1 Elevated Road, Extradosed Bridge, Flyover, Clover Leaves, Loops, Ramps, Footpath, Cycle Track, Road Work including Signages, Street Light Works & Allied Works Pile, Pile Cap, Pier cap, Pier, well foundation and casting of segment 2015.04.18 2017.10.17 96400.00 139348.49 (Mar'23) 0.00 (Mar'23) Larson & Toubro Limited Work in progress Detail Report
Graph / Photo
2 Corridor improvement of outer ring road from IIT to NH-8 and its influence area (1)C/o flyover from Munirka to Army RR Hospital on outer ring road (2) C/o underpass & skywalk etc. at juncture of BJ Marg, Ring Road 2014.11.27 2016.11.26 27807.81 22221.15 (Mar'23) 0.00 (Mar'23) Hindustan Construction Co. Ltd Work Complete. Detail Report
Graph / Photo
3 Construction of Flyover at Nand Nagri and Gagan Cinema Junction of Mangal Paney Marg including Elevated Corridor Footpath Road Work and Road Signages Electrical Works Drainage Rain Water Harvesting and Allied works on EPC mode 2023.02.03 2024.07.31 15785.00 1.35 (Jun'23) 0.00 (Jun'23) Ram Kumar Contractor

Work has been recently awarded. The land allotment for installation of plant etc. is awaited from DDA. Hopefully, DDA will allot the land in the next week. Agency set up the temporary site and started the piling work.

Detail Report
Graph / Photo
4 Extension of Ashram Flyover to DND Flyover. 2020.06.19 2021.06.18 12879.00 15278.65 (May'23) 0.00 (May'23) KCC Buildcon Pvt. LTD

The extended Ashram Flyover has been inaugurated by the Hon'ble CM, Delhi on 06.03.2023. Other misc. development work is in progress.

Detail Report
Graph / Photo
5 Construction of underpass by jack pushing of pre-cast RCC boxes at outer ring road near Mukarba Chowk including construction of approach road from Badli Junction to Haiderpur Metro Station. 2022.10.14 2023.10.13 4329.32 0.00 (Apr'23) 5.00 % (Apr'23) Dharamraj Contracts (I) Pvt. Ltd. Work affected due to non-availibility of NOC from I & FC Department, non shifting of utility by IGL, TPDDL etc. Detail Report
Graph / Photo
6 C/o Three Lane Flyover, Road Work, Footpath, Drainage System, Landscaping, Railing, Road Signages, Street Light & Allied works. 2022.07.15 2023.07.14 4199.50 1762.20 (Apr'23) 0.00 (Apr'23) Gawar Construction Ltd., work in progress Detail Report
Graph / Photo
7 Covering of the ramps of all the underpass (entry & exit) i.e. Underpass 1 to 6 as well as the main tunnel entry and exit ramps, branch tunnel entry ramps developed in the construction of Integrated Transit Corridor Development plan in and around Pragati Maidan. 2022.05.21 2022.11.20 4144.69 400.41 (May'23) 0.00 (May'23) R S Sharma Contractors Pvt. Ltd. Detail Report
Graph / Photo
8 W/O Mahrauli Mahipalpur Road. SH: from 4 lanes to 8 lanes and Service Road from Andheria More to Masoodpur Village. 2012.10.30 2013.04.29 3812.11 KCC Buildcon Pvt. LTD . Detail Report
Graph / Photo
9 Providing Slip Road Bridge On Kondli Bridge over Gazipur Drain Hindon Canal from Road along Gazipur drain to Shamshan Ghat Ghazipur Dairy Farm Road Delhi 2021.11.22 2022.10.17 1773.27 2049.22 (Mar'23) 0.00 (Mar'23) Harbel Singh & Sons

Work in progress. Structural work almost completed. Girder launching started. 2 slabs of 36 meter span out of 5 slabs have been casted.

