S. No.क्र. सं. | Name of Workकार्य का नाम | Date of Startकार्य आरम्भ करने की तिथि | Date of Completionकार्य समाप्त करने की तिथि | Cost (In Lac) |
Expenditure (In Lac) |
Progress | Agency | Status | Viewदेखें |
---|---|---|---|---|---|---|---|---|---|
1 | Elevated Road, Extradosed Bridge, Flyover, Clover Leaves, Loops, Ramps, Footpath, Cycle Track, Road Work including Signages, Street Light Works & Allied Works Pile, Pile Cap, Pier cap, Pier, well foundation and casting of segment | 18/04/2015 | 17/10/2017 | 96400.00 | 65950.89 (Feb'21) | 0.00 (Feb'21) | Larson & Toubro Limited | Pile, Pile Cap, Pier cap, Pier, well foundation and casting of segment, pylon, erection of segments is in progress |
Detail Report
Graph / Photo |
2 | Underground Tunnel, Underpass, FOB, Loops, Ramps, Footpath, Road Work including Road Signage, Road/Street Lighting works, Tunnel furnishing (FF& FA system, PA system, Automated drainage, integrated tunnel management system etc.), landscaping/horticulture work & allied works | 08/11/2017 | 29/08/2019 | 77700.00 | 30431.78 (Feb'21) | 0.00 (Feb'21) | M/s L&T Ltd. | work is in progress |
Detail Report
Graph / Photo |
3 | Supply, installation, testing, commissioning of CCTV camera in Delhi. (Sub: Empanelment of firms for supply, installation, testing, commissioning & CAMC of CCTV system in Delhi). | 24/11/2018 | 23/11/2019 | 42798.32 | 1098.76 (Mar'19) | 0.00 (Mar'19) | Bharat Electronics Ltd | work partially completed for approximate 1,22,000 nos. CCTV camera out of 1,40,000 Nos.CCTV camera |
Detail Report
Graph / Photo |
4 | Corridor improvement of outer ring road from IIT to NH-8 and its influence area (1)C/o flyover from Munirka to Army RR Hospital on outer ring road (2) C/o underpass & skywalk etc. at juncture of BJ Marg, Ring Road | 27/11/2014 | 26/11/2016 | 27807.81 | 27597.16 (Sep'19) | 70.00 % (Sep'19) | Hindustan Construction Co. Ltd | RE amounting to Rs. 364.87 Cr. has been approved. Flyover opened for traffic on 16.07.2019. Construction of Underpass work is under progress. |
Detail Report
Graph / Photo |
5 | Extension of Ashram Flyover to DND Flyover. | 19/06/2020 | 18/06/2021 | 12879.00 | 0.00 (Nov'20) | 1.00 % (Nov'20) | KCC Buildcon Pvt. LTD | The widening of road and drainage work is in progress. The work in central portion could not be taken up due to non-receipt of Phase-II NOC from the Traffic Police. The approval for the tree transplantation and shifting of services utility are being pursuaded. |
Detail Report
Graph / Photo |
6 | Construction of Bridge on Najafgarh Drain at Tri Nagar/Inderlok, Karampura and Rampura, Delhi to cover the complete Right of Way (ROW) excluding area of already constructed bridge alongwith road improvement on either side of bridge including making. | 16/03/2019 | 30/09/2021 | 5388.53 | 3842.44 (Mar'21) | 0.00 (Mar'21) | Ram Kumar Contractor | work is in progress. |
Detail Report
Graph / Photo |
7 | Construction of underpass along Mathura Road at Ashram Chowk New Delhi | 05/07/2019 | 04/07/2020 | 4907.38 | 2293.25 (Feb'21) | 0.00 (Feb'21) | Dharamraj Contracts (I) Pvt. Ltd. | The work is in progress and present progress is 50%. Shifting of DJB, BSES, IGL, DTL etc. utilities are being done by the utility owning departments. |
Detail Report
Graph / Photo |
8 | W/O Mahrauli Mahipalpur Road. SH: from 4 lanes to 8 lanes and Service Road from Andheria More to Masoodpur Village. | 30/10/2012 | 29/04/2013 | 3812.11 | KCC Buildcon Pvt. LTD | . |
Detail Report
Graph / Photo |
||
9 | Construction of Bridge on Najafgarh drain at Basaidarapur along with road improvement on either side of bridge drainage scheme, footpath etc. complete. | 01/03/2019 | 31/08/2020 | 3463.50 | 1513.31 (Mar'21) | 0.00 (Mar'21) | Ram Kumar Contractor | Substructure work under progress. Girder fabrication and erection under progress. |
Detail Report
Graph / Photo |
10 | Construction of Bridge on Supplementary Drain on NH-10, Nangloi, Delhi to cover complete width of 60 m with road improvement in 100 meter length on either side of bridge including making of drainage scheme, footpath etc. complete (after dismantling ). | 06/03/2019 | 05/12/2020 | 3350.31 | 1390.90 (Mar'21) | 58.00 % (Mar'21) | Ram Kumar Contractor | Working piles (72 nos.) for Phase-1 completed. Pile cap (4 nos.), Pier (4 nos.) & Pier Cap (4 nos.) casted. Fabrication and assembly of Steel Girder in progress. |
Detail Report
Graph / Photo |
11 | Construction of two numbers of vehicular half underpasses between Wazirabad and Jagatpur and one number pedestrian subway near Gandhi Vihar on Outer Ring Road, Delhi. | 20/12/2018 | 19/03/2020 | 3142.96 | 1344.66 (Mar'21) | 0.00 (Mar'21) | K. R. ANAND | Casting of segments of Vehicular Half Underpass in progress. Finishing work of Pedestrians Subway in progress. |
Detail Report
Graph / Photo |
12 | Strengthening of SSN Marg ID- 392 and 100 Foota Road ID- 1187 New Delhi. | 10/09/2020 | 09/01/2021 | 1893.62 | 649.69 (Feb'21) | 0.00 (Feb'21) | MAHAVIR PRASAD GUPTA AND SONS |
Detail Report
Graph / Photo |
|
13 | Additional bridge on Supplementary drain near SLFS Plant. | 14/09/2018 | 19/03/2020 | 1128.32 | 889.75 (Nov'20) | 0.00 (Nov'20) | R S Sharma Contractors Pvt. Ltd. | Work Completed and Final bill has been done. |
Detail Report
Graph / Photo |
14 | Re-Carpeting of Najafgarh Road from Raja Garden to Uttam Nagar T-Point under Division WR-I PWD New Delhi | 06/01/2021 | 05/05/2021 | 893.04 | Awasthi Construction Co. |
Detail Report
Graph / Photo |
|||
15 | Strengthening of SA Road from Outer Ring Road to MB Road T-Point (RD-0 to Rd-5460) (Length 5.46 Km.) | 14/03/2017 | 28/09/2020 | 886.98 | 59.71 (Dec'20) | 0.00 (Dec'20) | SATYA PARKASH AND BROS PVT LTD |
Detail Report
Graph / Photo |
|
16 | Construction of Pedestrian Underpass Subway Across Aurobindo Marg Between Delhi Haat and Entry No 4 of East Kidwai Nagar. | 27/10/2020 | 26/08/2021 | 856.26 | 67.00 (Jan'21) | 0.00 (Jan'21) | M/s Satish Builders | Work is in progress. Barricading has been done for excavation in central portion. |
Detail Report
Graph / Photo |
17 | Strengthening of Ring Road from Prembari Pull to Punjabi Bagh Flyover under PWD North West Road 1 during 2017 18 | 29/04/2018 | 26/08/2018 | 796.47 | MAHAVIR PRASAD GUPTA AND SONS |
Detail Report
Graph / Photo |
|||
18 | Construction of 66 feet Libaspur Gurudwara Road including providing street light fittings (SH- Civil and Electrical Work) | 02/08/2019 | 28/01/2020 | 709.56 | 548.15 (Nov'20) | 0.00 (Nov'20) | MOHAN BUILDERS | Work in Progress and 75% work has been completed |
Detail Report
Graph / Photo |
19 | Construction of 3 Nos. Foot Over bridge on Outer Ring Road between Saraswati Vihar to Prashant Vihar. | 21/06/2018 | 20/03/2019 | 685.00 | 324.95 (Mar'21) | 0.00 (Mar'21) | Raghav Engineers | work is in progress. |
Detail Report
Graph / Photo |
20 | Strengthening of Ghevra Road, (MDR-138) from NH-10 to Chor Piao under PWD Division West Road-2, Sub-Division WR-22, Delhi | 20/11/2019 | 19/03/2020 | 618.64 | 249.26 (Jan'21) | 0.00 (Jan'21) | A S Infratech | Work is in progress |
Detail Report
Graph / Photo |
21 | Construction of drainage system of Main Burari Road from Hiranki Bandh to Amrit Vihar upto Irrigation drain at Swaroop Nagar Road under Sub-Division-I, of PWD Division CandND Roads, New Delhi | 31/03/2018 | 30/09/2018 | 563.91 | 63.01 (Jul'19) | 0.00 (Jul'19) | Competent Construction Company |
Detail Report
Graph / Photo |
|
22 | Construction of Two No. Foot Over Bridge across Sri Aurobindo Marg (ID-96) at (i) PTS Bus Stop (ii) T.B. Hospital with staircase and lift including Electrical Installations under Sub Division-II of Division South Road-II, PWD New Delhi. | 21/03/2020 | 20/09/2020 | 489.85 | 53.00 (Mar'21) | 0.00 (Mar'21) | S S Chauhan & Sons | Work in Progress. |
Detail Report
Graph / Photo |
23 | Widening and Strengthening of Bandh Road of Division SR-1 under Sub-Division SR-13 at New Delhi i/c shifting and installation of Electrical Poles Street lights etc. | 01/12/2019 | 31/05/2020 | 459.03 | Bansal Associates |
Detail Report
Graph / Photo |
|||
24 | Construction of Subway in front of Dilshad Garden Metro Station. (3rd Call) | 06/10/2019 | 05/04/2020 | 422.68 | 121.30 (Nov'20) | 0.00 (Nov'20) | Pawan Kumar | Work in Progress |
Detail Report
Graph / Photo |
25 | Remodeling of Maujpur drain from Road No. 66 to Ghonda Chowk and Main Brahmpuri Road drain from Ghonda Chowk to MCD Dhalav. | 28/10/2018 | 27/04/2019 | 419.30 | 144.51 (Mar'21) | 0.00 (Mar'21) | Gee International | work in progress |
Detail Report
Graph / Photo |
26 | Thermoplastic painting on various roads under Division M-413, New Delhi dg. 2013-14. | 29/10/2013 | 28/02/2014 | 404.14 | K.L. Arora & Son |
Detail Report
Graph / Photo |
|||
27 | Improvement of Khari Bawali and HC Sen Marg | 27/09/2013 | 26/05/2015 | 382.36 | Satya Parkash & Bros. Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
28 | Comprehensive Annual maintenance of all roads including Carriageway, Footpaths, Central Verge, Service Roads etc. within the Right of way, Mechanized/Manual Desilting of Drains, Repairing of Pot Holes, Maintenance and Cleaning of FOBs and ...WR-22 | 15/08/2019 | 14/08/2020 | 378.50 | 95.93 (May'20) | 0.00 (May'20) | MAHAVIR PRASAD GUPTA AND SONS | work is in progress |
Detail Report
Graph / Photo |
29 | Nazafgarh Road to A-71, Rajauri Garden, A-31 Rajauri Garden, 20-Block Tilak Vihar Road, Radhaswami Satsang Marg and Tilak Nagar Main Market Road under PWD Division WR-1, New Delhi. | 30/01/2019 | 29/05/2019 | 370.28 | 119.29 (Oct'19) | 0.00 (Oct'19) | Y. D. Builders & Hotel Pvt Ltd |
Detail Report
Graph / Photo |
|
30 | Comprehensive maintenance of Various Road Under PWD Division West Road-2/WR-23 for one year such as Footpaths, Central Verge, Planter, drainage system etc. and other misc. repair works during-2019-20. | 15/08/2019 | 14/08/2020 | 360.34 | 240.10 (Jun'20) | 0.00 (Jun'20) | MAHAVIR PRASAD GUPTA AND SONS | Work completed final bill yet to be made |
Detail Report
Graph / Photo |
31 | Strengthening of Ring Road from Metcalf House crossing to Timarpur intersection | 28/07/2017 | 27/11/2017 | 351.90 | SATYA PARKASH AND BROS PVT LTD |
Detail Report
Graph / Photo |
|||
32 | Strengthening of various roads under Sub Division SR-11/South Road-1 PWD New Delhi.Phirni Road West End Marg Durbal Nath Marg H Block Dakshin Puri Road Maharishi Balmiki Marg and Raja Ram Marg. | 06/11/2019 | 05/02/2020 | 348.51 | 193.75 (Feb'21) | 0.00 (Feb'21) | Chaudhary Construction Company Pvt. Ltd. |
Detail Report
Graph / Photo |
|
33 | Strengthening of road including repair of footpath of Satguru Ram Singh Marg (Road No. 36) from Mayapuri Chowk to S.D. Public School under PWD Division West Road-2, Sub Division WR-21 during 2018-19 | 14/03/2019 | 12/05/2019 | 344.85 | 230.68 (Sep'19) | 0.00 (Sep'19) | M C Constructions Company | work is in progress |
Detail Report
Graph / Photo |
34 | Strengthening of Dera Bhatti Road of Sub-Division SR-13 under Division SR-1 at New Delhi. | 27/11/2019 | 26/02/2020 | 341.72 | 478.95 (Nov'20) | 0.00 (Nov'20) | Bansal Associates |
Detail Report
Graph / Photo |
|
35 | Comprehensive maintenance of Various Road Under PWD Division West Road-2/WR-21 for one year such as Footpaths, Central Verge, Planter, drainage system etc. and other misc. repair works during-2019-20 | 15/08/2019 | 14/08/2020 | 336.56 | 20.00 (Aug'20) | 0.00 (Aug'20) | R R ENTERPRISES | Work is in progress |
Detail Report
Graph / Photo |
36 | Comprehensive maintenance of Various Road Under PWD Division West Road-2/WR-24 for one year such as Footpaths, Central Verge, Planter, drainage system etc. and other misc. repair works during-2019-20 | 15/08/2019 | 14/08/2020 | 335.53 | 40.00 (Dec'20) | 0.00 (Dec'20) | MAHAVIR PRASAD GUPTA AND SONS | Work completed final bill yet to be made |
Detail Report
Graph / Photo |
37 | Construction of drains, footpath Central Verge and improvement of side berm portion of S-Bend road (Maharishi Dayanand Marg ID-539) New Delhi. | 24/10/2019 | 23/01/2020 | 330.83 | 60.00 (Mar'21) | 0.00 (Mar'21) | S S Chauhan & Sons | Work in Progress |
Detail Report
Graph / Photo |
38 | Comprehensive Maintenance of various Roads under SRD Project Division-I, Sub-Division-I, PWD, Delhi. (SH- Civil Works- Mechanised Desilting of Drains, Mechanised Repairing of Pot Holes, Maintenance and Cleaning of Subways and other misc. Repair wor | 27/08/2019 | 23/08/2020 | 323.91 | 196.90 (Aug'20) | 0.00 (Aug'20) | Awasthi Construcion Co. |
Detail Report
Graph / Photo |
|
39 | Remodelling of drain from 5th Pusta to Ghonda Chowk at Gamri Road Delhi | 13/01/2020 | 05/04/2020 | 318.40 | 172.67 (Feb'21) | 0.00 (Feb'21) | Thermal Enginners & Insulators Pvt. Ltd. |
Detail Report
Graph / Photo |
|
40 | Construction of Foot Over Bridge with staircase and lift for pedestrian on Multan Nagar Metro Pillar No224 to 225, at Delhi Rohtak Road, NH-10, New Delhi. SH- Civil and Electrical Work | 22/09/2019 | 21/03/2020 | 306.50 | 0.54 (Aug'19) | 0.00 (Aug'19) | S S Chauhan & Sons | work stop due to Court Case |
Detail Report
Graph / Photo |
41 | Resurfacing of Road and Repairing of footpath and Central Verge at Asaf Ali Road and Chaman Lal Marg under Division SRD Project I, under Sub Division II, PWD during 2019 20 New Delhi | 23/09/2019 | 20/03/2020 | 302.16 | 154.05 (Feb'21) | 0.00 (Feb'21) | Chaudhary Construction Company Pvt. Ltd. |
Detail Report
Graph / Photo |
|
42 | Construction of road including street lighting from Durbal Nath Vatika to Rohtak Road (NH-10) West-2, Roads, New Delhi and in front of Virat co-operative society at Jwalapuri colony. | 18/03/2018 | 25/06/2018 | 299.53 | 265.52 (Oct'19) | 65.00 % (Oct'19) | Ramesh Chander | work is in progress |
Detail Report
Graph / Photo |
43 | Providing and fixing M.S Steel railing at central verge of SSN Marg. | 03/11/2019 | 02/05/2020 | 295.66 | 113.95 (Nov'20) | 0.00 (Nov'20) | B M & Sons |
Detail Report
Graph / Photo |
|
44 | Comprehensive Maintenance of Aacharya Shree Tulsi Marg M.G.Road Aya Nagar Road Ghitorni Road to CPWD Land Ghitorni Village Road M.G.Road to Ghitorni Village Road and Mandi Road under the Jurisdiction SD-15 under SR-1 during 2019-20 | 01/11/2019 | 31/10/2020 | 288.88 | S S Chauhan & Sons |
Detail Report
Graph / Photo |
|||
45 | Comprehensive Maintenance of various Roads under SRD Project Division-I, Sub-Division-II, PWD, Delhi. (SH- Civil Works- Mechanised Desilting of Drains, Mechanised Repairing of Pot Holes, Maintenance and Cleaning of Subways and other misc. Repair wo | 24/08/2019 | 23/08/2020 | 285.85 | 183.38 (Nov'20) | 0.00 (Nov'20) | Awasthi Construcion Co. |
Detail Report
Graph / Photo |
|
46 | Widening of IGNOU Road and construction of RCC drain and footpath at IGNOU Road from Z more to M.B. Road T-Point. | 18/07/2018 | 16/09/2018 | 242.58 | 345.71 (Feb'21) | 0.00 (Feb'21) | Y. D. Builders & Hotel Pvt Ltd | Work in progress |
Detail Report
Graph / Photo |
47 | Construction of Subway near Baba Khakshah / Balmiki Mandir at G.T.K. Road near Azadpur SH: Civil and Electrical Works | 14/03/2020 | 08/11/2020 | 241.84 | Dilshad Khan | Design & drawing are being prepared |
Detail Report
Graph / Photo |
||
48 | C/o Foot Over Bridge with stair case and lift near Living Style Mall at Road No. 13A Sarita Vihar, New Delhi. | 04/07/2020 | 30/11/2020 | 225.33 | 491.52 (Mar'21) | 0.00 (Mar'21) | S S Chauhan & Sons |
Detail Report
Graph / Photo |
|
49 | Construction of Foot Over Bridge with staircase, electrical works and lift for pedestrian across press Enclave Road near Select City Mall, New Delhi. | 31/08/2019 | 29/02/2020 | 222.53 | 187.92 (Jul'20) | 0.00 (Jul'20) | S. S. Chauhan & Sons |
Detail Report
Graph / Photo |
|
50 | Improvement of riding surface of flyovers namely Nand Nagri flyover, Loni Flyover, Gokalpuri and Khajuri Gol Chakkar Flyover on Wazirabad Road (Road No- 63 and 59) | 15/07/2019 | 14/10/2019 | 192.33 | 244.82 (Dec'19) | 0.00 (Dec'19) | Pawan Kumar | Work in progress. |
Detail Report
Graph / Photo |
51 | Improvement of Sewadham Road from road No.-63 to UP Border. | 01/03/2019 | 30/04/2019 | 190.73 | 226.00 (Jul'19) | 0.00 (Jul'19) | Pawan Kumar | work in progress |
Detail Report
Graph / Photo |
52 | Strengthening of Roads Improvement of Footpath and drain providing and fixing retro reflective signage and upgradation of street light horticulture work of various roads in South and North Area of Shalimar Bagh Delhi under PWD Zone M 3 SH Strengt | 24/02/2018 | 23/06/2018 | 159.28 | M C Constructions Company |
Detail Report
Graph / Photo |
|||
53 | Providing and laying waste water pipe line from Arvind Nagar pump house Gamri Road to Drain no. 1 at road no. 66 via Maujpur Road Delhi. | 26/02/2019 | 25/06/2019 | 149.77 | 182.60 (Nov'20) | 0.00 (Nov'20) | K. CONSTRUCTION COMPANY | work in progress |
Detail Report
Graph / Photo |
54 | C/o FOB on Kalidas Marg between Motibagh and Sarai Rohilla near KD Crossing | 10/05/2013 | 05/11/2013 | 138.34 | 0.00 (Sep'16) | 98.00 % (Sep'16) | Fiberfill Engineer | work in progress |
