Building - Maintenance Workभवन - रखरखाव का कार्य
Zoneअंचल
Divisionमंडल
Categoryश्रेणी
Work Typeकार्य का प्रकार
S. No.क्र. सं. Name of Workकार्य का नाम Date of Startकार्य आरम्भ करने की तिथि Date of Completionकार्य समाप्त करने की तिथि Cost
(In Lac)
Expenditure
(In Lac)
Progress Agency Status Viewदेखें
1 C/o New Block for Medicaine, Maternity and advance pediatric centre at L.N.Hospital 2020.11.04 2023.05.03 46552.58 4.75 (Jul'22) 0.00 (Jul'22) Work in progress. In LN1 Terrace casting completed at Pour-1 and Pour-3, 22nd Floor, terrace floor is Casted. In LN2, Pour-1 16th Floor Casted, Pour-2 20th Floor casted Pour-3 18th Floor Casted. Detail Report
Graph / Photo
2 Construction of New Block For Medicine, Maternity And Advanced Pediatric Centre ( Composite Steel plus RCC framed 2B plus G plus 22 Storyed building At LN Hospital including internal water supply, Sanitary installation, External Development works, Dr 2020.11.04 2023.05.03 46552.58 17206.66 (Jun'23) 0.00 (Jul'23) Swadeshi Civil Infrastructure Pvt. Ltd., 302, DLF Tower B Jasola, New Delhi-110025 Work in progress. In LN1 Terrace casting completed at Pour-1 and Pour-3, 22nd Floor, terrace floor is Casted. In LN2, Pour-1 15th Floor Casted, Pour-2 19th Floor casted Pour-3 17th Floor Casted. Detail Report
Graph / Photo
3 CONSTRUCTION OF NEW HOSPITAL AT SIRASPUR, NEW DELHI (ON EPC MODE -I) INCLUDING ALL CIVIL, ELECTRICAL, MECHANICAL, HORTICULTURE AND MEDICAL SERVICES. 2020.08.10 2023.05.08 38439.53 18880.43 (Jul'23) 0.00 (Mar'24) Ramacivil India Construction Private Limited (i) MCH Block Outer plaster work upto terrace 1 floor completed and parapet wall work is in progress. Internal plaster owrk and other finishing works are in progress up to 8 th floor. Plumbing work completed upto 5th floor and in progress in other floors. Fixing of tile in toilets and wards is in progress. Granite flooring work completed upto 8th floor & italian Marble flooring completed upto 8th floor. (ii) SOPD Block Flooring work in G/F & 1st Floor is completed. Outer plaster work upto terrace level is completed. Brick work completed upto 1st floor. Internal plaster work and plumbing work is in progress. Brick coba water proofing completed. flooring is completed upto 1st floor, Brick cova is completed. Detail Report
Graph / Photo
4 Repairing of fire alarm system installed at Lawyers chamber block 3 2020.02.28 2020.03.27 27388.89 Ekta Enterprises Detail Report
Graph / Photo
5 Construction of Hospital at Jwalapuri, New Delhi 2020.08.07 2022.08.13 26950.37 10513.98 (Jun'23) 0.00 (Aug'24) Parnika Commercial and Estates Pvt. Ltd. Structure RCC work & masonry work completed. Sanitary installation work completed, façade work, development work & electrical work is in progress. Detail Report
Graph / Photo
6 REWIRING/REPAIRING OF ELECTRICAL ACCESSORIES IN TOILETS AT VARIOUS DELHI GOVT. SCHOOL 2017.08.09 2019.11.09 23127.43 NKG Infrastructure Limited Detail Report
Graph / Photo
7 Construction of Mother and Child Block and Screening OPD Block at Dr. Baba Saheb Ambedkar Hospital at Rohini, Delhi, including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. 2020.03.04 2021.09.03 10708.84 3716.18 (Jun'23) 0.00 (Sep'24) Quality Buildcon Pvt. Ltd. work in progress Detail Report
Graph / Photo
8 C/o Trauma Centre and Utility Block at Sanjay Gandhi Memorial Hospital at Mangolpuri, Delhi, including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. 2019.09.04 2021.03.03 7122.09 2126.89 (Jul'23) 0.00 (Jul'24) PNSC Infrastructure Pvt. Ltd

work in progress.

Detail Report
Graph / Photo
9 Construction of Pucca School Building (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and comprising with complete site development, RWHS, STP, Tubewell, Gen Set, PA System etc. at Ladpur Village, New Delhi (Package - 7) 2021.07.18 2022.07.17 6988.57 605.62 (Oct'22) 2.00 % (Oct'22) A. K. Mehta & Co.

Work in progress.

Detail Report
Graph / Photo
10 Construction of 3 Nos. Pucca School Buildings (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and comprising with complete site development, RWHS, STP, Tubewell, Gen Set, PA System etc. at RPVV A-6, Paschim Vihar, Vasant Kunj and Ladpur Village, New Delhi (Package - 7). SH : Civil & Electrical work. 2021.07.18 2022.07.17 6988.57 2658.53 (Jul'23) 0.00 (Sep'24) A. K. Mehta & Co.

Work is in progress.

Detail Report
Graph / Photo
11 Expansion remodeling of ASBGH Moti Nagar New Delhi 2019.08.06 2020.10.28 6759.71 1985.40 (Jun'23) 0.00 (Jul'24) Abhilasha Enterprises

Work is in progress

Detail Report
Graph / Photo
12 Remodelling of 94Nos Delhi govt Disp to Polyclinic SH Remodelling of 23nos DGD at various places in constituencies of District SW of Delhi including Water supply Sanitary installations Elect installations AC Lifts Fire fighting system etc PackageII 2019.01.17 2019.10.13 3751.40 2030.58 (Apr'23) 0.00 (Mar'24) A. K. Builders

Work in progress

Detail Report
Graph / Photo
13 E & M works relating to all day to day operation & maintenance, A/R & M/O Works & Special Repair Works etc 2022.05.27 2024.05.26 3516.35 1446.89 (Sep'23) 0.00 (Aug'24) Swastik Electrotech Pvt. Ltd.

Work in progress

Detail Report
Graph / Photo
14 Supply, Installation, Testing and Commissioning of additional CCTV cameras to be integrated with existing (BOSCH Make) CCTV Surveillance System installed at Tihar, Rohini and Mandoli Prison Complexes 2022.12.24 2023.06.23 3483.10 2253.60 (Jun'23) 0.00 (Jun'24) OPTIMUM SECURITY SOLUTIONS PVT. LTD.

Work in progress

Detail Report
Graph / Photo
15 SITC and CAMC of CCTV System in Delhi Govt. Schools. SH- Providing and Maintenance of Internet lease line Connection. 2019.08.17 2020.02.16 2691.32 Reliance Jio Infocomm Work is in progress and shall be completed along with main work of installation of CCTV camera in Delhi Government Schol. Detail Report
Graph / Photo
16 SITC of Modular Operation Theatre and MOT Integration System and MGPS 2023.06.05 2034.03.04 1896.47 0.00 (Jan'24) MDD Medical System (INDIA) Pvt. Ltd

work in progress

Detail Report
Graph / Photo
17 Mechanised House Keeping and Security Services/Facility Management services (FMS) for Chandni Chowk Road and appurtenances/System installed from Lal Jain Mandir to Fatehpuri Mosque for the Period 2022-2023(1 Years) 2022.08.26 2023.08.25 983.09 556.14 (Jun'23) 0.00 (Aug'24) Soni Management & Allied Services Pvt. Ltd. Detail Report
Graph / Photo
18 Running operation of lifts 2021.05.06 2024.05.05 909.76 105.86 (Oct'23) 0.00 (Mar'24) Guruji Elevator Detail Report
Graph / Photo
19 C/o Pucca School Building at Mandawali Fazalpur (I.P Extn) Delhi. 2012.03.09 2013.06.08 827.32 935.50 (Apr'14) 100.00 % (Apr'14) PNSC Infrastructure Pvt. Ltd. Detail Report
Graph / Photo
20 Operation & Maintenance of E.I, pumps, sub-station, DG Sets, firefighting & fire alarm system, HVAC & AC units & R.O. Plant etc 2022.05.24 2024.05.23 754.12 132.64 (Sep'23) 0.00 (May'24) SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. Detail Report
Graph / Photo
21 Comprehensive Consultancy Services for Designing and Development of Hospitals at Madipur, Sarita Vihar, Hastsal and Jwalapuri, Delhi. 2018.11.17 2022.01.16 720.00 22.36 (Aug'22) 0.00 (Aug'22) ARCOP ASSOCIATES PVT. LTD. Work in progress.... Detail Report
Graph / Photo
22 Comprehensive Consultancy Services for Planning, Designing and Development of New Campus of Ambedkar University Delhi (PHASE-I Works) at Dheerpur, Delhi-110009. 2019.09.05 2025.09.04 720.00 402.19 (Mar'23) 0.00 (Mar'23) ARCOP ASSOCIATES PVT. LTD. EFC approved the proposal on 10.05.2022. Case to be put up in Cabinet. Detail Report
Graph / Photo
23 Comprehensive Consultancy Services for Planning, Designing and Development of New Campus of Ambedkar University Delhi at Sector 3, Rohini, Delhi 110085 2019.09.05 2025.09.04 720.00 316.96 (Jun'23) 0.00 (Mar'24) SIKKA ASSOCIATES REGD. P.E. for the work amounting to Rs. 1107.56 Crores submitted to Vice Chancellor, AUD on 03.03.2020 . A/A & E/S awaited till date. Detail Report
Graph / Photo
24 Comprehensive maintenance of Civil services at Deen Dayal Upadhyaya Hospital & Residential Complex, Hari Nagar, Janakpuri Superspeciality Hospital C2B Janakpuri New Delhi, Shree Dada Dev Matri avum Shishu Chikitsalya, Dabri and DG at various places, P.W.D (GNCTD), New Delhi for 2 years i.e. 2022-2023, 2023-24 2022.05.27 2024.05.26 683.47 178.07 (Oct'23) 0.00 (Sep'24) Anand and Company

Work in Progress

Detail Report
Graph / Photo
25 C/o East Delhi Campus of Guru Gobind Singh Indrasprastha University at Surajmal Vihar, Shahdara, Delhi. (SH: Supplying, Installation, Testing and Commissioning of Grid Interactive roof top solar photo voltaic power generation system). 2020.08.28 2021.02.23 680.89 282.07 (Jun'23) 0.00 (May'24) Uneecops Technologies Ltd. Work completed and final bill yet to be submitted by the agency. Detail Report
Graph / Photo
26 Re laying of World Athletics approved 400 Mtr. synthetic athletic track at Chhatrasal Stadium, Delhi 2022.03.26 2022.07.24 679.06 656.95 (Apr'23) 0.00 (Jan'24) ADVANCED SPORT TECHNOLOGIES LLP Work in progress Detail Report
Graph / Photo
27 COMPREHENSING PLANNING AND DESIGNING FOR C/O NEW BLOCK ADDITIONAL FLOORS AND REMODELING AND UPGRADATION OF EXISTING BLOCK FOR EXPANSION OF G H STRUCTURAL IN WEST AND SOUTH WEST DISTT OF DELHI 2016.03.19 2017.12.08 656.25 25.63 (Oct'22) 0.00 (Mar'24) Suresh Goel & Associates Detail Report
Graph / Photo
28 ARMO Various Electrical and Mechanical services at District Court Rohini, Delhi. 2023.09.05 2025.09.04 646.46 Anand and Company

Work in progress.

Detail Report
Graph / Photo
29 E & M works relating to day to day operation & maintenance, A/R & M/O Works & Special Repair Works 2022.05.26 2024.05.25 619.38 303.69 (Sep'23) 0.00 (Aug'24) H. N. TRADERS & ENGINEERS

Work in progress

Detail Report
Graph / Photo
30 Comprehensive routine maintenance and operation of EI and Fans compound lights High Masts, Lifts, pumps, Fire Fighting System, AFA and PA system, HVAC plant, RO Plant and water softening plant, water coolers and substation DG sets at District Court Dwarka New Delhi 2022.07.26 2024.07.25 600.77 89.58 (Jan'23) 0.00 (Nov'23) Swastik Electrotech Pvt. Ltd. Detail Report
Graph / Photo
31 Structural Work. 2012.02.21 2012.10.20 588.19 Rama Const. Co. Detail Report
Graph / Photo
32 Renovation / construction works at Rajiv Gandhi Stadium, Bawana 2022.07.07 2022.11.04 535.01 0.00 (Mar'24) M/s Vinod Kumar & Company Work in progress Detail Report
Graph / Photo
33 Running and Maintenance of lifts installed in residential and non-residential buildings at GTB Hospital complex, Shahdara, Delhi Sub Head Running operation of lifts 2019.01.17 2021.01.16 485.43 0.00 (Oct'23) Guruji Elevator Work in progress 3RD RA 40220380 Detail Report
Graph / Photo
34 Operation & Maintenance of E.I., pumps, fire fighting& fire alarm system, DG Sets & Sub-station, Lifts, ETP/STP Plant and HVAC System & AC units etc. 2022.06.04 2024.06.03 457.53 80.00 (Oct'23) 0.00 (Aug'24) M/s Jain Electric Works Detail Report
Graph / Photo
35 RMO specialized Electrical and Mechanical services of Delhi High Court, Delhi. (Sub Head Operation, Routine Maintenance and special repairs of various Electrical and Mechanical installations at Delhi High Court, New Delhi.) 2024.05.27 2025.05.26 452.42 0.00 (Sep'24) M/s Shaka Electrical (India) WORK IN PROGRESS Detail Report
Graph / Photo
36 SITC of structure cabling and CCTV System at District Court Rohini, Delhi 2023.03.06 2023.09.05 449.96 0.00 (Oct'23) TIRUPATI CONSTRUCTION COMPANY 2nd RA Bill Rs 2256596/- CV no 24 dt 17.10.23 Detail Report
Graph / Photo
37 Routine maintenance and operation of EI and fans Compound Lights High Masts Lifts Pumps Fire Fighting System AFA and PA system Sub Station and DG set and 4 x 400 TR Central HVAC Plant at Delhi Judicial Academy and National Law University at Sector 14 2023.03.06 2026.03.05 443.54 76.31 (Jul'23) 0.00 (Nov'23) GLOBAL ENTERPRISES Detail Report
Graph / Photo
38 Providing Manpower services of Clericals, Drivers, Multitasking and Housekeeping Staff (Unskilled, Semi skilled, Clerical and Non-Technical Supervisory Staff) in various offices under Higher Education Projects, PWD 2021.11.21 2023.11.20 433.86 399.24 (Oct'23) 0.00 (Jun'24) Shri Krishna Constructions Work in progress. Detail Report
Graph / Photo
39 EI work (Composite Work) 2009.01.19 2012.08.31 417.80 Bhart Eletricals (Associated of M/s ERA) 00 Detail Report
Graph / Photo
40 EI work (Composite Work) 2009.01.19 2013.11.30 417.80 Bhart Eletricals (Associated of M/s ERA) 00 Detail Report
Graph / Photo
41 Operation of lifts 2022.10.22 2024.10.21 389.63 81.17 (Jul'23) 0.00 (May'24) Akash enterprises 1st RA bill paid Detail Report
Graph / Photo
42 Operation & Maintenance of E.I, pumps, substation, DG Sets, fire fighting & fire alarm system, HVAC & ductable AC system, lift, Cold Room & solar water heating system etc. 2022.05.10 2024.05.09 376.50 100.66 (Oct'23) 0.00 (Mar'24) M/s Vivek Associates Detail Report
Graph / Photo
43 Providing of services of Security Guard ,security supervisor & security manager &Mechanized Housekeeping Services for Internal and External areas of Tis Hazari court Extension block in Delhi-110054. 2023.07.01 2023.12.31 373.04 0.00 (Jul'24) SONI MANAGEMENT AND ALLIED SERVICES PVT. LTD. Detail Report
Graph / Photo
44 Consultancy Services for Comprehensive Architectural & Engineering Planning and Designing for Construction of MCH Block, Medical College, Boys Hostel, Girls Hostel, Nurse’s Hostel, Interns & Residents Hostel in Indira Gandhi Hospital, Sector-9 / 17, Dwarka, New Delhi 2023.03.15 2026.03.14 356.40 3.00 % (Jan'24) Sikka Associates Work is under progress. Detail Report
Graph / Photo
45 (1) SITC of Additional Surveillance CCTV System at different locations of Dwarka Court Complex at Sector10, Dwarka, New Delhi. (2) Up-gradation of existing analog CCTV Surveillance system to I P Base CCTV Surveillance System at District Court, Sector-10, Dwarka, New Delhi 2022.05.22 2022.11.21 348.67 0.00 (Aug'23) Pan Intellecom Ltd work in progress Detail Report
Graph / Photo
46 Renovation of 64 Nos. Toilets of Lawyers Chamber Block D E F and G at Karkardooma Court Delhi dg. 2023 24.(Civil and Electrical Work. 1st Recall) 2023.08.27 2024.02.22 348.05 0.00 (Dec'23) Mohd Aftab laying of cpvc pipe E block Detail Report
Graph / Photo
47 Comprehensive maintenance of Civil works at Guru Gobind Singh Govt. Hospital, Raghubir Nagar, Delhi and Rao Tula Ram Memorial Govt. Hospital, Jaffarpur Kalan, Delhi P.W.D. (GNCTD), New Delhi for 2 years 2021-22, 2022-23. 2022.05.23 2024.05.21 343.73 35.20 (Jul'23) 0.00 (Mar'24) Aliyan Constaruction Company Work is under progress. Detail Report
Graph / Photo
48 comprehensive architetural consultancy services for construction of multistoried EWS Houses for Slum Dwellers at Bhalaswa, Jahangir Puri, Phase-I, New Delhi 2021.04.04 2024.04.03 335.09 7.23 (Sep'22) 0.00 (Sep'22) Invalid Design Forum International Presentation was made to Hon'ble Minister on 23.09.2021. Formal approval from ministry is awaited. DUSIB intimated vide File no. F/WC/4444/Bhalaswa/EEC-11/DUSIB/2022, Computer No. 204389371 that Hon'ble Chief Minister of Delhi desire to hold on the work till further orders. Detail Report
Graph / Photo
49 Comprehensive Maintenance of RO Filtration Units in Ortho Block Hostels LNRDH Various Location in LNH 2023.01.02 2026.01.01 327.30 236.55 (Feb'23) 0.00 (May'24) M/s Vivek Associates

Work in progress

Detail Report
Graph / Photo
50 Comprehensive Maintenance of RO Filtration Units in Ward Block , Gynae Block , OPD Block , Emergency and OT Block in LNH 2022.10.21 2025.10.20 322.38 0.00 (May'24) M/s Vivek Associates