Detail Report
Graph / Photo
10 Strengthening of Road No. 57 (Swami Dayanand Marg from Bihari Colony Railway crossing to Telco T-point red light) 2022.09.17 2022.12.15 861.04 653.41 (May'23) 0.00 (May'23) SBG Infracon Pvt Ltd Detail Report
Graph / Photo
11 Re-Carpeting of Najafgarh Road from Raja Garden to Uttam Nagar T Point under Division WR-I, PWD, New Delhi. (Balance Work). 2022.09.30 2023.03.29 818.33 711.49 (Jun'23) 0.00 (Jun'23) SATYA PARKASH AND BROS PVT LTD Detail Report
Graph / Photo
12 Strengthening of Najafgarh Road from Uttam Nagar to Dwarka Mod under Sub - Division WR-14, PWD New Delhi 2022.07.14 2022.10.13 751.50 Chaudhary Construction Company Pvt. Ltd. Detail Report
Graph / Photo
13 Strengthening of road of Bawana to Auchandi Border under Sub-Division NR-15, PWD Division North Roads, Delhi 2022.04.28 2022.10.24 718.31 863.97 (Apr'23) 0.00 (Apr'23) SBG Infracon Pvt Ltd Detail Report
Graph / Photo
14 Strengthening of Outer Ring Road from Wazirabad Flyover to Gandhi Vihar Subway under Sub Division-1, Division C&ND-Road, PWD, New Delhi. 2022.06.24 2022.08.23 717.68 802.65 (May'23) 0.00 (May'23) Chaudhary Construction Company Pvt. Ltd. Detail Report
Graph / Photo
15 Laying of RCC Drain/pipe and raising of levels of existing carriage way of Ring Road in between toe of IP Flyover and opposite of WHO Building including laying of 1200mm dia. Pipe through trenchless pushing to solve water logging problem, New Delhi. 2022.04.28 2022.07.11 694.86 882.70 (May'23) 0.00 (May'23) A S INFRATECH Detail Report
Graph / Photo
16 Strengthening of road of Major District Road -138 from Mazara Dabas Mor to CRPF gate under Sub-Division NR-15, PWD Division North Roads, Delhi 2022.04.28 2022.10.24 643.92 420.02 (Apr'23) 0.00 (Apr'23) Kundu Nirma Detail Report
Graph / Photo
17 Strengthening of roads from Nangli Poona to Mohan Adda, Khera Kalan Road, Safiabad Mor to Safiabad Border, Holambi Kalan Crossing to Bawana Narela Road via Metro Vihar, under Sub-Division NR-13 of North Road Division, PWD, Delhi 2022.03.20 2022.07.17 640.59 574.70 (Oct'22) 0.00 (Oct'22) SATYA PARKASH AND BROS PVT LTD Detail Report
Graph / Photo
18 Remodelling of drain from PTS to IIT Both Side of Road on Sri Aurobindo Marg (ID -96) under Sub Division-II of Division South Road-II, New Delhi during 2022-23. (2nd Call). 2023.03.25 2023.07.24 631.30 Mangat Ram Gupta Work in Progress Detail Report
Graph / Photo
19 Resurfacing of roads from (i) Lampur Mor to Lampur Border, (ii) Ramdev Chowk to Railway crossing Narela, (iii) Y-section Narela to Shahpur Garhi Turn, under Sub-Division NR-13, North Roads Division, PWD, Delhi 2022.03.20 2022.07.17 617.72 316.83 (Apr'23) 0.00 (Apr'23) Sethi Construction Detail Report
Graph / Photo
20 Strengthening of Road No. 56 i.c Service Road from Gazipur Grade Separator to Apsara Border and its subsequent maintenance for three years. 2021.11.27 2022.03.26 615.26 670.71 (Feb'23) 0.00 (Feb'23) Pawan Kumar Detail Report
Graph / Photo
21 Strengthening of various roads such as prof. Joginder Singh Marg Major Deepak Tyagi Marg Lal Sai Marg 60 Futa Road Possangi Pur Road A 1 Block Main Road Opp A 1 Block Main Road and Asalat Pur Road 1 under Sub Division WR 12 Division WR-1 PWD New Delh 2022.09.25 2023.01.24 578.76 467.80 (May'23) 0.00 (May'23) MAHAVIR PRASAD GUPTA AND SONS Detail Report