Detail Report
Graph / Photo |
55 | Upgradation of 21 Nos. staff rooms of GNCTD Schools under Jurisdiction of SRD Project Division-1, PWD dg. 2018-19 | 30/11/2018 | 28/01/2019 | 135.88 | 147.99 (Feb'21) | 0.00 (Feb'21) | Munzareen Ahmed | work in progress |
Detail Report
Graph / Photo |
56 | Balance Compensatory Tree plantation work including development of Entry point at Mukarba Chowk and Maintenance of Existing Horticulture Features. | 24/12/2018 | 23/12/2019 | 135.72 | 0.00 (Dec'19) | 100.00 % (Dec'19) | Vedvan Consultants Pvt. Ltd. | Work completed. |
Detail Report
Graph / Photo |
57 | Construction of RCC drain at Budh Ram Singh Marg and Sameer Bhan Marg | 08/12/2018 | 07/03/2019 | 130.52 | 57.26 (Mar'21) | 0.00 (Mar'21) | Dinesh Chand Sharma | Work in progress |
Detail Report
Graph / Photo |
58 | Construction of footpath and repair of damaged RCC slab of Storm Water drain from Outer Ring Road to Burari Morh, under PWD Sub Division -I of C & ND-R Division New Delhi. | 29/09/2017 | 28/12/2017 | 129.36 | Dilshad Khan |
Detail Report
Graph / Photo |
|||
59 | Construction of Foot Over Bridge balance portion at D.B. Gupta Road | 28/08/2014 | 27/12/2014 | 129.06 | K.L. Arora & Son |
Detail Report
Graph / Photo |
|||
60 | Redevelopment of drainage system at Lothian SPM Road Junction and Construction of Sump. (SH Civil Works) | 28/09/2018 | 25/01/2019 | 122.76 | 93.23 (Oct'19) | 0.00 (Oct'19) | K.P. Singh & Co. | Work in progress |
Detail Report
Graph / Photo |
61 | Strengthening of Roads Improvement of Footpath and drain providing and fixing retro reflective signage and upgradation of street light of various roads in Ashok Vihar and Lawrence Road area Delhi SH Strengthening of Roads and Improvement of Fo | 24/02/2018 | 23/06/2018 | 119.01 | M C Constructions Company |
Detail Report
Graph / Photo |
|||
62 | Strengthening of Roads Improvement of Footpath and drain providing and fixing retro reflective signage and upgradation of street light horticulture work of various roads in South Pitam Pura Delhi under PWD Zone M 3 SH Strengthening of Roads and | 24/02/2018 | 23/06/2018 | 103.94 | M C Constructions Company |
Detail Report
Graph / Photo |
|||
63 | Landscape development work on Aruna Asaf Ali Marg under Sub Division-III of Division South Road-II, PWD, New Delhi. | 20/02/2020 | 19/05/2020 | 100.23 | 112.22 (Mar'21) | 0.00 (Mar'21) | Bhawani Constructions | Work in Progress. |
Detail Report
Graph / Photo |
64 | Construction of Foot Over Bridge near Kardampuri and Yamuna Vihar on Road No.-66 , Delhi (Approximate Length 30.00 Metre). | 09/06/2019 | 06/09/2019 | 98.85 | 140.38 (Mar'21) | 0.00 (Mar'21) | Dilshad Khan | Work in progress. |
Detail Report
Graph / Photo |
65 | Making New Carriageway , Drain , Footpath and Planter below Shadipur Flyover under PWD Division West Road-2, Sub-Division WR-21 , New Delhi dg 2019-20. | 24/10/2019 | 23/01/2020 | 97.92 | Bishwa Mohan Jha | Work is in progress |
Detail Report
Graph / Photo |
||
66 | Resurfacing of Sadar Thana Road, Foota Road, Bahadur Garh Road, Chelmsford and Faiz Road. | 14/09/2016 | 13/01/2017 | 88.85 | Raj Kumar Sachdeva | Permission from the Traffic Police not received. |
Detail Report
Graph / Photo |
||
67 | AR and MO to Various Roads under Sub Division NWR 14 PWD Division NWR 1 dg 2016 17 SH Comprehensive desilting of drains of various categories and sizes along PWD roads | 22/04/2017 | 18/10/2017 | 86.98 | SAHIL GOYAL |
Detail Report
Graph / Photo |
|||
68 | Development of various parks by providing and fixing of Tensile Fabric Umbrella in Shakur Basti Assembly Constituency, AC-15 under MLA LAD Fund during 2019-2020. | 29/11/2019 | 27/01/2020 | 85.87 | 25.86 (Nov'20) | 0.00 (Nov'20) | Swaraj Construction |
Detail Report
Graph / Photo |
|
69 | Misc. repair works. 33/EE/PWD M-312/2015-16 | 12/08/2015 | 11/07/2016 | 82.68 | 0.00 (Aug'16) | 87.00 % (Aug'16) | Kalyan Chandra Goyal & Co. | work in progress 87 % |
Detail Report
Graph / Photo |
70 | A/R and M/O to Various Roads under Sub Division NWR-21, PWD Division NWR-2 dg. 2016-17 (SH- Comprehensive desilting of drains of various categories and sizes along PWD roads.) | 14/04/2017 | 10/10/2017 | 79.95 | SAHIL GOYAL |
Detail Report
Graph / Photo |
|||
71 | A/R and M/O to Various Roads under Sub Division NWR-24, PWD Division NWR-2 dg. 2016-17 (SH- Comprehensive desilting of drains of various categories and sizes along PWD roads.) | 14/04/2017 | 10/10/2017 | 79.75 | Rajnish Yadav |
Detail Report
Graph / Photo |
|||
72 | Strengthening of Roads Improvement of Footpath and drain providing and fixing retro reflective signage and upgradation of street light and horticulture work of various roads in North Pitam Puram Delhi under PWD Zone M 3 SH Strengthening of road | 24/02/2018 | 23/06/2018 | 79.21 | M C Constructions Company |
Detail Report
Graph / Photo |
|||
73 | A/R and M/O to Various Roads under Sub Division NWR-23, PWD Division NWR-2 dg. 2016-17 (SH- Comprehensive desilting of drains of various categories and sizes along PWD roads. | 22/04/2017 | 18/10/2017 | 78.64 | Inderjit Singh |
Detail Report
Graph / Photo |
|||
74 | Improvement / Providing and fixing of MS railing in Central verge from Peeragrahi chowk to Metro Pillar No. 410 under PWD Division West Road-2/ Sub-Division WR-23, New Delhi during 2019-20 | 24/10/2019 | 23/01/2020 | 72.08 | Inderjit Singh | Work is in progress |
Detail Report
Graph / Photo |
||
75 | Improvement and Strengthening of Gamri Road from 5th Pusta to Ghonda Chowk Delhi | 02/08/2019 | 29/10/2019 | 69.82 | 69.55 (Jan'20) | 0.00 (Jan'20) | MAHAVIR PRASAD GUPTA AND SONS | Work in Progress |
Detail Report
Graph / Photo |
76 | Restoration of Road cut by DJB at Abdul Aziz Road from Pusa road crossing to Bank Street, New Delhi | 23/12/2016 | 21/01/2017 | 68.15 | Bishwa Mohan Jha | Determined |
Detail Report
Graph / Photo |
||
77 | A/R and M/O to Various Roads under PWD Division NWR-2 dg. 2017-18. (SH- Patch repair of Service Road no. 316 at Mangolpuri Industrial area, Phase-I under Sub Division NWR-21.) | 01/04/2018 | 30/05/2018 | 67.32 | A S INFRATECH |
Detail Report
Graph / Photo |
|||
78 | Micro surfacing of various Road under SRD Project Sub-Division III SRD Project Division II PWD New Delhi SH Micro surfacing and Improvement of footpath at Arya Samaj Road | 20/08/2018 | 11/02/2019 | 66.76 | 70.27 (Jan'21) | 0.00 (Jan'21) | SATYA PARKASH AND BROS PVT LTD | Work in Progress |
Detail Report
Graph / Photo |
79 | (Sh- Repair of old damaged brick masonary drain of B-block road, Mangolpuri (from Mangolpuri flyover to Kanjhawala Link Road) under sub division NWR-21.) | 29/01/2019 | 28/05/2019 | 66.00 | SAHIL GOYAL |
Detail Report
Graph / Photo |
|||
80 | A/R and M/O Various Roads under Project Circle, PWD, New Delhi dg. 2017-18 (SH-Security Guards for various offices under Project Circle, PWD, Govt, of Delhi). | 29/06/2017 | 28/06/2018 | 63.56 | 0.00 (Mar'19) | 77.10 % (Mar'19) | Good Year Security Services | Work completed and final bill paid |
Detail Report
Graph / Photo |
81 | Resurfacing of Road under SRD Project Sub-Division III SRD Project Division II PWD New Delhi SH Resurfacing of road and improvement of Footpath at Tank Road | 18/08/2018 | 12/02/2019 | 63.43 | 73.44 (Sep'19) | 0.00 (Sep'19) | RAJ KUMAR SACHDEVA | Work completed |
Detail Report
Graph / Photo |
82 | AR and MO to Various Roads under Sub Division NWR 12 PWD Division NWR 1 dg 2016 17 SH Comprehensive desilting of drains of various categories and sizes along PWD roads | 22/04/2017 | 18/10/2017 | 60.15 | Aditya Construction Co. |
Detail Report
Graph / Photo |
|||
83 | A/R and M/O to various roads under SRD Project Division-I during 2018-19. (SH-Repairing of Drain andfootpath at back side of New Delhi court building at Kotla Road and repairing of footpath NMV Lane infront of Court building at DDU Marg under Sub Di | 21/06/2018 | 20/10/2018 | 59.92 | 74.26 (Sep'19) | 0.00 (Sep'19) | Satyam Construction Co. | work in progress |
Detail Report
Graph / Photo |
84 | Construction of RCC drain at Dallupura Road Near Timber Market | 13/12/2018 | 12/03/2019 | 59.46 | 12.01 (Jan'21) | 0.00 (Jan'21) | Shiv Construction Co. | Work in progress |
Detail Report
Graph / Photo |
85 | Restoration of roads cut by cut by DJB for laying of 700 mm dia water supply line from Shalimar Palace to Vijay Chowk at Swaroop Nagar Road 60ft. Road, New Delhi. Recall of Tender. | 22/04/2019 | 21/07/2019 | 58.58 | 76.66 (Dec'19) | 0.00 (Dec'19) | Mls Rajat Construction Co. |
Detail Report
Graph / Photo |
|
86 | Restoration of various road under SRD Project Sub Divn. I SRD Project Divn. II PWD, New Delhi.SH Restoration of road cut by BSES at Panchkuiyan Road, Rani Jhansi Road and D.B. Gupta Road | 24/04/2018 | 22/07/2018 | 58.00 | AMCON | Work completed |
Detail Report
Graph / Photo |
||
87 | A/R and M/O various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2016-17. SH Bituminous concrete patch repair. | 03/12/2016 | 02/03/2017 | 56.05 | Chaudhary Construction Co. | Completed |
Detail Report
Graph / Photo |
||
88 | Widening of Bhagwan Pur Khera Culvert over 52 cusec drain on Loni Road. | 09/08/2019 | 06/12/2019 | 55.71 | 60.94 (Jul'20) | 0.00 (Jul'20) | Ravinder Kumar | award under process |
Detail Report
Graph / Photo |
89 | Construction of missing drain at Safiabad border and repair of safiabad road under Sub Division NR-13 (Revised) | 31/05/2020 | 29/07/2020 | 55.71 | Sethi Construction | Work in progress and 26% work completed |
Detail Report
Graph / Photo |
||
90 | Desilting of drains by chassis mounted high pressure suction cum jetting machine under Sub Division 2. | 05/08/2019 | 04/10/2019 | 55.58 | 49.88 (Nov'20) | 0.00 (Nov'20) | Maan Builders | award in process |
Detail Report
Graph / Photo |
91 | Comprehensive Development of Corridor (Outer Ring Road) between Mukarba Chowk to Wazirabad. SH. Providing and laying stone pitching and chute drain on embankment slope and construction of cycle track. | 10/04/2017 | 09/04/2017 | 55.56 | AANISHA COMMUNICATION PVT.LTD. |
Detail Report
Graph / Photo |
|||
92 | A/R and M/O to various roads under PWD (North East) Road Division dg. 2019-20. (SH- Providing M.S. Grill in central verge from Railway Line bridge to Road no. 66 T-Point at Road no. 68 under PWD Sub Division-4). | 18/08/2019 | 16/11/2019 | 54.89 | 46.71 (Aug'20) | 0.00 (Aug'20) | MOHD. FIROZ |
Detail Report
Graph / Photo |
|
93 | AR Mo to various roads under PWD SWR II dg 2018 19 SH Improvement of Drain from Golak Dham to Bijwasan flyover RHS and providing footpath from IOC Morh to Bijwasan Flyover Sub Division 24 | 22/03/2019 | 19/07/2019 | 54.67 | Bishwa Mohan Jha | work in progress |
Detail Report
Graph / Photo |
||
94 | Micro surfacing of various Road under SRD Project Sub-Division III SRD Project Division II PWD New Delhi SH Micro surfacing and Improvement of footpath at East Park Road | 20/08/2018 | 12/02/2019 | 54.25 | 53.03 (Nov'20) | 0.00 (Nov'20) | SATYA PARKASH AND BROS PVT LTD | Work Completed & first R/A bill paid for Rs. 1777119 |
Detail Report
Graph / Photo |
95 | A/R and M/O to various road under SRD Project Sub-Division-III/SRD Project Division-II, PWD, New Delhi during 2017-18 SH Comprehensive Maintenance of road | 20/03/2018 | 14/11/2018 | 52.96 | Satyam Construction Co. | Work Completed |
Detail Report
Graph / Photo |
||
96 | AR and Mo to various roads under Sub Division 21 SWR-II PWD dg 2018 19. SH Repair of drain and footpath on Peer Baba Road ID 1218 Bindapur New Delhi. | 11/02/2019 | 11/05/2019 | 52.63 | BLG Innovations | work in progress |
Detail Report
Graph / Photo |
||
97 | Improvement of Central Verge on Road No. 66 from 1st Metro Pillar (Seelampur side) to Moujpur Chowk Red light. | 30/06/2019 | 29/07/2019 | 52.35 | 64.65 (Jan'20) | 0.00 (Jan'20) | Ravinder Kumar | Work in progress. |
Detail Report
Graph / Photo |
98 | Restoration of road cut by TATA Power DDL at Main Burari Road from Hiranki Bandh to Outer Ring Road at various place | 27/05/2017 | 26/06/2017 | 50.97 | S S Chauhan & Sons |
Detail Report
Graph / Photo |
|||
99 | Strengthening, of Azad Road, Sarai Rohilla Flyover, under RUB of Zakhira including Improvement of footpath & Drain, Providing and Fixing retro reflective signage and upgradation of street light of various roads under PWD Zone M-3.SH:- (Improvement of Road footpath & Drain of Nand Lal Marg, Azad Road, saria Rohila Flyover & under RUB of Zakhira) (Microsurfacing Work). | 25/01/2018 | 24/05/2018 | 50.81 | Pawan Kumar |
Detail Report
Graph / Photo |
|||
100 | Resurfacing of Road under SRD Project Sub-Division III SRD Project Division II PWD New Delhi SH Resurfacing of road and improvement of Footpath at Gurudwara Road | 17/08/2018 | 14/12/2018 | 50.73 | 54.15 (Nov'19) | 0.00 (Nov'19) | ASLAM BUILDERS | Work completed |
Detail Report
Graph / Photo |
101 | Cement concrete patch repair at East park road footpath, Panchkuyia NMV, Crimination Ground at Rani Jhansi Road, Military Road and Ajmal Khan Road repair | 04/01/2017 | 03/04/2017 | 50.49 | Shree Vishnu Steel Works | Completed |
Detail Report
Graph / Photo |
||
102 | Road Restoration at Goyla Deenpur Road Road Cut by Delhi Jal Board under Sub Div24 SWR II New Delhi dg 2018 19 | 25/04/2019 | 23/06/2019 | 50.28 | Dhanna Ram & Sons | work completed |
Detail Report
Graph / Photo |
||
103 | Providing Computer operator, MTS, Clerk and MLD, in Sub Divisions office, Division office and CE South office. | 21/07/2020 | 20/01/2021 | 50.23 | 33.89 (Jan'21) | 0.00 (Jan'21) | Trendy Security Services | Work in Progress |
Detail Report
Graph / Photo |
104 | AR and MO to Various Roads under Sub Division NWR 11 PWD Division NW R 1 dg 2016 17 SH Comprehensive desilting of drains of various categories and sizes along PWD roads | 28/04/2017 | 24/10/2017 | 49.61 | Jitendra Singh | Work Awarded |
Detail Report
Graph / Photo |
||
105 | Comprehensive maintenance of various roads under SRD Project Division-I, Sub Division-II PWD, New Delhi during 2019-20. (SH- Misc. Repair Work.) | 18/03/2019 | 17/03/2020 | 48.71 | 42.68 (Mar'21) | 0.00 (Mar'21) | M/s. Satyam Construction | work in progress |
Detail Report
Graph / Photo |
106 | Renovation of A Block, B Block and C Block at Urdu Academy, CPO Building, Kashmere Gate under SRD Division-I, Sub-Division-III, PWD, New Delhi. | 13/08/2018 | 12/01/2019 | 47.47 | 5.34 (Aug'20) | 0.00 (Aug'20) | Kamal Construction Co. | Work completed final bill yet to be paid |
Detail Report
Graph / Photo |
107 | Resurfacing of Road under SRD Project Sub-Division III SRD Project Division II PWD New Delhi SH Resurfacing of Road and improvement of Footpath at Abdul Rehman Road | 18/08/2018 | 12/02/2019 | 46.36 | 41.09 (Sep'19) | 0.00 (Sep'19) | RAJ KUMAR SACHDEVA | Work completed |
Detail Report
Graph / Photo |
108 | AR and MO to Various Roads under Sub Division NWR 13 PWD Division NWR 1 dg 2016 17 SH Comprehensive desilting of drains of various categories and sizes along PWD roads | 22/04/2017 | 18/10/2017 | 44.80 | Aditya Construction Co. |
Detail Report
Graph / Photo |
|||
109 | Road Restoration for replacement/shifting of 900mm dia Zakhira Patel Road Rising main from RPF Camp Shastri Nagar to Patel Nagar BPS.(Under jurisdiction of PWD M-311 (N) from RPF Camp Shastri Nagar to Zakhira Under Bridge at Old Rohtak Road Bituminous Portion). | 23/06/2016 | 21/08/2016 | 44.68 | 0.00 (Sep'16) | 40.00 % (Sep'16) | Shiv Shakti Enterprises | Work in Progress |
Detail Report
Graph / Photo |
110 | Providing and Fixing M.S. Railings on loni Road from Durgapuri chowk to Loni Gole chakkar under (North East) Road Division. | 30/06/2019 | 29/07/2019 | 43.93 | 52.77 (Nov'19) | 0.00 (Nov'19) | Sandeep Kumar | Work in progress. |
Detail Report
Graph / Photo |
111 | Misc. Repair works. | 29/08/2016 | 26/11/2016 | 43.53 | 0.00 (Apr'19) | 0.10 % (Apr'19) | Sudesh Kumar | work in progress |
Detail Report
Graph / Photo |
112 | A/R and M/O various roads under SRD Division-I, Sub-Division-II, PWD, New Delhi dg. 2018-19. (SH-Repair/renovation of footpath/carriageway of Kotla road.) | 05/10/2018 | 19/11/2018 | 43.03 | A.R Infrastructure | Work in progress |
Detail Report
Graph / Photo |
||
113 | Repair of Footpath and Central Verge at Road No.37 (Maharaja Nahar Singh Marg) from Keshav Puram to Inderlok Metro Station under Sub Division M-3113, Road No.41 from Wazirpur Flyover to Madhuvan Chowk Delhi under Sub Division M-3114 & Shri Shyam ji Krishan Verma Marg i.e. Road No. 44 under Tri Nagar Vidhan Sabha Sub Division). | 27/08/2016 | 25/10/2016 | 42.80 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Inderjit Singh | work in progress |
Detail Report
Graph / Photo |
114 | AR MO to various roads under Sub Div 21 Division SWR II PWD dg 2018 19 SH Repair of Footpath Misc Works at Satguru Ram Singh Marg New Delhi. | 12/03/2019 | 10/05/2019 | 42.74 | P. R. S. Yash & Co. | work completed |
Detail Report
Graph / Photo |
||
