graph / Photo |
||
474 | RMO Electrical and Mechanical Services at GPO Building, Vikas Bhawan-II, Delhi. | 2022.08.29 | 2022.10.28 | 32.46 | 48.05 (Sep'22) | 0.00 (Sep'22) | Shree Jee Electrical & Mechanical Works |
Detail Report
Graph / Photo |
|
475 | Supplying and Placing of Furniture Items For E Library at Lawyer Chamber G block GF Karkardooma Court Delhi | 2021.12.17 | 2022.02.14 | 32.43 | 33.59 (Oct'22) | 0.00 (Oct'22) | Royal safe company (KB) | In progress. |
Detail Report
Graph / Photo |
476 | Electrical Works, Smart Board and Audio System | 2023.02.17 | 2023.04.16 | 32.39 | RCC Enterprises | Work in progress |
Detail Report
Graph / Photo |
||
477 | Operation and preventive maintenance of ETP Plant based on EBR Technol | 2022.09.22 | 2023.09.21 | 32.23 | Wellkome engineers | Work in progress |
Detail Report
Graph / Photo |
||
478 | Emergent addition/ Alteration Electrical works in Endoscopy and Colonoscopy area at Block-6, RGSS Hospital, Tahirpur, Delhi-110093 | 2022.04.06 | 2022.06.05 | 32.15 | M/s Shri Durga Electricals |
Detail Report
Graph / Photo |
|||
479 | Providing Labour for day to day maintenance | 2022.05.02 | 2023.05.01 | 32.05 | 31.95 (Mar'23) | 0.00 (Mar'23) | RAJIV RANJAN |
Detail Report
Graph / Photo |
|
480 | Replacement of 2 number 15 passenger 1020 kg lifts at S.T.C.9 Metcalf Road Delhi | 2021.01.01 | 2021.05.31 | 31.98 | Thyssenkrupp Elevator (India) Pvt. Ltd. | Work in progress by M/s Thyssenkrupp Elevator (P) Ltd. |
Detail Report
Graph / Photo |
||
481 | Construction of 10 Toilets and 10 Bathrooms) (Composite Work Civil and Electrical. | 2023.03.12 | 2023.06.11 | 31.97 | M P BHATIA |
Detail Report
Graph / Photo |
|||
482 | Supplying, installation, testing and commissioning of laundry equipments at JPCH Shastri Park Delhi | 2018.04.08 | 2022.04.07 | 31.84 | 33.08 (Oct'22) | 0.00 (Oct'22) | Lucky Engineering Works | Work in Progress 2ND RA 767530 |
Detail Report
Graph / Photo |
483 | EOR to renovation of all toilet block at Sarvodaya Vidyalaya Bhalswa Village (School ID 1309280), Delhi | 2022.09.22 | 2022.12.21 | 31.84 | 19.39 (Mar'23) | 0.00 (Mar'23) | Nurul Hak | Work in progress |
Detail Report
Graph / Photo |
484 | 1). Prosn of New Air Conditioners and Rep of Old ACs with Energy Efficient Air Conditioners GGSGH 2) EOR SVBPH (SH Rep of Old ACs with Energy Efficient Air Conditioners at SVBPH) 3) EOR SVBPH (SH SITC of Air Conditioners in IEC Room and DOT Centre) | 2019.05.17 | 2019.07.16 | 31.78 | MATHARU ELECTRIC WORKS |
Detail Report
Graph / Photo |
|||
485 | Day to day maintenance of all E and M installations | 2021.08.02 | 2023.08.01 | 31.77 | A K Electric Works |
Detail Report
Graph / Photo |
|||
486 | SITC of Water Coolers at Various locations at Lok Nayak Hospital, New Delhi | 2019.09.02 | 2019.11.01 | 31.67 | M/s Vivek Associates | work in progress by Vivek Associates |
Detail Report
Graph / Photo |
||
487 | A/R and M/O Residential Building under Sub Division North-West B-6, PWD during 2021-22 SH: (A) Attending Day to Day Labour Complaints And Other Misc Work. at D.A. Flats, Nimri Colony, Ashok Vihar, Delhi. (B) Attending Day to Day Labour Complaints at Aryabhatt Enclave, Sawan Park Colony, Ashok Vihar, Delhi) | 2021.09.13 | 2022.09.12 | 31.57 | 23.90 (Feb'23) | 0.00 (Feb'23) | RAJIV RANJAN |
Detail Report
Graph / Photo |
|
488 | Fixing of S.S. Railing on GT Road footpath in front of CC Colony (Rana Pratap Bagh) and repair of Berm from C.C. Colony Gate to Tripolia Gate | 2022.09.13 | 2022.11.12 | 31.53 | 37.55 (Feb'23) | 0.00 (Feb'23) | R.D. Constructions |