Graph / Photo
22 Construction of Inter-connecting RCC box type storm water drain between JhaitkaraMorh via Chhawla Village to IandFC Najafgarh drain, NajafgarhBijwasan Road (ID 1173) under PWD Division SWR-II, New Delhi. 2023.03.17 2023.09.12 564.26 Rajan Builders Detail Report
Graph / Photo
23 Strengthening / Resurfacing of (1) Road No. 70, (2) Road 62, (3) Road from Seemapuri Bus depot Road no. 70 to GTB Hospital Road (Gurudwara road), (4) Road from Labour chowk (Seemapuri link road) to General Hospital Road no. 64 (Divider Road), (5) Road from Rajiv Gandhi Super Specialty Hospital to GTB Hospital Road. 2023.01.26 2023.05.25 554.25 50.00 (Jun'23) 0.00 (Jun'23) Kundu Nirman Detail Report
Graph / Photo
24 Strengthening of Kanjhawala Road (Road No.3) from Mangolpur Kalan Marble Market to Rajeev Nagar under PWD Sub Division-NWR-25 and Division NWR-2, Sainik Vihar Delhi under PWD North Zone with hot recycling method after cold milling for roads upto 30m ROW 2022.02.27 2022.06.26 548.07 550.78 (Feb'23) 0.00 (Feb'23) RK Brothers Detail Report
Graph / Photo
25 Strengthening of Anuvrat Marg (ID-1198) through cold milling and recycling process under Sub-Division-3 of Division South Road-2 PWD, New Delhi. 2023.04.19 2023.08.18 536.44 R K Brothers & Company Detail Report
Graph / Photo
26 Strengthening of Arterial Roads having right of way more than 30.00 metre like Satyagrah Marg, IG Slip Road, Velodrome Road, Sachivalya Road, Club Road & Flag Staff Road under Sub Division – 3 of Division C & ND – Roads, New Delhi 2022.03.31 2022.06.30 535.88 669.19 (Apr'23) 0.00 (Apr'23) A S INFRATECH Detail Report
Graph / Photo
27 Resurfacing of roads from (i) Shahpur Garhi Turn to Old GTK road Alipur, (ii) Shubhash Chowk to Palla Village via Bakhtawarpur, (iii) Holambi Khurd Crossing to Shahpur Garhi turn, (iv) New GTK Road to Old GTK Road (via Shani Mandir), (v) New GTK Road to Old GTK Road (via PHC Alipur) under Sub-Division NR13, PWD North Roads Division, Delhi. 2022.03.20 2022.07.17 526.50 659.38 (Apr'23) 0.00 (Apr'23) SATYA PARKASH AND BROS PVT LTD Detail Report
Graph / Photo
28 Strengthening of Swaroop Nagar Road with Construction of footpath on existing drain and improvement of road side berm from Main Burari Road to Kathia Baba Ashram under Sub Division-1, C&ND-Road Division Delh 2022.04.28 2022.06.27 523.21 1054.73 (May'23) 0.00 (May'23) MAHAVIR PRASAD GUPTA AND SONS Detail Report
Graph / Photo
29 Strengthening of Asiad Games Village Road (ID 1137), NIFT Road (ID-1139), Subhash Chopra Road (ID-1138) and August Kranti Marg (ID-16) through cold milling and recycling process under Sub-Division-1 of Division South Road-2 PWD, New Delhi 2022.10.06 2023.01.05 516.92 440.10 (May'23) 0.00 (May'23) MAHAVIR PRASAD GUPTA AND SONS Work in Progress Detail Report
Graph / Photo
30 Construction of Two No. Foot Over Bridge across Sri Aurobindo Marg (ID-96) at (i) PTS Bus Stop (ii) T.B. Hospital with staircase and lift including Electrical Installations under Sub Division-II of Division South Road-II, PWD New Delhi. 2020.03.21 2020.09.20 489.85 255.38 (Nov'22) 0.00 (Nov'22) S S Chauhan & Sons Work in Progress. Detail Report
Graph / Photo