115 | A/R & M/O to various roads under Sub division CRMSD NW R-15 PWD Division NW R-1 during 2016-17. SH:- Misc. Repair Work under Tri Nagar Vidhan Sabha. | 14/09/2016 | 12/12/2016 | 41.69 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Mangat Ram Gupta | work in progress |
Detail Report
Graph / Photo |
116 | Misc. Repair Work under Tri Nagar Vidhan Sabha. | 14/09/2016 | 12/12/2016 | 41.69 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Mangat Ram Gupta | work in progress |
Detail Report
Graph / Photo |
117 | A/R and M/O to various roads under SRD Division-I, Sub-Division-II ,PWD, New Delhi during 18-19 (SH-Repairing of damaged portion of roads, under Matia Mahal Constituency) | 20/09/2018 | 19/11/2018 | 39.91 | Satyam Construction Company | work completed final bill paid |
Detail Report
Graph / Photo |
||
118 | drain by increasing of existing section from Karala Chowk to Shiv Vihar on Guru Gowalkar Marg under Sub Division WR-22. | 12/02/2020 | 11/05/2020 | 39.69 | Mohd. Arif |
Detail Report
Graph / Photo |
|||
119 | AR and Mo to various roads under PWD Division South West Road II New Delhi during 2019-20 SH Providing services of Clerk Computer Operators and MTS for Division Office | 01/08/2019 | 30/07/2020 | 38.51 | 15.79 (Aug'20) | 0.00 (Aug'20) | M/s Trendy Security Services | WORK IN PROGRESS |
Detail Report
Graph / Photo |
120 | Development of Khajuri Chowk for making left turn free of smooth flow of traffic under PWD Sub Division M-2134. | 31/12/2019 | 29/03/2020 | 38.44 | 45.44 (Feb'21) | 0.00 (Feb'21) | Maan Builders |
Detail Report
Graph / Photo |
|
121 | AR and MO various roads under Project Circle PWD New Delhi during 2019 20 SH Security Guards for various offices under Project Circle SRD Project Division I and Sub Division I II and III | 29/09/2019 | 28/09/2020 | 37.87 | 62.57 (Nov'20) | 0.00 (Nov'20) | Star security & Placement Services |
Detail Report
Graph / Photo |
|
122 | Provision for Rain Water Harvesting Systems in SKV Bulbuli Khana Matia Mahal, SBV No. 1 (UM) Jama Masjid and GGSSS Pataudi House Darya Ganj under SRD Project Division-I, Sub-Division-III, PWD, Delhi. | 09/11/2018 | 08/01/2019 | 37.49 | 36.01 (Nov'20) | 0.00 (Nov'20) | Ved Pal | work in progress |
Detail Report
Graph / Photo |
123 | Restoration of various road under SRD Project Sub Divn.III SRD Project Divn.II, PWD, New Delhi. SH Restoration of various road cut by BSES at D.B. Gupta Road, East Park Road, Sant Sujan Singh Road and Ajmal Khan Road. | 26/04/2018 | 23/06/2018 | 36.92 | AMOCON | Work completed |
Detail Report
Graph / Photo |
||
124 | AR and MO various roads under Division SWR-II, PWD Delhi during 2019-20. SH Improvement of drain by laying 600 mm dia NP3 pipe Hospital and BSES side from Rawta Morh to Jafferpur Engineering College in Prithvi Singh Dagar Marg | 03/09/2019 | 01/12/2019 | 36.30 | Ashok Kumar Rathi | work not started |
Detail Report
Graph / Photo |
||
125 | Development of Open Land as Public Park at Sheikh Sarai - 2 Press Enclave Road New Delhi dg.2018-19. | 14/09/2018 | 12/12/2018 | 35.74 | 34.84 (Mar'20) | 0.00 (Mar'20) | Ravi Tanwar | Work in progress |
Detail Report
Graph / Photo |
126 | AR Mo various roads under PWD Division SWR II during 2018 19 SH Miscellaneous Repair work of drain path of Section II under Sub Division II New Delhi. | 12/03/2019 | 09/07/2019 | 35.27 | H.P Builders Pvt Ltd | WORK foreclosed |
Detail Report
Graph / Photo |
||
127 | Construction of RCC drain at Punjab khor under Sub Division NR-15 during 2019-20, North Roads, PWD, Delhi | 22/12/2019 | 20/03/2020 | 35.24 | ASEEM CONSTRUCTION CO. | Work in progress and 45% Work Completed |
Detail Report
Graph / Photo |
||
128 | Resurfacing of Road under SRD Project Sub Division-III SRD Project Division-II PWD New Delhi Sh Resurfacing of road and improvement of footpath at Elahi Bux Road | 17/08/2018 | 14/12/2018 | 34.08 | 28.82 (Nov'19) | 0.00 (Nov'19) | ASLAM BUILDERS | Work completed |
Detail Report
Graph / Photo |
129 | AR and Mo various roads under Division South West Road II PWD dg 2018-19 SH Providing and Installation of Sewerage Pump at Different Vulnerable Location under Sub Division III. | 07/02/2019 | 02/02/2020 | 33.55 | 24.99 (Aug'19) | 0.00 (Aug'19) | Tripurari Prasad Singh | work complted |
Detail Report
Graph / Photo |
130 | Desilting | 15/04/2017 | 11/10/2017 | 32.78 | SAHIL GOYAL |
Detail Report
Graph / Photo |
|||
131 | A/R & M/O to various roads under M-4423 during 2014-15 (SH: Repair to storm water drain at IGNOU Road from MB Road cut to Z-crossing under Sub-Division M-4423). | 19/01/2015 | 18/03/2015 | 32.55 | Surender Singh Chouhan | work completed |
Detail Report
Graph / Photo |
||
132 | A/R and M/O to various roads under PWD Division NWR-2 dg. 2018-19. (SH- Repair of existing drains and roads at Avantika Market, Rohini under Sub Division NWR-21.) | 18/10/2018 | 15/01/2019 | 31.72 | WORK CEE |
Detail Report
Graph / Photo |
|||
133 | Providing and fixing precast Jersey Barrier on Sadar Thana Road and Foota Road. | 25/01/2017 | 23/02/2017 | 30.95 | B.M. & Sons | Completed |
Detail Report
Graph / Photo |
||
134 | AR and MO TO VARIOUS ROADS UNDER NW R 14 PWD NW R 1 DURING 2016 17 SH PATCH REPAIR WORK AT RING ROAD(ID : 27597) | 16/07/2017 | 13/09/2017 | 30.72 | Sethi Construction |
Detail Report
Graph / Photo |
|||
135 | AR and MO TO VARIOUS ROAD UNDER PWD DIVISION NORTH WEST ROAD 1 DURING 2017 18 SH COMPREHENSIVE MAINTENANCE OF FOOTPATH OF VARIOUS ROADS UNDER SUB DIVISION NW R 13 | 08/11/2017 | 06/05/2018 | 28.69 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
136 | Providing services of outsourcing staff (Computer operators) | 07/06/2017 | 26/06/2018 | 27.77 | Harshidhi Security Service |
Detail Report
Graph / Photo |
|||
137 | Restoration of Road No. 5 from D.B. Gupta Road to Tank Road in Karol Bagh, New Delhi cut by Delhi Jal Board for laying sewer line | 01/01/2017 | 01/03/2017 | 27.68 | Aslam Builders | Completed |
Detail Report
Graph / Photo |
||
138 | Renovation work in Kothi No. 3, Behind DCP Office Complex, Central Distt. Darya Ganj, under SRD Division-I, Sub-Division-III, PWD, New Delhi-110002. | 02/06/2018 | 01/11/2018 | 27.48 | 34.29 (Jun'19) | 0.00 (Jun'19) | Manohar Lal Sharma | Work in porgress |
Detail Report
Graph / Photo |
139 | Remodeling of old damaged Brick Masonry drain of G-Block Road Mangolpuri (from Police Station Road to Senior Secondary School), Delhi. | 04/08/2019 | 02/09/2019 | 27.28 | Jitender Singh |
Detail Report
Graph / Photo |
|||
140 | A/R & M/O to various roads under Sub division CRMSD NW R-14 PWD Division NW R-1 during 2016-17. (SH:- Misc. Repair Work under Shalimar Constituency) | 12/09/2016 | 10/12/2016 | 27.04 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Raj Associates | work in progress |
Detail Report
Graph / Photo |
141 | IMPROVEMENT OF ROAD SURFACE OF PREMBADI UNDERPASS AT RING ROAD | 25/10/2017 | 23/12/2017 | 26.97 | Gaurav Construction Co. |
Detail Report
Graph / Photo |
|||
142 | A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2016-17. SH Desilting of Road side storm water Drains. | 03/05/2017 | 31/07/2017 | 26.32 | Shakur Ahmed & Sons | Completed |
Detail Report
Graph / Photo |
||
143 | A/R and M/O to various roads under Division NWR-2 during 2016-17 (SH- Desilting of Drains and Removal of Malba/ sludge etc. under the jurisdiction of Sub-Division NWR-25) (Re-call and Short Notice) | 27/04/2017 | 26/04/2017 | 26.29 | Vinay Shanker |
Detail Report
Graph / Photo |
|||
144 | Removal of malba and disposal at approved MCD & dumping groun. | 14/02/2016 | 13/02/2017 | 25.66 | 13.11 (Nov'19) | 75.00 % (Nov'19) | B.M. Gupta & Sons | work in progress |
Detail Report
Graph / Photo |
145 | A/R and M/O various road under PWD SRD Project Division-I, PWD, New Delhi dg. 2018-19. (SH-Provision of two nos. yellow coloured maintenance van with required labour and T and P for day to day maintenance of roads). | 26/11/2018 | 25/11/2019 | 25.46 | 12.62 (Oct'19) | 0.00 (Oct'19) | RANJIT CONSTRUCTION COMPANY | work in progress |
Detail Report
Graph / Photo |
146 | A/R & M/O to various roads under Sub division CRMSD NW R-13 PWD Division NW R-1 during 2016-17 | 12/09/2016 | 10/12/2016 | 25.36 | 0.00 (Sep'16) | 0.01 % (Sep'16) | work in progress |
Detail Report
Graph / Photo |
|
147 | AR to MO to various Roads of PWD Division NW R 1 under Sub Division NW R 14 during 2017 18 SH Repair of existing footpath and other misc repair work at Road no 41(ID : 26747) | 08/07/2017 | 05/10/2017 | 25.22 | Globe Builders |
Detail Report
Graph / Photo |
|||
148 | A/R & M/O various road under Sub -Division M-2111 during 2019-20.(SH: Widening of Service Road and Exit of Anand vihar Railway Station and DTC Bus terminal on Road No- 56.). Recall | 28/05/2020 | 26/06/2020 | 25.18 | 19.07 (Oct'20) | 0.00 (Oct'20) | Nation Star Enterprises | work in progress |
Detail Report
Graph / Photo |
149 | A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (Sh- Comprehensive repair of road footpath, drain, painting etc. under Section-I, Sub Division NWR-22.) | 16/03/2019 | 13/06/2019 | 24.98 | 41.60 (Jul'19) | 0.00 (Jul'19) | Jitender Singh |
Detail Report
Graph / Photo |
|
150 | PROVIDING OFFICE STAFF, LDC AND COMPUTER OPERATOR FOR CHIEF OFFICE MZ-3 (NORTH) & CIRCLE NORTH WEST (CRMC M-31 | 11/05/2016 | 10/05/2017 | 24.83 | 0.00 (Sep'16) | 60.00 % (Sep'16) | Shaka Electrical India | Work in Progress |
Detail Report
Graph / Photo |
151 | AR and MO TO VARIOUS ROAD UNDER SUB DIVISION NW R 14 PWD NW R 1 DURING 2017 18 SH IMPROVEMENT AND REPAIR OF EXISTING DRAINAGE SYSTEM AND FOOTPATH AT ABHINAV MODEL PUBLIC SCHOOL ROAD(ID : 27995) | 08/07/2017 | 21/08/2017 | 24.72 | Pawan Kumar Gupta |
Detail Report
Graph / Photo |
|||
152 | A/R and M/O various Roads under SRD Project Sub-Division-III/SRD Project Division-II, PWD, New Delhi during 2017-18. | 22/11/2017 | 05/01/2018 | 24.68 | Shiv Shakti Enterprises | DETERMINED |
Detail Report
Graph / Photo |
||
153 | AR and Mo various roads under Division South West Road II PWD dg 2018 19 SH Providing of Maintenance Van with required labours T and P for day to day upkeeping maintenance of roads under Sub Div III Jaffarpur Section. | 13/02/2019 | 12/02/2020 | 24.14 | 23.38 (May'20) | 0.00 (May'20) | Bishwa Mohan Jha | work in progress |
Detail Report
Graph / Photo |
154 | Improvement of various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2016-17. SH: Footpath repair in Panchkuiyan Road, Rani Jhansi Road and New Rohtak Road, Karol Bagh. | 22/05/2017 | 20/07/2017 | 23.85 | Ramesh Chand | Completed |
Detail Report
Graph / Photo |
||
155 | AR TO MO TO VARIOUS ROADS OF PWD NW R 1 UNDER PWD SUB DIVISION NW R 14 DURING 2017 18 SH MISC REPAIR AND IMPROVEMENT WORK NEAR BRITANNIA FLYOVER(ID : 27325) | 22/06/2017 | 20/08/2017 | 23.49 | Globe Builders |
Detail Report
Graph / Photo |
|||
156 | Removal of malba & dispaosal at approved MCD dumping ground. | 30/11/2014 | 29/12/2015 | 22.89 | 0.00 (Aug'16) | 85.00 % (Aug'16) | Jitendra Singh | Work in progress |
Detail Report
Graph / Photo |
157 | Desilting of drains and culverts on Sultanpuri area roads under | 08/03/2016 | 05/07/2016 | 22.87 | 0.00 (Aug'16) | 95.00 % (Aug'16) | Nand Kishore Yadav | work in progress 95 % |
Detail Report
Graph / Photo |
158 | A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (SH- Providing and installation of signages, Overhead cantilever and Gantry Sign Board in Rani Bagh area under sub Division NWR-24.) | 21/07/2018 | 18/09/2018 | 22.86 | 26.83 (Sep'20) | 0.00 (Sep'20) | Sethi Construction |
Detail Report
Graph / Photo |
|
159 | Desilting of drains & culverts on mangolpuri areas roads | 08/03/2016 | 05/07/2016 | 22.79 | 0.00 (Aug'16) | 95.00 % (Aug'16) | Nand Kishore Yadav | work in progress 95 % |
Detail Report
Graph / Photo |
160 | A/R & M/O to various Roads under SRD Project Division-II, New Delhi dg. 2017-18. SH: Monsoon preparation works. | 31/05/2017 | 27/09/2017 | 22.46 | Kashi Nath Jha | completed |
Detail Report
Graph / Photo |
||
161 | A/R and M/O various Road under Sub Division NWR-21, PWD, Division NWR-2 during 2017-18. SH- Hiring Inspection Vehicle for S.E. North West, PWD Sectt, Deputy Secretary to CM and E.E. NWR-2 for official purpose.). | 27/03/2018 | 26/03/2019 | 22.43 | 7.01 (Aug'19) | 0.00 (Aug'19) | Gaurav Construction Co. |
Detail Report
Graph / Photo |
|
162 | Road Restoration. | 16/01/2016 | 15/03/2016 | 22.38 | Vinod Kumar | Work in progress |
Detail Report
Graph / Photo |
||
163 | Speed beakers 06 bituminous concrete at various location PWD Roads. | 20/02/2016 | 19/05/2016 | 22.07 | 0.00 (Aug'16) | 90.00 % (Aug'16) | Jitendra Singh | work in progress 90 % |
Detail Report
Graph / Photo |
164 | Providing distribution line for water supply to plantation in central verge of Main Burari Road from Outer Ring Road to Hiranki Bandh. | 30/05/2017 | 29/06/2017 | 21.80 | Satyam Construction Company |
Detail Report
Graph / Photo |
|||
165 | Deposit Work | 16/01/2016 | 15/03/2016 | 21.75 | Vinod Kumar | Work in progress |
Detail Report
Graph / Photo |
||
166 | Restoration of road under SRD Project Sub Division III SRD Project DivisionII, PWD, New Delhi during 2017-18.SH Restoration of various road cut by BSES at DB Gupta Road Ajmal Khan Road Saraswati Marg, Vishnu Mandir Marg and Padam Singh Road. | 24/04/2018 | 07/06/2018 | 21.61 | Satyam Construction Co. | Work completed |
Detail Report
Graph / Photo |
||
167 | Improvement of service road from Nigam Bodh Ghat to start of Ring Road Bypass. | 27/05/2017 | 10/07/2017 | 21.10 | Maa Vaishno Developers |
Detail Report
Graph / Photo |
|||
168 | A/R and M/O various roads under SRD Division, PWD, New Delhi, During 2018-19. (SH-Desilting of road side water drain/ sewer line by manual and super sucker machine on Various roads, under Sub Division-II.) | 10/03/2019 | 09/09/2019 | 20.87 | 33.58 (Aug'20) | 0.00 (Aug'20) | M/s. Satyam Construction | work in progress |
Detail Report
Graph / Photo |
169 | A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18 SH Repair of footpath and central verge on Azad Market Road | 07/02/2018 | 07/04/2018 | 20.54 | Kashi Nath Jha | Work Completed |
Detail Report
Graph / Photo |
||
170 | AR and MO VARIOUS ROAD OF PWD DIVISION NW R 1 DG 2016 17 UNDER SUB DIVISION NW R 14 SH REPAIR AND REPLACEMENT OF OLD DAMAGED DRAIN SLABS AT GOPAL MANDIR MARG SIDE PITAMPURA SECOND CALL(ID : 27473) | 01/07/2017 | 29/08/2017 | 20.52 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
171 | Strengthening, Improvement of footpath and providing and fixing Retro-reflective road signages of Ahinsa Marg and Road passing through Laxmikunj Appt. to Razapur transformer in Rohini, Delhi. (SH- Microsurfacing of Bituminous road.) Re-call. | 23/03/2019 | 20/06/2019 | 20.51 | 22.05 (Jan'20) | 0.00 (Jan'20) | Pawan Kumar |
Detail Report
Graph / Photo |
|
172 | Restoration of road cut by Indraprastha Gas Limited 12” dia steel pipeline along Ring Road from I.P. Estate | 15/06/2017 | 14/08/2017 | 20.25 | Ram Singh |
Detail Report
Graph / Photo |
|||
173 | Repair of drain, footpath at Jagdamba Road, Sultanpuri, Delhi | 04/07/2017 | 01/10/2017 | 20.00 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
174 | A/R and M/O other PWD roads under SRD Division-I, Sub-Division-I, PWD, New Delhi dg. 2018-19 (SH-Repairing of footpath and other Misc. work at Gokhle Road) | 18/03/2019 | 17/07/2019 | 19.92 | 24.81 (Nov'19) | 0.00 (Nov'19) | TKN Developers | work in progress |
Detail Report
Graph / Photo |
175 | A/R and M/O to various roads under SRD Project Division-I during 2016-17 (SH-Laying of storm water pipe and reconstruction of footpath near Gurudwara side gate to Mata Sundri College on Mata Sundri Road Kotla Road around Gurudwara). | 02/06/2017 | 01/09/2017 | 19.82 | 0.00 (Mar'18) | 24.61 % (Mar'18) | Satyam Construction Company |
Detail Report
Graph / Photo |
|
176 | Construction of Badminton Court including lighting arrangement and fixtures etc. in Green Park Extension near House No. V-20, AC-43 Malviya Nagar. | 13/10/2019 | 12/12/2019 | 19.74 | 12.50 (Nov'20) | 0.00 (Nov'20) | Jai Bhawani Constructions | Work in Progress |
Detail Report
Graph / Photo |
177 | A/R and M/O various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Development of Baba Lal Dayal Chowk. | 29/12/2017 | 11/02/2018 | 19.68 | Sirohi Construction Co. | Work Completed |
Detail Report
Graph / Photo |
||
178 | A/R and M/O various roads under SRD Division-I, Sub-Division-II, PWD, New Delhi during 2018-19. (SH- Repairing of damaged Footpath, Central Verge and Main Carriageway at Asaf Ali Road.) | 18/03/2019 | 17/06/2019 | 19.62 | 24.40 (Nov'19) | 0.00 (Nov'19) | M/s. Satyam Construction | work in progress |
Detail Report
Graph / Photo |
179 | Desilting of road side drains and culvert on Rohini Sector 1,2,3 & 4 area road drains, ORR-26 & Road No.43 area drains.) | 02/06/2016 | 30/08/2016 | 19.58 | 0.00 (Aug'16) | 95.00 % (Aug'16) | Jitendra Singh | work in progress 95 % |
Detail Report
Graph / Photo |
180 | A/R and M/O various Roads under SRD Project Sub-Division-III/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Repair of Footpath at Guru Dwara Road, Abdul Aziz Road, Ganga Mandir Marg and Desh Bandhu Gupta Road etc | 29/12/2017 | 28/03/2018 | 19.45 | Sirohi Construction Co. | Work Completed |