Work in progress

Detail Report
Graph / Photo
51 1. RMO of Central AC Plant at A BlockGIPMER2. RMOof Central AC Plant B BlockGIPMERSH Operation and Comprehensive maintenance of Blue Star Make Central AC Plant 2019.09.11 2021.09.10 306.35 130.70 (Mar'23) 0.00 (Mar'23) Blue Star Limited work in progress and 2nd R/A paid to M/s Blue Star Ltd. Detail Report
Graph / Photo
52 Comprehensive Maintenance of RO Filtration Units 2023.03.03 2026.03.02 305.87 0.00 (Mar'24) M/s Vivek Associates

work in progress

Detail Report
Graph / Photo
53 RMO EI and fans and all Various Electrical and Mechanical services installed at District Court Complex, Saket, New Delhi 110017 (SH Operation of E.I. and Fans, Pumps, Automatic Fire Fighting system, Fire Alarm system, Substation, Lifts , Stair lifts, DG sets installed at Main Court Building , Advocate Block , Utility Block , Lock Up Building and Residential Complex) 2024.04.28 2025.04.27 305.60 HST Enterprises WORK IN PROGRES Detail Report
Graph / Photo
54 Construction of Change Room including toilet, Guard Room, Office Room, Coach Room, S.S. fencing on Periphery of Athletic Track & Boundary wall with concertina coil fencing etc. and Renovation of existing block, pump house, entry road and provision of stone cladding on boundary wall at Pooth Kalan Sports Complex, Delhi. 2023.07.01 2023.12.27 305.16 Sham Lal Gupta & Sons Dholpur stone cladding work completed for left side wall and other side wall is in progress and construction of front boundary wall is completed. Renovation of existing changeroom building is in progress. The vetting of drawing for changeroom building is in progress. (Physical Progress upto date 31.03.2024 is 20%) Detail Report
Graph / Photo
55 Installation of target system, bullet proofing and Anti ricochet treatment, ventilation and acoustical works) (Composite work Civil and Electrical) 2023.02.07 2023.06.06 298.45 72.35 (Mar'23) 0.00 (Mar'24) Work in Progress Detail Report
Graph / Photo
56 Running operation and comprehensive maintenance of online UPS, TVSS, APFF, PAC and Isolation transformer of different capacity installed at RGSS Hospital, Tahirpur, Delhi 2022.01.26 2024.01.25 296.84 111.84 (Jul'23) 0.00 (Jul'24) Invalid Detail Report
Graph / Photo
57 Lift 2011.06.21 2013.11.15 295.04 Johnson Lifts Pvt. Ltd. 00 Detail Report
Graph / Photo
58 RMO of various Electrical and Mechanical services at District Court Rohini, Delhi. dg. 2021-22 2022.05.05 2023.05.04 293.17 0.00 (Mar'24) Swastik Construction Co. 5th RA Bill Rs. 35121146/- CV No. 01 dt. 03.01.2024 Detail Report
Graph / Photo
59 Civil and Electrical work. 2023.05.04 2023.06.05 283.09 38.78 (Jun'23) 0.00 (Mar'24) BHARDWAJ ENTERPRISES Detail Report
Graph / Photo
60 (A) Renovation of E.I. and Other Electrical accessories works on 5th, 6th and 7th Floor at DGHS (HQ) Building , Karkardooma, Delhi.(B) Upgradation of Fire Fighting System at Directorate Health Services, Karkardooma, Delhi.(C) Replacement of old damaged/unserviceable Fire Alarm System at Directorate Health Services, F-17, Karkardooma, Delhi.(D)Replacement of existing 1 No. 15 Passenger lift and 2 Nos 10 Passenger lifts at Directorate General of Health Services, Karkardooma, Delhi. 2023.08.30 2023.11.29 280.47 GLOBAL ENTERPRISES Detail Report
Graph / Photo
61 Consultancy Services for Comprehensive Architectural and Engineering Planning and Designing for Construction of New Hospital at Siraspur, New Delhi (Recall) 2019.09.04 2022.09.03 267.00 42.14 (Jun'23) 0.00 (Jun'23) Design Associates Inc. work in progress Detail Report
Graph / Photo
62 (1) RMO E& M Services at Various Locations at LNJP , Delhi.SH: Comprehensive Maintenance of RO/ Filtration Units in Surgical Block, NMB & Special Ward in LNH) (2) RMO E&M services various locations at GNEC, Delhi. (SH:- Provision of spares etc for Atsin make RO/Filtration Units). 2023.01.02 2026.01.01 266.73 8.10 (Jul'23) 0.00 (Jul'24) M/s Vivek Associates

work in progress

Detail Report
Graph / Photo
63 Annual Maintenance & Repair of Cummins make DG Sets and allied services installed at LN Hospital. 2023.04.27 2025.04.26 239.05 0.00 (Mar'24) M/s Shri Durga Electricals Detail Report
Graph / Photo
64 Comprehensive maintenance of Civil works at Pt. Madan Mohan Malviya Hospital, Malviya Nagar, P.W.D. (GNCTD) and NHMC and BR Sur Hospital , Defence Colony and Moti Bagh and DGD at various places, New Delhi for 2 years i.e. 2021-22, 2022-23 2022.05.24 2024.05.23 227.67 150.97 (Aug'23) 0.00 (Sep'24) Anand and Company

Work in progress.

Detail Report
Graph / Photo
65 4into200 KVA UPS. 2013.10.31 2013.10.31 224.00 Labotech 00 Detail Report
Graph / Photo
66 Medical Gas Pipe Line. 2013.09.01 2013.11.15 219.00 Medical Product System 00 Detail Report
Graph / Photo
67 Routine maintenance and operation of EI & Fans, Compound Lights, High Masts, Pumps, Fire Fighting System, AFA & PA System and SubStation, STP Plant, Solar Water Heating System & DG set at DDU College at Sector-3, Dwarka New Delhi. 2023.04.28 2025.04.27 218.40 0.00 (Dec'23) Jain Electric Works Detail Report
Graph / Photo
68 Renovation of school building and Multipurpose hall (Composite work Civil & Electrical) 2022.05.22 2023.01.21 217.86 252.67 (May'23) 0.00 (Mar'24) Invalid Work in progress Detail Report
Graph / Photo
69 Annual comprehensive maintenance of 4 Nos. X 1010 KVA & 2 Nos. X 500 KVA DG sets installed at Mandoli Prison Complex. 2023.05.14 2025.05.13 215.13 0.00 (Dec'23) M/s Shri Durga Electricals Work in progress Detail Report
Graph / Photo
70 Providing Two Way Communication System in Various court Rooms at Distt. Court, Karkardooma, Delhi. 2022.09.23 2022.11.22 202.16 134.22 (Apr'23) 0.00 (Mar'24) Valley Electrovision Pvt. Ltd. Detail Report
Graph / Photo
71 Routine Maintennace of Street lights and RMO of E and M services on various roads under NWED, Delhi (SH:- Maintennace of E and M services in Underpass / RUB's subway's , FOB's, Drainns, fountains and Lifts 2- Maintennace of Street Lights 2024.03.27 2025.04.26 192.53 0.00 (Jun'24) M/s Shaka Electrical (India) Detail Report
Graph / Photo
72 Construction of Indoor Volleyball Hall. 2023.07.31 2024.01.30 192.23 0.00 (Jan'24) Sarthak Construction Co. Work in Progress Detail Report
Graph / Photo
73 Mechanized Housekeeping Services for Internal and External areas of Delhi Vidhan Sabha, Old Sectt., Delhi 110054. 2023.02.03 2025.02.03 191.62 70.66 (Jun'23) 0.00 (Jun'24) M/s Aleena Enterprises, Detail Report
Graph / Photo
74 Comprehensive maintenance of Blue star make central AC Plant 2022.06.14 2024.06.13 187.29 110.23 (Jul'23) 0.00 (Mar'24) Blue Star Limited

Work in progress

Detail Report
Graph / Photo
75 Annual Comprehensive Maintenance of Online UPS and its accessories 2021.10.23 2024.10.22 177.62 209.73 (Mar'23) 0.00 (May'24) power house Detail Report
Graph / Photo
76 Construction of boundary wall in existing land. 2023.04.02 2023.10.01 173.81 0.00 (Mar'24) Shubh Contractors and Builders Work in Progress Detail Report
Graph / Photo
77 Structural strengthening of RCC slab, Beam, Column and Fins of remaining portion of building (Phase-II part area) 2021.09.25 2022.03.23 165.91 12.71 (Mar'23) 98.00 % (Jan'24) Cembond Construction Pvt. Ltd Work has been physically completed. Detail Report
Graph / Photo
78 Comprehensive Maintenance to Residential & Non-residential buildings under jurisdiction of North Building Division (Sub Division M3221, 3222 & 3223), Delhi during 2023-24. 2023.06.01 2024.05.31 164.06 0.00 (Aug'24) KAMAAL CONSTRUCTION CO. Detail Report
Graph / Photo
79 Comprehensive Consultancy for Planning and Development of NSUT East Campus, Geeta Colony, New Delhi 2022.10.12 2022.12.12 163.05 Design Forum International Conceptual drawing has been approved by local bodies and P.E. sent to the client. Detail Report
Graph / Photo
80 Replacement of old, SCI pipe doors and windows, floor and wall tiles, internal and external finishing work, sanitary and water supply fittings etc. 2023.02.18 2024.02.17 159.90 112.12 (Aug'23) 0.00 (Mar'24) MOHD. WAJID Detail Report
Graph / Photo
81 Comprehensive Consultancy Services (Balance Services) for Designing and Development of Buildings under Stage-1 of Phase-II of Delhi Technological Universityat Bawana Road, Delhi 2018.05.05 2022.11.04 159.42 15.94 (Jul'22) 0.00 (Mar'24) Suresh Goel & Associates Work in progress. Detail Report
Graph / Photo
82 Comprehensive maintenance and operation and augmentation of existing LAN Communication System (Active and Passive) and Voice Communication System installed at RGSS Hospital Tahirpur, Delhi 2022.01.07 2023.02.06 155.31 67.17 (Feb'23) 0.00 (Feb'23) Tracom Enterprises Detail Report
Graph / Photo
83 SITCofcentr.med.grade compr air sys semi dry suction sys with amalgam separ incl5yr Comp. maint 2020.02.25 2020.05.24 154.81 Villa India

work in progress by agency

Detail Report
Graph / Photo
84 Upgradation of Various Pump House under North East Distt. Delhi. 2023.03.23 2023.06.22 152.31 38.26 (Apr'23) 0.00 (Mar'24) Pratham Enterprises Detail Report
Graph / Photo
85 RMO 2000/1600/1500 KVA capacity Andrew Yule make HT AVR installed at Sub-station No. 1 2 3 and 4 L.N. Hospital New Delhi. SH Comprehensive maintenance of 2000 KVA 1600 KVA and 1500 KVA HT AVR Andrew Yule make at sub station No. 1 2 3 and4 L.N. Hospit 2020.01.28 2023.01.27 142.09 58.21 (Mar'23) 0.00 (Dec'23) Harsh India Enterprises Work in progress by Harsh India Enterprises Detail Report
Graph / Photo
86 Civil : A/R & M/O and Special repair work. 2023.03.27 2024.03.26 141.40 21.00 (May'23) 0.00 (Aug'24) Khush Construction Co. Detail Report
Graph / Photo
87 Water proofing of basement top slab. 2023.06.27 2023.09.24 136.94 0.00 (May'24) HARI RAM VERMA Detail Report
Graph / Photo
88 SITC of 2x220 KVA UPS System 2010.06.06 2010.08.05 136.39 Labotech Detail Report
Graph / Photo
89 Providing Data Entry Computer Operators Messengers Clerical Staff MTS etc for the Oo Honble Minister PWD at 7th Floor and Oo Principal Secretary PWD Delhi B SH Provid 2023.05.21 2024.05.20 134.49 0.00 (Mar'24) placement security services Work in progress. 10% work has been done. Detail Report
Graph / Photo
90 Annual maintenance & repair of Cummins make DG Sets and allied services. 2023.04.07 2025.04.06 131.85 0.00 (Feb'24) M/s Shri Durga Electricals Detail Report
Graph / Photo
91 Repairing, Operation and AMC of Trane make HVAC Plant at CBPACS, Khera Dabar. 2023.08.12 2025.08.11 129.98 Hilltop Refrigeration Detail Report
Graph / Photo
92 Mechanized Cleaning of underground & Overhead RCC/PVC water storage tanks of Hospital Buildings DDU Hospital, SVBPH Patel Nagar, Janakpuri Super Specialty Hospital, Guru Govind Singh Govt. Hospital, NHMC Hospital Defence Colony, BR Sur Hospital, Pt. Madan Mohan Malviya Hospital, Malviya Nagar, RTRM Hospital Jaffarpur Kalan, DDMASC Dabri, Acharya Shree Bhikshu Govt. Hospital Moti Nagar. 2023.05.27 2024.05.26 129.90 0.00 (Jul'24) Bharat construction & tank cleaner

Work in Progress.

Detail Report
Graph / Photo
93 C/O Additional SPS class rooms and toilet block for different Delhi Govt. School 2012.08.31 2013.04.30 129.32 Om Prakash Gupta Detail Report
Graph / Photo
94 (1) Operation & Maintenance of OTIS make lifts installed at MRD Block, L.N. Hospital, New Delhi. (2) Operation & Maintenance of OTIS make lifts installed at B.L. Taneja Block, L.N. Hospital, New Delhi. (3) Operation & Maintenance of ECE & Olympus make lifts installed at MAIDS, New Delhi (4) Operation & Maintenance of Johnson make lifts installed at New Orthopedic Block of L.N Hospital, New Delhi.(SH - Operation of lift installed at various locations in hospital complex). 2017.11.14 2019.11.13 128.68 148.24 (Oct'22) 0.00 (Oct'22) Akash Enterprises work in progress. Detail Report
Graph / Photo
95 Comprehensive Consultancy for Planning and Development of NSUT East Campus, Geeta Colony, New Delhi 2022.07.02 2025.07.01 124.93 60.77 (Jun'23) 0.00 (Jun'23) M/s Design Accord Consultants Conceptual drawing has been approved by local bodies and P.E. submitted to Client Deptt. Detail Report
Graph / Photo
96 Comprehensive maintenance of Civil Works at Acharya Shree Bhikshu Govt. Hospital and Residential Complex, Moti Nagar and SVBP Hospital and DGD at various places, P.W.D. (GNCTD), New Delhi for 2 years i.e. 2021-22, 2022-23. 2022.05.24 2024.05.23 122.92 20.42 (May'23) 0.00 (May'24) GLOBAL ENTERPRISES

Work in progress.

Detail Report
Graph / Photo
97 C/o Stage-I of Phase-II, Delhi Technological University at Bawana Road, Delhi (SH: Art Work in Ceramic in fine Clay, Modern Art Work Wall Paintings on canvas of Warli Art / Gond Art and Sculptures). 2024.03.15 2024.09.10 120.32 0.00 (Mar'24) Konserve bhaav (N.G.O.) Work in progress Detail Report
Graph / Photo
98 Construction of 5 Nos. AAMC Centres (4 Nos. in Badli Constituency and 1 No in Bawana Constituency including civil and electrical work). 2022.10.01 2023.01.29 113.99 28.20 (Mar'23) 0.00 (Mar'24) Gaur Construction Work in progress Detail Report
Graph / Photo
99 Routine Maintenance of EI and Fans including RMO Pumpset & DG Set 2022.06.01 2023.05.31 113.64 0.00 (Nov'23) GLOBAL ENTERPRISES 4th RA bill Rs. 8016520/- dt. 14.06.2023 Detail Report
Graph / Photo
100 SITC of 2x500 KVA DG Set for non-residential area (Behind College Block) at GTB Hospital, Shahdara, Delhi 2022.08.11 2022.11.10 112.85 137.55 (Mar'23) 0.00 (Oct'23) M/s Shri Durga Electricals Detail Report
Graph / Photo
101 RMO various electrical and mechanical services (internal and external) at Deep Chand Bandhu Hospital Kokiwala Bagh Ashok Vihar New Delhi SH Annual Comprehensive maintenance of 4 x 200KVA UPS 2019.10.21 2022.10.20 111.48 power house Detail Report
Graph / Photo
102 External Development Work 2011.04.15 2011.10.14 108.76 Detail Report
Graph / Photo
103 1)Replacement of 1000 KVA Oil type transformer at Chacha Nehru Bal Chikitsalaya, Geeta Colony, Delhi.2)Replacement of existing LT Panel & Emergency Panel at Chacha Nehru Bal Chikitsalaya at Geeta Colony, Delhi. 2023.05.20 2023.08.19 108.76 0.00 (Jan'24) KAALI ENTERPRISES Detail Report
Graph / Photo
104 Civil: A/R & M/O and Special repair work). Recall of Tender. 2023.03.17 2024.03.16 106.88 28.00 (May'23) 0.00 (May'24) Khush Construction Co. Detail Report
Graph / Photo
105 Replacement of 4Nos. Lift of OPD and ward block at GNEC, New Delhi. (SH:- SITC of 16 persons Hospital lift 2Nos. and 20 persons Hospital lift 2 Nos.) 2015.02.20 2015.08.20 105.23 8.06 (Mar'23) 0.00 (Mar'23) Invalid Detail Report
Graph / Photo
106 Up-gradation and enhancement of old Sub Station equipments at JPCH, Shastri Park, Delhi 2022.03.28 2022.07.27 100.63 SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. Detail Report
Graph / Photo
107 Comprehensive maintenance of Matachana CSSD system installed at Rajiv Gandhi Super Specialty Hospital Tahirpur. 2023.08.08 2024.08.07 99.78 0.00 (Jul'24) LSR MEDICAL PVT LTD Detail Report
Graph / Photo
108 Comprehensive maintenance of Matachana CSSD system installed at Rajiv Gandhi Super Specialty Hospital Tahirpur 2022.07.26 2023.07.25 99.69 0.00 (Jul'24) LSR MEDICAL PVT LTD Detail Report
Graph / Photo
109 Comprehensive maintenance of carrier make central AC plant 2021.11.28 2023.11.27 97.83 111.67 (Jul'23) 0.00 (Jan'24) G D Enterprises Detail Report
Graph / Photo
110 Appointment of Consultant 2008.05.18 2010.10.31 97.00 Detail Report
Graph / Photo
111 Annual maintenance and servicing, repairing of 1000KVA DG Sets with Cummins make Engine 2022.05.04 2023.05.03 96.12 0.00 (Feb'24) M/s Shri Durga Electricals Detail Report
Graph / Photo
112 RMO of HT AVR in A-Block, B-Block C-Block & D Block at GIPMER New Delhi (Comprehensive maintenance of 1500 KVA 2000 KVA and 750 KVA HT AVR Andrew yule make at Sub station No. 1, 3 & 5) 2021.12.18 2024.12.17 95.89 95.01 (Sep'23) 0.00 (Mar'24) Harsh India Enterprises Detail Report
Graph / Photo
113 Comprehensive Maintenance of RO/Filtration Units. 2023.04.10 2026.04.09 95.78 20.68 (Jun'23) 0.00 (Aug'24) Vivek associates Detail Report
Graph / Photo
114 Repairing and upgradation of Bosch make existing CCTV system and replacement of defective CCTV cameras at Delhi Vidhan Sabha, Delhi. 2023.03.25 2023.05.24 94.46 103.29 (Jul'23) 0.00 (Jul'23) Total Security Systems