31 Construction of Two No Foot Over Bridge across (i)Sri Aurobindo Marg (ID-96) at Adhchini Village (ii) Hauz Khas Enclave (Near Padmini Enclave) with staircase and lift including Electrical Installation under Sub Division-II of Division South Road-II 2020.03.21 2020.09.20 489.30 335.56 (Nov'22) 0.00 (Nov'22) S S Chauhan & Sons Work in Progress. Detail Report
Graph / Photo
32 Remodelling of drain from Gurudwara near Mahendra Park Junction to G.T.K. Depot near Sanjay Enclave, both side carriageway at Mall Road Extension under Sub Division NR-12 2022.08.06 2022.12.03 484.07 232.87 (May'23) 0.00 (May'23) AVNG INFRASTRUCTURES PRIVATE LIMITED Detail Report
Graph / Photo
33 Construction of precast drain and Improvement of side berm including footpath from Amrit Vihar to Nathupura road on Main Burari Road 2022.04.28 2022.07.12 434.22 721.07 (May'23) 0.00 (May'23) Amit Buildcon Detail Report
Graph / Photo
34 Remodeling of Maujpur drain from Road No. 66 to Ghonda Chowk and Main Brahmpuri Road drain from Ghonda Chowk to MCD Dhalav. 2018.10.28 2019.04.27 419.30 370.25 (Mar'23) 0.00 (Mar'23) Gee International work in progress Detail Report
Graph / Photo
35 Construction of RCC drain in Narela Alipur road along the DDA land from Bhorgarh to Shahpur Garhi turn under Sub Division NR-13, North Roads Division,PWD, Delhi 2022.01.07 2022.07.05 412.34 111.83 (Jun'22) 0.00 (Jun'22) R K Enterprises Detail Report
Graph / Photo
36 Strengthening of Keshopur Sabzi Mandi Road from Outer Ring Road to Subhash Nagar Drain Chowkhandi Road, Road from GuruVirjananad Marg to Distt. Park Vikas puri, Tilak Vihar Main Road, Pelicon Road from Guru Virjananad Marg to Road No. 235 Ext, Brain 2022.09.25 2022.12.24 386.35 150.00 (Jun'23) 0.00 (Jun'23) MAHAVIR PRASAD GUPTA AND SONS Detail Report
Graph / Photo
37 Strengthening of Geeta Colony Yamuna Bridge Road from Ring Road Crossing to Pusta Road by cold milling and recycling process. Sub-Division East Road-I under Division East Road/(M-212) Delhi. dg. 2021-22 2022.02.25 2022.05.25 362.56 430.06 (Sep'22) 0.00 (Sep'22) Pawan Kumar Detail Report
Graph / Photo
38 Construction of Foot Over Bridge at Gurudwara Majnu ka Tila on Road No. 45 under Sub-Division-4 of Division C and ND-R, New Delhi. 2022.09.06 2023.03.05 358.46 Fiberfill Engineer Detail Report
Graph / Photo
39 Strengthening of various roads by cold milling of sub-Div. East road-III under East road/(M-212) Delhi during 2022-23. 1. Sadhabhawna Marg (Road No. 111) 2. Club Avenue Marg (Road No. 112) 3. Sekarita Marg (Road No. 113) 4. Ambedkar Marg. 5. Subhash Market road. 6. Block No. 1 to 11 Trilokpuri. 7. Khudiram Bose Marg 2022.08.29 2023.02.24 342.13 SATYA PARKASH AND BROS PVT LTD Detail Report
Graph / Photo
40 Strengthening of Western Approaches of Signature Bridge from Signature Bridge to Majnu ka Tila, Signature Bridge to Timarpur, Azadpur and Slip road from Wazirabad flyover to Signature Bridge, Burari flyover and Tagore Park under Sub Division-1, C&ND-Roads, New Delhi 2022.03.31 2022.06.30 336.11 510.14 (Apr'23) 0.00 (Apr'23) SATYA PARKASH AND BROS PVT LTD Detail Report
Graph / Photo
41 Construction of drains, footpath Central Verge and improvement of side berm portion of S-Bend road (Maharishi Dayanand Marg ID-539) New Delhi. 2019.10.24 2020.01.23 330.83 376.66 (Jul'22) 0.00 (Jul'22) S S Chauhan & Sons Work in Progress Detail Report
Graph / Photo