Detail Report
Graph / Photo |
||
181 | A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (Sh- Improvement of berm portion at Pt. Deen Dayal Upadhyay Marg and Major Ashwani Kanwa Marg under Section-II, Sub Division NWR-24.) | 29/11/2018 | 12/01/2019 | 19.36 | 24.12 (Sep'19) | 0.00 (Sep'19) | Jitender Singh |
Detail Report
Graph / Photo |
|
182 | Hiring Inspection Vehicle for SE M-31, PWD Sectt., Secretary Deputy CM & EE M-312 for official purpose | 22/01/2016 | 21/01/2017 | 19.15 | 0.00 (Aug'16) | 60.00 % (Aug'16) | Jitendra Singh | work in progress 60 % |
Detail Report
Graph / Photo |
183 | A/R and M/O to various roads under PWD division NWR-2 during 2018-19. (SH- P/L Stone Matrix Asphalt (SMA) on existing mastic surface at B-4 road and Conl. Sarna Marg, Rohini, under Section-I, Sub Division NWR-23.) | 28/08/2018 | 26/10/2018 | 19.07 | 19.49 (May'19) | 0.00 (May'19) | Sanjay Kaura |
Detail Report
Graph / Photo |
|
184 | Providing Services of maintenance vehicle with labour and T&P in Sub Division M-3122 for Section-II) | 22/01/2016 | 21/01/2017 | 18.65 | 0.00 (Aug'16) | 73.00 % (Aug'16) | SACHIN KUMAR | work in progress |
Detail Report
Graph / Photo |
185 | A/R and M/O various roads under SRD Division, PWD, New Delhi, During 2018-19. (SH-Desilting of road side water drain/ sewer line by manual and super sucker machine on Various roads, under Sub Division-I.) | 10/03/2019 | 09/09/2019 | 18.54 | 23.10 (Mar'20) | 0.00 (Mar'20) | Shiva Construction | work in progress |
Detail Report
Graph / Photo |
186 | A/R & M/O various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2016-17. SH: Provision of Maintenance Van in Karol Bagh (Roads in between D.B Gupta Road & New Rohtak Road from Faiz Road crossing to Military Road and Arya Samaj Road). | 19/12/2016 | 14/09/2017 | 18.25 | AMCON | Completed |
Detail Report
Graph / Photo |
||
187 | Civil Misc. woks and painting of ORR-6 from Mangolpuri to Madhuvan Chowk. | 11/06/2017 | 25/07/2017 | 18.25 | 12.86 (Apr'19) | 0.00 (Apr'19) | Globe Builders |
Detail Report
Graph / Photo |
|
188 | Providing services of maintenance vehicle with labour and T & P in sub division M-3122 for section-I. | 14/02/2016 | 13/02/2017 | 17.89 | 0.00 (Aug'16) | 73.00 % (Aug'16) | Jitendra Singh | work in progress |
Detail Report
Graph / Photo |
189 | A/R and M/O various roads under SRD Division-I, Sub-Division-II, PWD, New Delhi during 2018-19. (SH- Repairing of damaged Footpath, NMV Lanes and Planters in front of LNJP Hospital at JLN Marg) | 18/03/2019 | 17/06/2019 | 17.56 | 21.01 (Jan'20) | 0.00 (Jan'20) | M/s. Satyam Construction | work in progress |
Detail Report
Graph / Photo |
190 | A/R and M/O to other PWD roads under SRD Division-I, New Delhi dg. 2018-19 (SH- Repairing of footpath and other Misc. work at Zorawar Singh Marg under Sub Division-I) | 26/02/2019 | 25/03/2019 | 17.56 | 21.83 (Sep'19) | 0.00 (Sep'19) | Sirohi Construction Co | work in progress |
Detail Report
Graph / Photo |
191 | A/R and M/O to various roads under SRD Division-I, PWD, New Delhi dg. 2018-19. (SH-Repairing of Traffic Islands at Jawahar Lal Nehru Marg and Turkman Road.) | 02/12/2018 | 01/02/2019 | 17.49 | 0.00 (Mar'19) | 21.43 % (Mar'19) | M/s. Satyam Construction | Work completed final bill paid |
Detail Report
Graph / Photo |
192 | Providing services of maintenance vehicle with labour and T&P in Sub Divison M-3121 for Section-II. | 24/01/2016 | 23/01/2017 | 17.45 | 0.00 (Aug'16) | 69.00 % (Aug'16) | Jitendra Singh | work in progrss 69 % |
Detail Report
Graph / Photo |
193 | Renovation of office of Commission for Protection of Child Rights, GNCT Delhi in ISBT Building Kashmere Gate under SRD Division-I, Sub-Division-III, PWD, New Delhi. | 26/02/2019 | 25/05/2019 | 17.37 | 12.48 (Feb'20) | 0.00 (Feb'20) | SUDHIR KUMAR SHARMA | work in progress |
Detail Report
Graph / Photo |
194 | Strengthening, Improvement of footpath and providing and fixing retro-reflective road signages and upgradation of street lighting of Shiva Road, Connecting sector 7 and 8 in Rohini, Delhi. (SH- Microsurfacing of Bituminous road.) Re-call. | 23/03/2019 | 20/06/2019 | 17.25 | Pawan Kumar |
Detail Report
Graph / Photo |
|||
195 | Repair of footpath, central verge on road from Shantivan to I.P. Flyover on Ring Road. | 01/06/2017 | 30/07/2017 | 17.18 | Aditya Construction Co. |
Detail Report
Graph / Photo |
|||
196 | A/R and M/O PWD roads under Sub Division-3 of Division C and ND- Roads during 2016-17. SH_ Filling of construction joints with polysulphide sealant on Ring Road Bypass road from Geeta Colony to Hanuman Setu. 2nd Call of Tender | 23/07/2017 | 06/07/2017 | 17.17 | Kuldeep Kumar |
Detail Report
Graph / Photo |
|||
197 | Providing services of maintenance vehicle with labour and T&P in Sub Divison M-3121 for Section-I | 24/01/2016 | 23/01/2017 | 17.04 | 0.00 (Aug'16) | 70.00 % (Aug'16) | Jitendra Singh | work in progress 70 % |
Detail Report
Graph / Photo |
198 | AR Mo various roads under Division South West Road II PWD dg 2018 19 SH Supply of Material for day to day Maintenance of Roads under Sub Division 21 New Delhi. | 15/03/2019 | 12/07/2019 | 17.02 | ASH NARAYAN SINGH | work complete |
Detail Report
Graph / Photo |
||
199 | Miscellaneous repair works such as, brick work, coble stone, plaster, painting and footpath repair on Ring Road Bypass | 05/05/2017 | 19/06/2017 | 16.76 | Amaan Enterprises |
Detail Report
Graph / Photo |
|||
200 | AR and MO various roads under NW R 14 PWD Division NW R 1 during 16 17 SH Providing Security arrangment at various locations in Subways Underpass etc | 16/06/2017 | 15/11/2017 | 16.59 | Devine Security Services |
Detail Report
Graph / Photo |
|||
201 | A/R and M/O various roads under SRD Project Division-I, Sub-Division-II, PWD, New Delhi during 2018-19. (SH-Improvement of footpath, drainage and main carriageway at Mirdard Road.) | 18/03/2019 | 17/06/2019 | 16.55 | 20.33 (Nov'19) | 0.00 (Nov'19) | M/s. Satyam Construction | work in progress |
Detail Report
Graph / Photo |
202 | ROAD NO. 40 OLD ROHTAK ROAD, HAJI ABDUL QUARESHI MARG, AZAD ROAD, LINK ROAD (EAST MOTI BAGH) & BHAGAT SINGH ROAD UNDER SUB DIVISION M-3113 DURING 2015-16. (SH:- DESILTING & MISC. REPAIR WORK OF DRAINS). | 04/04/2016 | 30/09/2016 | 16.50 | 0.00 (Sep'16) | 70.00 % (Sep'16) | Pawan Kumar | Work in Progress |
Detail Report
Graph / Photo |
203 | A/R and M/O to various roads under PWD Division NWR-2 during 2017-18. (SH- Comprehensive Repair of road footpath, drain, painting etc. under Sub division NWR-23.) | 19/10/2017 | 15/02/2018 | 16.42 | Arif |
Detail Report
Graph / Photo |
|||
204 | VARIOUS ROADS SWAMI NARAYAN MARG, NAND LAL MARG, PRATAP NAGAR ROAD, NIMRI COLONY ROADS, BHARAT BAGAR ROAD,SUNDER LAL JAIN ROAD & TAWETIA MARG UNDER SUB DIVISION M-3113 DURING 2015-16.(SH:- DESILTING & MISC. REPAIR WORK OF DRAINS). | 04/04/2016 | 30/09/2016 | 16.39 | 0.00 (Sep'16) | 70.00 % (Sep'16) | Pawan Kumar | Work in Progress |
Detail Report
Graph / Photo |
205 | AR and MO TO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD I UNDER SUB DIVISION NW R 11 DURING 2016 17 SH REPAIRS OF FOOTPATHS ROAD BERM and OTHER MISC WORK AT BALBIR SINGH SIDHU MARG(ID : 27727) | 29/06/2017 | 27/08/2017 | 16.13 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
206 | A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (Sh- Patch repair of H-block road Sultanpuri, Delhi under Sub Division NWR-21.) | 04/12/2018 | 18/12/2018 | 16.11 | Awasthi Construction |
Detail Report
Graph / Photo |
|||
207 | PROVIDING AND FIXING MISSING RETRO REFLECTIVE SIGNAGE BOARDS AT VARIOUS ROADS OF PITAMPURA AREA UNDER PWD DIVISION NW R 1 OF SUB DIVISION NW R 14 DELHI DURING 2019 20 | 26/06/2019 | 25/07/2019 | 15.75 | Fiberfill Engineer |
Detail Report
Graph / Photo |
|||
208 | Desilting of open drains, covered drain, culverts, pipe etc. | 26/05/2016 | 22/10/2016 | 15.71 | 0.00 (Aug'16) | 90.00 % (Aug'16) | Rajpal Sehgal | work in progress |
Detail Report
Graph / Photo |
209 | AR and MO TO VARIOUS ROADS OF PWD NORTH WEST ROAD 1 DIVISION UNDER SUB DIVISION NW R 14 DG 2017 18 SH PROVIDING OFFICE STAFF LDC AND COMPUTER OPERATOR FOR CHIEF OFFICE MZ 3 NORTH and CIRCLE NORTH WEST CRMC M 31 | 16/06/2017 | 12/12/2017 | 15.63 | Harshidhi Security Service |
Detail Report
Graph / Photo |
|||
210 | PROVIDING SECURITY ARRANGEMENT AT VARIOUS LOCATIONS IN SUBWAYS, UNDERPASS ETC. UNDER SUB-DIVISION M-3114 FOR 5 MONTHS | 11/05/2016 | 07/10/2016 | 15.39 | 0.00 (Sep'16) | 90.00 % (Sep'16) | Harshidhi | Work in Progress |
Detail Report
Graph / Photo |
211 | A/R and M/O to various road under PWD SRD Project Division-I, dg. 2017-18 (SH-Provision of yellow coloured two maintenance van with required labour with T and P to attend day to day maintenance under Sub Division-II). | 25/06/2017 | 24/12/2017 | 14.94 | 0.00 (Mar'18) | 18.63 % (Mar'18) | Satyam Construction Company | Work completed and final bill paid |
Detail Report
Graph / Photo |
212 | DESILTING OF DRIANS AND REMOVAL OF MALBA/SLUDGE ETC. IN ROAD NO. 44 & OTHER ADJOINING ROAD IN PITAMPURA VILLAGE UNDER TRI NAGAR VIDHAN SABHA SUB DIVISION | 05/06/2016 | 01/12/2016 | 14.90 | 0.00 (Sep'16) | 75.00 % (Sep'16) | Sanjay Malohtra | work in progress |
Detail Report
Graph / Photo |
213 | A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Misc. Road Repair works under Sadar Constituency) | 06/02/2018 | 07/05/2018 | 14.88 | TKN Developers | Work Completed |
Detail Report
Graph / Photo |
||
214 | Covering of drain by RCC slab of Road No. 316, Mangolpuri, Delhi.) | 02/07/2016 | 30/08/2016 | 14.86 | 0.00 (Aug'16) | 10.00 % (Aug'16) | Dharam Vir Singh | work in progress 10 % |
Detail Report
Graph / Photo |
215 | A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Laying of non pressure NP-2 class (light duty) R.C.C. pipes on Pahari Dhiraj road.) | 05/03/2018 | 03/05/2018 | 14.77 | Surender Singh Chahal | Foreclosed on 18.12.2018 |
Detail Report
Graph / Photo |
||
216 | A/R and M/O various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2016-17. SH Painting of kerbs and central verge. | 12/12/2016 | 10/04/2017 | 14.02 | Aslam Builders | Completed |
Detail Report
Graph / Photo |
||
217 | A/R and M/O to various roads under PWD Division NWR-2 during 2017-18. (SH- Repair of footpath, central verge and Painting under section-II, Sub-Division NWR-21.) Re-call. | 10/01/2018 | 09/04/2018 | 14.01 | Jai Builders |
Detail Report
Graph / Photo |
|||
218 | A/R and M/O to various roads under SRD Division-I, PWD, New Delhi during 2017-18. (SH-Provision of semi permanent office for Sub-Division-II.) | 25/06/2017 | 24/08/2017 | 13.87 | 0.00 (Jan'18) | 17.31 % (Jan'18) | Krishan Kumar | Work completed and final bill paid |
Detail Report
Graph / Photo |
219 | A/R and M/O to various roads under SRD Division-I, PWD, New Delhi during 2018-19.(SH-Providing and fixing Bollards and other Misc. works at N.S. Marg) | 30/11/2018 | 29/01/2019 | 13.82 | 17.01 (Nov'19) | 0.00 (Nov'19) | M/s. Satyam Construction | work in progress |
Detail Report
Graph / Photo |
220 | A/R and M/O to various road under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18 SH Misc. Road Repair works under Ballimaran Constituency | 07/02/2018 | 07/05/2018 | 13.72 | Kashi Nath Jha | Work Completed |
Detail Report
Graph / Photo |
||
221 | Cleaning of underground pipe drain/RCC culvert etc by super sucker machine.) | 29/05/2016 | 25/09/2016 | 13.70 | 0.00 (Aug'16) | 54.00 % (Aug'16) | RichCon Engineering Company | work in progress |
Detail Report
Graph / Photo |
222 | Road restoration under PWD NWR-21. | 31/07/2017 | 13/09/2017 | 13.50 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
223 | A/R and M/O to various road under PWD SRD Project Division-I, dg. 2018-19 (SH-Provision of yellow coloured maintenance van with required labour and T and P for Chandni Chowk Constituency to attend day to day complaints under Sub Division-I) | 09/08/2018 | 08/08/2019 | 13.45 | 6.67 (Nov'19) | 0.00 (Nov'19) | Sirohi Construction Co. | Work completed and final bill paid |
Detail Report
Graph / Photo |
224 | A/R & M/O to various road under PWD SRD Project Division-I, dg. 2016-17 (SH: Provision of yellow coloured maintenance van with required labour with T&P to attend day to day maintenance under Sub Division-I). | 02/06/2017 | 01/06/2018 | 13.40 | 0.00 (Aug'18) | 10.16 % (Aug'18) | RANJIT CONSTRUCTION COMPANY | Work completed and final bill paid |
Detail Report
Graph / Photo |
225 | A/R and M/O to various roads under SRD Project Division-I, New Delhi dg. 2018-19 (SH- Providing services of diesel pumps for removing water logging during rains, under Sub Division-II). | 01/07/2018 | 11/10/2018 | 13.37 | 0.00 (Nov'18) | 16.30 % (Nov'18) | Satyam Construction Company | Work Completed and final bill paid |
Detail Report
Graph / Photo |
226 | Providing and fixing RCC drain cover of different sizes for the various opening drains.) | 03/07/2016 | 29/12/2016 | 13.36 | 0.00 (Aug'16) | 10.00 % (Aug'16) | Jitendra Singh | work in progress 10 % |
Detail Report
Graph / Photo |
227 | Improvement of drainage system and footpath at T-junction of Ring Road and Shamnath Marg near Flag Staff Road. | 05/06/2017 | 19/07/2017 | 13.31 | Globe Builders |
Detail Report
Graph / Photo |
|||
228 | A/R and M/O other PWD Roads under SRD Division-I, PWD, New Delhi during 2018-19. (SH-Painting of Kerb Stones and Other Misc. Work on various roads for Independence Day and Diwali festival under Sub Division-I.) | 30/07/2018 | 29/11/2018 | 13.24 | Arif | Work completed and final bill paid |
Detail Report
Graph / Photo |
||
229 | Road Restoration of various roads cut by civic agencies for laying/cable/pipe etc. under section-1, sub division NWR-23, Division NWR-2 during 2017-18. | 10/01/2018 | 23/02/2018 | 13.22 | Jai Builders |
Detail Report
Graph / Photo |
|||
230 | A/R and M/O to various roads under sub-division NWR-24, PWD, Division NWR-2 dg. 2016-17. (SH- Repair of footpath at Hans Raj Marg (near Shakti Vihar to Sant Nagar Chowk), Pitam pura, Delhi. | 25/04/2017 | 23/07/2017 | 13.12 | Vinay Babu Sharma |
Detail Report
Graph / Photo |
|||
231 | A/R & M/O to various roads under sub division M-3121, PAD CRUD M-312 dg. 2014-15 | 31/03/2015 | 14/05/2015 | 12.93 | 0.00 (Aug'16) | 15.00 % (Aug'16) | Sanjay Kaura | work in progress 15 % |
Detail Report
Graph / Photo |
232 | A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Repair of footpath and Improvement of Drainage system on Gali No. 10 | 08/02/2018 | 09/05/2018 | 12.78 | TKN Developers | Work Completed |
Detail Report
Graph / Photo |
||
233 | RAMLEELA GROUND ROAD, CANAL ROAD, AHINSA PATH ROAD, ABHINAV MODAL ROAD, HAIDERPUR MAIN ROAD, GOPAL MANDIR MARG, BD-FD ROAD, POWER HOUSE ROAD, T.V TOWER ROAD, SP-TP & NP-MP MARG, MUNI MAYA RAM MARG IN SOUTH & NORTH PITAMPURA AREA UNDER SUB DIVISIREA UNDER SUB DIVISION M-3114/ PWD CRMD M-311 DG.2016-17 (SH:- DESILTING & MISCLLENEOUS REPAIR OF DRAIN). | 30/04/2016 | 26/09/2016 | 12.76 | 0.00 (Sep'16) | 90.00 % (Sep'16) | Sanjay Kaura | Work in Progress |
Detail Report
Graph / Photo |
234 | NETAJI SUBHASH PLACE TO MADHUBAN CHOWK AT ROAD NO.41 AND SHALIMAR BAGH F.O.B TO PUNJABI BAGH FLY OVER ON RING ROAD AND DEEP DRAINS AT BRITANNIA CHOWK TO NEAR TEMPLE AREA UNDER SUB DIVISION M-3114/ PWD CRMD M-311 DG.2016-17 (SH:- DESILTING & MISCLLENEOUS REPAIR OF DRAIN). | 30/04/2016 | 26/09/2010 | 12.63 | 0.00 (Sep'16) | 90.00 % (Sep'16) | Anil Malhotra | Work in Progress |
Detail Report
Graph / Photo |
235 | Provision of Maintenance Van with required labour and T&P to attend day to day urgent repairs of roads on Sachivalya road, velodrome road, Kisan Ghat road & I.P. Marg area and Pahar Ganj Area. | 22/04/2015 | 21/10/2015 | 12.48 |
Detail Report
Graph / Photo |
||||
236 | DESILTING OF DRIANS AND REMOVAL OF MALBA/SLUDGE ETC. IN RAMPURA AREA, ROAD NO. 43 & BALBIR SINGH SIDHU MARG ETC. UNDER TRI NAGAR VIDHAN SABHA | 05/06/2016 | 02/10/2016 | 12.46 | 0.00 (Sep'16) | 85.00 % (Sep'16) | Anil Malhotra | work in progress |
Detail Report
Graph / Photo |
237 | A/R and M/O various Roads under SRD Project Division-II, PWD, New Delhi during 2016-17. SH Desilting of drains by Super Sucker Machine. | 09/01/2017 | 07/07/2017 | 12.41 | Sai Tubewell | Completed |
Detail Report
Graph / Photo |
||
238 | Providing man power for VIP road like Ring Road Bypass and Sachivalaya Roads. | 01/07/2017 | 30/06/2018 | 12.31 | Kuldeep Kumar |
Detail Report
Graph / Photo |
|||
239 | A/R and M/O to various roads under PWD division NWR-2 during 2017-18. (SH- Improvement of footpath and berm portion of Guru Virja Nand Marg from Road No.42 to Mahatma Hans Raj Marg Under Sub Division NWR-24.) | 29/03/2018 | 27/05/2018 | 12.17 | R. V. Constructions |
Detail Report
Graph / Photo |
|||
240 | Improvement of Drain in I - Block under Tri Nagar Vidhan Sabha Sub-Division | 13/08/2016 | 10/11/2016 | 12.13 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Sanjay Kaura | work in progress |