100% Work Completed

Detail Report
Graph / Photo
115 Running operation and annual maintenance of the sub-station, DG Sets, E and M service, Fire Fighting and Fire Alarm, RO Plant and Pumps House at RGSS Hospital, Tahirpur, Delhi 2019.07.06 2020.07.05 94.43 GLOBAL ENTERPRISES work in progress 6th RA 18182135 Detail Report
Graph / Photo
116 Comprehensive Maintenance to Residential and Non residential buildings under jurisdiction of North Building Division (Sub Division M 3221, 3222 and 3223), Delhi during 2022 23. 2022.09.04 2023.05.03 94.40 99.35 (May'23) 0.00 (Jun'24) Jeetender Kumar Verma Work in Progress Detail Report
Graph / Photo
117 Annual Comprehensive Maintenance of water purifier and inbuilt RO System. 2023.05.05 2026.05.04 93.95 0.00 (Jan'24) Vivek associates Detail Report
Graph / Photo
118 Annual Comprehensive Maintenance of RO,Hot & Cold Water Dispensers of ATSIN make Under sub division-V HMED(C) 2022.05.27 2025.05.26 93.66 92.15 (Oct'23) 0.00 (Jul'24) AADITYA ENVIRO INDIA PVT.LTD Work in progress Detail Report
Graph / Photo
119 SITC of 2 Nos. 315 KVA Electrical Compact Substation at SCERT Building,Varun Marg Defence Colony, New Delhi) (Civil and Electrical Works) 2022.05.02 2022.09.01 92.47 63.83 (Mar'23) 0.00 (Mar'24) KAUSHIK DIESEL GENERATOR Detail Report
Graph / Photo
120 Comprehensive maintenance of 2000 KVA, 1600 KVA and 1500 KVA HT AVR Andrew Yule make at sub-station No. 1, 2, 3, & 4 L.N. Hospital. 2023.03.23 2024.09.22 91.43 0.00 (Jan'24) Harsh India Enterprises

work in progress

Detail Report
Graph / Photo
121 A/R and M/O to Residential Buildings & Non Residential Buildings under PWD, North-West Building Delhi during 2021-22 SH: Mechanized cleaning of underground /overhead RCC/PVC Water Storage tanks. 2021.08.09 2022.08.08 91.40 77.15 (Mar'23) 0.00 (Aug'23) ROYAL CONSTRUCTION Work in progress Detail Report
Graph / Photo
122 Enhancement of LT Supply to HT Supply with 630 KVA Substation at A&U Tibbia College and Hospital, Karol Bagh, New Delhi. 2022.07.05 2022.10.04 91.10 76.91 (Jan'23) 0.00 (Jul'24) Jain Electric Works

Work in progress

Detail Report
Graph / Photo
123 RMO Specialized Electrical and Mechanical Services of Delhi High Court, New Delhi. (SH Comprehensive Maintenance of security equipments). 2024.02.17 2025.02.16 89.59 0.00 (Jun'24) FORTUNA CONTROL & AUTOMATIONS PVT. LTD. Work in progress Detail Report
Graph / Photo
124 Running Comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV RO Systems, Water Dispensers with Inbuilt RO Systems, RO Water Purifiers and Aquaguards 2019.12.23 2020.12.22 87.51 Aditi Enterprises work in progress by Aditi Enterprises Detail Report
Graph / Photo
125 Epoxy Flooring in Workshop 2022.12.09 2023.01.08 86.86 32.74 (May'23) 0.00 (Aug'24) Rohit Kumar Work in progress Detail Report
Graph / Photo
126 RMO UPS system installed at 2nd floor, 4th floor 6th floor Casualty BlockGynae Block, Ward 14 Genetic Lab OT Block and New OPD Block at L.N. Hospital New Delhi.SH Comprehensive annual maintenance of Emerson Make UPS system installed at Casualty Bl 2019.08.26 2022.08.25 86.20 10.43 (Jul'23) 0.00 (Oct'23) Labotek work in progress by Labotek Detail Report
Graph / Photo
127 Mechanized Cleaning of over head & underground tank. 2023.07.24 2024.07.23 85.38 0.00 (Mar'24) Unitech Water Solution Detail Report
Graph / Photo
128 Providing Services of Computer Operator, MTS etc. under various PWD Offices of North Building Division & office of SA North, Delhi during 2022-23. 2023.04.01 2024.03.31 84.82 15.16 (Jul'23) 0.00 (Jun'24) placement security services Detail Report
Graph / Photo
129 Replacement of Damaged Windows, Strengthening of Corridor, Toilet Slab, Waterproofing of Primary Wing Food Production, Renovation of Stage, Accessible CWSN and Other Misc. Works 2022.10.23 2023.04.22 84.66 25.07 (Jul'23) 0.00 (Jan'24) Lavneesh Pal Work in Progress Detail Report
Graph / Photo
130 Routine Maintenance, Operation of CNG Oil Fired 2.5 TPH B16 3Nos 600kg hr Autoclave Capacity Fire Tube IBR Boiler 01 Nos and Operation of Boilers and Water Softening plant 2020.09.01 2022.08.31 83.64 44.25 (Mar'23) 0.00 (Mar'23) Boilermart Work in progress by M/s Boilermart Detail Report
Graph / Photo
131 1 RMO Elect and Mech Services in Lawyers chambers Blk DEFG and H. 2 In KKD Court (Court Block) ACI B and JKL DEFG and H. 3 At UTCS Bldg. SH- Operation and Routine Maint. of EI DG Set Sub Station Fire Fighting Fire Alarm System and Vrs type pump sets. 2019.05.18 2020.05.17 83.16 103.48 (Sep'20) 0.00 (Sep'20) PARASAR Electrical & Refrigeration Detail Report
Graph / Photo
132 Providing, Data Entry/Computer Operators, Messengers, Peon etc. for various offices under Delhi Sachivalaya & M.S.O Builiding. 2023.06.11 2024.06.10 82.59 0.00 (Jul'24) Akash Narang Detail Report
Graph / Photo
133 Operation & Comprehensive Maintenance of LED Video Wall & Sound System. 2023.03.12 2025.03.11 81.50 0.24 (Mar'23) 0.00 (Aug'24) Electrorama Detail Report
Graph / Photo
134 Waterproofing of Roof Main School Building Guard Room and Pump Room, Renovation of Toilets Recharge of Rain Water Pit and Other Misc Works 2022.10.23 2023.02.22 80.38 48.51 (Jun'23) 0.00 (Mar'24) Sohan Lal Chhitoria and Sons Work in Progress Detail Report
Graph / Photo
135 Running Comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UVRO Systems, Water Dispensers with Inbuilt RO Systems, RO Water Purifiers. 2022.12.06 2024.12.05 80.01 0.48 (Jun'23) 0.00 (Mar'24) Real Value Systems & Services

Work in progress

Detail Report
Graph / Photo
136 Providing CCTV Surveillance System in Judges Residence complex O Block at District Court Karkardooma Shahdara Delhi. 2018.10.07 2019.02.06 79.60 21.54 (Dec'19) 0.00 (Dec'19) TECHNOSYS SECURITY SYSTEMS PVT. LTD Detail Report
Graph / Photo
137 Comprehensive annual maintenance contract of various capacity CVCF 2022.12.21 2024.12.20 79.27 0.00 (Jul'24) Labotek Detail Report
Graph / Photo
138 RMO of HT AVR in A-Block, B-Block, C-Block D Block at GIPMER, ND Comprehensive maintenance of 1500 KVA HT AVR Andrew yule make at Sub station No. 2 2022.02.18 2025.02.17 78.70 50.63 (Sep'23) 0.00 (Mar'24) Harsh India Enterprises Detail Report
Graph / Photo
139 1 RMO E and M Services in Lawyers chambers Block. 2 At KKD Court Court Block. 3 At UTCS Bldg. Vishwas Nagar Shahdara. SH-Routine Maintenance and Operation of various E and M services. 2018.05.10 2019.05.09 78.60 30.59 (Sep'19) 0.00 (Sep'19) M I Enterprises Detail Report
Graph / Photo
140 Pdg & installation of computer LAN System 2010.04.28 2010.07.27 78.33 Tracom Enterprises Detail Report
Graph / Photo
141 Day to Day maintenance and Operation of E and M installations 2022.03.03 2023.03.02 77.90 M/s Krishna Electrical works Detail Report
Graph / Photo
142 Comprehensive maintenance of Balance 08 Nos. Escalators installed at District Court, New Block 1 and 2, Saket Court, New Delhi. 2024.05.27 2025.05.26 77.58 Johnson Lift Pvt. Ltd. Work in progress Detail Report
Graph / Photo
143 Renovation of MP Hall and Repairing/Replacement of Electrical Installations Flood Light Fitting Air Conditioning PA System etc. at SKV Vivek Vihar Delhi. School ID-1001022 2018.09.27 2019.01.26 76.31 51.34 (Sep'20) 0.00 (Sep'20) Mars Engineers Detail Report
Graph / Photo
144 RMO of Lifts at Dr BSA Hospital Sec 6 Rohini Delhi SH Operation of Lifts 2018.12.04 2020.12.03 75.44 Guruji Elevator Work in progress Detail Report
Graph / Photo
145 Dismantling, Removing and Re-fixing of G.I. False Ceiling and Revampment of Damaged RCC Portion Area for FSL Rohini 2023.06.01 2023.11.30 75.20 0.00 (Mar'24) Invalid Work in Progress Detail Report
Graph / Photo
146 Comprehensive consultancy for construction of Additional Academic and Administrative Block at Campus of DPSRU, Sector-3, M.B. Road, Pushp Vihar, New Delhi-110017 2022.02.27 2023.10.26 75.02 6.22 (Mar'23) 5.00 % (Jul'23) DESIGN ACCORD CONSULTANT A/A & E/S is still awaited. Detail Report
Graph / Photo
147 SITC of retrofit kit for emission control equipment for diesel generators install in substation 4 at L.N. Hospital New Delhi 2022.09.01 2022.12.31 74.35 chakr innovation pvt ltd.

Work in progress

Detail Report
Graph / Photo
148 Comprehensive Maintenance of OTIS Lifts and Escalators 2022.05.08 2023.05.07 74.27 60.74 (Mar'23) 0.00 (Mar'24) Otis Elevator Company (India) Ltd. Detail Report
Graph / Photo
149 Renovation for Urology and Renal Transplant Department at (Block 3, 2nd Floor) RGSS Hospital, Tahirpur, Delhi. Sub Head Providing Medical Instruments 2019.08.17 2019.11.16 73.86 MDD Medical System (INDIA) Pvt. Ltd No Payment Detail Report
Graph / Photo
150 RMO E and M Services installed at Karkardooma Court Complex, Delhi. (SH Operation of lifts in Lawyers Chamber Blocks Lawyers Chambers Block D,E,F,G and Parking H Block). 2024.03.05 2025.01.04 73.55 0.00 (Aug'24) M/s Parasar Electricals & Refrigeration Work in progress Detail Report
Graph / Photo
151 Providing Services of Computer Operator, MTS etc. under various PWD Offices of North Building Division and office of SA North 2022.02.01 2023.01.26 73.51 94.00 (Jul'23) 0.00 (Oct'23) placement security services Work in progress Detail Report
Graph / Photo
152 Construction of new rooms between old and new building (G+3) floor, C/o lift shaft and raising of boundary wall and fixing of MS grill with concertina coil 2022.07.11 2022.10.09 72.99 ARIF, Jahangirpuri, Delhi Work in progress Detail Report
Graph / Photo
153 Mechanized Cleaning of over head tank and underground tank 2021.08.07 2022.08.06 72.88 34.56 (May'23) 0.00 (Aug'24) Invalid Detail Report
Graph / Photo
154 Replacement of old rusted/damaged cable tray and busbar trunking at sub-station to building 2022.08.17 2022.10.16 72.23 M/s Shri Durga Electricals Detail Report
Graph / Photo
155 Comprehensive Maintenance of Carrier make Central AC Plant 2022.12.10 2023.12.09 72.16 40.33 (Jul'23) 0.00 (May'24) G D Enterprises work in progress by M/s G.D. Enterprises Detail Report
Graph / Photo
156 Name of work 1 to 6 MOEI Fans and RMO Air- Conditioner, pump set, DG set installed at registrar co-operative societies, old court building, parliament street, New Delhi 2017.10.07 2018.10.06 71.64 22.75 (Mar'23) 0.00 (Mar'23) Parasar Electricals & Refrigeration Detail Report
Graph / Photo
157 RMO E and M Services installed at Karkardooma Court Complex, Delhi. (SH Operation of lifts installed in Court Block ACI, B, JKL and New Court Building) 2024.03.14 2025.02.13 71.32 Guruji Elevator Work in progress Detail Report
Graph / Photo
158 RMO EI and fans and all Various Electrical and mechanical services installed in New Block No.1 and 2 at District Court Complex Saket, New Delhi. 110017 (SH Operation of EI and Fans, Pumps, Fire Fighting, Fire Alarm system, Lift and Escalators) 2024.03.18 2025.03.17 71.32 ELE MEC ENGINEERING CO Work in progress Detail Report
Graph / Photo
159 Running Comprehensive Maintenance of Eureka Forbes Water Coolers with Inbuilt UV/ RO Sys. Water Dispensers with Inbuilt RO Sys RO Water Purifiers 2020.10.06 2022.10.05 71.14 39.10 (Apr'22) 0.00 (Apr'22) Aditi Enterprises Work in progress by M/s Aditi Enterprises Detail Report
Graph / Photo
160 Repair & renovation work in various flats of Type-VI & V, D-II Flats Vasant Kunj, New Delhi 2022.08.23 2023.04.22 71.08 62.78 (Jun'23) 0.00 (May'24) SHRI DATTA KRUPA ENTERPRISES

Work in Progress 65%

Detail Report
Graph / Photo
161 SITC of Router, UTM Firewall and Core Switch at District Court, Sector-10, Dwarka, New Delhi 2022.11.07 2023.03.06 71.06 Arsenal Info Solution Pvt. Ltd. Detail Report
Graph / Photo
162 Providing various Services for the Office of Senior Architect Office, Chief Engineer (North), Superintendent Engineer and O/o Executive Engineer (North West Building) 2023.05.01 2024.04.30 70.88 0.00 (Jul'24) R K Enterprises Work in Progress Detail Report
Graph / Photo
163 CAMC maintenance of Tadiran Make IP-EPBAX system at Rouse Avenue 2023.02.17 2025.02.16 70.72 0.00 (May'24) M/s Momentum Techsys Pvt. Ltd. Work in progress Detail Report
Graph / Photo
164 A/R & M/O to various Mohalla Clinics under Sub Division-I, South Building Maintenance (M-422), during 2022-23. 2022.06.22 2023.06.21 70.37 33.94 (Jan'23) 0.00 (Mar'24) Afjal Construction Work in Progress 65% Detail Report
Graph / Photo
165 Renovation and modification of De-stress Room at 3rd floor, Medical Health Centre, Delhi High Court, New Delhi. 2023.03.31 2023.06.29 70.06 0.00 (Oct'23) R L WADHWA Work in progress Detail Report
Graph / Photo
166 Comprehensive maintenance of buildings including supply of materials and providing service of man power for day to day maint. work of UTCS Complex Employment exchange JJB Court. and others buildins under SD M2312 dg.2021 22 2022.02.05 2023.02.04 69.93 91.25 (May'23) 0.00 (Feb'24) RAman KUmar Detail Report
Graph / Photo
167 Renovation of MP Hall i/c Wooden Flooring, Wall Panelling, False Ceiling, up Liftmen of Stage Stepping in Flooring etc. and Electrical Renovation of MP Hall at SCERT Bhawan, New Delhi. (Civil and Electrical Works) 2022.03.17 2022.05.16 69.80 1.52 (Feb'23) 0.00 (Feb'23) SHRI DATTA KRUPA ENTERPRISES Detail Report
Graph / Photo
168 Construction of Porta Cabin for security officers and outer force near Annexure -II building at Tis Hazari, Delhi (Civil Work) 2022.07.30 2022.09.27 69.57 0.00 (Dec'23) Jabir Husain Detail Report
Graph / Photo
169 Retrofitting & rehabilitation of B & C Block of DA Flats, Model Town,Delhi. 2023.09.13 2024.01.10 69.42 Cembond Construction Pvt. Ltd Detail Report
Graph / Photo
170 Comprehensive maintenance Supply of materials and providing services of manpower for day to day maintenance work of KKD Court Main Buildings A B C I J K and L Blocks under SD M 2312 dg 2021 22 2022.01.28 2023.01.27 69.22 100.36 (Jun'23) 0.00 (May'24) Uma Shankar In Progress. Detail Report
Graph / Photo
171 Supply, installation, testing and commissioning of Medical Gas Pipe Line system for balance beds in Wards, PNC Wards and other locations at LBS Hospital, Khichripur, Delhi 2023.01.19 2023.04.18 69.19 Med Freshe Pvt. Ltd. Detail Report
Graph / Photo
172 Providing aluminium windows 2013.06.28 2013.08.27 69.04 72.34 (Apr'14) 100.00 % (Apr'14) Manglam COnstruction Detail Report
Graph / Photo
173 Renovation of MP Hall i/c Wooden Flooring, Wall Panelling, False Ceiling, up Liftmen of Stage Stepping in Flooring etc. & Electrical Renovation of MP Hall at SCERT Bhawan, New Delhi). (Civil & Electrical Works).(Balance Work) 2022.09.02 2022.11.01 68.53 28.65 (Mar'23) 0.00 (May'24) Jyoti Eelectricals Detail Report
Graph / Photo
174 Repair and day to day maintenance of DM North office building, SDM Alipur Office, SDM Narela Office, e-SR office Narela, BDO North Alipur office under District North, Delhi-36 during 2022-23 2022.09.25 2023.09.24 68.38 30.78 (Mar'23) 0.00 (Mar'24) Raju Kumar Singh Work in progress Detail Report
Graph / Photo
175 Providing services of computer operator, skilled, semi-skilled, un-skilled labour etc. 2023.07.08 2024.07.07 68.35 0.00 (Oct'23) Trendy Security Services Detail Report
Graph / Photo
176 Comprehensive Maintenance of RO/ Filtration Units 2022.04.01 2022.09.30 68.24 129.53 (Feb'23) 0.00 (Feb'23) M/s Vivek Associates Detail Report
Graph / Photo
177 A/R and M/O to Delhi High Court, New Delhi dg. 2024-25 (SH: Providing services of plumbing, carpentry jobs etc.) 2024.06.09 2025.06.08 68.07 VINEET SINGH Work in progress Detail Report
Graph / Photo
178 Running operation and comprehensive maintenance of Online UPS, Servo Voltage and CVCF of different capacity 2022.09.16 2024.09.15 67.88 0.00 (May'24) Power House Detail Report
Graph / Photo
179 Renovation A Block at SBV, Saket, J-Block (Vir Chander Singh Garhwali), New Delhi. (School ID:-1923056, Bldg ID:- 19231465, EOR ID:-20211890). (Civil + Electrical Work). 2023.07.27 2023.12.26 67.85 0.00 (Mar'24) Bhardwaj Brothers Detail Report
Graph / Photo
180 Structural Strengthening to slab beam and column 2022.02.09 2022.05.09 67.79 52.43 (Mar'23) 0.00 (Aug'24) Cembond Construction Pvt. Ltd In Progress. Detail Report
Graph / Photo
181 Comprehensive maintenance of KKD Court Main Buildings A B C I J K and L Blocks including supply of materials and engaging labour for day to day maintenance at Karkardooma Court Delhi during 2022 23 2023.01.06 2024.01.05 67.55 0.00 (Mar'24) Manish Construction In progress. Detail Report
Graph / Photo
182 Requirement of CCTV camera in various departments of GIPMER, New Delhi. 2023.06.06 2023.08.05 67.25 0.00 (Mar'24) Lotus Techsol Pvt Ltd.