42 Comprehensive Maintenance of various Roads under SRD Project Division-I, Sub-Division-I, PWD, Delhi. (SH- Civil Works- Mechanised Desilting of Drains, Mechanised Repairing of Pot Holes, Maintenance and Cleaning of Subways and other misc. Repair wor 2019.08.27 2020.08.23 323.91 485.41 (May'21) 0.00 (May'21) Awasthi Construcion Co. Detail Report
Graph / Photo
43 Widening and strengthening of Bandh Road of Division SR-1 under Sub-Division SR-13 at New Delhi ic shifting and installation of Electrical Poles, Street lights etc. (Balance Work) 2022.02.19 2022.07.10 318.43 78.52 (Mar'23) 0.00 (Mar'23) Pawan Kumar work in progress Detail Report
Graph / Photo
44 Remodelling of drain from 5th Pusta to Ghonda Chowk at Gamri Road Delhi 2020.01.13 2020.04.05 318.40 352.26 (Sep'22) 0.00 (Sep'22) Thermal Enginners & Insulators Pvt. Ltd. Detail Report
Graph / Photo
45 Strengthening of Mall Road from Timarpur Red Light to GTB Metro Station under Sub-Division-2 of Division C& ND-Roads, New Delhi. (Width- ROW Above 60.00 meter). 2022.04.28 2022.06.27 302.96 528.75 (Mar'23) 0.00 (Mar'23) MAHAVIR PRASAD GUPTA AND SONS Detail Report
Graph / Photo
46 Resurfacing of Road and Repairing of footpath and Central Verge at Asaf Ali Road and Chaman Lal Marg under Division SRD Project I, under Sub Division II, PWD during 2019 20 New Delhi 2019.09.23 2020.03.20 302.16 285.99 (Dec'21) 0.00 (Dec'21) Chaudhary Construction Company Pvt. Ltd. Detail Report
Graph / Photo
47 Strengthening of Arterial Road (Bahadur Shah Zafar Marg) having right of way more than 60.00 metre under Sub Division – 3 of Division C & ND – Roads, New Delhi 2022.03.31 2022.05.30 289.31 408.51 (Apr'23) 0.00 (Apr'23) A S INFRATECH Detail Report
Graph / Photo
48 Comprehensive Maintenance of various Roads under SRD Project Division-I, Sub-Division-II, PWD, Delhi. (SH- Civil Works- Mechanised Desilting of Drains, Mechanised Repairing of Pot Holes, Maintenance and Cleaning of Subways and other misc. Repair wo 2019.08.24 2020.08.23 285.85 569.67 (Aug'21) 0.00 (Aug'21) Awasthi Construcion Co. Detail Report
Graph / Photo
49 Strengthening of RMC Road from Shaheed Bhagat Singh Marg to Chanchal park under Sub Division WR 14 Division WR 1 New Delhi during 2021-22 2022.12.26 2023.02.25 282.98 361.83 (May'23) 0.00 (May'23) RUDRA CONSTRUCTIONS Detail Report
Graph / Photo
50 Widening of road and providing road infrastructure near Majnu ka Tila and Chandgi Ram Akhara for implementation of back-to-back U-turn under Sub Division-1, C&ND-Road Division. 2nd RECALL 2022.07.20 2022.11.19 243.86 MAHAVIR PRASAD GUPTA AND SONS Detail Report
Graph / Photo
51 Development of road side of DAV School road stretch in front of Govt. School and DAV School for making it pedestrian student friendly under Sub-Division-III of Division South Road-II, PWD, New Delhi (Civil Elect. works) 2022.07.26 2022.11.25 238.89 Bhawani Constructions Work in Progress Detail Report
Graph / Photo
52 Remodelling of drain at Porta Cabin road from Kondli Bridge to Porta Cabin, MCD under PWD Sub-Division East Road-II during 2022-23. 2023.03.29 2023.07.26 226.79 Vinod Kumar Detail Report
Graph / Photo
53 Widening of road and providing road infrastructure near Majnu ka Tila and Chandgi Ram Akhara for implementation of back-to-back U-turn under Sub. Division-1, C and ND-Road Division. (1st RECALL) 2022.03.09 2022.07.08 225.35 Sethi Construction Detail Report
Graph / Photo