Detail Report
Graph / Photo |
|
489 | RMC Work in Berm and kerb channels in various roads. | 2023.02.15 | 2023.04.15 | 31.49 | RAMESH CHANDER |
Detail Report
Graph / Photo |
|||
490 | AR and MO Delhi High Court New Delhi during 2022 23 SH Strengthening and rehabilitation of RCC parapet wall of Lawyers Chambers Block 1 Delhi High Court New Delhi | 2022.10.14 | 2022.12.12 | 31.40 | Shah Pandya & Shot Crete | Work in progress |
Detail Report
Graph / Photo |
||
491 | RMO Electrical and Mechanical services at MV Hospital Pooth Khurd Delhi SH Operation Routine Maintenance and preventive maintenance of IBR approved Steam Boiler | 2019.06.25 | 2020.05.24 | 31.31 | Kamal Engineers | Work in progress |
Detail Report
Graph / Photo |
||
492 | SH- Repair and Up-gradation of Electrical Installation of residential quarters and toilet block at police station | 2018.08.06 | 2018.10.05 | 31.30 | 13.02 (Nov'19) | 0.00 (Nov'19) | Prem And KP Electric Co. |
Detail Report
Graph / Photo |
|
493 | Finishing and other misc. repair work at Chhatrasal Stadium Model Town, Delhi. | 2023.03.13 | 2023.05.11 | 31.29 | ARIF, Jahangirpuri, Delhi |
Detail Report
Graph / Photo |
|||
494 | SH- Maintenance and Operation of split AC, Pressurization and Ventilation at Delhi Sachivalaya, New Delhi | 2018.07.05 | 2019.07.04 | 31.26 | 6.04 (Sep'19) | 0.00 (Sep'19) | KELVIN ASSOCIATES |
Detail Report
Graph / Photo |
|
495 | Urgent repair work for FRRO Building, Lampur, Delhi-110040 | 2022.07.21 | 2022.10.19 | 31.23 | 34.81 (Feb'23) | 0.00 (Feb'23) | Ankur Bhardwaj | Work in progress |
Detail Report
Graph / Photo |
496 | Operation and Routine Maintenance of Electric Substation, DG Sets, Fire Fighting System including Routine Maintenance of EI and Fans and Compound Security Light | 2023.01.05 | 2025.01.04 | 31.17 | Tej Enterprises |
Detail Report
Graph / Photo |
|||
497 | Anti termite treatment, replacement of profile sheet along with other misc. civil work in various buildings under SRD Project Division-I/ Sub-Division-III | 2022.08.16 | 2022.09.30 | 31.03 | 46.64 (Feb'23) | 0.00 (Feb'23) | KAMAAL CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
498 | Miscellaneous Repair Works | 2022.08.21 | 2023.04.20 | 31.00 | 27.43 (Mar'23) | 0.00 (Mar'23) | AMAN CHOUDHARY |
Detail Report
Graph / Photo |
|
499 | SITC of Phase Sequence Corrector for mechanical ventilation/Smoke management fans at Lok Nayak Hospital, New Delhi. | 2023.02.19 | 2023.04.18 | 30.92 | 24.32 (Mar'23) | 0.00 (Mar'23) | M/S C MOS SYSTEMS | Work in progress |
Detail Report
Graph / Photo |
500 | Renovation of TCPC (Rehabilitation Complex) Block No.-1, Lajpat Nagar-II, New Delhi during 2019-20. | 2019.07.25 | 2019.10.24 | 30.89 | SABUR ALAM |
Detail Report
Graph / Photo |
|||
501 | RMO CCTV, sub-station, DG sets, UPS system, RO and compressed air system at MAIDS, New Delhi. SH CMC of 3x200KVA UPS at MAIDS | 2017.12.26 | 2020.12.25 | 30.87 | 8.00 (Jan'19) | 25.92 % (Jan'19) | POWER HOUSE | Work in progress by M/s Power House |
Detail Report
Graph / Photo |
502 | Providing Services of Carpenter, Plumber, Enquiry Clerk, Sewerman , Mason and Beldar at PWD Service Centre M-3212, Tis Hazari Court, Delhi | 2022.01.01 | 2022.12.26 | 30.82 | D.S. Construction Co |
Detail Report
Graph / Photo |
|||
503 | Reconstruction of Collapsed Boundary wall PL vitrified floor tiles and PF SS railing on staircase | 2021.09.30 | 2021.12.28 | 30.71 | 28.28 (Mar'22) | 0.00 (Mar'22) | N.M. CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