work in progress

Detail Report
Graph / Photo
183 RMO of Substation in A-Block and BBlock at GIPMER, New Delhi SH Comprehensive Maintenance of HT AVR 2018.01.06 2020.01.05 67.10 69.65 (Sep'19) 77.93 % (Sep'19) Harsh India Enterprises Work in progress. Detail Report
Graph / Photo
184 AR and MO to Delhi High Court New Delhi dg 2023 24 SH Providing services of plumbing carpentry jobs etc 2023.07.14 2024.07.07 66.90 0.00 (Mar'24) VINEET SINGH Work in progress Detail Report
Graph / Photo
185 Replacement of existing old ECE Make Lifts after dismantling the existing lift No. 5, 4, 2, 1A in District Court Rohini, Delhi dg. 2021-22 2021.11.24 2022.03.23 66.64 22.91 (Nov'22) 0.00 (Nov'22) Techno Industries Limited 2nd RA Bill Rs. 7274053/- dt. 10.11.2022 Detail Report
Graph / Photo
186 Comprehensive maintenance and operation of CCTV Surveillance installed in COVID-19 Ward 2022.07.30 2025.07.29 66.48 0.00 (May'24) TRACOM ENTERPRISES Detail Report
Graph / Photo
187 Repair and Maintenance of various AAMC and other buildings under North East B&R division dg. 2022-2023. 2022.06.05 2023.06.04 66.46 15.00 (Mar'23) 0.00 (Jan'24) GEE Internationals Detail Report
Graph / Photo
188 C/o six Science Laboratory (SPS) for Boys & Girls 2013.11.30 2014.07.29 65.94 0.00 (Aug'14) 370.00 % (Aug'14) Shekhar Detail Report
Graph / Photo
189 Augmentation of existing Sub Station and allied equipments at Delhi Archive Building, Qutub Institutional Area, New Delhi. 2018.07.14 2019.01.13 65.58 67.81 (Jun'19) 75.00 % (Jun'19) Dubey Electric Works Detail Report
Graph / Photo
190 SITC of air cooled air conditioning system in Fetal Medicine OT and Gynae OT at Lok Nayak Hospital, New Delhi. 2023.03.01 2023.04.30 65.10 0.00 (Jan'24) KUNAL

work in progress

Detail Report
Graph / Photo
191 Providing Services of Computer Operators, Clerk and MTS / Khallasi in PWD North West Electrical Maintenance Division, Sub Divisions and other offices, Delhi. 2023.09.04 2024.09.03 64.61 0.00 (Aug'24) Sehra Electric Works Detail Report
Graph / Photo
192 RMO Electrical & Mechanical services at RGSS Hospital, Tahirpur, Delhi.(Annual maintenance & servicing of DG Sets) 2023.08.21 2024.08.20 64.57 0.00 (May'24) KAALI ENTERPRISES Detail Report
Graph / Photo
193 Comprehensive maintenance of Labotek make UPS 2022.07.31 2025.07.30 64.25 13.53 (Oct'23) 0.00 (Feb'24) power house

Work in progress

Detail Report
Graph / Photo
194 1 RMO Vrs E and M services installed at O Blk Rsdl Court complex KKD. 2 At Juvenile Justice Board Delhi. SH- Operation of EI and fans and water supply pump sets Lifts Fire Fighting and Fire Alarm System PA System DG Set and CCTV Surveillance System 2018.10.01 2020.09.24 64.13 65.84 (Jun'21) 0.00 (Jun'21) A. G. Enterprises Detail Report
Graph / Photo
195 Comprehensive maintenance of DBSOLX developed Complaint Tracker system at Meerdard Lane, ND 2023.06.01 2026.05.30 64.11 0.00 (Jul'24) SCS Technologies

work in progress

Detail Report
Graph / Photo
196 Renovation of MP Hall i/c Wooden Flooring, Wall Panelling, False Ceiling, up Liftmen of Stage Stepping in Flooring etc. & Electrical Renovation of MP Hall at SCERT Bhawan, New Delhi). (Civil & Electrical Works) 2022.06.16 2022.08.15 63.93 0.52 (Feb'23) 0.00 (Feb'23) M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 Detail Report
Graph / Photo
197 Replacement of damaged profile shed with puff panel, renovation of toilet block, finishing work in all rooms, repair of damaged windows and other misc. civil work in Savitri Bai Phule I.T.I., Mori Gate, Delhi under SRD Project Division-I/Sub-Division-III, PWD. Recall of Tender. 2023.04.10 2023.07.09 63.67 52.00 (Jun'23) 0.00 (Mar'24) M.R. CONSTRUCTION CO. Detail Report
Graph / Photo
198 Maintenance and Face Lifting of Fire Station Narela Delhi-110040. 2023.04.25 2023.07.24 63.64 0.00 (Jun'24) MAHIDEEP SHARMA Detail Report
Graph / Photo
199 Comprehensive maintenance of DBSOLX developed Complaint Tracker system at GIPMER New Delhi. 2023.05.20 2026.05.19 63.49 0.00 (Aug'24) SCS Technologies

work in progress

Detail Report
Graph / Photo
200 Comprehensive maintenance of DBSOLX developed Complaint Tracker system at GNEC New Delhi 2022.12.24 2025.12.23 63.49 12.54 (Jul'23) 0.00 (Jul'24) DBSOLX

work in progress

Detail Report
Graph / Photo
201 Replacing of rusted water supply line for main building & service block i/c all toilets. 2023.03.13 2023.05.26 63.30 16.53 (Jun'23) 0.00 (Mar'24) Nabi Hussain

Work in progress

Detail Report
Graph / Photo
202 Operation and routine maintenance of E.I, D.G. Set, Sub Station, Fire Fighting, Fire Alarm System and Various type Pump Sets during 2021-22 2021.10.22 2022.10.29 62.92 78.64 (Feb'23) 0.00 (Feb'23) Ele Mec Engineering Co. Detail Report
Graph / Photo
203 Construction of CC pavement and steel shed for Fire Fighting Vehicle and repair & sprucing up the building premises at Fire Station, DSIIDC, Bawana, Delhi. 2023.06.07 2024.09.04 62.78 0.00 (Aug'24) Sham Lal Gupta & Sons Detail Report
Graph / Photo
204 RMO EI & Fans, Lifts, Sub-Station, DG set, Fire Alarm, Fire Fighting System, Split ACs, Water Coolers and RO system, 2 x 250 Tr HVAC system, AV system, LAN system etc. installed at DDU College at Sector-3, Dwarka, New Delhi.(Comprehensive maintenance of Johnson make Lifts) 2023.10.20 2026.10.19 62.61 0.00 (Jun'24) Johnson Lifts Pvt. Ltd. Detail Report
Graph / Photo
205 Up-gradation/Renovation of 25 Qtrs. Block No. 1109 to 1516, 1577 to 1642 & 1643 to 2143 under sub-division, M-3222 at Gulabi Bagh, Delhi 2022.04.30 2022.12.29 62.60 56.48 (Mar'23) 0.00 (Jun'24) Irshad Ahmed Work in Progress Detail Report
Graph / Photo
206 Civil Work. 2023.07.08 2023.08.07 62.58 Shri Shyam Sunder Tyagi Detail Report
Graph / Photo
207 Providing outsourced staff in Circle Office M 23 Division Office M 231 and in Sub Division Offices M 2311 M 2312 M 2313 M 2314 i.e.Computer Operator LDC Diary Dispatcher Office Clerk Messenger MTS and Peon dg. 2022 23. 2023.12.12 2024.02.11 62.52 7.65 (Jul'23) 0.00 (Jul'24) MOHAMMAD HUSSAIN Detail Report
Graph / Photo
208 Providing services of Skilled, Semi-skilled, Un-Skilled labour etc. 2023.05.31 2024.05.30 62.16 0.00 (Mar'24) R.K. Jain and Sons Hospitality Services Pvt. Ltd. Detail Report
Graph / Photo
209 3. Running and Maintenance of Fire Fighting and Wet Riser at GTB Hospital complex, Shahdara, Delhi. Sub Head Maintenance and operation of E and M services at residential and non-residential area 2018.08.25 2019.08.24 61.90 61.00 (May'22) 0.00 (May'22) PARASAR Electrical & Refrigeration Work in Progress (4TH RA bill paid) Detail Report
Graph / Photo
210 A/R & M/O Old Saint Stephen’s College Building Kashmere Gate, C.P.O Building, Old Court Building, N.C.C Offices Buildings, Novelty Fire Station, Fire Station Jama Masjid, Disability Commissioner Office and Lok Nayak Setu Office Complex, Delhi During 2023- 24. 2023.07.06 2023.11.05 61.67 0.00 (May'24) KAMAAL CONSTRUCTION CO. Detail Report
Graph / Photo
211 Annual Maintenance and Extension of Central Medical Gas Pipeline System at LNH and Sushruta Trauma Centre ND 2021.12.08 2022.12.07 61.48 10.99 (Mar'23) 0.00 (Mar'23) Maxon Healthcare India Pvt. Ltd. Detail Report
Graph / Photo
212 Renovation of Guest House at Mahatma Gandhi Institute for Combating Climate Change at Bakoli Alipur, Delhi-110036. 2023.08.21 2023.12.20 61.44 0.00 (Mar'24) RITIK KUMAR SHARMA Detail Report
Graph / Photo
213 Repair and renovation work of the property No. 7 55, Church Road, Jwala Nagar, Shahdara Health Department for opening of Polyclinic. (Composite work of Civil and Electrical) 2019.08.03 2020.02.04 60.92 R. P. Electrical and Maintenance Works Work in progress but work is affected due to Covid-19 Detail Report
Graph / Photo
214 M/o Hort. Works in different non residential building under Hort. Division (East), PWD, Delhi dg 2023-24. 2023.06.24 2024.06.22 60.61 Friends Detective Security Services Detail Report
Graph / Photo
215 Regarding construction of MP hall, 02 Nos. of Labs and 01 Library at GGSSS, Bankner Delhi-40. Sch Id-1310049, EOR Id-20181894 Bldg. ID-13101408. 2022.07.03 2022.12.30 60.31 76.23 (May'23) 0.00 (May'23) Sh. Devender Singh Work in progress Detail Report
Graph / Photo
216 Providing Services of Data Entry Computer Operators Messengers cum Peon, Work Assistant Enquiry Clerk Clerical Staff etc for the office of Central and New Delhi 2022.05.01 2023.04.30 60.08 68.81 (Apr'23) 0.00 (Aug'23) TRENDY SECURITY SERVICES Detail Report
Graph / Photo
217 Comprehensive maintenance supply of materials and providing services of manpower for day to day maintenance work of Judges Flat and Residential Complex at KKD Court under Sub Division M 2311 Delhi during 2022 23 2023.01.13 2024.01.12 60.03 53.83 (Sep'23) 0.00 (Jun'24) Uma Shankar In Progress. Detail Report
Graph / Photo
218 Laying of RMC, laying interlocking paver blocks with drainage, Kerb stone along with road, construction of 2 Nos. Security guard room & fixing of granite in tree guard 2022.05.22 2022.08.21 59.84 ARIF, Jahangirpuri, Delhi Work in Progress Detail Report
Graph / Photo
219 RMO of VRV VRF system installed at New Block 1 and 2 District Court Complex, Saket, New Delhi (SH Routine Operation and Comprehensive Maintenance of Daikin Make VRV/VRF System). 2024.02.18 2025.02.17 59.74 0.00 (Aug'24) Weather Conditioners Work in progress Detail Report
Graph / Photo
220 Construction of Collapse/Tilted boundary wall at Govt. SKV Prahaladpur, Delhi-110042 (Sch ID-1310032) (Bldg ID 13101331) 2022.06.30 2022.09.28 59.59 17.52 (Apr'23) 0.00 (Mar'24) Rajeev Kumar Work in progress Detail Report
Graph / Photo
221 Annual Maintenance and Operation of Central Medical Gas Pipeline System at LokNayak Hospital and Sushruta Trauma Center, New Delhi. 2023.02.11 2024.02.10 59.59 0.00 (Jul'24) Med Freshe Pvt. Ltd.

work in progress

Detail Report
Graph / Photo
222 Civil Work. 2023.07.22 2023.09.21 59.56 Saeed Builders Detail Report
Graph / Photo
223 Pvdg. Ren./repair of Ramp, Railing, Tactile Tile, Signage etc. in school bldg and barrier free accessible for student (C) EOR to SK 2022.09.08 2023.01.06 59.29 68.42 (Mar'23) 0.00 (Aug'24) Ankur Bhardwaj Work in progress Detail Report
Graph / Photo
224 Supplying, Installation, Testing and Commissioning of Biomedical treatment units near OT’s for pre treatment of yellow (f) category of Bio-Medical Waste at Lok Nayak Hospital, New Delhi 2022.03.25 2022.04.24 59.06 41.34 (Aug'22) 0.00 (Aug'22) Texol Engineers Detail Report
Graph / Photo
225 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block F at District Court Karkardooma Courts Delhi. 2018.07.24 2019.03.23 58.95 9.50 (Feb'20) 0.00 (Jul'24) Invalid Work in progress Detail Report
Graph / Photo
226 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block G at District Court Karkardooma Courts Delhi. 2018.07.24 2019.03.23 58.95 9.50 (Feb'20) 0.00 (Dec'23) Invalid Work in progress Detail Report
Graph / Photo
227 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block E at District Court Karkardooma Courts Delhi. 2018.07.24 2019.03.23 58.95 9.50 (Feb'20) 0.00 (Feb'24) Invalid Work in progress Detail Report
Graph / Photo
228 EOR for Reconstruction of damaged boundary wall and repair of 15 class rooms in GSKV No 2, Narela Delhi (EOR ID- 20221152), (School I.D-1310170). 2023.07.01 2023.09.28 58.87 0.00 (Nov'23) Ankur Bhardwaj Detail Report
Graph / Photo
229 RMO specialized Electrical and Mechanical services of Delhi High Court, New Delhi.(SH Operation and day to day maintenance of various E and M services at S Block of Hon ble Delhi High Court) installed at Main Court Building , Advocate Block , Utility Block , Lock Up Building and Residential Complex) 2024.05.27 2025.05.26 58.64 M/s Shaka Electrical (India) Work in progress Detail Report
Graph / Photo
230 A/R and M/O of Lifts and Escalators at Thyagraj Sports Complex during 2022-23. (SH:-Comprehensive Maintenance of Otis Lifts & Escalators.) 2023.08.28 2024.08.27 58.09 0.00 (Jan'24) Otis Elevator Company (India) Ltd. Detail Report
Graph / Photo
231 Annual comprehensive Maintenance and Operation of LG make inverter VRV or VRF type Air Conditioning units 2023.01.22 2024.01.21 57.54 0.00 (Aug'24) LG ELECTRONICS INDIA PVT LTD Detail Report
Graph / Photo
232 Operation & Maintenance of EI, streets light, Lift , Fire Fighting , Fire Alarm System & Solar Water Heating System installed at Prison Complex Mandoli. 2023.03.19 2024.03.18 57.20 0.00 (Dec'23) Vee Aar Traders Work Transferred to Division M-251 (Maintenance) Detail Report
Graph / Photo
233 Replacement of old outlived lifts in Academic and NRDH in GIPMER New Delhi 2020.09.22 2021.01.21 57.10 11.14 (Apr'23) 0.00 (Apr'23) Thyssenkrupp Elevator (India) Pvt. Ltd. Work in progress by M/s THyssen Krupp Elevator Detail Report
Graph / Photo
234 Replacement of Three Passengers Lift having capacity to carry 13 persons installed in Lawyers Chamber Block D at District Court Karkardooma Courts Delhi. 2018.07.21 2019.04.20 56.86 5.72 (Mar'21) 0.00 (Jul'24) Invalid Work in progress Detail Report
Graph / Photo
235 Repair & renovation for Light Gauge Steel Structure with new technology at D.M (North) office and BDO (North) office Building Alipur Delhi-36. 2023.07.06 2023.10.03 56.64 0.00 (Feb'24) IZHAR AHMED Detail Report
Graph / Photo
236 Constructing Shed with Profile Sheet and Providing and Laying Synthetic Grass 2022.09.08 2022.11.07 56.57 51.03 (Apr'23) 0.00 (Oct'23) Nurul Hak Work in progress Detail Report
Graph / Photo
237 Complete maintenance of garden features and potted plants at Delhi Sachivalya & Nursery. 2022.11.11 2023.11.10 56.19 37.82 (Aug'23) 0.00 (Jan'24) Invalid Detail Report
Graph / Photo
238 Construction of building block G+1 porta cabin & renovation work at back side of AAP office, Stone work at wall near gate, Fixing of wall tiles and floor tiles in room & other Major Misc. works 2022.09.04 2022.11.17 55.88 Mool Chand Detail Report
Graph / Photo
239 Structural Repair and Rehabilitation Retrofitting Works of RCC damaged portion 2023.06.12 2024.09.09 55.84 0.00 (Mar'24) Cembond Construction Pvt. Ltd Detail Report
Graph / Photo
240 Re-construction boundary of the office Campus of the District Magistrate (North) office, Alipur, Delhi-110036. 2023.08.02 2023.10.30 55.75 0.00 (Aug'24) IZHAR AHMED Detail Report
Graph / Photo
241 Comprehensive annual maintenance of Schneider Electric (APC) Make UPS system installed at Casualty Block, L.N. Hospital 2022.08.26 2024.08.25 55.65 75.70 (Oct'23) 0.00 (Mar'24) ARECA TECHNOLOGIES

Work in progress

Detail Report
Graph / Photo
242 Providing and placing furniture in VWDC Court at District Court Complex Saket, New Delhi. 2023.02.09 2023.03.08 55.57 0.00 (Mar'24) Delite Hi- Tech Furniture India Pvt. Ltd. Detail Report
Graph / Photo
243 Repairing/Replacement of Old worn out MGPS at Sushruta Trauma Centre-9, Metcalfe Road, Delhi 2022.10.20 2022.12.19 55.53 38.87 (Mar'23) 0.00 (Mar'24) U. S. Engineering

Work in progress

Detail Report
Graph / Photo
244 A/R and M/O Various works under Delhi High Court Civil Division, PWD, New Delhi dg. 2023-24 (SH:- Providing Data Entry/Computer Operators, Messengers, Clerical Staff, Security Guard etc. for Delhi High Court Division, PWD, Govt. of Delhi). 2024.01.19 2025.01.18 55.52 0.00 (Aug'24) VINEET SINGH work in progress Detail Report
Graph / Photo
245 SITC of window/split type air-conditioning system at various locations in Lok Nayak Hospital, New Delhi 2022.09.12 2022.11.11 55.47 37.82 (Mar'23) 0.00 (Mar'23) RCC Enterprises 1st RA Bill Paid Detail Report
Graph / Photo
246 Comprehensive maintenance and operation of HVAC system 2018.05.17 2020.05.16 55.43 19.35 (Feb'19) 60.00 % (Feb'19) COMFORT SYSTEM Work in progress 8th RA 6146479 Detail Report
Graph / Photo
247 RMO of UPS and Boiler at GIPMER, NDShComprehensive maintenance of Labotek make UPS 2019.08.26 2020.08.25 54.61 18.96 (Feb'23) 0.00 (Oct'23) power house work in progress by Power House Detail Report
Graph / Photo
248 RMO Specialised Electrical and Mechanical works of Tis Hazari Court (SH Annual Comprehensive Maintenance of VRV system installed at Extension Block Tis Hazari Court Complex.) 2024.03.08 2025.03.07 54.33 0.00 (Aug'24) Modern HVAC Solutions PVT LTD Work in progress Detail Report
Graph / Photo
249 Operation and Comprehensive Maintenance of 3 x 350 TR. Capacity Carrier Make water cooled Centrifugal Chilling Units with ancillaries of New O.P.D. Block at Lok Nayak Hospital, New Delhi 2020.08.14 2022.08.13 54.27 64.65 (Jul'23) 0.00 (Jul'23) Royel Electricals work in progress by M/s Royel Electrical Detail Report
Graph / Photo
250 Operation and Comprehensive Maintenance of 3 x 350 TR. Capacity Carrier Make water cooled Centrifugal Chilling Units with ancillaries of New O.P.D. Block at LNH ND 2022.12.10 2023.12.09 54.20 84.34 (Jul'23) 0.00 (Mar'24) Royel Eletcricals