Detail Report
Graph / Photo |
241 | A/R and M/O to various roads under SRD Project Division-I, New Delhi during 2017-18. (SH-Providing and Laying of NP-2 Pipe lines at different locations on various roads for proper drainage during monsoon season under Sub Division-I) | 16/06/2017 | 15/08/2017 | 12.10 | 0.00 (Apr'18) | 22.62 % (Apr'18) | RANJIT CONSTRUCTION COMPANY | Work completed and final bill paid |
Detail Report
Graph / Photo |
242 | A/R and M/O to various roads under SRD Project Division-I, New Delhi dg. 2017-18 (SH-Providing services of diesel pumps for removing water logging during rains, under Sub Division-I and II). | 02/06/2017 | 14/09/2017 | 11.93 | 0.00 (Feb'18) | 11.66 % (Feb'18) | Satyam Construction Company | Work completed and final bill paid. |
Detail Report
Graph / Photo |
243 | SHAHEED UDHAM SINGH MARG, MAHARISHI DAYANAND MARG, BHAGWAN MAHAVIR MARG, SWAMI SARDANAND SARASWATI MARG, CLUB ROAD, K.L BAGGA MARG, GURUDWARA MARG, DIVIDING ROAD BJ BLOCK AND BG BLOCK, JHULE LAL MARG AND MAHARAJA AGGRASEN MARG IN SHALIMAR BAGH AREA UNDER SUB DIVISION M-3114/ PWD CRMD M-311 DG.2016-17 (SH: - DESILTING & MISCLLENEOUS REPAIR OF DRAIN). | 30/04/2016 | 26/09/2016 | 11.87 | 0.00 (Sep'16) | 90.00 % (Sep'16) | Anil Malhotra | Work in Progress |
Detail Report
Graph / Photo |
244 | A/R and M/O to various road under PWD SRD Project Division-I, dg. 2017-18 (SH-Provision of yellow coloured maintenance van with required labour with T and P for Chandni Chowk constituency to attend day to day Complaints under Sub Division-I) | 20/07/2017 | 19/07/2018 | 11.77 | K.P. Singh & Co. | Work completed and final bill paid |
Detail Report
Graph / Photo |
||
245 | R/R of various road berms cut by DJB for laying water pipe line, NDPL for cable etc. under Section-1, sub division NWR-23, PWD division NWR-2 dg. 2016-17. (Re call and Short Notice) | 07/05/2017 | 20/06/2017 | 11.71 | Laxman |
Detail Report
Graph / Photo |
|||
246 | IMPROVEMENT OF DRAIN IN H-BLOCK UNDER TRI NAGAR VIDHAN SABHA SUB DIVISION | 13/08/2016 | 10/11/2016 | 11.67 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Jitendra Singh | work in progress |
Detail Report
Graph / Photo |
247 | Providing Parabolic Speed Calming Measures on Various Road under Tri Nagar Vidhan Sabha | 15/07/2016 | 12/09/2016 | 11.67 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Jitendra Singh | Traffic Police not approving the location map. Hence work could not be started. |
Detail Report
Graph / Photo |
248 | A/R M/O Old Saint Stephon College building at K.Gate Building, C.P.O Building, Old Court Building, N.C.C offices buildings, N.C.C offices buildings Chabi Ganj, Novelty Fire Station, Fire Station Jama Masjid, Disability Commissioner office, Nayak Se | 08/11/2018 | 07/11/2019 | 11.61 | 12.58 (Jan'20) | 0.00 (Jan'20) | ANSHUL SINGH | WORK IN PROGRESS |
Detail Report
Graph / Photo |
249 | C/o kerb channel on B-5 road and refixing of missing steel railing on central verge of K.N.Katju Marg, B-8 and B-5 road etc.) | 14/07/2017 | 11/09/2017 | 11.48 | Laxman |
Detail Report
Graph / Photo |
|||
250 | A/R & M/O various Roads under SRD Project Division-II, PWD, New Delhi during 2016-17. SH: Providing Water Tanker with Hydraulic Jet Facilities for day to day cleaning of Kerb Stone, Crash Barrier, Central Verge, Footpath, Railing, Plants and Planters etc. | 13/01/2017 | 21/07/2017 | 11.44 | Madhu Construction Co. | Work Completed |
Detail Report
Graph / Photo |
||
251 | A/R and M/O to various roads under PWD division NWR-2 during 2018-19. (SH- Repair of footpath and Central Verge from Corner of Baba Wala Park to Rohini jail at B-8 road, Sector-19, Rohini under Sub Division NWR-23.) (Re-call) | 18/10/2018 | 16/11/2018 | 11.41 | 11.42 (Jun'19) | 0.00 (Jun'19) | Rajdhani Constructions |
Detail Report
Graph / Photo |
|
252 | A/R and M/O to various roads under SRD Project Division-I during 2017-18. (SH-Providing and Laying of NP-2 Pipe lines at different locations on various roads for proper drainage during monsoon season under Sub Division-II) | 04/06/2014 | 03/08/2017 | 11.39 | 0.00 (Mar'18) | 14.12 % (Mar'18) | RANJIT CONSTRUCTION COMPANY | Work completed final bill paid |
Detail Report
Graph / Photo |
253 | A/R and M/O to various roads under Division NWR-2, PWD during 2017-18. (SH- C/O Speed Breaker under Sub division NWR-22.) | 17/06/2018 | 31/07/2018 | 11.31 | A B Associates |
Detail Report
Graph / Photo |
|||
254 | REPAIR OF DRY PITCHING AREA OF ROAD NO. 37 | 13/08/2016 | 11/10/2016 | 11.28 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Sanjay Kaura | Work in progress |
Detail Report
Graph / Photo |
255 | SH:- Provision of Maintenance van with required labour material and T&P to attending day to day repair of roads for DDU Marg, Vishnu Digamber Marg, Mahawat Khan Road, Minto Road, Ranjeet Singh Marg and Thomson road under Sub Divn. M-4131, New Delhi | 29/04/2015 | 28/10/2015 | 10.91 |
Detail Report
Graph / Photo |
||||
256 | PROVIDING MAINTENANCE VAN WITH REQUIRED LABOUR AND T&P UNDER SUB DIVISION M-3114 | 27/12/2015 | 26/12/2016 | 10.52 | 0.00 (Sep'16) | 80.00 % (Sep'16) | Work in Progress |
Detail Report
Graph / Photo |
|
257 | DESSILTING & MISC. REPAIR WORK OF DRAINS | 30/04/2016 | 26/09/2016 | 10.47 | 0.00 (Sep'16) | 80.00 % (Sep'16) | Anil Malhotra | Work in progress |
Detail Report
Graph / Photo |
258 | AR and MO VARIOUS ROAD OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 15 DURING 2017 18 SH PATCH REPAIR WORK AT POWER HOUSE and MUNI MAYA RAM ROAD SECOND CALL(ID : 27468) | 16/07/2017 | 14/08/2017 | 10.15 | Sethi Construction |
Detail Report
Graph / Photo |
|||
259 | A/R and M/O to various roads under PWD division NWR-2 during 2017-18. (SH- Repair of footpath, Kerb Stone and drain of S.N.Hardikar Marg, Mangolpuri, Delhi under Sub Division NWR-21.) | 22/03/2018 | 19/06/2018 | 10.05 | ATHAR PARVEZ |
Detail Report
Graph / Photo |
|||
260 | Repair of Road in the campus of Delhi Govt. Officer Flats at Upper Bela Road, Delhi-110054. | 01/08/2016 | 31/08/2016 | 9.99 | 0.00 (Aug'16) | 20.00 % (Aug'16) | Munzareen Ahmd | work in progress |
Detail Report
Graph / Photo |
261 | P/F precast RCC Crash Barrier at RUB Shalimar Bagh approach | 25/07/2016 | 22/09/2016 | 9.81 | 0.00 (Sep'16) | 20.00 % (Sep'16) | Raj Associates | Work in Progress |
Detail Report
Graph / Photo |
262 | Providing supervisor and security guard for watch and ward for sub Division office and store etc. | 10/07/2017 | 09/07/2018 | 9.72 | UDIT VATS |
Detail Report
Graph / Photo |
|||
263 | A/R and M/O to Various Roads under PWD SRD Project Division-I, during 2017-18. (SH-Disposal of unclaimed malba, building rubbish etc. from the various roads under Sub Division-I.) | 26/05/2017 | 25/05/2018 | 9.60 | 0.00 (Apr'18) | 10.59 % (Apr'18) | TKN Developers | Work Completed and final bill paid |
Detail Report
Graph / Photo |
264 | AR AND MO VARIOUS ROADS UNDER DIVISION NW R 1 DG 2016 17 SH IMPROVEMENT OF DRAINAGE SYSTEM AT MADHAV MARG UNDER SUB DIVISION NW R 12 | 01/06/2017 | 30/06/2017 | 9.48 | Laxman Construction Co. |
Detail Report
Graph / Photo |
|||
265 | Outsourcing Staff in the Office of Assistant Engineer Tri Nagar Vidhan Sabha Sub Division | 29/02/2016 | 28/02/2017 | 9.43 | 0.00 (Sep'16) | 75.00 % (Sep'16) | work in progress |
Detail Report
Graph / Photo |
|
266 | A/R and M/O other PWD Roads under SRD Project Division-I, PWD, New Delhi during 2017-18. (SH- Painting of Kerb Stones on various roads before Independence Day under Sub-Division-II.) | 11/08/2017 | 10/05/2018 | 9.40 | 0.00 (Apr'18) | 5.92 % (Apr'18) | Mohd. Asif | Work completed and final bill paid |
Detail Report
Graph / Photo |
267 | Providing service of JCB, TIPPERS etc. for removal encroachment and malba within ROW of various roads Section-1) | 01/05/2016 | 27/10/2016 | 9.37 | 0.00 (Aug'16) | 80.00 % (Aug'16) | Sanjay Kaura | work in progress |
Detail Report
Graph / Photo |
268 | PROVIDING SERVICE OF MAINTENANCE VAN WITH REQUIRED LABOUR AND T&P UNDER SUB DIVISION M-3112 | 01/09/2016 | 31/08/2017 | 9.13 | 0.00 (Sep'16) | 8.00 % (Sep'16) | Pawan Kumar | Work in Progress |
Detail Report
Graph / Photo |
269 | PROVIDING OF MAINTENANCE VAN WITH REQUIRED LABOUR AND T&P UNDER SUB DIVISION M-3114 UNDER SECTION-I | 10/09/2016 | 09/09/2017 | 8.98 | 0.00 (Sep'16) | 5.00 % (Sep'16) | Sudesh Kumar | Work in Progress |
Detail Report
Graph / Photo |
270 | A/R & M/O various road under division M-442 during 2014-15 (Disposal of malba from various roads) | 31/05/2014 | 30/03/2015 | 8.94 | B.M. & Sons | |
Detail Report
Graph / Photo |
||
271 | A/R and M/O various PWD roads under SRD Division-I, PWD, New Delhi during 2019-20 (SH- Supply of Material for various roads under Sub Division-I) | 11/08/2019 | 25/08/2019 | 8.88 | 5.06 (Sep'19) | 0.00 (Sep'19) | TKN Developers |
Detail Report
Graph / Photo |
|
272 | A/R and M/O various road under SRD Project Division-I, Sub-Division-I, PWD, New Delhi dg. 2019-20 (SH- Providing and installation of height guage on both side for restriction of heavy vehicles movement at Pul Mithai Bridge and Pul Duffr in Bridge at | 02/07/2019 | 01/08/2019 | 8.77 | 10.92 (Mar'21) | 0.00 (Mar'21) | TKN Developers |
Detail Report
Graph / Photo |
|
273 | A/R and M/O to various Roads under PWD Division NWR-2, Delhi during 2017-18 (SH- Providing and operation of water tankers mounted on TATA-709 or equivalent of capacity 10000 Litres with required labour and T and P for washing of ...... (Re-call) | 03/06/2018 | 27/02/2019 | 8.64 | 2.56 (Nov'19) | 0.00 (Nov'19) | Prashant Gupta |
Detail Report
Graph / Photo |
|
274 | Providing and operation of water tankers mounted on TATA-709 or equivalent of capacity 10000 Litres with required labour and T and P for washing of kerbstone, crash barrier, signages etc. | 15/06/2017 | 11/03/2018 | 8.64 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
275 | Patch repair work on road from B-8 to DJB booster pump, B-4 to Baba Wala Park corner of booster pump and PWD road B-4 to corner of E-II Astha Kunj. | 14/07/2017 | 12/08/2017 | 8.54 | ABHILEKH YADAV |
Detail Report
Graph / Photo |
|||
276 | MISC. REPAIR WORK UNDER SUB DIVISION M-3114 | 14/05/2016 | 09/11/2016 | 8.52 | 0.00 (Sep'16) | 75.00 % (Sep'16) | Pawan Kumar | Work in Progress |
Detail Report
Graph / Photo |
277 | PROVIDING SERVICES OF MAINTENANCE VEHICLE WITH LABOUR & T&P ETC. FOR TRI NAGAR VIDHAN SABHA SUB DIVISION | 08/02/2016 | 06/02/2017 | 8.49 | 0.00 (Sep'16) | 75.00 % (Sep'16) | Rajesh Gupta | work in progress |
Detail Report
Graph / Photo |
278 | AR and MO VARIOUS ROAD PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 13 DURING 17 18 SH REPAIR OF FOOTPATH AND PLANTER AT SARAI ROHILLA FLYOVER | 02/09/2017 | 01/10/2017 | 8.33 | Shivam Builders |
Detail Report
Graph / Photo |
|||
279 | A/R and M/O to various Residential Building under SRD Division-I, SRD Sub-Division-III, PWD, Delhi during 2018-19. (SH-Misc., Repair Work in Minister Bungalow No. 217). | 29/07/2018 | 11/09/2018 | 8.31 | 0.00 (Jan'19) | 10.30 % (Jan'19) | Intkahb Alam | Work completed and final bill paid |
Detail Report
Graph / Photo |
280 | A/R and M/O other Roads under SRD Division-I, PWD, New Delhi during 2018-19.(SH-Painting of Kerb Stones on various roads, under Sub-Division-II.) | 27/07/2018 | 26/03/2019 | 8.23 | 0.00 (Apr'19) | 9.67 % (Apr'19) | Mudassir Hussain | Work Completed and final bill paid |
Detail Report
Graph / Photo |
281 | A/R and M/O to Various Roads under Sub Division NWR-25, PWD Division NWR-2 dg. 2016-17 ( SH- Comprehensive desilting of drains of various categories and sizes along PWD roads from Madhuvan Chowk to Mangolpuri.) | 27/04/2017 | 26/05/2017 | 8.23 | ABHILEKH YADAV |
Detail Report
Graph / Photo |
|||
282 | A/R and M/O to various roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Painting of Kerb Stone and central Verge. | 09/02/2018 | 08/08/2018 | 8.20 | Mudassir Husain | A letter has been written for proposal to rescind the work. |
Detail Report
Graph / Photo |
||
283 | PROVIDING MAINTENANCE VAN FOR ATTENDING DAY TO DAY COMPLAINTS UNDER SECION-I | 09/04/2016 | 08/04/2017 | 8.10 | 0.00 (Sep'16) | 40.00 % (Sep'16) | Amit kumar | Work in Progress |
Detail Report
Graph / Photo |
284 | AR and MO TO VARIOUS ROAD OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 15 DURING 2017 18 SH PROVIDING and LAYING PRECAST RCC CRASH BARRIER SECOND CALL(ID : 27551) | 01/07/2017 | 30/07/2017 | 7.86 | Sudesh Kumar |
Detail Report
Graph / Photo |
|||
285 | AR and MO VARIOUS ROAD OF PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH PROVIDING SERVICES OF SECURITY GUARDS FOR WATCH AND WARD OF OFFICE PREMISES and SUBWAYS(ID : 27655) | 01/07/2017 | 27/12/2017 | 7.47 | City Commercial Services |
Detail Report
Graph / Photo |
|||
286 | A/R and M/O to Various Roads under PWD Division NWR-2 during 2018-19. (SH- Comprehensive desilting of drains of various categories and sizes along PWD roads from Madhuvan Chowk to Mangolpuri under Sub Division NWR-25 | 27/05/2018 | 20/02/2019 | 7.30 | 1.35 (Apr'19) | 0.00 (Apr'19) | Jitender Singh |
Detail Report
Graph / Photo |
|
287 | A/R and M/O PWD Roads under SRD Division-I, Sub-Division-I, PWD, New Delhi during 2018-19. (SH-Providing water tanker with Hydraulic Jet Facilities for day to day cleaning of kerb stone, crash barrier, footpath, railling, plants and planter etc.) | 02/06/2018 | 01/12/2018 | 7.20 | 17.90 (Oct'19) | 0.00 (Oct'19) | TKN Developers | Work in progress |
Detail Report
Graph / Photo |
288 | A/R and M/O to various roads under PWD division NWR-2 during 2018-19. (Sh- Providing services of security guard for watch and ward for Division office and Sub Division office under Sub-division NWR-24) | 27/09/2018 | 26/09/2019 | 7.20 | 5.03 (Aug'19) | 0.00 (Aug'19) | Friends Detective Security Services |
Detail Report
Graph / Photo |
|
289 | Provision of table top/speed breaker on PWD roads in GK-2. | 18/02/2019 | 30/12/2019 | 7.15 | 8.94 (Sep'20) | 0.00 (Sep'20) | Awasthi Construcion Co., PAN: ACGPA1281M, Address: A-35, VEER SINGH COLONY, BUDH VIHAR, PHASE-II, NEW DELHI-110086 | 20% |
Detail Report
Graph / Photo |
290 | Providing service of sewerman for day to day maintenance of roads and drains. | 25/07/2016 | 21/11/2016 | 7.13 | 0.00 (Aug'16) | 35.00 % (Aug'16) | Jitendra Singh | work in progress |
Detail Report
Graph / Photo |
291 | DISPOSAL OF UNCLAIMED MALBA, BUILDING RUBBISH ETC. FROM FOOTPATH AND ROAD UNDER SUB DIVSIOIN CRMSD M-3113, PWD, DELHI UNDER SECTION-II | 20/07/2016 | 15/01/2017 | 7.06 | 0.00 (Sep'16) | 20.00 % (Sep'16) | Rajesh Gupta | Work in progress |
Detail Report
Graph / Photo |
292 | Construction of Boundary Wall with steel gate at Harijan Basti at Tilak Vihar (DUDA) | 28/07/2019 | 10/09/2019 | 7.02 | M. N. Construction Co. | Work in Progress |
Detail Report
Graph / Photo |
||
293 | Providing and fixing solar studs and spring post on Ring Road Bypass. | 05/07/2017 | 24/07/2017 | 6.97 | Sethi Construction |
Detail Report
Graph / Photo |
|||
294 | Misc. repair work at Section office-I, West Enclave, Pitampura, Delhi. | 04/07/2017 | 02/08/2017 | 6.97 | NAR SINGH PAL |
Detail Report
Graph / Photo |
|||
295 | Providing Security guard for watch and ward for Sub-division office and store. | 16/01/2016 | 15/01/2017 | 6.92 | 0.00 (Aug'16) | 67.00 % (Aug'16) | Good Luck Enterprises | work in progress 67 % |
Detail Report
Graph / Photo |
296 | A/R and M/O to IGDTUW at Kashmere Gate, Delhi During 2018-19. (SH-Renovation of Pro Vice Chancellor Room and Room No. 218, 219 and 215 under SRD Division-I, Sub-Division-III, PWD, New Delhi.) | 19/07/2018 | 01/09/2018 | 6.75 | 6.33 (Sep'19) | 0.00 (Sep'19) | Intkahb Alam | Work completed final bill yet to be paid |
Detail Report
Graph / Photo |
297 | A/R and M/O Old Saint Stephon College building at K.Gate Building C.P.O Building, Old Court Building, N.C.C offices buildings N.C.C offices buildings Chabi Ganj Novelty Fire Station Fire Station Jama Masjid Disability Commissioner office Lok Naya | 09/11/2018 | 08/11/2019 | 6.74 | Kamal Construction Co. | work in progress |
Detail Report
Graph / Photo |
||
298 | P/F of missing steel railings of existing pattern on central verge at B-2, B-4, B-6 and B-7, Roads | 15/07/2017 | 12/09/2017 | 6.74 | Globe Builders |
Detail Report
Graph / Photo |
|||
299 | Outsourcing Staff | 16/06/2017 | 13/09/2017 | 6.56 | Praveen Gupta |
Detail Report
Graph / Photo |
|||
300 | Disposal of unclaimed malba, building rubbish etc. from footpath and road under Sub Divsioin CRMSD M-3113, PWD, Delhi under Section-I | 28/07/2016 | 23/01/2017 | 6.55 | 0.00 (Sep'16) | 20.00 % (Sep'16) | Rajesh Gupta | Work in Progress |
Detail Report
Graph / Photo |
301 | AR and MO TO VARIOUS ROADS PWD OF DIVISION NORTH WEST ROAD I UNDER SUB DIVISION AE NW R 11 DURING 2017 18 SH PROVIDING SERVICES OF OUTSOURCING STAFF(ID : 28154). | 08/07/2017 | 03/01/2018 | 6.49 | Rajesh Gupta |
Detail Report
Graph / Photo |
|||