504 | (SH- Routine maintenance and Operation of EI and Fans, Fountains and Pump Sets, DG Sets, Fire Alarm System and Fire Fighting System ). | 2019.03.19 | 2020.03.18 | 30.69 | 26.51 (Feb'20) | 0.00 (Feb'20) | Kamal Electrical Works |
Detail Report
Graph / Photo |
|
505 | RMO various Electrical and Mechanical Services at Rohini Central Jail, Sector - 19, Rohini, Delhi | 2022.10.12 | 2023.10.11 | 30.65 | DHARAM ENTERPRISES |
Detail Report
Graph / Photo |
|||
506 | Replacement of Damaged Water Pipe Line in KIT Campus | 2022.11.03 | 2023.01.02 | 30.58 | Lavneesh Pal |
Detail Report
Graph / Photo |
|||
507 | Operation and maintenance of Pelco Make CCTV surveillance system at Rouse Avenue Court Complex, DDU Marg, New Delhi | 2022.03.31 | 2023.03.30 | 30.55 | 0.40 (Mar'23) | 0.00 (Mar'23) | Sonal Enterpries Pvt. Ltd. | Work in Progress |
Detail Report
Graph / Photo |
508 | Repair of damaged floor tiles and making openable access to shaft and other misc repair work at Judicial Complex Sec. 26 Rohini, Delhi | 2022.09.22 | 2022.12.21 | 30.41 | Adesh Kumar | Work in progress |
Detail Report
Graph / Photo |
||
509 | Providing services of Labour for Day to Day Maintenance | 2022.05.07 | 2023.05.06 | 30.29 | 20.86 (Mar'23) | 0.00 (Mar'23) | M/s Trendy Security Services |
Detail Report
Graph / Photo |
|
510 | Mechanized Cleaning of over head tank and underground tank. | 2019.06.20 | 2020.06.19 | 30.29 | 18.31 (Aug'20) | 0.00 (Aug'20) | UNITECH WATER SLOUTIONS | work in progress |
Detail Report
Graph / Photo |
511 | Pdg.fixing solar hybrid street light system for existing 90 to 120 watt street light Supported by solar Photo Voltaic Power generation System | 2022.02.20 | 2022.03.19 | 30.24 | 10.32 (Apr'22) | 0.00 (Apr'22) | Electric India Control Devices |
Detail Report
Graph / Photo |
|
512 | Providing centralized air conditioning by VRV System in Mortuary complex at MAMC New Delhi. | 2022.05.15 | 2022.07.14 | 30.19 | 19.69 (Dec'22) | 0.00 (Dec'22) | Sai Aircon Engineers | Work in progress |
Detail Report
Graph / Photo |
513 | Civil Work in 5 Court Rooms | 2022.12.25 | 2022.12.31 | 30.11 | Mool Chand |
Detail Report
Graph / Photo |
|||
514 | A/R & M/O to various Building under jurisdiction of Sub Divn. M-2221 D.C. office Nand Nagari, Delhi & Sub Divn.M-2222, Dilshad Garden, Delhi dg 2021-22 .( SH: Attending day to day complaints) | 2021.09.14 | 2022.09.13 | 30.05 | 15.23 (May'22) | 0.00 (May'22) | R R Realtors |
Detail Report
Graph / Photo |
|
515 | Providing & Fixing Shed, Stainless Steel Gate, Floor Tiles, Main Door & Window | 2022.08.18 | 2022.10.17 | 29.94 | 27.97 (Feb'23) | 0.00 (Feb'23) | BHARAT SINGH |
Detail Report
Graph / Photo |
|
516 | Relocation of School Gates by Raising the Height with S.S. Gates. Construction of Planters, Renovation of School Libraries and Computer Lab alongwith HOS Toilet and White Wash in School Building with Minor Repair Work. Railing and Ramps for CWSN Students in Ist, IInd and IIIrd Floors. | 2022.05.02 | 2022.09.01 | 29.90 | 23.42 (Sep'22) | 0.00 (Sep'22) | N Y Construction |
Detail Report
Graph / Photo |
|
517 | Providing Services of Computer Operator, Office Assistant & MTS in the Office of Executive Engineer(E), PWD EMD South East (M-452) & Sub –Division-I, Thyagraj Stadium, New Delhi | 2022.07.26 | 2023.07.23 | 29.64 | 12.84 (Jan'23) | 0.00 (Jan'23) | R. DIAMOND ENTREPRISES |
Detail Report
Graph / Photo |
|
518 | Upgradation of EBR based ETP plant at Dada Dev Child and Maternity Hospital. Nasirpur, New Delhi. | 2019.06.15 | 2019.08.14 | 29.55 | Wellkome engineers |
Detail Report
Graph / Photo |
|||