Work in progress

Detail Report
Graph / Photo
251 Construction of Ramps, Railings, Toilets as per RPWD Act 2016. (Composite Work Civil and Electrical) 2022.08.06 2022.11.05 54.04 48.87 (Mar'23) 0.00 (Jan'24) LT INFRABUILD Work in Progress Detail Report
Graph / Photo
252 Annual Comprehensive once of Commercial RO System, Water Cooler with inbuilt RO+UV and Water dispensers with inbuilt RO+UV water purification of Eureka Forbes make. 2022.08.04 2024.08.03 53.69 0.00 (Mar'24) ADITI ENTERPRISES

Work in progress

Detail Report
Graph / Photo
253 Comprehensive maintenance of DBSOLX developed Complaint Tracker system. 2023.03.27 2026.03.26 53.53 12.26 (Jul'23) 0.00 (Aug'24) DBSOLX

work in progress

Detail Report
Graph / Photo
254 Erecting/ Fixing of Stainless Steel Poles Under G20 works at Technical Area Airforce Station Palam Under Sub Division-25, SWRII, PWD, New Delhi. 2023.08.24 2023.09.07 53.36 0.00 (Mar'24) TKN Developers Detail Report
Graph / Photo
255 Comprehensive maintenance Supply of material and providing services of manpower for day to day maintenance work of lawyers chamber blocks i.e. D E F G and H blocks under jurisdiction of Sub Division M 2311 KKD Court PWD Delhi dg. 2022 23. 2023.01.21 2024.01.20 53.28 62.67 (Sep'23) 0.00 (Jul'24) Mohd Azam All labour present and attending complaints Detail Report
Graph / Photo
256 Repair/Renovation work in office of Veterinary Hospital Tis Hazari in District Central.(Civil Work) 2022.04.17 2022.07.15 53.01 D.S. Construction Co Detail Report
Graph / Photo
257 Finishing works at Lift-Lobby area of Block A and C, Water proofing of roof top and repair works at various location in premises,at D-II Flats,Vasant Kunj, New Delhi 2022.03.18 2022.07.17 52.84 13.13 (Aug'22) 0.00 (Oct'23) Vision Constructions Work in Progress 80% Detail Report
Graph / Photo
258 Construction of fountain opposite NH wall. 2023.02.24 2023.03.23 52.75 74.63 (Jun'23) 0.00 (Jun'23) SP CONSTRUCTION Detail Report
Graph / Photo
259 Replacement of 3 Nos old outlived bed cum assenger lifts in Surgical ard block at L.N. Hospital New Delhi 2021.12.13 2022.06.12 52.71 44.21 (Feb'23) 0.00 (Jan'24) L.T. Elevator Pvt. Ltd. Detail Report
Graph / Photo
260 Comp. Maint of EXTREME Make LAN Sys Installed at GBPH EDP Cell ND 2021.07.21 2023.07.20 52.70 0.00 (Mar'24) TRACOM ENTERPRISES Detail Report
Graph / Photo
261 (1) Maintenance & Operation of E&M Services under PWD EMD South East, Thyagraj Sports Complex, New Delhi. 2. RMO Various E and M Services in DC (South East) Old Gargi College, Lajpat Nagar-IV, New Delhi 3. RMO all E&M Services installed at ITI Arab Ki Sarai, Nizamuddin, New Delhi.(Providing Services of Computer Operator, Office Assistant & MTS ) 2023.09.02 2024.09.01 52.64 0.00 (Jul'24) placement security services Detail Report
Graph / Photo
262 Annual Comprehensive Maintenance of 1250 KVA Capacity HT Automatic Voltage Regulator Andrew Yule make 2022.01.03 2025.01.02 52.63 21.08 (Sep'22) 0.00 (Jan'24) Harsh India Enterprises Detail Report
Graph / Photo
263 SITC of three (03) numbers 20 passenger cum bed lift at JPCH Shastri Park Delhi 2022.03.17 2022.09.16 52.54 31.52 (Oct'22) 0.00 (Nov'23) EVAAN ELEVATORS PVT LTD Detail Report
Graph / Photo
264 Repairing, replacement & extension of fire fighting, fire alarm & PA system at GTB Hospital Complex, Shahdara, Delhi 2022.06.29 2022.08.28 52.51 0.00 (Aug'23) Fire Triangle Detail Report
Graph / Photo
265 RMO of Various Electrical and Mechanical Services (Internal and External) at Prison Complex, Mandoli, Delhi. (SH: Operation and Maintenance of EI, streets light, Lift, Fire Fighting, Fire Alarm System and Solar Water Heating System installed at Prison Complex Mandoli.) 2024.04.02 2025.02.01 52.51 Vee Aar Traders Work in progress Detail Report
Graph / Photo
266 Up gradation of computer labs Cal lab Library conversion of hall into meeting room laying of paver blocks raising of boundary wall and other miscellaneous maintenance work 2022.10.16 2023.04.13 52.15 37.76 (Jun'23) 0.00 (Jul'24) JAI KALKA CONSTRUCTION COMPANY In Progress. Detail Report
Graph / Photo
267 2 x 630 KVA SUB STATION AND 2 x 210 KVAR APFC PANEL 2012.07.02 2013.01.01 52.10 Shiv Electric Detail Report
Graph / Photo
268 Providing and installation of CCTV Surveillance System (Balance Work) in Lawyers Chambers Block at District Court Karkardooma Shahdara, Delhi 2018.04.28 2018.07.27 52.07 2.63 (Aug'22) 0.00 (Aug'22) Invalid Detail Report
Graph / Photo
269 RMO UPS system installed at 2nd floor, 4th floor & 6th floor, Casualty Block, Gynae Block, Ward 14, Genetic Lab, OT Block and New OPD Block at L.N. Hospital, New Delhi 2022.04.03 2024.04.02 51.85 53.75 (Jul'23) 0.00 (Mar'24) Labotek Detail Report
Graph / Photo
270 Replacement of old existing 3 Nos. 60 TR Central AC Plant at GNEC, New Delhi. (Balance Work). 2023.06.03 2023.09.02 51.61 0.00 (Feb'24) GD Enterprises

work in progress

Detail Report
Graph / Photo
271 RMO Specialized Electrical and Mechanical services of Delhi High Court, New Delhi.(SH Repairing of existing microprocessor based Addressable fire alarm system and P.A. System at A and C Block and Extension Block of Hon ble Delhi High Court and repairing of the fire fighting, Wet Riser system) 2024.06.08 2024.08.07 51.59 0.00 (Aug'24) R K Fire Safety Device Work in progress Detail Report
Graph / Photo
272 SITC of Fire fighting system in Gynae ward Block at Lok Nayak Hospital, New Delhi 2022.05.19 2022.07.18 51.58 45.53 (Oct'22) 0.00 (Oct'22) Swastik Electrotech Pvt. Ltd. Detail Report
Graph / Photo
273 Provision of Washed Stone Grit Plaster and Roof Water Proofing of A–Block, Provision of SS Main Gates and Shed at both Main Gates. Renovation of Classrooms (with Provision of Almirah), Labs, Library, Repairing of Toilet Blocks, Staircase and Corridor Plaster, Construction of Store Room, Replacement of Window and Damaged Water Tanks and Other Misc. Works 2022.06.18 2022.12.17 51.57 61.51 (Mar'23) 0.00 (Jan'24) UR Construction Work in Progress Detail Report
Graph / Photo
274 Exterior work for repair of roof and replacement of exterior grit wash by plaster of Residential Complex and Girl's Hostel in the campus of DPSRU Complex, Pushp Vihar, Sector-III, M.B. Road, New Delhi 2022.08.02 2022.12.01 51.57 44.45 (Jun'23) 0.00 (Jul'24) Subhash Enterprises Detail Report
Graph / Photo
275 M/o Hort. work at Ring Road from Bhairon Marg T-point to Moolchand Flyover under Hort. Sub Division South-III/HD-South/PWD, New Delhi dg. 2022-23. (SH- Complete Maintenance of Hort. work.) 2022.09.17 2023.09.16 51.51 0.00 (Jan'24) Ashok Kumar Contractors abdfa0012c Detail Report
Graph / Photo
276 Providing and fixing Multicell Polycarbonate flyover sound barrier on Rani Jhansi Flyover from St. Stephens Hospital to Azad Market, Delhi under SRD Project Division-I, PWD, New Delhi. 2023.05.27 2023.06.10 51.50 0.00 (Mar'24) M.R. CONSTRUCTION CO. Detail Report
Graph / Photo
277 Miscellaneous Repair Works such as Replacement of Kitchen Cabinet, Doors of WC and Toilet Repairing of Boundary Wall Behind Type-IV Quarters, 2022.10.01 2023.03.30 51.47 21.61 (Jul'23) 0.00 (May'24) Anil Kumar Dahiya Work in progress Detail Report
Graph / Photo
278 False Ceiling Granite and Wooden Flooring work and Electrical Installation work in court rooms of East district Karkardooma Court Complex Delhi Civil and Electrical Works. 2023.03.16 2023.06.13 51.40 107.45 (Jun'23) 0.00 (Jun'24) Rakesh Kumar Rai In Progress. Detail Report
Graph / Photo
279 Upgradation of Type V Judges flat no. 602 403 Servant Qtrs. 602 403 Repair replacement of existing car parking shed around the O block and Providing and fixing stainless steel gate in place of M S gate in judges residential qtrs.at KKD Court Delhi. 2023.05.06 2023.08.03 51.34 4.96 (Jun'23) 0.00 (Jul'24) Uma Shankar Detail Report
Graph / Photo
280 Construction of 4 Nos. Rooms at 2nd Floor and 3rd Floor) (Civil and Electrical Composite Work) 2022.11.03 2023.02.02 50.98 0.00 (Mar'24) Pankaj Gureja Work in progress Detail Report
Graph / Photo
281 A/R and M/O to Delhi High Court, New Delhi during 2024-25 (SH: Stone cleaning and fastening of Lawyer Chambers Block-I, II and III, Delhi High Court, New Delhi.) 2024.07.08 2024.10.05 50.86 Jamshed Ali and Sons Work in progress Detail Report
Graph / Photo
282 Comprehensive Maintenance of RO Filtration Units 2021.12.07 2022.12.06 50.81 17.34 (May'22) 0.00 (Jan'24) M/s Vivek Associates Detail Report
Graph / Photo
283 (A) Repairing/Maintenance of Roof of the school (B) Repairing/Grit wash on Boundary wall of the Govt. Co-Ed SSS Bhorgarh(Sch. ID- 1310022), (Bldg. Id-13101121), (EORId-20211543). 2022.09.11 2023.01.11 50.80 36.74 (Mar'23) 0.00 (Aug'24) Raju Kumar Singh Work in progress Detail Report
Graph / Photo
284 Renovation of Girls Cottage 1 to 5, Boundary Wall of Park, Repairing of Ramps of Dormitory, Sewerline at Backside of Dormitory and Other Miscellaneous Work 2022.08.06 2023.02.05 50.80 26.80 (Mar'23) 0.00 (Nov'23) sabur alam Work in Progress Detail Report
Graph / Photo
285 Replacement of old existing 3 Nos. 60 TR Central AC Plant at GNEC, New Delhi 2022.01.01 2022.02.28 50.77 SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. Detail Report
Graph / Photo
286 Renovation/ Upgradation of Ward-5. 2022.09.12 2022.12.11 50.72 12.59 (Mar'23) 0.00 (Mar'24) RAJESH KUMAR JAIN & SONS

Work in progress.

Detail Report
Graph / Photo
287 Providing & Fixing of Stainless Steel Poles Under G20 works at Technical Area Airforce Station Palam Under Sub Division-24, SWRII, PWD, New Delhi. 2023.08.24 2023.09.07 50.61 0.00 (Mar'24) TKN Developers Detail Report
Graph / Photo
288 Exclusively for COVID-19 patients in current affairs in Orthopedic Block in Basement for installation of energy efficient air-conditioning plant at L.N. H 2021.01.28 2021.05.27 50.56 SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. Work in progress by M/s Skyline Air Conditioning Engineers Pvt. Ltd. Detail Report
Graph / Photo
289 Providing and Fixing Stone Bench and Stone Planter at Dhaula Kuan to IGI airport, New Delhi. 2023.01.30 2023.04.29 50.47 0.00 (Mar'24) Bhawani Constructions Detail Report
Graph / Photo
290 Comprehensive annual maintenance of Emerson Make UPS system installed at Casualty 2022.10.08 2024.10.07 50.20 16.94 (Oct'23) 0.00 (Mar'24) POWER HOUSE

Work in progress

Detail Report
Graph / Photo
291 ARMO various Electrical Installation and Mechanical Equipment at Forensic Science Laboratory, Madhuban Chowk, Sector-14, Rohini, Delhi dg. 2023-24 (SH: Operation and Preventive maintenance of 3x 200 TR York make AC plant) 2023.10.13 2024.10.12 50.19 0.00 (Aug'24) Cascade Detail Report
Graph / Photo
292 RMO E and M Services in KKD Court (Court Block) ACI, B and JKL at District Court Karkardooma Delhi. (SH Annual Comprehensive maintenance and Operation of Daikin make VRV/VRF System installed in New Court Building) 2024.04.28 2025.04.27 50.17 Modern HVAC Solutions PVT LTD Work in progress Detail Report
Graph / Photo
293 A/R and M/O various Govt. AAMCs and other Govt. buildings under Sub Divn. M-2131 and 2133 under North East (B and R) M division dg. 2023-24. 2023.07.09 2024.07.08 50.12 0.00 (Mar'24) CBC and Sons Detail Report
Graph / Photo
294 Comprehensive Maintenance of UPS System. 2023.07.30 2025.07.09 49.94 Labotek Detail Report
Graph / Photo
295 SITC of Pump Set at Drain No. 1 2022.07.11 2022.10.10 49.89 58.97 (Sep'22) 0.00 (Sep'22) Krishna Electrical works Detail Report
Graph / Photo
296 Emergent Civil Revampment and Re-Strengthening of Duct, Columns, Basement Ceiling and Retaining Wall in Court Building 2022.12.18 2023.04.17 49.76 0.00 (Mar'24) Cembond Construction Pvt. Ltd Work in Progress Detail Report
Graph / Photo
297 Supplying Installation, Testing and commissioning of HT Panel and Transformers in AIT , Shakarpur, Delhi. 2023.06.10 2023.09.09 49.76 0.00 (Dec'23) J R CONSULTANT & ENGINEERS Detail Report
Graph / Photo
298 Routine Maintenance of EI , Fans, compound light and Routine maintenance and operation of Electrical Sub Station, DG Set , Pump Set, Fire Alarm,Fire fighting, PA system 2017.06.17 2018.06.16 49.72 Krishna Electrical Works Detail Report
Graph / Photo
299 Supplying and fixing of LED Lights in Saket Bar Association office and Toilets Rooms in Lawyers Chamber Block, Saket Court Complex ND- 17. (4) Supplying and Rep. of old lights in Basement 1 and 2 in Lawyers Chamber Block, at District Court Saket. 2018.09.16 2018.11.14 49.71 60.11 (Jun'23) 0.00 (Jun'23) ACE Engineers Bureau Detail Report
Graph / Photo
300 Pdg & installation of CCTV Security Service System 2010.06.17 2010.09.16 49.56 Pan Intellicom Ltd. Detail Report
Graph / Photo
301 Comprehensive maintenance of buildings including supply of materials and providing service of man power for day to day maintenance work of ITI Vivek Vihar Fire Station Tahirpur and Shahdara under SD M 2314 during 2022 23 2023.01.22 2024.01.21 49.37 29.78 (Aug'23) 0.00 (Jan'24) In Progress. Detail Report
Graph / Photo
302 Up gradation of fire alarm system in Pathology Block at MAMC, New Delhi 2021.11.06 2022.01.05 49.32 26.79 (Apr'22) 0.00 (Apr'22) Jain Electric Works Detail Report
Graph / Photo
303 Providing and Laying Water Proofing Treatment, Exterior Repair and Strengthening Beam, Chajja and Other Misc. Civil Works at Satyawati College (Balance Work). 2023.01.01 2023.03.31 49.30 18.46 (Mar'23) 0.00 (Aug'24) Sh. Waseem Akram Work in Progress Detail Report
Graph / Photo
304 Construction of parking shed, covering of balconies, renovation of residential Quarters and other misc. civil repair works at Fire Station Gokalpur, Delhi. 2023.04.05 2023.06.03 49.30 0.00 (Feb'24) SUSHIL KUMAR Detail Report
Graph / Photo
305 Providing services of office staff like Computer Operator, Messenger, Peon, Sweeper etc. at Division office & Sub-Division-II at PTS Malviya Nagar, New Delhi. 2023.03.17 2024.03.16 49.14 0.00 (Mar'24) R.K. Jain& Sons Hospitality Servies (P) Ltd. Work in Progress 20% Detail Report
Graph / Photo
306 Providing Services of Data Entry / Computer Operator, Messenger, MTS etc. for office of DOH and various office under Horticulture Division East. 2023.02.27 2024.02.26 48.84 27.37 (Oct'23) 0.00 (May'24) Goodone Security Service Pvt Ltd Detail Report
Graph / Photo
307 Provision of new gate of stainless steel at the entry of Delhi Secretariat 2022.04.15 2022.10.14 48.82 SHREE VISHNU STEEL WORKS Detail Report
Graph / Photo
308 Construction of Underground water tank, open cafeteria, Aluminium Cupboards, notice Boards, Laptop Workstation at Aditi Mahavidyalaya. 2023.04.19 2023.06.17 48.68 0.00 (Mar'24) Kohinoor Enterprises Detail Report
Graph / Photo
309 Comprehensive maintenance of 310 DA staff qtrs Supply of materials and providing services of manpower for day to day maintenance work of 310 DA staff qtrs Karkardooma Delhi under jurisdiction of Sub Division M 2313 during 2022 23. 2023.02.11 2024.02.10 48.48 29.23 (Oct'23) 0.00 (Jul'24) JAI KALKA CONSTRUCTION COMPANY In progress. Detail Report
Graph / Photo
310 Construction of New RCC framed Structure boundary wall, with red sand stone and fixing of concertina coil (Phase-1 2023.05.24 2023.09.20 48.45 0.00 (Nov'23) B.R. Sonwal & Sons work in progress Detail Report
Graph / Photo
311 Repair/maintenance work in Raj Niwas, 1, Mahadev Road, 217 & Aap Party Office DDU Marg & Session House Delhi 2022.09.18 2023.03.13 48.22 64.74 (Feb'23) 0.00 (Feb'23) Mool Chand Detail Report
Graph / Photo
312 Providing and Laying of Lumber Processor System ic operation and maintenance for 2 years after completion of work 2022.08.31 2022.09.29 48.15 56.18 (Mar'23) 0.00 (Aug'24) LAXMAN Detail Report
Graph / Photo
313 Comprehensive (civil works) maintenance of DA flats 2022.07.13 2023.07.12 48.04 95.00 % (Jun'23) Rainbow Constructions Detail Report
Graph / Photo
314 Providing Laying of Lumber processor system 1st Recall 2022.02.12 2022.03.13 47.96 52.60 (May'23) 0.00 (Aug'24) Laxman In Progress. Detail Report
Graph / Photo
315 Construction of Porta Cabin for security officers and outer force near Annexure -II building at Tis Hazari , Delhi.(Balance Work) 2023.08.04 2023.09.18 47.83 0.00 (Dec'23) Ismail Detail Report
Graph / Photo
316 Supplying & replacement of old/burnt out main power supply to building (HT Panel) in Sub Station No. 1 at GTB Hospital Complex, Shahdara, Delhi. 2023.03.18 2023.05.17 47.83 40.00 (Jul'23) 0.00 (Aug'23) Ajay Machine Tools Detail Report
Graph / Photo
317 Repair and Maintenance of AAMCs under North Building Division (M 322), PWD, Delhi. 2022.05.22 2023.05.21 47.49 39.64 (Apr'23) 0.00 (Dec'23) GEE Internationals Work in Progress Detail Report
Graph / Photo
318 micro controller display system 2013.04.14 2013.06.13 47.03 Bontronics System & Devices Detail Report
Graph / Photo
319 Comprehensive maintenance of Thyssenkrupp make lifts 2022.02.19 2025.02.18 47.02 0.00 (Jun'24) TK Elevator India Private Limited Detail Report
Graph / Photo
320 A/R & M/O 62 Nos DA flats at Motia Khan under Sub Divn. IV, SRDP-I, PWD, College of Art, Tilak Marg, New Delhi dg. 2023-24.(Mechanized Housekeeping of Block 2 & Block 5, Motia Khan building Campus) 2023.08.28 2024.08.27 46.96 0.00 (Mar'24) Friends Detective Security Services Detail Report
Graph / Photo
321 Replacement of Defective/ Burnt-out fittings with new LED fittings Power/light plug etc. in Lawyers Chambers Blocks at District Court Karkardooma, Delhi. 2019.01.19 2019.04.18 46.93 21.98 (Jan'20) 0.00 (Jan'20) S K Engineers Detail Report
Graph / Photo
322 Repair & Restoration of footpath from 25 foota to Kachha Talab at Goyala Deenpur road under sub division-25. 2023.05.13 2023.07.11 46.70 0.00 (Mar'24) Invalid Detail Report
Graph / Photo
323 Repair and Replacement of damaged broken window, ventilators, doors, wall tiles and Construction of Parking shed and sprucing up the building premises at Fire Station, Bawana, Delhi 2023.04.19 2023.06.17 46.61 0.00 (Mar'24) Jeetender Kumar Verma Detail Report
Graph / Photo
324 Providing the services of Skilled, Semi-skilled, un-skilled staff & House keeping etc for day to day maintenance at D-II flats, Vasant Kunj, New Delhi. 2023.04.03 2024.04.02 46.42 0.00 (May'24) R.K. Jain and Sons Hospitality Services Pvt. Ltd.