54 Remodelling of drain along road No. 102 (Pragati Marg) from Khora Chowk towards Road No. 108 under PWD Sub-Division East Road-II during 2022-23. 2023.03.29 2023.07.26 214.13 BASAU CONSTRUCTION (INDIA) Detail Report
Graph / Photo
55 Construction of RCC drain from Road no. 64 to Road no. 62 at Mother dairy Road in Dilshad Garden, New Delhi 2022.12.25 2023.09.20 212.33 Digital Controls & Automation Detail Report
Graph / Photo
56 Construction of RCC drain from Road no. 64 to Road no. 62 at Mother dairy Road in Dilshad Garden, New Delhi. (Recall). 2023.04.06 2023.12.31 202.76 Singh Construction Co. Detail Report
Graph / Photo
57 Improvement of riding surface of flyovers namely Nand Nagri flyover, Loni Flyover, Gokalpuri and Khajuri Gol Chakkar Flyover on Wazirabad Road (Road No- 63 and 59) 2019.07.15 2019.10.14 192.33 245.19 (Dec'21) 0.00 (Dec'21) Pawan Kumar Work in progress. Detail Report
Graph / Photo
58 Improvement of Sewadham Road from road No.-63 to UP Border. 2019.03.01 2019.04.30 190.73 226.00 (Jul'19) 0.00 (Jul'19) Pawan Kumar work in progress Detail Report
Graph / Photo
59 Multi Modal Integration (MMI) Development works at existingPanchsheel Park Metro Station at Outer Ring Road (ID-1369) under Sub Division-IV of Division South Road-II, PWD, New Delhi 2022.07.19 2022.11.18 167.43 224.37 (Jun'23) 0.00 (Jun'23) AMOCON Work in Progress Detail Report
Graph / Photo
60 Strengthening of (1) Rishabh Vihar Road, (2) Surajmal Vihar Market Road and (3) Shrestha Vihar Road, under Sub-Division M-2112 during 2021-22. (Modified 2nd recall) 2022.03.18 2022.05.16 153.67 188.95 (Oct'22) 0.00 (Oct'22) Nirmit Construction Co. Detail Report
Graph / Photo
61 Providing and laying waste water pipe line from Arvind Nagar pump house Gamri Road to Drain no. 1 at road no. 66 via Maujpur Road Delhi. 2019.02.26 2019.06.25 149.77 182.60 (Nov'20) 0.00 (Nov'20) K. CONSTRUCTION COMPANY work in progress Detail Report
Graph / Photo
62 Upgradation of 21 Nos. staff rooms of GNCTD Schools under Jurisdiction of SRD Project Division-1, PWD dg. 2018-19 2018.11.30 2019.01.28 135.88 147.99 (Feb'21) 0.00 (Feb'21) Munzareen Ahmed work in progress Detail Report
Graph / Photo
63 Construction of RCC drain at Budh Ram Singh Marg and Sameer Bhan Marg 2018.12.08 2019.03.07 130.52 63.31 (Sep'21) 0.00 (Sep'21) Dinesh Chand Sharma

Work in progress

Detail Report
Graph / Photo
64 Strengthening of Bipin Chandra Pal Marg from DDA Market to Gurudwara Road, New Delhi under Sub Division SER-25. 2023.02.14 2023.04.13 127.11 193.05 (May'23) 0.00 (May'23) Awasthi Construction Co. Detail Report
Graph / Photo
65 Strengthening of Roshnara Road by cold milling method from Pulbangash Metro Station to Roshnara Gol Chakkar 2022.03.31 2022.05.30 124.78 372.37 (Jan'23) 0.00 (Jan'23) A S INFRATECH Detail Report
Graph / Photo
66 Redevelopment of drainage system at Lothian SPM Road Junction and Construction of Sump. (SH Civil Works) 2018.09.28 2019.01.25 122.76 122.76 (Jan'22) 0.00 (Jan'22) K.P. Singh & Co. Work in progress Detail Report
Graph / Photo
67 Strengthening of Gandhi Vihar Main Road under jurisdiction of Sub Division-1, C and ND-Road Division Delhi 2022.03.31 2022.05.30 122.01 193.12 (Oct'22) 0.00 (Oct'22) A S INFRATECH Detail Report
Graph / Photo