302 | A/R and M/O to various roads under PWD division NWR-2 during 2017-18. (SH- Miscellaneous work of 70 foota road under Kirari Vidhan Sabha, Delhi under Sub Division NWR-21) | 27/10/2017 | 25/11/2017 | 6.47 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
303 | SUPPLY OF R.C.C. COVER, MANHOLE COVER AND BITUMINOUS READYMIX CONCRETE UNDER WAZIRPUR VIDHAN SABHA SUB-DIVISION M-3112 | 08/09/2016 | 22/09/2016 | 6.43 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Sanjay Kaura | Work in Progress |
Detail Report
Graph / Photo |
304 | Repair and Refixing of the duct slabs and providing Jersey Barrier. | 24/08/2017 | 23/10/2017 | 6.35 | 0.00 (Dec'17) | 7.23 % (Dec'17) | B P Rai and Sons | Work completed and final bill paid |
Detail Report
Graph / Photo |
305 | Providing and operating mobile maintenance vehicle under Sub Division M-2 under section - 1 and section-2. | 29/07/2019 | 26/09/2019 | 6.35 | 7.76 (Dec'19) | 0.00 (Dec'19) | Ashok Kumar Rathi | P.G. letter issued |
Detail Report
Graph / Photo |
306 | A/R & M/O various Road under Sub-Division M-2113 during 2019-20. (SH: Improvement of Road No. 57 near Swarn Cinema Culvert.). | 28/05/2020 | 26/06/2020 | 6.27 | Nation Star Enterprises | work in progress |
Detail Report
Graph / Photo |
||
307 | Construction of slip road for jointing B-4 road to B-8 road near Baba Park corner Sector-19, Rohini Delhi. | 15/06/2017 | 13/08/2017 | 6.22 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
308 | AR and MO VARIOUS ROADS PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 13 DURING 16 17 SH REPAIR WORK IN PUMP HOUSE AT ZAKHIRA SECOND CALL(ID : 27467) | 29/06/2017 | 28/07/2017 | 6.15 | Jawala Prasad Koli |
Detail Report
Graph / Photo |
|||
309 | Providing Security Guard for watch and ward for Sub-division office and store and MTS staff. | 09/07/2017 | 08/07/2018 | 6.01 | 7.50 (Jun'19) | 0.00 (Jun'19) | Friends Detective Security Services |
Detail Report
Graph / Photo |
|
310 | Providing outsourcing staff like Security Guard, Sweeper and Supervisor for Section-I. | 24/06/2017 | 23/06/2018 | 5.98 | Planet Security Group |
Detail Report
Graph / Photo |
|||
311 | Construction of speed breaker and repairing the road surface at Nandi Vithi Marg near N Block | 06/09/2018 | 30/12/2019 | 5.93 | 7.37 (Sep'20) | 0.00 (Sep'20) | Awasthi Construcion Co., PAN: ACGPA1281M, Address: A-35, VEER SINGH COLONY, BUDH VIHAR, PHASE-II, NEW DELHI-110086 | 70% |
Detail Report
Graph / Photo |
312 | AR and MO VARIOUS ROADS PWD OF DIVISION NORTH WEST ROAD I UNDER SUB DIVISION NW R 12 DURING 2017 18 SH PROVIDING SERVICES OF OUTSOURCING STAFF(ID : 28150) | 08/07/2017 | 03/01/2018 | 5.77 | Pawan Kumar Gupta |
Detail Report
Graph / Photo |
|||
313 | AR and MO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD I UNDER SUB DIVISION NW R 15 DURING 2017 18 SH REPAIR OF FOOTPATH OF OUTER RING ROAD(ID : 26613) | 26/06/2017 | 25/07/2017 | 5.67 | Jawala Prasad Koli |
Detail Report
Graph / Photo |
|||
314 | AR and MO TO VARIOUS ROAD PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH PROVIDING and LAYING PIPE DRAINAGE SYSTEM NEAR GULABI BAGH BUS STAND AT SWAMI NARAYAN MARG(ID : 28207) | 09/07/2017 | 07/08/2017 | 5.61 | Shivam Builders |
Detail Report
Graph / Photo |
|||
315 | Misc. Repair and White wash of sub division office, stores, Horticulture office and nursery at Sec-11, Rohini, Delhi. | 15/07/2017 | 12/09/2017 | 5.39 | Sageer Ahmad |
Detail Report
Graph / Photo |
|||
316 | PROVIDING MAN POWER FOR CLEANING OF SUBWAYS & OFFICE PREMISES | 08/04/2016 | 07/03/2017 | 5.37 | 0.00 (Sep'16) | 100.00 % (Sep'16) | Pawan Kumar | Work in Progress |
Detail Report
Graph / Photo |
317 | AR and MO VARIOUS ROADS OF DIVISION NW R 1 UNDER SUB DIVISION NW R 15 DURING 2017 18 SH PROVIDING SECURTIY GUARD FOR WATCH AND WARD and CLEANING OF SUBWAY NEAR POWER HOUSE AT OUTER RING ROAD(ID : 27619) | 01/07/2017 | 30/06/2018 | 5.35 | City Commercial Services |
Detail Report
Graph / Photo |
|||
318 | Desilting of Drains and Removal of Malba/ sludge etc. at misc roads under Tri Nagar Vidhan Sabha Sub-Division | 26/09/2016 | 25/03/2017 | 5.23 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Rajesh Gupta | work in progress |
Detail Report
Graph / Photo |
319 | AR and MO VARIOUS ROAD OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 14 DURING 2017 18 SH IMPROVEMENT AND REPAIR OF EXISTING DRAINAGE SYSTEM AT SHALIMAR BAGH CROSSING(ID : 27726) | 29/06/2017 | 12/08/2017 | 5.09 | Jawala Prasad Koli |
Detail Report
Graph / Photo |
|||
320 | Providing security guard for watch and ward for Sub Division office and Store. | 04/07/2015 | 03/07/2016 | 5.03 | 0.00 (Aug'16) | 100.00 % (Aug'16) | Divine Security Services | work in progress, Bill awaited by contractor. |
Detail Report
Graph / Photo |
321 | A/R and M/O other PWD roads under SRD Project Division-I, PWD, New Delhi during 2017-18 (SH- Essential miscellaneous ancillary work for various roads under Sub Division-I). | 01/07/2017 | 30/07/2017 | 4.98 | 0.00 (Sep'17) | 5.99 % (Sep'17) | TKN Developers | work completed and final bill paid |
Detail Report
Graph / Photo |
322 | Road Restoration of various roads under SRD Project Division-I, PWD, New Delhi during 2017-18. (SH-Repair of the road/ footpath cut by BSES Yamuna Power Limited for laying of Stringing on Chandni Chowk Road under Sub-Division-I) | 01/07/2017 | 31/08/2017 | 4.96 | 0.00 (Feb'18) | 5.73 % (Feb'18) | RANJIT CONSTRUCTION COMPANY | Work completed and final bill paid |
Detail Report
Graph / Photo |
323 | Hiring of inspection vehicle for EE, SER-2 | 19/07/2019 | 18/07/2020 | 4.89 | 1.92 (Sep'20) | 0.00 (Sep'20) | R. N. Construction Company |
Detail Report
Graph / Photo |
|
324 | AR and MO to various roads under NW R 1 PWD dg 2016 17 SH Providing services of Office Staff in Division Office and Sub Division NW R 14 Office | 11/06/2017 | 07/12/2017 | 4.68 | Praveen Gupta |
Detail Report
Graph / Photo |
|||
325 | AR TO MO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISOIN NW R 12 PWD DELHI DURING 2016 17 SH MISC REPAIR WORK(ID : 27680) | 01/07/2017 | 30/07/2017 | 4.66 | Sethi Construction |
Detail Report
Graph / Photo |
|||
326 | Misc. repair works at Sub-division office at Sector-21, Rohini, Delhi. | 01/07/2017 | 30/07/2017 | 4.54 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
327 | AR and MO VARIOUS ROAD OF PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH PROVIDING MAN POWER FOR CLEANING OF SUBWAYS FOB and OFFICE PREMISES(ID : 28231). | 28/07/2017 | 27/07/2018 | 4.52 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
328 | A/R and M/O other PWD Roads under SRD Division -I, PWD, New Delhi during 2019-20. (SH- Painting of Kerb Stones on various roads before Independence Day under Sub Division-I.) | 13/08/2019 | 27/08/2019 | 4.45 | 5.20 (Nov'19) | 0.00 (Nov'19) | Mohd Arshad |
Detail Report
Graph / Photo |
|
329 | A/R and M/O to various road under PWD SRD Project Division-I, PWD, New Delhi dg. 2017-18 (SH-Supplying, Commissioning, installing and testing of Desktop, UPS and Printer in Circle Office, Division Office and Sub Division-II and III). | 03/07/2017 | 17/07/2017 | 4.40 | 0.00 (Jul'17) | 5.12 % (Jul'17) | Network Infotech | Work completed and final bill paid |
Detail Report
Graph / Photo |
330 | A/R and M/o to various roads under PWD Division NWR-2 during 2018-19. (SH- Providing services of Security Guard, Sweeper and Supervisor under Section-I, sub Division NWR-25.) | 26/08/2018 | 25/08/2019 | 4.36 | 5.16 (Dec'19) | 0.00 (Dec'19) | Planet Security Group |
Detail Report
Graph / Photo |
|
331 | Providing and fixing Retro Reflective Signage Board on various roads under SRD Project Sub Division I SRD Project Division II PWD New Delhi. | 12/10/2018 | 10/11/2018 | 4.35 | 4.15 (Aug'20) | 0.00 (Aug'20) | Mohan KUMAR | Work completed |
Detail Report
Graph / Photo |
332 | AR and MO VARIOUS ROADS UNDER DIVISION NW R 1 DURING 2017 18 SH PROVIDING SECURITY GUARD FOR WATCH AND WARD and CLEANING OF FOB and SUB DIVISION OFFICE UNDER NW R-12 | 07/05/2017 | 06/11/2017 | 4.32 | Planet Security Group |
Detail Report
Graph / Photo |
|||
333 | Supply and stacking of cutback based instant curing bituminous ready mix/cold mix concrete road maintenance compound | 12/01/2016 | 09/07/2016 | 4.27 | 0.00 (Aug'16) | 99.00 % (Aug'16) | VCS Enterprises Ltd. | work in progress,Provisional EOT granted upto 30.09.2016 |
Detail Report
Graph / Photo |
334 | Securing Govt. Land at Y-block, Sanjay Gandhi Hospital Road, Mangolpuri, Delhi. | 21/07/2017 | 18/10/2017 | 4.23 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
335 | Providing speed calming measures near Golcha Cinema Dariyaganj at N.S. Marg under SRD Division-I, PWD, New Delhi. | 07/12/2018 | 06/01/2019 | 4.18 | 0.00 (Mar'19) | 5.21 % (Mar'19) | B P Rai and Sons | Work completed final bill paid |
Detail Report
Graph / Photo |
336 | AR and MO TO VARIOUS ROADS OF PWD DIVSION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH PROVIDING SERVICES OF DIESEL ENGINE PUMP SET AND LABOUR DURING MONSOON SEASON IN ODD HOUR NIGHT(ID : 27560) | 02/07/2017 | 29/09/2017 | 4.16 | Pawan Kumar Gupta |
Detail Report
Graph / Photo |
|||
337 | A/R and M/O to various roads under PWD Division NWR-2 during 2017-18. (SH- Supply of material for day to day maintenance work for section-II under Sub-Division NWR-23). | 25/11/2017 | 24/12/2017 | 4.09 | Kehar Singh |
Detail Report
Graph / Photo |
|||
338 | A/R and M/O various Roads under SRD Project Sub-Division-III/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Supply of materials for day to day maintenance work. | 07/02/2018 | 06/06/2018 | 4.03 | Kashi Nath Jha | Work Completed |
Detail Report
Graph / Photo |
||
339 | PROVIDING SECURITY GUARD FOR WATCH AND WARD & CLEANING OF FOB ROAD NO. 37 | 01/06/2016 | 30/05/2017 | 4.02 | 0.00 (Sep'16) | 30.00 % (Sep'16) | Devine Security Services | Work in progress |
Detail Report
Graph / Photo |
340 | A/R and M/O to various roads under Division NWR-2 during 2017-18 (SH- Supply of material for day to day maintenance work under Section-II, Sub-Division NWR-24). | 29/10/2017 | 27/11/2017 | 3.96 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
341 | PROVIDING SERVICE OF MAINTENANCE VEHICLE WITH LABOUR AND T&P ETC. FOR TRI NAGAR VIDHAN SABHA SUB DIVISION | 14/05/2016 | 09/11/2016 | 3.92 | 0.00 (Sep'16) | 90.00 % (Sep'16) | Amit kumar | work in progress |
Detail Report
Graph / Photo |
342 | AR and MO various Roads under SRD Project Division II PWD New Delhi during 2017-18. SH Provision of inspection vehicle for use of Executive Engineer SRD Project Division II PWD. | 07/04/2018 | 06/04/2019 | 3.90 | 4.49 (Sep'20) | 0.00 (Sep'20) | Ram Prasad Singh & Sons | Work Completed |
Detail Report
Graph / Photo |
343 | A/R and M/O to various roads under PWD Division NWR-2 during 2017-18. (SH- Repair work on road B-5 to B-9, Sector-4, Rohini, Delhi under Sub Division NWR-21.) | 05/11/2017 | 04/12/2017 | 3.86 | Jitender Singh |
Detail Report
Graph / Photo |
|||
344 | A/R and M/O to various roads under SRD Project Division-I, New Delhi dg. 2019-20 (SH-Providing services of diesel pumps for removing water logging during rains, under Sub Division-II) | 02/07/2019 | 08/10/2019 | 3.86 | Tripurari Prasad Singh |
Detail Report
Graph / Photo |
|||
345 | A/R and M/O various Roads under SRD Project Sub-Division-III/SRD Project Division-II, PWD, New Delhi during 2016-17. SH Repair of central verge on New Rohtak Road and fixing of slab on drain. | 20/03/2017 | 18/05/2017 | 3.84 | Sarwar | Completed |
Detail Report
Graph / Photo |
||
346 | Supply of Material | 19/06/2017 | 03/07/2017 | 3.73 | Sethi Construction |
Detail Report
Graph / Photo |
|||
347 | DISPOSAL OF UNCLAIMED MALBA, BUILDING RUBBISH ETC. FROM THE ROADS UNDER SUB DIVISION CRMSD M-3114, PWD, DELH | 25/04/2016 | 21/10/2016 | 3.70 | 0.00 (Sep'16) | 98.00 % (Sep'16) | Pawan Kumar | Work in Progress |
Detail Report
Graph / Photo |
348 | Providing Maintenance vehicle with Pump Set with labour for odd hours for maintenance of roads and drains during Monsoon season. | 16/07/2017 | 03/10/2017 | 3.65 | A.B. Associates |
Detail Report
Graph / Photo |
|||
349 | PROVIDING MAINTENANCE AND UPKEEPING AT VARIOUS LOCATIONS IN SUBWAYS, UNDERPASS ETC. UNDER SUB DIVISION M-3114 FOR 06 MONTHS | 05/06/2016 | 01/12/2016 | 3.58 | 0.00 (Sep'16) | 50.00 % (Sep'16) | Pawan Kumar | Work in Progress |
Detail Report
Graph / Photo |
350 | A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Supply of materials for day to day maintenance work. | 16/07/2017 | 30/07/2017 | 3.57 | TKN Developers | Work completed |
Detail Report
Graph / Photo |
||
351 | A/R and M/O to various roads under PWD Division NWR-2 during 2017-18. (SH- Repair work of Road No. 42A nearby Deepali Chowk under sub division NWR-21.) | 29/10/2017 | 27/11/2017 | 3.53 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
352 | Providing and fixing sign board / name display board of Honourable MLA in Badli Assembly Constituency Delhi | 14/11/2019 | 13/12/2019 | 3.52 | Rajesh Construction co. | Work in Progress and 90% work completed |
Detail Report
Graph / Photo |
||
353 | Supply of Material | 19/06/2017 | 03/07/2017 | 3.42 | Sethi Construction |
Detail Report
Graph / Photo |
|||
354 | Providing Maintenance vehicle with Pump Set with labour for odd hours for maintenance of roads and drains during Monsoon season. | 16/07/2017 | 03/10/2017 | 3.42 | Mls Rajat Construction Co. |
Detail Report
Graph / Photo |
|||
355 | AR and MO TO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH SUPPLY OF CUT BACK COLD MIX SPECIALIZED INSTANTEOUS ROAD MAINTENANCE BITUMEN CONCRETE COMPOUND SECOND CALL(ID : 27289) | 19/06/2017 | 03/07/2017 | 3.36 | Sethi Construction |
Detail Report
Graph / Photo |
|||
356 | PROVIDING SERVICE OF MOBILE MAINTENANCE VAN FOR ATTENDING DAY TO DAY COMPLAINT UNDER WAZIRPUR CONSTITUENCY | 27/07/2016 | 20/01/2017 | 3.36 | 0.00 (Sep'16) | 40.00 % (Sep'16) | Rajesh Gupta | Work in progress |
Detail Report
Graph / Photo |
357 | AR and MO TO VARIOUS ROADS OF DIVISION NW R 1 UNDER SUB DIVISION NW R 11 DURING 2017 18 SH CONSTRUCTING THE ROAD GULLY CHAMBER AND LAYING OF RCC PIPE 250MM DIA IN SHAKURPUR AREA(ID : 27277) | 22/06/2017 | 21/07/2017 | 3.35 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
358 | A/R and M/O to various roads under SRD Project Division-I, New Delhi dg. 2017-18. (SH-Providing services of Sewerman for cleaning bell mouth, kerb channel, drain etc. and removing water logging during rains under Sub Division-II). | 22/06/2017 | 19/10/2017 | 3.32 | 0.00 (Nov'17) | 4.12 % (Nov'17) | RANJIT CONSTRUCTION COMPANY | Work completed and final paid |
Detail Report
Graph / Photo |
359 | A/R and M/O to various roads under SRD Project Division-I, PWD, New Delhi during 2018-19. (SH- Providing photocopy machine with operator for the office of SE (Project) and EE, SRD-I). | 18/03/2019 | 17/03/2020 | 3.21 | 4.01 (Dec'20) | 0.00 (Dec'20) | TKN Developers | work in progress |
Detail Report
Graph / Photo |
360 | A/R and M/O to various roads under Sub-division NWR-23, PWD Division NWR-2 during 2016-17. (SH- Supplying and staking of cutback based instant curing bituminous ready mix/cold mix concrete road maintenance compound at sub division NWR-23, Delhi). | 21/04/2017 | 05/05/2017 | 3.20 | Manish Chandak |
Detail Report
Graph / Photo |
|||
361 | A/R and M/O to various roads under sub-division NWR-25, PWD, division NWR-2 dg. 2016-17 (SH- Supplying and staking of cutback based instant curing bituminous ready mix/cold mix concrete road maintenance compound at sub division NWR-25.) | 12/04/2017 | 26/04/2017 | 3.20 | Manish Chandak |
Detail Report
Graph / Photo |
|||
362 | A/R and M/o to various roads under sub division NWR-24, PWD, division NWR-2 dg. 2016-17 (SH- Supplying and staking of cutback based instead curing bituminous ready mix/cold mix concrete road maintenance compound at sub division NWR-24, Delhi.) | 25/04/2017 | 09/05/2017 | 3.17 | Rajpal Sehgal |
Detail Report
Graph / Photo |
|||
363 | A/R & M/O VARIOUS ROAD UNDER SUB DIVISION M-3114/PWD CRMD M-311 DURING 2016-17. (SH:- DESILTING & MISCLLENEOUS REPAIR OR DRAIN AT WAZIRPUR INDUSTRIAL AREA). | 25/04/2016 | 21/09/2016 | 3.15 | 0.00 (Sep'16) | 70.00 % (Sep'16) | Pawan Kumar | work in progress |
Detail Report
Graph / Photo |
364 | A/R &M/O Various Roads under Shahdara Roads Civil Divn PWD during 2020-21. (SH Repair and maintenance of EPABX, KTS, Push button Phone, Plan & Inverter in sub division, Division & Circle office (M-21).) | 06/08/2020 | 05/08/2021 | 3.07 | Sagar Systems | Work in Progress |
Detail Report
Graph / Photo |
||
365 | AR TO MO TO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 14 DURING 2017 18 SH SUPPLY OF MATERIAL(ID : 27285) | 22/06/2017 | 21/07/2017 | 3.01 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
366 | Providing Maintenance vehicle with Pump Set with labour for odd hours for maintenance of roads and drains during Monsoon season. | 16/07/2017 | 03/10/2017 | 2.98 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