Work in Progress 70%

Detail Report
Graph / Photo
325 Supplying And Fixing of Solar Studs Under G20 works at Technical Area Airforce Station Palam Under Sub Division-25, SWR-II, PWD, New Delhi. 2023.08.30 2023.09.13 46.38 0.00 (Mar'24) Nishant Const. co Detail Report
Graph / Photo
326 Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System 2020.09.28 2023.09.27 46.00 12.27 (Mar'23) 0.00 (Jan'24) DB Solx Work in progress by M/s D.B. Solx Detail Report
Graph / Photo
327 Running & Maintenance of Effluent Treatment Plant at GTB Hospital Complex, Shahdara, Delhi [Maintenance and Operation of capacity 1.2 MLD ETP (Texol) based on EBR technology) 2023.10.21 2024.10.20 45.95 Wellkome engineers Detail Report
Graph / Photo
328 Repair & renovation and day to day maintenance of E-Sub Registrar Office building at Libaspur, Delhi. 2023.08.02 2023.10.30 45.61 0.00 (Mar'24) DILIP KUMAR SAH Detail Report
Graph / Photo
329 (A) Construction of new septic tank (B) Providing and laying horticulture pipe line and sewer line for toilets in CH-I & II. 2022.05.31 2022.08.30 45.54 44.18 (Jun'23) 0.00 (Jun'24) IZHAR AHMED Work in Progress Detail Report
Graph / Photo
330 1.MOEI,fans at GynB,Sk,2. M.O.E.Ifansat Spe.WB,T.B. cent3. M.OE.I,F at Casu B,OPD4. MOEI.,fan at Sur B,NOT,MS off5. RMOF F. Sys inst vari buil 6. RMO Fire AlaSys instat var.bui7 RMO Sub StatNo.1234 ,8. RMO Pumset at SHMaint,Operof EM ser. 2019.07.18 2019.09.17 45.38 45.38 (Oct'19) 0.00 (Oct'19) M/s Vivek Associates, PAN: AAEPB5404H, Address: 205, Iind Floor, Plot No. 8, Chabra Complex, Veer Savarkar Block, Near Nirman vihar, Metro station, shakarpur, Delhi-110092 work in progress by M/s Vivek Associates and 3rd RA paids Detail Report
Graph / Photo
331 Operation and Comprehensive Maintenance of Bosch Make CCTV System at casualty Block, Special ward Block and Gynae Block 2020.12.13 2022.12.12 45.28 9.43 (May'22) 0.00 (May'22) HITECH AUDIO SYSTEMS PVT LTD Work in progress by M/s Hi-tech Audio System Detail Report
Graph / Photo
332 Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System at GIPMER, New Delhi 2020.04.28 2023.04.27 44.66 14.88 (Apr'22) 0.00 (Oct'23) DBSOLX work in progress by M/s D.B. Solx Detail Report
Graph / Photo
333 Comprehensive Maintenance of DBSOLX developed Complaint Tracker System at GNEC 2019.11.03 2020.11.02 44.66 17.57 (Mar'23) 0.00 (Mar'23) DBSOLX work in progress by DB SOLX Detail Report
Graph / Photo
334 Comprehensive Maintenance and operation of DBSOLX developed Complaint Tracker System at Meerdard Lane, New Delhi 2020.04.09 2023.04.08 44.65 7.11 (Jul'22) 0.00 (Dec'23) SCS Technologies work in progress by SCS Technologies Detail Report
Graph / Photo
335 Change of tenancy for 6nos. Judge’s flats at Residential Complex. 2023.07.12 2023.12.11 44.63 0.00 (Jun'24) SABUR ALAM Detail Report
Graph / Photo
336 Renovation of toilet block in A,B & C block, repairing of boundary wall replacement of gate, repairing of Guard room and fixing of fencing wire) (Sch. ID1310049). 2023.07.01 2023.10.28 44.62 0.00 (Nov'23) Ankur Bhardwaj Detail Report
Graph / Photo
337 RMO Elect. and Mech. Services in Lawyers chambers Block D E F G and H at District Courts Karkardooma Delhi. SH-Operation of lifts in Lawyers chamber Blocks. 2018.10.01 2019.09.11 44.60 37.15 (Mar'21) 0.00 (Mar'21) Guruji Elevator Detail Report
Graph / Photo
338 Repair/maintenance work in Raj Niwas, 1, Mahadev Road, 217 & Aap Party Office DDU Marg & Session House Delhi. 2023.02.18 2023.08.15 44.56 0.00 (Jan'24) JAI KALKA CONSTRUCTION COMPANY Detail Report
Graph / Photo
339 Day to day Running Maintenance & Operation of Electrical and Mechanical services of MAIDS Phase- II Building, New Delhi 2022.07.01 2023.06.30 44.55 21.45 (Apr'23) 0.00 (Feb'24) GLOBAL ENTERPRISES

Work in progress

Detail Report
Graph / Photo
340 Laying of new grid line for the drinking water purpose. 2023.04.30 2023.07.29 44.34 Rainbow Constructions work in progress. 20% work has been done. Detail Report
Graph / Photo
341 EOR to 405 DA flats, Kalyanvas dg. 2023-24. (SH: Laying of new grid line for the drinking water purpose). 2023.04.30 2023.07.29 44.34 20.00 % (Jun'23) Rainbow Constructions

work in progress.

Detail Report
Graph / Photo
342 Comprehensive Maintenance of RO Filtration Units 2021.10.30 2022.04.29 44.32 32.26 (Aug'22) 0.00 (Aug'22) M/s Vivek Associates Detail Report
Graph / Photo
343 RMO UPS system installed at 2nd floor, 4th floor and 6th floor Casualty Block, Gynae Block, Ward 14, Genetic Lab, OT Block and New OPD Block at L.NHSHComprehensive annual maintenance of Magna Flux Make UPS system installed at New OPD BlockL.N.H 2019.08.31 2022.08.30 44.30 15.02 (Feb'23) 0.00 (Feb'23) power house Work in progress by M/s Power House. Detail Report
Graph / Photo
344 ComprMaint opera of DBSOLX devel Comp Tracker Sys at MAMC 2020.01.01 2022.12.31 44.22 0.00 (Mar'24) SCS Technologies

work in progress by SCS Technologies

Detail Report
Graph / Photo
345 Complete maintenance of garden Features at Delhi Vidhan Sabha. 2023.02.04 2024.02.03 44.06 29.37 (Oct'23) 0.00 (Jan'24) Pioneer Horticulturist Pvt. Ltd Detail Report
Graph / Photo
346 Supplying, Installation, Testing and Commissioning of Centralized cooling and heating type AirConditioning System in ward 26 New Medical Block, CCU & RCU at L. N. Hospital, New Delhi. 2022.05.15 2022.07.14 43.91 0.00 (Jan'24) Sai Aircon Engineers

Work in progress

Detail Report
Graph / Photo
347 Providing and fixing Solar Hybrid street light system in existing light 2022.05.21 2022.06.20 43.85 54.80 (Aug'22) 0.00 (Aug'22) SAFTY Engineers, PAN: AARPW4473E, Address: 1836/3F, Shp No. 8, Bhagirath Place, New Delhi-72

Work in progress

Detail Report
Graph / Photo
348 Renovation/Upgradation of Auditorium Hall in ABCON at LN Hospital, New Delhi 2022.10.04 2022.12.03 43.81 0.00 (Dec'23) KUNAL

Work in progress

Detail Report
Graph / Photo
349 Supply, Installation, Testing & Commissioning of 500 KVA Silent type DG Set with AMF Panel at Badarpur Pump House under PWD EMD South East. 2023.06.10 2023.08.09 43.65 0.00 (Mar'24) Ist alarm system associates Private Limited Detail Report
Graph / Photo
350 Comprehensive Maintenance of Microprocessor based nurse call bell system 2021.11.11 2023.11.10 43.61 46.79 (Oct'23) 0.00 (Jan'24) AKOUSTIK COMMUNICATIONS Detail Report
Graph / Photo
351 Construction of footpath at one side of Rao Laxmi Chand Marg from Ghummanhera to Jhuljhuli Morh and in front of Govt. School Ghummanhera facing towards road under Sub Division-23, New Delhi) 2022.12.08 2023.03.07 43.58 53.75 (Jun'23) 0.00 (Jun'23) Sirohi Construction Co Detail Report
Graph / Photo
352 Remodeling of drain opposite Goyala dairy and construction of Footpath at various stretch From Dwarka Sector 19 red light to Tajpur mor on Goyala Deenpur Road under Sub Division- 25, New Delhi. 2023.04.05 2023.06.03 43.58 ABHILEKH YADAV Detail Report
Graph / Photo
353 Mechanized Cleaning of over head & underground tank. 2023.04.04 2024.04.03 43.39 0.00 (Mar'24) Unitech Water Solution

Work in Progress 68%

Detail Report
Graph / Photo
354 M/o Hort. work in Non-residential Building under HSDM-East, HDM East, PWD GNCTD Delhi dg 2022-23. 2023.04.25 2024.04.23 43.17 0.00 (May'24) GARDEN GLOW Detail Report
Graph / Photo
355 Running Comprehensive Maintenance of Eureka Forbs water treatment RO sys, water coolers with inbuilt UV/ RO sys water dispenser with inbuilt RO Sys 2022.12.31 2024.12.30 43.13 0.00 (Mar'24) ADITI ENTERPRISES

work in progress

Detail Report
Graph / Photo
356 Replacement of old/defective Panel Board, rising mains & cable due to enhancement of electrical load in New Medical Block at LN Hospital, New Delhi 2022.12.06 2023.02.05 43.05 15.36 (Mar'23) 0.00 (Mar'24) RCC Enterprises

work in progress

Detail Report
Graph / Photo
357 Comprehensive maintenance and operation of DBSOLX developed Complaint Tracker System. 2023.06.05 2025.06.04 43.00 0.00 (Jan'24) SCS Technologies Detail Report
Graph / Photo
358 Replacement and Extension of existing steam boiler pipeline in Gyane Block and Repair/Replacement of rusted boiler pipe lines and faulty valves at Lok Nayak Hospital, New Delhi. 2023.04.04 2023.06.03 42.90 0.00 (Feb'24) A. K. Machinary Tools

work in progress

Detail Report
Graph / Photo
359 Regarding providing and fixing wall tiles, almirah, interlocking tiles and renovation of labs and MP hall at SKV A-Block, Plot No.5, Jahangir puri, Delhi - 110033 (Sch Id. 1309279) (Bldg. Id. 13091875) (EOR Id. 20211168) 2022.04.18 2022.08.15 42.66 55.20 (Mar'23) 0.00 (Dec'23) Rang Lal Singh Work in Progress Detail Report
Graph / Photo
360 Renovation of temporary structure of ‘Typists Pool’ in the rear side of the Lawyer’s Chamber Block-1 of the High Court of Delhi. 2024.06.19 2024.07.18 42.57 R L WADHWA Work in progress Detail Report
Graph / Photo
361 Making arrangement of water through stainless steel water tankers 2022.08.11 2023.02.10 42.53 45.60 (Jun'23) 0.00 (Oct'23) AMIT WATER SUPPLIYERS Detail Report
Graph / Photo
362 Repair of toilet block, Corridor, Varandah, Laundary area and other misc. works at Ashadeep, Narela, Delhi 110040 2022.06.30 2022.10.27 42.47 52.26 (Jun'23) 0.00 (Jun'24) MAHIDEEP SHARMA Work in progress Detail Report
Graph / Photo
363 Repairing of damaged internal road, improvement of drainage system and other misc repair works 2023.07.05 2023.10.02 42.40 0.00 (Mar'24) WaJid Detail Report
Graph / Photo
364 Comprehensive maintenance of HVAC 752HP Daikin Make VRVAHU system installed at MAIDS Phase II NewDelhi 2022.06.08 2023.06.07 42.25 20.57 (Mar'23) 0.00 (Feb'24) TF AIR SYSTEMS PRIVATE LIMITED

Work in progress

Detail Report
Graph / Photo
365 Comprehensive annual maintenance of APC Make UPS system installed at OT Block Genetic Lab Ward 14 L.N. Hospital 2020.12.13 2023.12.12 42.11 8.19 (Aug'22) 0.00 (Feb'24) POWER HOUSE Work in progress by M/s Power House Detail Report
Graph / Photo
366 Renovation and modification of De-stress Room at 3rd floor, Medical Health Centre, Delhi High Court, New Delhi. SW:- Water proofing and roof treatment Heat Resistant Tiles, sanitary fittings, Fire safety doors and other misc. works. 2024.03.18 2024.05.16 41.92 R L WADHWA Work in progress Detail Report
Graph / Photo
367 Providing Security equipment at Gate No. 3 at District Court Karkardooma Delhi. 2022.09.11 2022.11.10 41.90 35.83 (Apr'23) 0.00 (Mar'24) Invalid Detail Report
Graph / Photo
368 Comprehensive and routine maintenance and operation of Audio and Video Conference installed at District Court Dwarka Bosch make. 2023.09.22 2026.09.21 41.85 Pan Intellecom Ltd Detail Report
Graph / Photo
369 Operation and maintenance of Pelco Make CCTV surveillance system at Rouse Avenue Court Complex, DDU Marg, New Delhi. 2024.03.26 2025.03.25 41.45 0.00 (May'24) SONAL ENTERPRISES PVT. LTD Work in progress Detail Report
Graph / Photo
370 Renovation Upgradation of Ward 6 Balance Work. 2023.06.13 2023.10.10 40.97 0.00 (Mar'24) Hak Construction Co

Work in progress.

Detail Report
Graph / Photo
371 Replacement of out lived fire alarm system at Tis Hazari Courts Building, Delhi. 2017.09.30 2017.12.29 40.96 34.00 (Oct'21) 0.00 (Oct'21) Royale Meridian (India ) Pvt. Ltd. Detail Report
Graph / Photo
372 RMO Electrical and Mechanical Service at District Court Rohini, Delhi(SH: Annual Comprehensive Maintenance of Coral make cloud based server and Topaz make lift Voice Announcement system) 2024.01.04 2026.01.03 40.95 0.00 (Mar'24) M/s TOPAZ SERVICES CORPORATION Detail Report
Graph / Photo
373 Interior Renovation Work of Doctor’s Hostel Library at Deen Dayal Upadhyay Hospital, Hari Nagar, New Delhi. 2023.02.05 2023.08.04 40.88 1.09 (May'23) 0.00 (Mar'24) Ravi Ranjan

Work in progres.