68 Microsurfacing on carriageway of Main Burari Road from Nathupura to Hiranki and All University Campus under Sub. Division-1 of Division C and ND-R during the year 2021-22 2022.04.07 2022.06.06 120.44 240.03 (Mar'23) 0.00 (Mar'23) M C Constructions Company Detail Report
Graph / Photo
69 Multi Modal Integration (MMI) Development works at existing IIT Metro Station at Outer Ring Road (ID-1369) under Sub Division-IV of Division South Road-II, PWD, New Delhi 2022.07.19 2022.11.18 120.24 174.87 (May'23) 0.00 (May'23) Bishwa Mohan Jha Work in Progress Detail Report
Graph / Photo
70 Construction of Foot Over Bridge near Kardampuri and Yamuna Vihar on Road No.-66 , Delhi (Approximate Length 30.00 Metre). 2019.06.09 2019.09.06 98.85 147.95 (Feb'23) 0.00 (Feb'23) Dilshad Khan Work in progress. Detail Report
Graph / Photo
71 Resurfacing of Sadar Thana Road, Foota Road, Bahadur Garh Road, Chelmsford and Faiz Road. 2016.09.14 2017.01.13 88.85 18.77 (Apr'21) 0.00 (Apr'21) Raj Kumar Sachdeva Permission from the Traffic Police not received. Detail Report
Graph / Photo
72 Construction of Staircase towards North side of Vishwakarma Setu Flyover at Mansarover Park Metro Station (Both side of Railway Line) at G.T. Road Shahdara under Sub Division M-2111 dg. 2022-23 2022.12.23 2023.03.22 84.41 26.83 (May'23) 0.00 (May'23) Avtar Builders Detail Report
Graph / Photo
73 Restoration of outer ring road (Keshopur Mandi to Janakpuri) cut by BSES for Laying of 04 Nos Cables under sub division WR-13, Division West Road-1 PWD during 2022-23 via ID 202112311521139. 2022.07.15 2022.08.28 82.92 100.37 (Jan'23) 0.00 (Jan'23) MAHAVIR PRASAD GUPTA AND SONS Detail Report
Graph / Photo
74 Construction of R.C.C. central verge on Basant Kaur Marg (ID-528), Malviya Nagar under Sub Division-IV of Division South Road-II, PWD Delhi, during 2022-23 2022.05.31 2022.07.30 79.57 58.60 (Apr'23) 0.00 (Apr'23) Buland Constructions Work in Progress Detail Report
Graph / Photo
75 Strengthening of road from Service Road Oberoi Flyover, Service Road ROB, Bhogal & School Road of Sub-Division R-14 under Division South East Road-1. 2022.07.02 2022.07.31 78.53 M C Constructions Company Detail Report
Graph / Photo
76 Providing and laying microsurfacing of B-4 road under Sub Division NWR-23, PWD Division NWR-2 during 2021-22 2022.05.30 2022.07.13 78.40 98.31 (Jan'23) 0.00 (Jan'23) SBG Infracon Pvt Ltd Detail Report
Graph / Photo
77 Providing and laying microsurfacing of various roads (B-6 Road, Coln. Sarna Marg, N.K. Bagrodia School to Vinobha Kunj, Chetak Appt. to New Modern Appt., Vidya Vihar to Neelgiri Appt. and Pragatisheel Appt. to Green View Appt.under Sub Division NWR-23, PWD Division NWR-2 dg. 2022-23. 2022.09.09 2022.10.22 75.51 83.10 (May'23) 0.00 (May'23) M.C. Construction Detail Report
Graph / Photo
78 Construction of RCC drain from NH-24 to Hindon cut at Murga Mandi Road, New Delhi 2022.02.14 2022.07.13 70.84 71.95 (Mar'23) 0.00 (Mar'23) Ravinder Kumar Detail Report
Graph / Photo
79 Improvement and Strengthening of Gamri Road from 5th Pusta to Ghonda Chowk Delhi 2019.08.02 2019.10.29 69.82 72.52 (Mar'23) 0.00 (Mar'23) MAHAVIR PRASAD GUPTA AND SONS Work in Progress Detail Report
Graph / Photo
80 Strengthening of Madanpur Khadar Road under the jurisdiction of South East Road-2 during 2022-23 (Road ID 958) 2022.05.29 2022.06.28 68.97 99.55 (Nov'22) 0.00 (Nov'22) RK Brothers and Co Detail Report
Graph / Photo