367 | Providing Pump Set with labour for day to day maintenance of roads and drains duing Monsoon Season. | 11/07/2016 | 28/09/2016 | 2.98 | 0.00 (Aug'16) | 80.00 % (Aug'16) | Jitendra Singh | work in progress |
Detail Report
Graph / Photo |
368 | PROVIDING SECURITY GUARD FOR WATCH AND WARD OF MUSICAL FOUNTAIN AT RAMPURA UNDER TRI NAGAR VIDHAN SABHA SUB-DIVISION | 13/08/2016 | 12/08/2017 | 2.93 | 0.00 (Sep'16) | 15.00 % (Sep'16) | work in progress |
Detail Report
Graph / Photo |
|
369 | Providing Pump set with labour for day to day maintenance of roads and drains during Monsson Season. | 11/07/2016 | 28/09/2016 | 2.91 | 0.00 (Aug'16) | 75.00 % (Aug'16) | SACHIN KUMAR | work in progress |
Detail Report
Graph / Photo |
370 | A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (SH- Supplying and stacking of cutback based instant bituminous ready mix concrete road maintenance compound at sub division NWR-25, Sector-21, Rohini, Delhi). | 18/05/2018 | 16/06/2018 | 2.83 | Manish Chandak |
Detail Report
Graph / Photo |
|||
371 | AR and MO TO VARIOUS ROADS UNDER NW R 1 PWD DG 2017 18 SH PROVIDING SERVICES OF OFFICE STAFF IN DIVISION AND SUB DIVISION NW R 15 | 01/03/2018 | 29/04/2018 | 2.82 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
372 | A/R and M/O to various roads under PWD Division NWR-2 during 2018-19. (SH- Supplying and stacking of cutback based instant bituminous ready mix concrete road maintenance compound at Section-I, sub division NWR-23, Delhi). | 02/06/2018 | 29/09/2018 | 2.81 | VCS Enterprises Ltd. |
Detail Report
Graph / Photo |
|||
373 | A/R and M/O PWD roads under Sub Division-3 of Division C and ND Roads during 2016-17. SH Carry out subsoil investigations, architectural, structural design and drawings for construction of foot over bridge at Metcalfe House Ring Road, Delhi. | 23/05/2017 | 07/07/2017 | 2.80 | 0.33 (Jul'19) | 0.00 (Jul'19) | TKN Developers |
Detail Report
Graph / Photo |
|
374 | AR and MO TO VARIOUS ROAD PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 12 DURING 2017 18 SH SUPPLY OF MATERIALS FOR ATTENDING DAY TO DAY COMPLAINTS | 02/09/2017 | 16/09/2017 | 2.71 | Jawala Prasad Koli |
Detail Report
Graph / Photo |
|||
375 | Construction of Bell Mouth and Gully Chamber on K.N.Katju Marg from Transport Authority to Irrigation Nallah Sector-11, Rohini, Delhi. | 08/09/2017 | 07/10/2017 | 2.71 | Kehar Singh |
Detail Report
Graph / Photo |
|||
376 | AR and MO TO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NW R 13 DURING 2017 18 SH DEMOLISHING PLANTER AND MAKING FOOTPATH AT ROAD NO 40 NEAR F BLOCK SHIV MANDIR DHARAMSHALA | 08/06/2017 | 06/07/2017 | 2.71 | Laxmi Narayan |
Detail Report
Graph / Photo |
|||
377 | AR and MO TO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 14 DURING 2017 18 SH PROVIDING SERVICES FOR MAINTENANCE OF ELEVATED CORRIDOR AND CARRIAGE WAY FROM RING ROAD PREMBARI TO AZADPUR(ID : 27994) | 13/07/2017 | 24/11/2017 | 2.59 | Pawan Kumar Gupta |
Detail Report
Graph / Photo |
|||
378 | Providing Maintenance vehicle with Pump Set with labour for odd hours for maintenance of roads and drains during Monsoon season. | 16/07/2017 | 03/10/2017 | 2.59 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
379 | Providing Pump set with labour for day to day maintenance of roads and drains during Monsson Season under Section-I, Pitampura, Rani Bagh area. | 10/07/2016 | 27/09/2016 | 2.55 | Vinay Babu Sharma | Work in Progress |
Detail Report
Graph / Photo |
||
380 | A/R and M/O to various roads under Sub-Division NWR-23, PWD Division NWR-2 during 2016-17. (SH- Supply of material for day to day maintenance work for Section-II). | 16/05/2017 | 14/06/2017 | 2.48 | ABHILEKH YADAV |
Detail Report
Graph / Photo |
|||
381 | AR and MO to various roads of Division North West Road 1 under Sub Division NW R 11 dg 2017 18 SH Disposal of unclaimed malba building rubbish etc from footpath and road(ID : 27327) | 22/06/2017 | 19/10/2017 | 2.47 | Rajesh Gupta |
Detail Report
Graph / Photo |
|||
382 | AR and MO TO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD 1 UNDER SUB DIVISION NWR 13 DURING 2017 18 SH URGENT REPAIR WORK OF SWAMI NARAYAN UNDERPASS ROAD | 06/05/2017 | 05/06/2017 | 2.41 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
383 | AR and MO TO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 14 DURING 2017 18 SH REMOVAL THE TEMPORARY ENCROACHMENT FROM PWD ROADS TIME TO TIME(ID : 27993) | 08/07/2017 | 04/10/2017 | 2.40 | Pawan Kumar Gupta |
Detail Report
Graph / Photo |
|||
384 | Desilting of Drains and Removal of Malba/ sludge etc. at misc roads under Wazirpur Vidhan Sabha under Sub-Division M-3112 | 01/09/2016 | 29/11/2016 | 2.34 | 0.00 (Sep'16) | 40.00 % (Sep'16) | Pawan Kumar | Work in Progress |
Detail Report
Graph / Photo |
385 | A/R and M/O to various roads under section-II, Sub-Division NWR-23, PWD Division NWR-2 during 2016-17. SH- Providing service of JCB, TIPPERS etc. for removal of encroachment and malba within ROW of various roads.) | 24/04/2017 | 23/10/2017 | 2.30 | ABHILEKH YADAV |
Detail Report
Graph / Photo |
|||
386 | AR and MO TO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 12 DG 2017 18 SH REPAIR OF LIFT PORTION OF FOB | 06/06/2017 | 20/06/2017 | 2.24 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
387 | Providing Maintenance vehicle with Pump Set with labour for odd hours for maintenance of roads and drains during Monsoon season. | 16/07/2017 | 03/10/2017 | 2.22 | Globe Builders |
Detail Report
Graph / Photo |
|||
388 | AR AND MO VARIOUS ROADS OF PWD DIVISION NW R 1 UNDER SUB DIVISION NW R 15 DG 2017 18 SH MISC REPAIR WORK | 06/05/2017 | 05/06/2017 | 2.21 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
389 | AR and MO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD1 UNDER SUB DIVISION NW R 15 DURING 2017 18 SH REPAIR OF DAMAGED DRAIN AT OUTER RING ROAD | 06/05/2017 | 20/05/2017 | 1.98 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
390 | AR and MO Various Road under Sub Division M 2111 during 2018 19 SH Providing Height Restricting Barrier for Seelampur Flyover SECTION I | 05/06/2018 | 04/07/2018 | 1.92 | DASHRATH KUMAR | WORK FORECLOSED |
Detail Report
Graph / Photo |
||
391 | Topographic Survey, OD Survey, Pedestrian Volume Count, etc. and detailed geometric design at junction of Parallel Road and Main Burari Road to provide solution to the congestion at junction by improving the geometry and suggesting feasible solutions | 26/07/2018 | 27/10/2018 | 1.90 | Integrated Techno Systems Private Limited | Revised proposed scheme submitted to UTTIPEC on 13.01.2020. UTTIPEC official visited site on 30.09.2020 and issued inspection report on 01.10.2020. |
Detail Report
Graph / Photo |
||
392 | Providing Pump set with labour for day to day maintenance of roads and drains during Monsoon season. | 12/07/2017 | 20/09/2017 | 1.87 | Jitendra Singh |
Detail Report
Graph / Photo |
|||
393 | REPAIR & IMPROVEMENT OF CARRIAGEWAY BELOW SARAI ROHILLA FLYOVER | 05/06/2016 | 19/06/2016 | 1.85 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Pawan Kumar | To be started by the Agency |
Detail Report
Graph / Photo |
394 | AR and MO to various Road under Sub Division NW R 13 PWD of Division NW R 1 during 2016 17 SH Disposal of unclaimed malba Building rubbish etc from various roads | 06/05/2017 | 03/08/2017 | 1.83 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
395 | AR and MO TO VARIOUS ROADS OF PWD DIVISION NORTH WEST ROAD I DURING 2017 18 SH Removal of malba from various places under Wazirpur Vidhan Sabha Constituency | 07/05/2017 | 20/06/2017 | 1.83 | Sanjay Kaura |
Detail Report
Graph / Photo |
|||
396 | Desilting | 11/04/2017 | 09/07/2017 | 1.82 | Happen Enterprises |
Detail Report
Graph / Photo |
|||
397 | Providing Pump set with labour for day to day maintenance of roads and drains during Monsoon season. | 09/07/2017 | 26/09/2017 | 1.70 | Mls Rajat Construction Co. |
Detail Report
Graph / Photo |
|||
398 | Providing Pump set with labour for day to day maintenance of roads and drains during Monsoon season. | 09/07/2017 | 26/07/2017 | 1.70 | Mls Rajat Construction Co. |
Detail Report
Graph / Photo |
|||
399 | A/R and M/O to various roads under Sub-Division NWR-24, PWD Division NWR-2 during 2016-17. SH- Providing service of JCB, TIPPERS etc. for removal of encroachment and malba within ROW of various roads.) | 20/04/2017 | 16/10/2017 | 1.58 | Usha Construction Co |
Detail Report
Graph / Photo |
|||
400 | Providing Pump set with labour for day to day maintenance of roads and drains during Monsoon season. | 12/07/2017 | 29/10/2017 | 1.51 | Vinay Shanker |
Detail Report
Graph / Photo |
|||
401 | A/R and M/O to various roads under PWD Division NWR-2 dg. 2018-19. (SH- Providing Pump set with labour for day to day maintenance of roads and drains during Monsoon season under Sub-Division NWR-23.) (Re-call) | 15/07/2018 | 12/10/2018 | 1.40 | Globe Builders |
Detail Report
Graph / Photo |
|||
402 | Annual Maintenance of office equipments and its allied items in Office of Superintending Engineer Project, Office of Executive Engineer, SRD Project Division I and Office of Assistant Engineer I, II, III and IV PWD, New Delhi Dg. 2019 20 | 28/09/2019 | 27/02/2020 | 1.01 | A.N. TECHNOLOGIES |
Detail Report
Graph / Photo |
|||
403 | PROVIDING MAN POWER FOR CLEANING OF MUSICAL FOUNTAIN KESHAV PURAM | 07/04/2016 | 06/04/2017 | 0.88 | 0.00 (Sep'16) | 60.00 % (Sep'16) | Pawan Kumar | work in progress |
Detail Report
Graph / Photo |
404 | Supply, Installation, Testing and Commissioning and Comprehensive maintenance and operation of 6 Nos. 13 Passenger Capacity Lifts (Machine Room less) | 08/01/2012 | -- |
Detail Report
Graph / Photo |
|||||
405 | Providing and laying Micro Surfacing on various PWD Roads under North-West Road Maintenance Division-I, PWD, Delhi during 2016-17. | 06/08/2016 | 05/11/2016 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Mahavir Parsad Gupta & Sons | work in progress |
Detail Report
Graph / Photo |
|
406 | Providing crash barrier on Balmiki Road Abdul Hameed Marg and Block G and Block B Marg at Central Verge in Shakurpur area under Tri Nagar Vidhan Sabha Sub Division. | 28/09/2016 | 26/12/2016 | 0.00 (Sep'16) | 0.01 % (Sep'16) | Mangat Ram Gupta | work in progress |
Detail Report
Graph / Photo |
|
407 | Brick Masonary drain and footpath at Hans Raj Gupta Marg | 29/05/2014 | 28/10/2014 | 0.00 (Mar'17) | 85.00 % (Mar'17) | Work is to be foreclosed after connecting with R Block drain. |
Detail Report
Graph / Photo |
||
408 | Construction of back to back u turn on road no. 13 A G.D. Birla Marg, Sarita Vihar, New Delhi | 20/02/2016 | 19/04/2016 | 0.00 (Feb'17) | 50.00 % (Feb'17) | Plan showing modified location of U turn as per the demand of local RWA submitted to UTTIPEC for approval |
Detail Report
Graph / Photo |
||
409 | Laying of 1000 mm dia RCC pipe along road no. 13 for disconnection of storm water drain from sewer line to open drain on both side at Tughlakabad Extn, Kalkaji New Delhi | 05/09/2016 | 04/10/2016 | 30.73 (Mar'17) | 35.00 % (Mar'17) | Work is held up due to non reciept of permission from Delhi Traffic Police |
Detail Report
Graph / Photo |
||
410 | Improvement of road surface of Hansraj Sethi Marg, Baba Fateh Singh Marg, Maharaja Agarsen Marg and Kashi Ram Takkar Marg | 16/07/2016 | 15/09/2016 | 191.64 (Mar'17) | 75.00 % (Mar'17) | Bituminous work completed road marking is yet to be done |
Detail Report
Graph / Photo |
||
411 | Improvement of road surface of Hansraj Gupta Marg | 16/07/2016 | 15/09/2016 | 111.72 (Mar'17) | 85.00 % (Mar'17) | bituminous work completed road marking is yet to be done |
Detail Report
Graph / Photo |
||
412 | Bituminous Work | 26/07/2016 | 25/09/2016 | 0.00 (Mar'17) | 5.00 % (Mar'17) | work is in progress |
Detail Report
Graph / Photo |
||
413 | Improvement of riding surface of Maharaja Agarsen Marg, Madanpur Khadar Road & Jaiptur Road from Mathura Road to Agra Canal under Division SER-2 during 2016-17 | 25/07/2016 | 24/09/2016 | 69.07 (Mar'17) | 15.00 % (Mar'17) | paver block in berm on agarsen marg has been fixed resurfacing on Madanpur Khadar Road has also been completed |
Detail Report
Graph / Photo |
||
414 | Improvement of service road of Road No. 13 from Crown Plaza to Sarita Vihar Underpass at New Delhi | 08/08/2016 | 07/10/2016 | 56.22 (Mar'17) | 25.00 % (Mar'17) | One side of service road completed in all respect and work is in progress on other side of road |
Detail Report
Graph / Photo |
||
415 | Improvement of Road surface of Saheed Surya Sen Marg and KPS Marg at Alaknanda Area | 08/07/2016 | 07/09/2016 | 57.40 (Mar'17) | 95.00 % (Mar'17) | Bituminous work completed. Thermoplastic painting work is to be taken up |
Detail Report
Graph / Photo |
||
416 | Repair of damaged drain & Covering with precast RCC slab on School Road, Gurudwara Road & Jaitpur Road under PWD Division SER-2 during 2016-17 New Delhi. | 25/10/2016 | 24/12/2016 | 0.00 (Feb'17) | 65.00 % (Feb'17) | Work is in progress |
Detail Report
Graph / Photo |
||
417 | Improvement of berm of Gurudwara Road from Don Bosco School to Savitri Cinema Road during 2016-17 | 15/11/2016 | 14/02/2017 | 0.00 (Mar'17) | 5.00 % (Mar'17) | Work is in progress |
Detail Report
Graph / Photo |
||
418 | Bridges & its approaches over river Yamuna down stream of the existing bridge at Wazirabad (DTTDC) | 20/03/2010 | 30/11/2017 | 0.00 (Jun'17) | 91.80 % (Jun'17) | The work is executed by DTTDC |
Detail Report
Graph / Photo |
||
419 | AR and MO various roads under SWR-II PWD NCTD Delhi dg. 2016-17 SH Desilting of storm water drains at Janakpuri Area Lal Sai Road Vidya Marg Ram Mandir Marg Dabri Road etc. under Sub Divn. I New Delhi. | 01/01/2017 | 30/06/2017 | Work Completed |
Detail Report
Graph / Photo |
||||
420 | AR and MO various roads under PWD Sub Divn I SWR II during 2016-17 SH Desilting of Drains under Section-I Pankha Road Area New Delhi | 09/06/2017 | 05/12/2017 | Work foreclosed on 18/10/2017 |
Detail Report
Graph / Photo |
||||
421 | A/R and M/O various Roads under SRD Project Sub-Division-I/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Supply of materials for day to day maintenance work | 23/04/2018 | 21/07/2018 | WORK COMPLETED |
Detail Report
Graph / Photo |
||||
422 | Detailed Feasibility Study and geometric design for construction of four lane road along bank of drain No. 8 (Najafgarh Drain) adjacent to existing single lane inspection road of Irrigation & Flood Control Department from Dhansa Regulator to Dwarka Mor for providing additional connectivity between Jhajjar (Haryana) and IGI Airport, New Delhi. | 12/06/2014 | 09/12/2014 | Feasibility to be approved by UTTIPEC after NOC from I&FC Department. NOC is awaited from I&FC department. On 11.05.2020, E-in-C PWD has written D.O. letter to secretary I&FC department (GNCTD) for issuing instruction for joint inspection. On 08.10.2020, presentation was made to Hon'ble PWD Minister. |
Detail Report
Graph / Photo |
||||
423 | A/R and M/O various Roads under SRD Project Division-II, PWD, New Delhi during 2017-18. SH Provision of inspection vehicle for use of Executive Engineer, SRD Project Division | 07/04/2018 | 06/04/2019 | Completed (Final Bill yet to be submitted by the agency) |
Detail Report
Graph / Photo |
||||
424 | Strengthening of road surface of Outer Ring Road from Modi Mill to Chirag Delhi (Masjid Moth). | 27/05/2018 | 26/07/2018 | 436.54 (Apr'19) | 73.00 % (Apr'19) | - |
Detail Report
Graph / Photo |
||
425 | A/Rand M/O various Roads under SRD Project Sub Division III SRD Project Division II PWD, New Delhi,during 2017-18.SH Supply of materials for day to day maintenance work | 24/03/2018 | 21/06/2018 | Work Completed |
Detail Report
Graph / Photo |
||||
426 | Detailed Feasibility Study and geometric design for construction of ROB/RUB on Cost-sharing basis on Railway crossing No. LC-12 (Delhi-Ambala line) on Khera Kalan to Khera Khurd Road. | 07/08/2018 | 06/01/2019 | Dhrupad Consultants Pvt. Ltd. | UTTIPEC Governing Body metting under chairmenship of Hon'ble L.G. was held on 25.12.2020. Scheme has been cleared / approved by UTTIPEC. Final drawings approved by UTTIPEC. |
Detail Report
Graph / Photo |
|||
427 | AR and MO various roads under SRD Project Sub Division II SRD Project Division II PWD New Delhi during 2018-19 SH Desilting through super sucker and manually of various roads drains under sub division II. | 19/06/2018 | 15/12/2018 | 34.12 (Jan'19) | 100.00 % (Jan'19) | WORK COMPLETED |
Detail Report
Graph / Photo |
||
428 | Widening of road from Kalindi Kunj Park Red Light to FOB Saheen Bagh to prevention of traffic jam and pollution at Road No 13 A under PWD SER 2 New Delhi | 02/06/2018 | 01/08/2018 | 43.19 (Jun'19) | 49.00 % (Jun'19) | 30% |
Detail Report
Graph / Photo |
||
429 | Shifting of drain from K Pocket Gate Sarita Vihar to Maharaja Agarsen Road for widening of road at Road No 13 A | 02/06/2018 | 01/08/2018 | 7.02 (Mar'19) | 100.00 % (Mar'19) | 100% |
Detail Report
Graph / Photo |
||