Detail Report
Graph / Photo
374 Providing Services for Running the Computer Operator, Messengers and Watch and Ward for Sub Division Office-1,2,3,6 2023.05.01 2024.04.30 40.82 R K Enterprises Work in Progress Detail Report
Graph / Photo
375 Operation and Comprehensive maintenance of 500 KLD ETP having BMW and OLM 2022.12.22 2024.12.21 40.77 0.00 (Jan'24) Wellkome engineers work in progress by M/s Wellkome Engineers Detail Report
Graph / Photo
376 Repair/Renovation of Electrical installation in the existing Working Womens' Hostel at Vishwas Nagar, Delhi. 2023.08.21 2023.11.20 40.73 0.00 (May'24) Cool India Detail Report
Graph / Photo
377 Urgent Essential Civil works in ward 21 at GTB Hospital, Shahdara, Delhi. 2023.05.26 2023.09.22 40.40 0.00 (Mar'24) Nasir Ali Work is in progress Detail Report
Graph / Photo
378 Supplying Outsourcing Staff for Day to Day Maintenance Work of DA Flats 2022.12.19 2023.12.18 40.37 20.43 (Aug'23) 0.00 (Jul'24) R.K JAIN & SONS HOSPITALITY SERVICE PRIVATE LTD. Work in Progress Detail Report
Graph / Photo
379 Annual Comprehensive maintenance of 1.5 TPH capacity fire tube Boilers (2 Nos.), Operation of Boilers and Water Softening Plant 2022.09.10 2024.09.09 40.25 0.00 (May'24) Boilermart Detail Report
Graph / Photo
380 Enhancing accessibility of built up environment of ITI Nand Nagri, Delhi-110093 -2nd call 2019.09.23 2019.12.22 40.22 43.67 (Sep'21) 0.00 (Sep'21) Invalid

work in progress

Detail Report
Graph / Photo
381 Renovation of Toilet and Primary Wing with Repairing of all Leakage, Upgrade System and Other Misc. Work 2022.02.27 2022.05.26 40.20 0.00 (Jan'24) Anshika Construction Co. Work in Progress Detail Report
Graph / Photo
382 Improvement of area around school Building 2012.08.26 2012.10.25 40.10 0.00 (Feb'14) 60.00 % (Feb'14) Murtaza Const. Co. Detail Report
Graph / Photo
383 RMO various electrical & mechanical services at Ch. Braham Prakash Ayurvedic Charak Sansthan, Khera Dabar, New Delhi during 2023-24 & 2024-25.(Repairing, Operation and routine maintenance of STP at CBPACS, Khera Dabar) 2023.08.14 2025.09.13 39.93 M/s Parasar Electricals & Refrigeration Detail Report
Graph / Photo
384 Modification and repairing of existing ETP plant of Capacity of 500 KLD at GNEC, New Delhi 2023.01.12 2023.03.11 39.90 41.42 (Apr'23) 0.00 (Apr'23) Texol Engineers

work in progress

Detail Report
Graph / Photo
385 Supplying of Materials & Manpower Services for Day to Day Maintenance. 2023.01.19 2023.07.18 39.60 31.63 (Mar'23) 0.00 (Aug'23) Work in progress Detail Report
Graph / Photo
386 Regarding Provision of Coba for Old Building, Guard Room with Wash Room, Overhead Tank, Counter Slab with Water Line in Chemistry, Physics and Biology Labs, Waiting Room with Covered Shed and all side Open for Parents, Shed on Assembly Stage, Replacement of Old Windows and Ventilators, P/F Grill for Protection of Green Plant of the School and Reconstruction of Broken Boundary Wall 2022.06.18 2022.09.17 39.53 32.56 (May'23) 0.00 (Mar'24) LT INFRABUILD Work in progress Detail Report
Graph / Photo
387 EOR to CPMF Site PTS Wazirabad to facilitate camping personnel Delhi 2018.09.25 2018.11.24 39.50 14.01 (Feb'20) 0.00 (Feb'20) S K Engineers Work in progress Detail Report
Graph / Photo
388 Operation and Routine Maintenance of E & M services 2022.03.11 2022.09.10 39.37 M/s R S Electricals Detail Report
Graph / Photo
389 Complete Maintenance of garden features at Rajniwas, Ministers Bungalows (2, 3 &4) at Rajniwas marg and Session House-2 and residence of Hon’ble Judges. 2023.05.12 2024.05.10 39.30 0.00 (May'24) Dev Hort. Services. BPXPS9958A Detail Report
Graph / Photo
390 Operation, Comprehensive maintenance and repairing of 25000 LPH RO Plant at CBPACS, Khera Dabar. 2023.06.08 2025.06.07 39.23 Graphite Works Detail Report
Graph / Photo
391 Special repairs and water proofing treatment of 31 class rooms of old building of GSKV Alipur on urgent basis at SKV. Alipur (ID-1310031), (Bldg. ID-13101515) & (EOR ID-20212310). 2023.08.02 2023.10.30 39.20 0.00 (Feb'24) MAHIDEEP SHARMA Detail Report
Graph / Photo
392 Comprehensive maintenance and operation of 4 x 400 TR Central HVAC Plant. 2019.05.20 2020.05.19 39.01 Unique Engineers Pvt. Ltd. Detail Report
Graph / Photo
393 RMO specialized Electrical and Mechanical services of Delhi High Court, Delhi (SH Operation and Routine Maintenance of NEC make EPBAX system installed in Delhi High Court at A Block) 2024.04.09 2025.04.08 38.95 Galaxy Telecommunication Work in progress Detail Report
Graph / Photo
394 Providing Security Guards at North and South Block of New Court Building at District Court Complex, Saket, New Delhi. 2023.02.14 2023.05.13 38.85 10.00 (Mar'23) SS4 SAFENET Detail Report
Graph / Photo
395 Routine, operation and maintenance of Stacker and Puzzle car Parking system 2022.06.20 2023.06.19 38.75 19.38 (Mar'23) 0.00 (Mar'23) Ram Ratna Infrastructure Pvt.

Work in progress

Detail Report
Graph / Photo
396 Internal & External finishing, cleaning and de-silting of sewer line. 2023.06.15 2023.12.12 38.74 0.00 (Sep'23) Mateen Ahmad In-progress Detail Report
Graph / Photo
397 Painting work on Kerb stone / Railing/ Thermoplastic paint 2022.09.22 2023.09.21 38.60 0.00 (Jan'24) Ashok Builders Detail Report
Graph / Photo
398 Maintenance and Operation of Pakage, Tower type AC units, water coolers and Pressurization & vetllation System. 2023.02.27 2024.02.26 38.48 9.62 (Jun'23) 0.00 (Mar'24) M/s Naj Refrigeration & Air Conditioning Works Detail Report
Graph / Photo
399 Providing Internal electrical Installation 2013.06.17 2013.08.01 38.45 Subham Electric Works Detail Report
Graph / Photo
400 Comprehensive maintenance of microprocessor based nurse call bell system 2019.10.28 2021.10.27 38.45 AKOUSTIK COMMUNICATIONS work in progress by Akoustik Communication Detail Report
Graph / Photo
401 Comprehensive maintenance of 3 x 100 KVA UPS system of Emerson make 2022.07.26 2025.07.25 38.32 0.00 (Mar'24) Power House Detail Report
Graph / Photo
402 Repair and Renovation of Workshop and Making Modification in room no. 9 of Women Wing 2019.08.30 2019.12.29 38.26 15.93 (Oct'21) 0.00 (Oct'21) Saeeduddin

work in progress

Detail Report
Graph / Photo
403 Comprehensive Maintenance and RMO of UVSS (Under Surveillance System) along with Automated License Plate reader, Driver Photo module and RFID management system for District Court Saket, New Delhi.(SH Comprehensive maintenance of UVSS along with Automated License Plate reader, Driver Photo module and RFID management System and operation of boom barriers). 2024.06.28 2025.06.27 38.22 SONAL ENTERPRISES PVT. LTD Work in progress Detail Report
Graph / Photo
404 Provision of air conditioning by VRV of room no. 353, 369, 370, 371 in Microbiology Department at MAMC 2021.11.02 2022.01.01 38.22 26.16 (Jan'23) 0.00 (Jan'23) Sai Aircon Engineers Detail Report
Graph / Photo
405 Upgradation of existing addressable fire alarm system at Dr. Hedgewar Arogya Sansthan, Karkardooma, Delhi. 2023.06.28 2023.08.27 38.03 0.00 (Jun'24) DELHI TRADERS AND ENGINEERS Detail Report
Graph / Photo
406 ARMO various electrical installation and mechanical equipment at Rohini Delhi dg. 2023-24(SH: Operation and Routine maintenance of EI & Fans and fittings & sub-station and Operation of RO plant.) 2023.12.04 2024.12.03 37.99 0.00 (Mar'24) SHASHANK ELECTRICALS Detail Report
Graph / Photo
407 SITC of Air Cooled Scroll Chiller Unit 17 Tr x 3 Nos for Lecture Hall in UCMS at GTB Hospital, Dilshad Garden, Shahdara, Delhi. 2023.06.28 2023.08.27 37.88 0.00 (Mar'24) KM H-VAC SYSTEM Detail Report
Graph / Photo
408 Repairing / Replacing of Roofing in Library Block at Dr.B.R. Ambedkar University During 2022-23. 2023.01.22 2023.03.21 37.87 0.00 (Aug'24) Jamshed Ali and Sons Detail Report
Graph / Photo
409 Water proofing of roof, Repairing of ceiling and stair case with SS rail, Granite stone work, Replacing of window, doors, damaged false ceiling and other misc. civil repair work in Sub Division-II, III, IV, SD-III electrical and Division Office--- 2022.09.06 2023.01.05 37.85 14.97 (Mar'23) 0.00 (Mar'24) PURAN CHAND Work in progress 90% Detail Report
Graph / Photo
410 RMO E and M Services in KKD Court Court Block ACI B JKL at District Court KKD Delhi. SH- Operation of lifts in Court Blocks 2018.09.25 2019.09.24 37.84 33.43 (Nov'19) 0.00 (Nov'19) Royal Electrical Co. Detail Report
Graph / Photo
411 Renovation of Principal office, providing SS railings in corridor, providing new main gate and other misc. works in GBSSS No.2 JJ Colony Bawana Delhi (School ID 1310460) 2022.05.22 2022.07.21 37.75 30.75 (Apr'23) 0.00 (Jun'24) Ravi Construction Co. Work in Progress Detail Report
Graph / Photo
412 Improvement of drainage system in front of DMRC Academy Shastri park on Eastern Approach Road. 2023.01.15 2023.02.28 37.65 16.77 (May'23) 0.00 (Jan'24) CBC and Sons Detail Report
Graph / Photo
413 Renovation of Multipurpose Hall of Mahatma Gandhi Institute For Combating Climate Change (MGICCC), Bakoli, Delhi-110036. 2023.04.27 2023.08.24 37.63 0.00 (Mar'24) ES TEE SOLUTIONS Detail Report
Graph / Photo
414 RMO Pump Set & Fountain, SCADA at College building, various hostel and Type VI, Type V, Type I, Residential Quarters at MAMC, New Delhi. (SH:- Operation and comprehensive RDS make automation of water supply and SCADA system installed at various location) 2020.03.07 2022.03.06 37.57 23.40 (Apr'23) 0.00 (Apr'23) RECKTRONIC DEVICES AND SYSTEMS work in progress by M/s Recktronic Devices system Detail Report
Graph / Photo
415 Cleaning, mopping of common area, like lift lobby, staircase, basement, community centre, footpath area, terrace, servant qtr. etc. by mopping machine at Residential Complex Saket--- 2022.12.14 2023.12.13 37.52 21.39 (Oct'23) 0.00 (Feb'24) R.K. Jain& Sons Hospitality Servies (P) Ltd. Work in Progress 60% Detail Report
Graph / Photo
416 Replacement of old and unserviceable air washer for kitchen and basement exhaust system 2022.07.30 2022.09.29 37.49 0.00 (Jul'24) S.K ENGINEERS Detail Report
Graph / Photo
417 EOR to District Court, Delhi during 2023-24 (SH: Renovation of meeting Room no. 403 in main court building under central Sponsored Scheme at Rohini Court Complex) (Revised) 2024.03.22 2024.05.21 37.45 0.00 (Jul'24) rahul associates Work in progress. Detail Report
Graph / Photo
418 Renovation of various rooms (Room No. 502-506, 534, 537, Toilets, Gallery) of Clinical Biochemistry, HLS in Blood Bank, Ward Block at GTB Hospital, Shahdara, Delhi. 2023.09.18 2023.11.17 37.36 0.00 (Feb'24) SAM ELECTRICALS Detail Report
Graph / Photo
419 Supply and Replacement of Defective Air Handling Units at various location as and when required at Delhi Sachivalaya, New Delhi 2022.04.28 2022.07.27 37.30 0.00 (May'24) M/s S K Engineers Detail Report
Graph / Photo
420 Comprehensive Maintenance of CMos Make Servo Voltage stabilizers installed at different locations 2023.01.17 2026.01.16 37.23 9.85 (Oct'23) 0.00 (Aug'24) S S Sales and Services

work in progress

Detail Report
Graph / Photo
421 RMO E and M services at New Delhi District Court Complex at Rouse Avenue, DDU Marg, New Delhi. (SH Comprehensive Annual Maintenance of HVAC Plant) 2024.03.05 2025.03.04 37.19 0.00 (Aug'24) DB-AIRE India Pvt. Ltd. Work in progress Detail Report
Graph / Photo
422 Pdg Nurse Call Bell System 2010.06.25 2010.08.24 37.15 Veekay Control Device Detail Report
Graph / Photo
423 Routine maintenance and operation of Lifts 2018.05.16 2019.05.15 37.05 33.96 (Apr'19) 94.00 % (Apr'19) Swastik Electrotech Pvt. Ltd. Work transferred and in progress Detail Report
Graph / Photo
424 EOR to EI and Fans and PA System at Govt. GSSS No.1 Ghonda Delhi-110053 (School ID- 1104025). 2019.01.14 2019.03.13 36.91 48.49 (Jan'20) 0.00 (Jan'20) V K Electrical Works Work in progress Detail Report
Graph / Photo
425 Providing services of Labour for Day to Day Maintenance. 2023.05.22 2024.05.21 36.90 0.00 (Sep'24) M/s Trendy Security Services Detail Report
Graph / Photo
426 A/R & M/O to various building under Division M-222 Delhi dg 2021-22 (SH: Providing Services of Data Entry/ Computer Operator, Messenger cum MTS and Clerk.). 2021.08.31 2022.08.30 36.67 37.41 (Dec'22) 0.00 (Dec'22) TRENDY SECURITY SERVICES Detail Report
Graph / Photo
427 Comprehensive Maintenance and Operation of Lifts installed in Main Court Building, Lawyers Block and residential block at District Court, Saket, New Delhi. (SH- Comprehensive maintenance of Johnson make lift) 2019.01.27 2020.01.26 36.66 77.93 (Apr'23) 0.00 (Apr'23) Invalid Detail Report
Graph / Photo
428 Providing EI Fans fire fighting systems Air conditioning unit 2022.12.06 2023.02.05 36.61 23.94 (Mar'23) 0.00 (Mar'23) Jain Electric Works

Work in progress

Detail Report
Graph / Photo
429 Renovation of office area of Pay and Accounts Office -IV and Pay and Accounts Office-VI in Treasury Building, Tis Hazari Court Complex, Delhi. (Civil Work) 2022.04.16 2022.06.14 36.42 0.00 (Nov'23) D.S. Construction Co Detail Report
Graph / Photo
430 Operation and Comprehensive Maintenance of 500 KLD ETP having BMW and OLMS system 2020.05.01 2022.04.30 36.30 0.00 (May'24) Wellkome engineers Work in progress by M/s Wellkome Engineer Detail Report
Graph / Photo
431 Providing and Installation of 500 KVA capacity Silent type DG Set for MSO Building, New Delhi. 2017.09.12 2018.01.11 36.23 Himalaya Generators Detail Report
Graph / Photo
432 Replacement of Defective/ Burnt-out fittings with new LED fittings ceiling fans fresh air fan power points etc. in Flats Type-II Type-III Type-IV Type-V Type-VI and Duplex in O block residential Complex at District Court Karkardooma Delhi 2018.09.05 2018.12.04 36.23 35.80 (Oct'19) 0.00 (Oct'19) Krishna Electreical Works Detail Report
Graph / Photo
433 Operation & maintenance of Pelco Make CCTV surveillance system at Rouse Avenue Court Complex, DDU Marg, New Delhi. 2023.04.16 2024.04.15 36.22 0.00 (Jan'24) SONAL ENTERPRISES PVT. LTD Work in progress Detail Report
Graph / Photo
434 Compr Maint of DBSOLX devel Compl Track Sys at L.N.H 2019.10.12 2022.10.11 36.21 0.00 (Oct'23) DBSOLX work in progress by DB SOLX Detail Report
Graph / Photo
435 Renovation work at 7th floor in New surgical block at L.N H SH S I T C of modular type Var. Refr. Flow/Var. Refr. Volume air cooled outdoor units 2020.06.26 2020.08.25 36.12 Royel Electricals work in progress by M/s Royel Electrical. Detail Report
Graph / Photo
436 RMO E and M Services installed at District Court Karkardooma Delhi. (SH Comprehensive maintenance and Operation of Pelco make CCTV Surveillance System) 2024.05.30 2025.05.29 36.07 Ashri Electronics Security Solutions Pvt. Ltd. Work in progress Detail Report
Graph / Photo
437 Providing and fixing MS window and aluminium cabins in workshop and Polycarbonate sheet and G.I gutter in north face truss workshop other misc. repair work 2022.08.06 2022.11.05 36.07 36.68 (Mar'23) 0.00 (Jun'24) Samsad Work in Progress Detail Report
Graph / Photo
438 Maintenance and operation of Panasonic CCTV Cameras System 2022.03.11 2024.02.10 36.04 6.01 (Aug'23) 0.00 (Mar'24) Media Tele Communication Detail Report
Graph / Photo
439 Compre. Mainte. of C-MOS Make Servo Voltage Stabilizer installed at deferent location 2021.03.24 2024.03.23 36.02 9.92 (Feb'23) 0.00 (Mar'24) S.S. Sales and Services Detail Report
Graph / Photo
440 1) ARMO various electrical installation and mechanical equipment at Fire Safety management Academy, Rohini, Delhi. 2) RMO various Electrical Installation and Mechanical Equipment installed at various Fire Stations under AE(E)-1, NWED, PWD Delhi. 2023.11.15 2024.11.14 35.95 0.00 (Aug'24) Kuldeep Traders Detail Report
Graph / Photo
441 (i) SITC of CCTV Cameras in Admin Block and Various offices of Saket Court Complex New Delhi-110017 (ii) SITC of CCTV Surveillance system in the Residential Complex at District Court saket New Delhi-110017. 2019.01.24 2019.04.23 35.83 70.96 (Mar'23) 0.00 (Mar'23) San Infotech Services Detail Report
Graph / Photo
442 Comprehensive annual maintenance of Magna Flux Make UPS system installed at New OPD Block, L.N. Hospital 2022.12.06 2025.12.05 35.82 6.30 (Oct'23) 0.00 (Mar'24) power house

Work in progress

Detail Report
Graph / Photo
443 RMO E&M services at New Delhi District Court Complex at Rouse Avenue, DDU Marg, New Delhi. (SH: Comprehensive Annual Maintenance of HVAC Plant). 2022.12.18 2023.12.17 35.78 0.00 (Nov'23) Voltas Ltd. WORK COMPLETED FINAL BILL PENDING Detail Report
Graph / Photo
444 Providing Security Guards at North and South Block of New Court Building at District Court Complex, Saket, New Delhi. 2023.07.26 2023.10.25 35.69 0.00 (Aug'24) V.R. India Security Services Pvt. Ltd. Detail Report
Graph / Photo
445 RMO Elect. and Mech. Services installed at Karkardooma Court Complex, Delhi. (SH Running Operation and Day to day maintenance of Electrical installation, DG Sets, Fire fighting and fire alarm system, pumps, lifts and fountain etc. installed in Hon ble Judges Resdl. O Block) 2024.03.26 2025.03.25 35.31 0.00 (Aug'24) A.G.Enterprises Work in progress Detail Report
Graph / Photo
446 Routine Operation and Maintenance of Wellkome Make 1250 KLD ETP based on EBR Technology 2022.05.22 2023.05.21 35.16 35.06 (Mar'23) 0.00 (Mar'23) Wellkome engineers

Work in progress

Detail Report
Graph / Photo
447 Operation and maintenance of DBSOLX developed Compliant Tracker Communication System 2022.08.15 2024.08.14 35.14 0.00 (Feb'24) DBSOLX Detail Report
Graph / Photo
448 To Cover the open space of the ‘B’ Block of school building for use of sports Activities/Cultural Activities of the students and Installation of lift/Elevator in the school ground floor to VIth Floor in Govt. Co-ed/ SSS, Bhorgarh Delhi. (Bldg. Id-13101121), (Sch. ID-1310022) & (EOR 20221154) 2022.09.05 2022.11.04 35.00 R.D. Constructions Work in progress Detail Report
Graph / Photo
449 SH- (a) Day to Day Maintenance of D.A. Flats, Nimri Colony, Ashok Vihar, Delhi, (b) Day to Day Maintenance of Aryabhatt Enclave, Sawan Park Colony, Ashok Vihar, Delhi 2022.11.03 2023.11.02 35.00 43.55 (Oct'23) 0.00 (Oct'23) Pankaj Gureja Work in Progress Detail Report
Graph / Photo
450 Providing and installation of Audio Video system, Stage Lighting, Stage Curtains, Air Conditioning and other electrical work in MP Hall at Govt. Co-Ed SSS, A-6, Paschim Vihar, Shakurbasti, Delhi. (School ID:- 1617032). 2023.06.28 2023.09.27 34.97 0.00 (Mar'24) R J P ENTERPRISE

2nd RA Bill Rs. 3257866/- CV No. 31 dt. 22.12.2023

Detail Report
Graph / Photo
451 Providing CCTV surveillance in New Parking area, Old Girls Hostel, Old Boys Hostel, New Girls Hostel Intern Hostel Mother Terresa Hostel Type 5 Quarter Type6 QuarterType1 Quarter at MAMC ND. 2023.05.20 2023.07.19 34.92 0.00 (Mar'24) YASH ENTERPRISES

work in progress

Detail Report
Graph / Photo
452 Repairing of 390 TR chiller plant of CARRIER Make. 2023.02.25 2023.04.24 34.91 43.55 (Mar'23) 0.00 (Mar'23) U S ENGINEERS

work in progress

Detail Report
Graph / Photo
453 Waterproofing Treatment of Roof at ‘A’ Block, Delhi High court, New Delhi. 2023.05.01 2023.06.29 34.86 0.00 (Mar'24) Irshad Ahmed work in progress Detail Report
Graph / Photo
454 (A) Repair to damaged floor of classroom & corridor and fixing wall tiles & C-B in all rooms. (B) Providing/renovation/repair of ramps, railing, tactile tiles, signage etc. to make school building and environment barrier free & accessible. (Sch ID-1310031) (Bldg. ID-13101515) (EOR ID-20211054/20211032) 2022.02.20 2022.06.26 34.80 28.42 (Mar'23) 0.00 (Sep'23) Aayan Construction Co. Work in progress Detail Report
Graph / Photo
455 Providing Services of Carpenter, Plumber, Enquiry Clerk, Sewerman , Mason and Beldar at PWD Service Centre M-3212, Tis Hazari Court, Delhi. 2023.01.31 2024.01.25 34.64 M/s Sharma construction company Detail Report
Graph / Photo
456 To Cover the open space of the ‘B’ Block of school building for use of sports Activities/Cultural Activities of the students and Installation of lift/Elevator in the school ground floor to VIth Floor in Govt. Co-ed/ SSS, Bhorgarh Delhi. (Bldg. Id-13101121), (Sch. ID-1310022) & (EOR 20221154) 2023.08.14 2023.10.12 34.51 0.00 (Jan'24) ALLIED CONSTRUCTIONS Detail Report
Graph / Photo
457 Civil and E and M Work 2023.01.01 2023.03.01 34.48 0.00 (Oct'23) Invalid Detail Report
Graph / Photo
458 Routine operation & maintenance of E & M services i/c operation of Lifts and misc. electrical work. 2023.05.14 2024.05.13 34.38 0.00 (Mar'24) DAYAL ELECTRICALS Detail Report
Graph / Photo
459 RMO specialized Electrical and Mechanical services installed at Delhi high Court, New Delhi. 2024.03.30 2025.03.29 34.21 0.00 (Jul'24) Havi Design India LLP Work in progress Detail Report
Graph / Photo
460 RMO Specialized Electrical and Mechanical Services installed at Delhi High Court, New Delhi. (SH Comprehensive maintenance of Networking system at C block) 2024.06.14 2025.06.13 33.57 STAR ENTERPRISES Work in progress Detail Report
Graph / Photo
461 Construction of New Classrooms (02 Nos.) and Toilet Block for at Dr. B.R. Sur Homeopathic Hospital and Research Centre, Nanakpura, Motibagh, New Delhi. 2023.03.09 2023.07.07 33.49 9.38 (Jun'23) 0.00 (Mar'24) Pulkit Dangi Work in progress. Detail Report
Graph / Photo
462 Provision for providing and laying of tactile path in corridors and school campus, construction of new ramp, stainless steel railing, new CWSN toilet as per requirement, replacement of damaged water line by new GI pipe, waterproofing of old building providing of urinals and shed, misc. civil repair work at Sarvodaya Co-ed Vidyalaya, Sector-2, R.K. Puram, New Delhi. (School ID: 1719013, Building ID: 17191390 & EOR ID: 20212207. 2023.08.24 2024.01.23 33.48 0.00 (Mar'24) Afjal Construction Detail Report
Graph / Photo
463 Renovation of Ground floor offices, Replacement of Damaged window with Aluminium window at ground floor and 1st floor, Improvement of drainage system, replacement of damaged C.C. Pavement repair of boundary wall, fixing of rolling shutter and other miscellaneous work in Fire Station building. 2023.03.12 2023.06.09 33.47 0.00 (Jul'24) Invalid Detail Report
Graph / Photo
464 Comprehensive Maintenance of Water Cooler with inbuilt RO and Water Dispensers with inbuilt RO Water Purifiers of Eureka Forbes Make. 2023.04.25 2026.04.24 33.42 0.32 (Jun'23) 0.00 (Jul'24) Real Value Systems & Services

work in progress

Detail Report
Graph / Photo
465 Operation, routine maintenance of 4x420TR and 1x150TR capacity AC Plant installed at RGSS Hospital, Tahirpur, Delhi 2022.03.17 2024.03.16 33.39 13.56 (Jul'23) 0.00 (May'24) Altone Aircon Detail Report
Graph / Photo
466 Misc. repair work of old building & white wash) (School ID-1003028). 2023.07.30 2024.01.29 33.38 0.00 (Mar'24) M N Construction Co. Detail Report
Graph / Photo
467 Repairing of ETP Plant of capacity 1250 KLD base on EBR. 2023.03.25 2023.05.24 33.22 0.00 (Dec'23) Texol Engineers

work in progress

Detail Report
Graph / Photo
468 Day to Day maintenance of civil work 2022.10.12 2023.10.11 33.21 0.00 (Mar'24) Ashok Builders Detail Report
Graph / Photo
469 Comprehensive Operation and Maintenance of Complaint Tracker System 2021.10.09 2023.10.08 33.19 21.18 (Oct'23) 0.00 (Jan'24) DBSOLX Detail Report
Graph / Photo
470 ARMO various electrical installation and mechanical equipment at Forensic Science Laboratory, madhuban Chowk, Sector-14, rohini, Delhi. (SH: Operation and routine maintenance of EI and fans & fittings, wet riser system, sprinkler system, water supply pumps, sewage disposable pumps, automatic fire alarm system, DG & sub station and operation of lifts. 2023.11.16 2024.11.15 33.18 0.00 (Aug'24) Dharam Enterprises Detail Report
Graph / Photo
471 (SH- Operation of EI and Fans including compound light substation DG set Water supply and Dewatering system Fire Fighting and Sprinkler System Lifts Fire Alarm and PA System.) 2019.01.21 2020.01.20 33.07 37.67 (Jun'21) 0.00 (Jun'21) M/s. A G ENTERPRISES Detail Report
Graph / Photo
472 Renovation of EI work in Room No. 420, 421, 422, 423, 425, 431, 433, 439 & all faculty rooms in Pathology Department, UCMS at GTB Hospital,Shahdara, Delhi. 2023.03.23 2023.05.22 33.03 0.00 (Sep'23) S. ROSE ENTERPRISES Detail Report
Graph / Photo
473 Operation of EI and fans, lifts, fire fighting & fire alarm system, PA system, water supply pump set & D.G Set 2014.04.21 2015.04.20 32.99 A.G. Enterprises Detail Report
Graph / Photo
474 RMO specialised E and M Services installed at Delhi High Court, New Delhi.(Sub Head Providing ATC in chiller of Admin block) 2024.04.14 2024.06.13 32.92 B B ENGINEERS Work in progress Detail Report
Graph / Photo
475 1) RMO various Electrical and Mechanical Services at KGI/DTTE/BTE at Pitampura, Delhi 2) RMO E&M services of ITI Building at Mangolpuri, Delhi 3) ARMO various Electrical and Mechanical Services (Internal and External) at SSCBS, Rohini, Delhi 4) ARMO various Electrical Installation and Mechanical Equipment at Keshav Maha Vidyalaya at Pitampura, Delhi (SH: Annual Comprehensive Maintenance of Coral make EPABX System & Topaz make Lift Voice Announcement System) 2023.12.26 2025.12.25 32.88 0.00 (Mar'24) M/s TOPAZ SERVICES CORPORATION Detail Report
Graph / Photo
476 Replacement of Defective/Burnt-out Air-Conditioning Units installed in Hostel Block at UTCS Bldg. Vishwas Nagar, Shahdara Delhi. 2019.02.25 2019.04.24 32.84 8.33 (Sep'19) 0.00 (Sep'19) S K Engineers Detail Report
Graph / Photo
477 Running maintenance and Operation of Medical and Gas Manifold plant installed at RGSS Hospital Tahirpur, Delhi-110093 during the remaining financial year of 2021-22 and complete financial year of 2022-23 2022.04.16 2023.04.15 32.73 MDD Medical System (INDIA) Pvt. Ltd Detail Report
Graph / Photo
478 Running maintenance of Lifts in non residential area at GTB Hospital Complex, Shahdara, Delhi 110095 Sub Head Annual maintenance contract for Johnson Make Lifts installed at College Block (UCMS), DEM Block, Library Block and Canara Bank 2023.06.09 2025.06.08 32.63 Johnson Lift Pvt. Ltd. Detail Report
Graph / Photo
479 Waterproofing treatment for terrace of A Wing of Delhi Secretariat 2022.08.17 2022.10.16 32.59 0.00 (Aug'23) Elevate Construction work in progress. 65% has been done. Detail Report
Graph / Photo
480 SITC of Audio Visual System with Interactive digital Panel Board in Auditorium at B.L. Taneja Block MAMC ND 2023.01.18 2023.03.17 32.51 Nectar Infosystems India Pvt. Ltd.

Work in progress

Detail Report
Graph / Photo
481 Supplying and Placing of Furniture Items For E Library at Lawyer Chamber G block GF Karkardooma Court Delhi 2021.12.17 2022.02.14 32.43 33.59 (Oct'22) 0.00 (Oct'22) Royal safe company KB In progress. Detail Report
Graph / Photo
482 Electrical Works, Smart Board and Audio System 2023.02.17 2023.04.16 32.39 0.00 (Nov'23) RCC Enterprises

work in progress

Detail Report
Graph / Photo
483 Operation and preventive maintenance of ETP Plant based on EBR Technol 2022.09.22 2023.09.21 32.23 14.33 (Mar'23) 0.00 (Feb'24) Wellkome engineers

Work in progress

Detail Report
Graph / Photo
484 Renovation/Upgradation of ICCU at Ist Floor, New Ward Block and Misc. Civil Works. 2023.06.13 2023.10.10 32.23 0.00 (Mar'24) Hak Construction Co

Work in Progress.

Detail Report
Graph / Photo
485 Emergent addition/ Alteration Electrical works in Endoscopy and Colonoscopy area at Block-6, RGSS Hospital, Tahirpur, Delhi-110093 2022.04.06 2022.06.05 32.15 0.00 (May'24) M/s Shri Durga Electricals Detail Report
Graph / Photo
486 Providing Labour for day to day maintenance 2022.05.02 2023.05.01 32.05 31.95 (Mar'23) 0.00 (May'24) RAJIV RANJAN Detail Report
Graph / Photo
487 Replacement of 2 number 15 passenger 1020 kg lifts at S.T.C.9 Metcalf Road Delhi 2021.01.01 2021.05.31 31.98 0.00 (Sep'23) Thyssenkrupp Elevator (India) Pvt. Ltd. Work in progress by M/s Thyssenkrupp Elevator (P) Ltd. Detail Report
Graph / Photo
488 Construction of 10 Toilets and 10 Bathrooms) (Composite Work Civil and Electrical. 2023.03.12 2023.06.11 31.97 0.00 (Sep'23) M P BHATIA Work in Progress Detail Report
Graph / Photo
489 Supplying, installation, testing and commissioning of laundry equipments at JPCH Shastri Park Delhi 2018.04.08 2022.04.07 31.84 33.08 (Oct'22) 0.00 (Oct'23) Lucky Engineering Works Work in Progress 2ND RA 767530 Detail Report
Graph / Photo
490 EOR to renovation of all toilet block at Sarvodaya Vidyalaya Bhalswa Village (School ID 1309280), Delhi 2022.09.22 2022.12.21 31.84 19.39 (Mar'23) 0.00 (Mar'23) Nurul Hak Work in progress Detail Report
Graph / Photo
491 Day to day maintenance of all E and M installations 2021.08.02 2023.08.01 31.77 A K Electric Works Detail Report
Graph / Photo
492 SITC of Solar tree for energy generation & Solar hybrid street light system for existing street light supported by solar Photo Voltaic Power Generation System at L.N. Hospital, New Delhi. 2023.03.25 2023.05.24 31.70 0.00 (Jan'24) Safety Engineers Detail Report
Graph / Photo
493 SITC of Water Coolers at Various locations at Lok Nayak Hospital, New Delhi 2019.09.02 2019.11.01 31.67 M/s Vivek Associates work in progress by Vivek Associates Detail Report
Graph / Photo
494 RMC Work in Berm and kerb channels in various roads. 2023.02.15 2023.04.15 31.49 0.00 (May'24) RAMESH CHANDER Detail Report
Graph / Photo
495 RMO Electrical and Mechanical services at MV Hospital Pooth Khurd Delhi SH Operation Routine Maintenance and preventive maintenance of IBR approved Steam Boiler 2019.06.25 2020.05.24 31.31 Kamal Engineers Work in progress Detail Report
Graph / Photo
496 Finishing and other misc. repair work at Chhatrasal Stadium Model Town, Delhi. 2023.03.13 2023.05.11 31.29 0.00 (Mar'24) ARIF, Jahangirpuri, Delhi Detail Report
Graph / Photo
497 Providing and fixing Interlocking tiles in assembly area along with drainage system. 2013.06.20 2013.10.19 31.28 0.00 (Feb'14) 95.00 % (Feb'14) Ramesh Chander Detail Report
Graph / Photo
498 Urgent repair work for FRRO Building, Lampur, Delhi-110040 2022.07.21 2022.10.19 31.23 43.19 (Jul'23) 0.00 (Aug'24) Ankur Bhardwaj Work in progress Detail Report
Graph / Photo
499 Operation and Routine Maintenance of Electric Substation, DG Sets, Fire Fighting System including Routine Maintenance of EI and Fans and Compound Security Light 2023.01.05 2025.01.04 31.17 Tej Enterprises Detail Report
Graph / Photo
500 SITC of Phase Sequence Corrector for mechanical ventilation/Smoke management fans at Lok Nayak Hospital, New Delhi. 2023.02.19 2023.04.18 30.92 24.32 (Mar'23) 0.00 (Jan'24) M/S C MOS SYSTEMS

work in progress

Detail Report
Graph / Photo
501 RMO CCTV, sub-station, DG sets, UPS system, RO and compressed air system at MAIDS, New Delhi. SH CMC of 3x200KVA UPS at MAIDS 2017.12.26 2020.12.25 30.87 8.00 (Jan'19) 25.92 % (Jan'19) POWER HOUSE Work in progress by M/s Power House Detail Report
Graph / Photo
502 Renovation of old DUSIB Building for conversion into Aam Aadmi Mohalla Clinic in Sonia Camp Jhilmil Industrial Area Delhi. Civil and Electrical works. 1st Recall 2023.08.25 2023.10.23 30.87 0.00 (Jul'24) Shobhit Kumar Detail Report
Graph / Photo
503 Providing Services of Carpenter, Plumber, Enquiry Clerk, Sewerman , Mason and Beldar at PWD Service Centre M-3212, Tis Hazari Court, Delhi 2022.01.01 2022.12.26 30.82 D.S. Construction Co Detail Report
Graph / Photo
504 Running, operation and comprehensive maintenance of Precision Air Conditioning System. 2023.04.04 2024.04.03 30.73 0.00 (May'24) J R CONSULTANT & ENGINEERS Detail Report
Graph / Photo
505 (SH- Routine maintenance and Operation of EI and Fans, Fountains and Pump Sets, DG Sets, Fire Alarm System and Fire Fighting System ). 2019.03.19 2020.03.18 30.69 26.51 (Feb'20) 0.00 (Feb'20) Kamal Electrical Works Detail Report
Graph / Photo
506 RMO various Electrical and Mechanical Services at Rohini Central Jail, Sector - 19, Rohini, Delhi 2022.10.12 2023.10.11 30.65 13.98 (Oct'23) 0.00 (Oct'23) DHARAM ENTERPRISES 3rd RA bill Rs 2895775/- CV no. 75 dt 19.10.23023 Detail Report
Graph / Photo
507 Replacement of Damaged Water Pipe Line in KIT Campus 2022.11.03 2023.01.02 30.58 0.00 (Jun'24) Lavneesh Pal Work in Progress Detail Report
Graph / Photo
508 Repair of damaged floor tiles and making openable access to shaft and other misc repair work at Judicial Complex Sec. 26 Rohini, Delhi 2022.09.22 2022.12.21 30.41 0.00 (Aug'24) Adesh Kumar Work in progress Detail Report
Graph / Photo
509 Providing centralized air conditioning by VRV System in Mortuary complex at MAMC New Delhi. 2022.05.15 2022.07.14 30.19 19.69 (Dec'22) 0.00 (Jan'24) Sai Aircon Engineers

Work in progress

Detail Report
Graph / Photo
510 Comprehensive Annual maintenance contract of 13 Nos. Lifts and 2 Nos. Dump Waiter Johnson make Lifts installed at RGSS Hospital Tahirpur, Delhi. 2023.10.07 2024.10.06 30.14 Johnson Lift Pvt. Ltd. Detail Report
Graph / Photo
511 Balance and additional works 2012.03.04 2012.04.03 30.11 Ist Alarm System Detail Report
Graph / Photo
512 Civil Work in 5 Court Rooms 2022.12.25 2022.12.31 30.11 Mool Chand Detail Report
Graph / Photo
513 A/R & M/O to various Building under jurisdiction of Sub Divn. M-2221 D.C. office Nand Nagari, Delhi & Sub Divn.M-2222, Dilshad Garden, Delhi dg 2021-22 .( SH: Attending day to day complaints) 2021.09.14 2022.09.13 30.05 15.23 (May'22) 0.00 (May'22) Invalid Detail Report
Graph / Photo
514 Addition & Alteration of Lawyers Canteen at District Court Complex, Saket, New Delhi. 2023.05.16 2023.07.15 29.97 Vision Construction Work in Progress 15% Detail Report
Graph / Photo
515 Providing & Fixing Shed, Stainless Steel Gate, Floor Tiles, Main Door & Window 2022.08.18 2022.10.17 29.94 27.97 (Feb'23) 0.00 (Aug'23) BHARAT SINGH Work in Progress Detail Report
Graph / Photo
516 Replacement of existing lifts at Lawyers Chamber in District Court, Dwarka, New Delhi. 2023.04.04 2023.07.03 29.93 0.00 (Mar'24) Neutech elevator system Detail Report
Graph / Photo
517 ARMO of various Electrical and Mechanical services at NCC Bhawan, Sec-19, Rohini Delhi. Dg 2023-24 (SH : Operation and Routine maintenance of EI and Fans & Fittings, DG Set & Sub, wet riser, Fire Alarm system, water supply Pumps) 2024.03.26 2025.03.25 29.87 R S ELECTRIC CO. Detail Report
Graph / Photo
518 Renovation of Transit Hostel at MAMC (SH:- SITC of 16 passenger lift) 2015.06.20 2015.10.01 29.80 Invalid Detail Report
Graph / Photo
519 Replacement of damaged and worn out indoor type wall mounted panel installed in Surgical block at L.N. Hospital, New Delhi. 2021.09.28 2021.11.27 29.78 23.82 (May'22) 0.00 (May'22) RCC Enterprises Detail Report
Graph / Photo
520 Comprehensive maintenance of Coral make EPABX System. 2023.08.14 2025.08.13 29.70 0.00 (Mar'24) M/s TOPAZ SERVICES CORPORATION Detail Report
Graph / Photo
521 Providing Services of Computer Operator, Office Assistant & MTS in the Office of Executive Engineer(E), PWD EMD South East (M-452) & Sub –Division-I, Thyagraj Stadium, New Delhi 2022.07.26