430 | Micro Surfacing of various road under SRD Project Sub division-III SRD Project Division II, PWD , New Delhi during 2017-18. SH Micro Surfacing and improvement of footpath at Khajoor Road. | 17/08/2018 | 14/12/2018 | Work completed. |
Detail Report
Graph / Photo |
||||
431 | Hiring of inspection vehicle for EE SER 2 | 17/06/2018 | 16/06/2019 | 4.53 (May'19) | 77.00 % (May'19) | 95% |
Detail Report
Graph / Photo |
||
432 | Providing and laying RMC in berm portion and repairing of footpath of Hansraj Sethi Marg and Kanshi Ram Takkar Marg | 03/05/2018 | 02/06/2018 | 90% |
Detail Report
Graph / Photo |
||||
433 | Re development of planter area for the prevention from the encroachment pollution unauthorised parking ease of movement of public and traffic jam etc at Guru Ravidass Marg under Division SER 2 | 17/05/2018 | 16/08/2018 | 61.76 (Apr'19) | 96.00 % (Apr'19) | - |
Detail Report
Graph / Photo |
||
434 | Making of missing drain for disposal of storm water near Paras ground side at Nehru Place on Outer Ring Road | 17/05/2018 | 16/06/2018 | The work has been completed ... Bill yet to be submit. |
Detail Report
Graph / Photo |
||||
435 | AR and MO various roads under SRD Project Sub Division I SRD Project Division II PWD New Delhi during 2018-19 SH Desilting through super sucker and manually of various roads drains under sub division I | 20/06/2018 | 16/12/2018 | 29.44 (Apr'19) | 100.00 % (Apr'19) | WORK COMPLETED |
Detail Report
Graph / Photo |
||
436 | AR and MO various roads under SRD Project Sub. Division III SRD Project Division-II PWD New Delhi during 2018-19 .SH Desilting through super sucker and manually of various roads drains under sub division III | 19/06/2018 | 15/12/2018 | WORK COMPLETED. |
Detail Report
Graph / Photo |
||||
437 | Shifting of Footpath and drain and Providing RCC retaining wall to prevention of traffic jam Pollution and encroachment from FOB Saheen Bagh to Kalindi Kunj Park Red Light at Road No 13 A under PWD Division SER 2 New Delhi | 29/05/2018 | 28/07/2018 | 27.26 (Mar'19) | 44.00 % (Mar'19) | 62% |
Detail Report
Graph / Photo |
||
438 | AR and MO Various Road under Sub Division M 2113 During 2018 19 SH Repairing of Drain at Babarpur Road SECTION II | 07/08/2018 | 05/10/2018 | Duplicate Work |
Detail Report
Graph / Photo |
||||
439 | A R and M O to various roads under subdivision III SRD project division II Delhi dg 2018 19 SH Laying of NP 2 pipe repair of footpath at Hardhyan Singh road between road 3 to road no 4 pyare lal road between road no 3 to DB Gupta road and Guru Ravida | 16/08/2019 | 13/11/2019 | Work in progress |
Detail Report
Graph / Photo |
||||
440 | Restoration of various roads under SRD Project Sub Division I of SRD Project Division II PWD dg 2019 20 SH Repair of roads and footpath cut by various utility services agencies | 06/08/2019 | 04/10/2019 | Work in progress |
Detail Report
Graph / Photo |
||||
441 | Providing and fixing M. S. Grill at central verge from Chhawla Village to BDO office, at Najafgarh Bijwasan Road (ID 1173) under PWD division SWR-II, New Delhi. | 14/09/2020 | 13/10/2020 | WORK not started |
Detail Report
Graph / Photo |
||||
442 | Rehabilitation and strengthening of Janak Setu Flyover in New Delhi (Balance Work) | 29/03/2020 | 29/09/2020 | Work in progress |
Detail Report
Graph / Photo |
||||
443 | Repair and Rehabilitation of Vehicular Under Pass (VUP) and its approaches and Approaches of three RoBs at PulMithai on SPM Marg, Delhi | 16/01/2020 | 15/10/2020 | Work in progress |
Detail Report
Graph / Photo |
||||
444 | Structural audit of flyovers of New Nizamuddin Flyover,Nehru Place Flyover,Sarita Vihar flyover,Andrews Ganj Flyover | 05/03/2020 | 28/05/2021 | Work in progress |
Detail Report
Graph / Photo |
||||
445 | Structural audit of flyovers of Tilak Nagar flyover near metro station,Punjabi Bagh Club flyover,Raja Garden Flyover,Tilak Nagar flyover near District Centre,Peera Garhi flyover | 05/03/2020 | 28/05/2021 | Work in progress |
Detail Report
Graph / Photo |
||||
446 | Construction of Two No Foot Over Bridge across (i)Sri Aurobindo Marg (ID-96) at Adhchini Village (ii) Hauz Khas Enclave (Near Padmini Enclave) with staircase and lift including Electrical Installation under Sub Division-II of Division South Road-II | 21/03/2020 | 20/09/2020 | Work in Progress. |
Detail Report
Graph / Photo |
||||
447 | Construction of Elevated Road over Barapulla Nallah is starting from Sarai Kale Khan to Mayur Vihar, New Delhi (Phase III). (SH Supplying and Fixing LED Street Light Fixtures) | 02/09/2018 | 01/03/2019 | in progress |
Detail Report
Graph / Photo |
||||
448 | Raising of manhole cover and making connection to the old drain with manhole chambers | 17/07/2018 | 16/08/2018 | Work is in progress. |
Detail Report
Graph / Photo |
||||
449 | Disposal and Removal of dumped malba | 30/03/2019 | 29/09/2019 | 4.73 (May'19) | 0.00 (May'19) | The 25% work has been completed and left work is in progress.. |
Detail Report
Graph / Photo |
||
450 | A/R and M/O various roads under SRD Project Sub. Division-III/SRD Project Division-II, PWD, New Delhi during 2018-19 .SH-Desilting through super sucker and manually of various roads drains under sub division- III. | 19/06/2018 | 15/12/2018 | 15.42 (Jan'19) | 0.00 (Jan'19) | WORK COMPLETED |
Detail Report
Graph / Photo |
||
451 | AR and MO various roads under SRD Project Sub Division III SRD Project Division II PWD New Delhi during 2018-19 SH Desilting through super sucker and manually of various roads drains under sub division III | 19/06/2018 | 15/12/2018 | WORK COMPLETED |
Detail Report
Graph / Photo |
||||
452 | Micro Surfacing of various road under SRD Project Sub division III SRD Project Division II PWD New Delhi during 2017-18. SH Micro Surfacing and improvement of footpath at Khajoor Road. | 17/08/2018 | 14/12/2018 | 25.48 (Nov'20) | 0.00 (Nov'20) | WORK COMPLETED |
Detail Report
Graph / Photo |
||
453 | Watch and ward of Subways under Sub Division SER-23 and SER-25 | 24/06/2018 | 23/06/2019 | 90% |
Detail Report
Graph / Photo |
||||
454 | Providing and running diesel pump set | 01/07/2018 | 30/09/2018 | 2.27 (Jun'19) | 0.00 (Jun'19) | 100% |
Detail Report
Graph / Photo |
||
455 | Micro surfacing of various Road under SRD Project Sub Division I SRD Project Division II PWD New Delhi SH Micro surfacing and Improvement of footpath at Chitra Gupta Road | 25/10/2018 | 21/02/2019 | 81.57 (Nov'20) | 0.00 (Nov'20) | WORK COMPLETED |
Detail Report
Graph / Photo |
||
456 | Providing services for special inspection, analysis of existing structure conducting tests and preparation of remedial measures report including BOQ for Repair and Rehabilitation of Seelampur Flyover Delhi | 18/02/2019 | 18/05/2019 | Work in Progress |
Detail Report
Graph / Photo |
||||
457 | Supply of sand stone aggregate and Bitumen emulsion for all Sub Divisions | 17/12/2018 | 23/12/2018 | - |
Detail Report
Graph / Photo |
||||
458 | Repair of central verge and P/F of missing grill and other misc works at MB Road. | 09/02/2019 | 10/03/2019 | 75% |
Detail Report
Graph / Photo |
||||
459 | Repair and beautification of kabootar chowk T Point of SA Road near Kalkaji Mandir and Hansraj Sethi Marg near Nehru Place | 31/12/2018 | 30/01/2019 | - |
Detail Report
Graph / Photo |
||||
460 | Construction of toe wall near Tehkhand Depot | 31/12/2018 | 28/02/2019 | 16.03 (Jun'19) | 0.00 (Jun'19) | - |
Detail Report
Graph / Photo |
||
461 | Raising and repair of footpath on Road No. 13 from Guru Ravi Dass Marg T Point to Crowne Plaza | 31/12/2018 | 30/01/2019 | - |
Detail Report
Graph / Photo |
||||
462 | Repair of damaged footpath from SA Road T Point to RUB Badarpur MB Road | 31/12/2018 | 30/01/2019 | - |
Detail Report
Graph / Photo |
||||
463 | Improvement of kerb wall on Okhla Estate Marg (Road No 13) from Guru Ravi Dass Marg T Point to Aggarwal sweets | 25/02/2019 | 24/03/2019 | 9.78 (May'19) | 0.00 (May'19) | The 60% work has been completed and the rest work is in progress. |
Detail Report
Graph / Photo |
||
464 | Provision of table top/speed breaker on PWD roads in GK-2. | 18/02/2019 | 01/03/2019 | - |
Detail Report
Graph / Photo |
||||
465 | A R and M O various road under Sub Division M 2113 during 2018 19 SH Covering of drain of Babarpur Road after necessary misc repair work SECTION II Balance Work RECALL | 28/10/2018 | 24/02/2019 | Work in progress |
Detail Report
Graph / Photo |
||||
466 | Providing JCB and Dumper with labours for removing temporary encroachment and collecting dumped malba | 02/11/2018 | 01/05/2019 | Work is completed ... Bill not submit yet.. |
Detail Report
Graph / Photo |
||||
467 | Construction of missing drain and widening of road due to heavy traffic jam etc at Road No. 13 A | 24/11/2018 | 23/02/2019 | 37.17 (May'19) | 0.00 (May'19) | 50% |
Detail Report
Graph / Photo |
||
468 | Providing services for special inspection, analysis of existing structure, conducting tests and preparation of remedial measures report including Bill of Quantities (BOQ) for Repair and Rehabilitation of Seelampur Flyover Delhi | 18/02/2019 | 18/05/2019 | Work in Progress |
Detail Report
Graph / Photo |
||||
469 | Providing and fixing M.S. Grill on footpath near FOB at Sarita Vihar Mathura Road | 13/09/2018 | 28/10/2018 | 5% |
Detail Report
Graph / Photo |
||||
470 | Development of open space at SA Road from DJB UGR to MCD SLF | 16/04/2019 | 14/06/2019 | 60% |
Detail Report
Graph / Photo |
||||
471 | Disposal of dumped malba | 30/03/2019 | 29/09/2019 | The 25% work has been completed and rest work is in progress... |
Detail Report
Graph / Photo |
||||
472 | Repair of berm portion of Nehru Enclave Service road on Outer Ring Road | 30/03/2019 | 29/04/2019 | The 80% work has been completed and the rest work is in progress. |
Detail Report
Graph / Photo |
||||
473 | Repair of damage footpath Hansraj Sethi Marg from EPDP Road to Nehru Place Flyover | 30/03/2019 | 28/04/2019 | - |
Detail Report
Graph / Photo |
||||
474 | A/R and M/O various road under SER-2/25 during 2018-19 (SH- Removal of grass and malba from central verge and side berms) | 30/03/2019 | 28/04/2019 | The 70% work has been completed.. |
Detail Report
Graph / Photo |
||||
475 | Raising of height of central verge SA Road from crowne plaza to MB Road T Point | 30/03/2019 | 28/04/2019 | - |
Detail Report
Graph / Photo |
||||
476 | A/R and M/O various road under Sub -Division M-2111 during 2019-20.(SH Covering drain of Apsara Border underpass.).(Balance work). | 02/09/2019 | 31/10/2019 | Work in progress (Agmt. No. 41/EE/PWD/SHAHDARA ROAD/M-211/2019-20/05014) |
Detail Report
Graph / Photo |
||||
477 | feasibility studies for the corridor network UG Tunnel and improvement of existing Dwarka Road from NH 8 to Dwarka | 28/12/2019 | 24/06/2020 | Work In progress. |
Detail Report
Graph / Photo |
||||
478 | Restoration of various roads under SRD Project Sub. Division II SRD Project Division II PWD New Delhi. SH Restoration of various road cuts by IGL and Vodafone at New Rohtak Road under Sub Division II tion of various road | 22/07/2019 | 19/10/2019 | Work in progress |
Detail Report
Graph / Photo |
||||
479 | Providing and fixing 6 feet high M.S. Railing on central verge of MB Road | 23/03/2019 | 22/04/2019 | - |
Detail Report
Graph / Photo |
||||
480 | A R and M O to various roads under subdivision III SRD project division II Delhi dg 2018 19 SH Laying of NP 2 pipe repair of footpath at Hardhyan Singh road between road 3 to road no 4 pyare lal road between road no 3 to DB Gupta road and Guru Ravida | 16/08/2019 | 13/11/2019 | work in progress |
Detail Report
Graph / Photo |
||||
481 | Raising of manhole height of storm water drain on Mathura road | 26/04/2019 | 10/06/2019 | 0% |
Detail Report
Graph / Photo |
||||
482 | Repair of footpath Outer Ring Road from Modi Mill to Kabootar Chowk and Providing and fixing carbonate sheet of FOB | 18/04/2019 | 17/05/2019 | The work is in progress... |
Detail Report
Graph / Photo |
||||
483 | Supply and stacking of material | 09/04/2019 | 18/04/2019 | 40% |
Detail Report
Graph / Photo |
||||
484 | Repair of footpath Jaitpur Road. | 21/02/2019 | 20/04/2019 | 95% |
Detail Report
Graph / Photo |
||||
485 | Restoration of SA Road, Hansraj Sethi Marg, Baba Fateh Singh Marg. | 01/03/2019 | 15/03/2019 | - |
Detail Report
Graph / Photo |
||||
486 | Repair of service road at Pul Pehladpur. | 01/03/2019 | 31/05/2019 | - |
Detail Report
Graph / Photo |
||||
487 | Construction of boundary wall near Giri Nagar, Maharaja Agarsen Marg. | 01/03/2019 | 30/04/2019 | - |
Detail Report
Graph / Photo |
||||
488 | Providing and placing jersey barrier on Madanpur Khadar Road. | 02/03/2019 | 16/03/2019 | 11.11 (Jun'19) | 0.00 (Jun'19) | - |
Detail Report
Graph / Photo |
||
489 | Providing and placing jersey barrier on Meethapur chowk in Jaitpur area. | 04/03/2019 | 18/03/2019 | 0% |
Detail Report
Graph / Photo |
||||
490 | Improvement of kerb wall on Okhla Estate Marg (Road No 13) from Guru Ravi Dass Marg T Point to Aggarwal sweets. | 25/02/2019 | 26/03/2019 | The 60% work has been done.... |
Detail Report
Graph / Photo |
||||
491 | Repair and Improvement of footpath from primary school lal Kuan to Suraj Kund crossing at MB Road. | 09/02/2019 | 08/04/2019 | - |
Detail Report
Graph / Photo |
||||
492 | Beautification of surrounding area near Delhi Institute of Tool Engineering at SA Road | 24/02/2019 | 25/03/2019 | 10.84 (May'19) | 0.00 (May'19) | - |
Detail Report
Graph / Photo |
||
493 | Providing and laying RCC kerb stone at roundabout at Hansraj Sethi marg | 18/02/2019 | 19/03/2019 | - |
Detail Report
Graph / Photo |
||||
494 | Road Restoration of Bipin Chander Pal Marg | 17/02/2019 | 18/03/2019 | The 60% work has been done and the left work is in progress... |
Detail Report
Graph / Photo |
||||
495 | Remodelling and construction of missing drain at R Block Road GK-I | 10/03/2019 | 08/05/2019 | - |
Detail Report
Graph / Photo |
||||
496 | Repair and renovation of Sub Division office | 15/03/2019 | 13/04/2019 | The work is in progress.. |
Detail Report
Graph / Photo |
||||
497 | Repair of footpath, Baba Fateh Singh Marg from SA Road to Guru Ravi Dass Marg | 18/03/2019 | 16/04/2019 | - |
Detail Report
Graph / Photo |
||||
498 | Providing and laying RMC at berm portion of KPS Marg | 15/03/2019 | 13/04/2019 | - |
Detail Report
Graph / Photo |
||||
499 | Providing and fixing of M.S. Railing at the footpath of Guru Ravi Dass Marg | 23/03/2019 | 21/04/2019 | 75% |
Detail Report
Graph / Photo |
||||
500 | Repair of damaged footpath and drain Guru Ravi Dass Marg from MB Road T Point to Road No. 13 Red Light | 14/04/2019 | 13/06/2019 | 90% |
Detail Report
Graph / Photo |
||||
501 | Repair of damage footpath Maharaja Agarsen Marg and Kanshi Ram Takkar Marg | 25/03/2019 | 24/04/2019 | - |
Detail Report
Graph / Photo |
||||
502 | Repair of damage footpath KPS Marg | 25/03/2019 | 23/04/2019 | - |
Detail Report
Graph / Photo |
||||
503 | Improvement of SA Road T Point Junction | 30/03/2019 | 28/05/2019 | - |
Detail Report
Graph / Photo |
||||
504 | Repair and raising of central verge by RCC Road No. 13 from Pocket 8 to Sarita Vihar Underpass | 30/03/2019 | 28/05/2019 | The work yet to be start... |
Detail Report
Graph / Photo |
||||
505 | Providing watch and ward for Sub Division office | 15/03/2019 | 14/09/2019 | - |
Detail Report
Graph / Photo |
||||
506 | Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on MB Road and Suraj Kund Road and 5 Nos cross culvert | 10/03/2019 | 05/10/2019 | - |
Detail Report
Graph / Photo |
||||
507 | Mechanical desilting of road side storm water drain and sewer mixed drains by Super Sucker Machine on Guru Ravi Dass Marg, KPS Marg and DDA Market Road | 10/03/2019 | 05/10/2019 | - |
Detail Report
Graph / Photo |
||||
508 | Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on Road No. 13 A | 09/03/2019 | 04/10/2019 | 0% |
Detail Report
Graph / Photo |
||||
509 | Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on Sarita Vihar Road, Maharaja Agarsen Road and Madanpur Khadar Road | 10/03/2019 | 05/10/2019 | - |
Detail Report
Graph / Photo |
||||
510 | Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on Mathura Road. | 09/03/2019 | 04/10/2019 | 8% |
Detail Report
Graph / Photo |
||||
511 | Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on Outer Ring Road, Hansraj Gupta Marg, R Block Road, Guru Nanak Market to Lala Lajpat Rai.. | 09/03/2019 | 04/10/2019 | - |
Detail Report
Graph / Photo |
||||
512 | Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on SA Road | 09/03/2019 | 04/10/2019 | - |
Detail Report
Graph / Photo |
||||
513 | Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on Baba Fateh Singh Marg, Maharaja Agarsen Marg, Hansraj Sethi Marg and Kanshi Ram Takkar Ma | 09/03/2019 | 04/10/2019 | - |
Detail Report
Graph / Photo |
||||
514 | Desilting of road side storm water drain on Savitri Cinema Road, Surya Sen Marg, Hansraj Gupta Marg, Lala Lajpat Rai Marg and other internal roads of GK-I and GK-II | 10/03/2019 | 05/10/2019 | - |
Detail Report
Graph / Photo |