81 Restoration of Road cut by DJB at Abdul Aziz Road from Pusa road crossing to Bank Street, New Delhi 2016.12.23 2017.01.21 68.15 Bishwa Mohan Jha Determined Detail Report
Graph / Photo
82 Micro surfacing of various Road under SRD Project Sub-Division III SRD Project Division II PWD New Delhi SH Micro surfacing and Improvement of footpath at Arya Samaj Road 2018.08.20 2019.02.11 66.76 70.27 (Jan'21) 0.00 (Jan'21) SATYA PARKASH AND BROS PVT LTD Work in Progress Detail Report
Graph / Photo
83 Construction of Drain from I.P. Estate DTC Depot to SDMC Drain & Making Slip Road near New Railway Bridge at Ring Road between Bhairon Marg T-Junction and Entry Tunnel Ring Road under Division C&ND- Roads, New Delhi. 2022.04.25 2022.05.24 66.21 Gee Internationals Detail Report
Graph / Photo
84 Providing main LT panels, Distribution boards i/c providing LED fittings, Ceiling Fans, & replacement of Air Conditioners, DG set with suitable AMF panel and other miscellaneous electrical work for Department of Training & Technical Building at Muni Maya Ram Marg, Pitampura, Delhi 2022.04.08 2022.10.07 64.45 42.27 (Mar'23) 0.00 (Mar'23) M/s R S Electric Co. Detail Report
Graph / Photo
85 A/R and M/O to various roads under SRD Project Division-I during 2018-19. (SH-Repairing of Drain andfootpath at back side of New Delhi court building at Kotla Road and repairing of footpath NMV Lane infront of Court building at DDU Marg under Sub Di 2018.06.21 2018.10.20 59.92 74.26 (Sep'19) 0.00 (Sep'19) Satyam Construction Co. work in progress Detail Report
Graph / Photo
86 Construction of RCC drain at Dallupura Road Near Timber Market 2018.12.13 2019.03.12 59.46 12.01 (Jan'21) 0.00 (Jan'21) Shiv Construction Co.

Work in progress

Detail Report
Graph / Photo
87 Remodeling of RCC drain and levelled footpath at Oriental apartment road under Sub-Division East Road-IV of East Road Division, PWD, Delhi during 2023-24. 2023.06.01 2023.08.29 58.12 Ravinder Kumar Detail Report
Graph / Photo
88 Widening of Bhagwan Pur Khera Culvert over 52 cusec drain on Loni Road. 2019.08.09 2019.12.06 55.71 62.33 (Dec'21) 0.00 (Dec'21) Ravinder Kumar award under process Detail Report
Graph / Photo
89 Desilting of drains by chassis mounted high pressure suction cum jetting machine under Sub Division 2. 2019.08.05 2019.10.04 55.58 51.12 (Dec'21) 0.00 (Dec'21) Maan Builders award in process Detail Report
Graph / Photo
90 Comprehensive Development of Corridor (Outer Ring Road) between Mukarba Chowk to Wazirabad. SH. Providing and laying stone pitching and chute drain on embankment slope and construction of cycle track. 2017.04.10 2017.04.09 55.56 AANISHA COMMUNICATION PVT.LTD. Detail Report
Graph / Photo
91 A/R and M/O to various roads under PWD (North East) Road Division dg. 2019-20. (SH- Providing M.S. Grill in central verge from Railway Line bridge to Road no. 66 T-Point at Road no. 68 under PWD Sub Division-4). 2019.08.18 2019.11.16 54.89 46.71 (Aug'20) 0.00 (Aug'20) MOHD. FIROZ Detail Report
Graph / Photo
92 AR Mo to various roads under PWD SWR II dg 2018 19 SH Improvement of Drain from Golak Dham to Bijwasan flyover RHS and providing footpath from IOC Morh to Bijwasan Flyover Sub Division 24 2019.03.22 2019.07.19 54.67 1.37 (May'22) 0.00 (May'22) Bishwa Mohan Jha work in progress Detail Report
Graph / Photo
93 Construction of Slip Road in front of Gurudwara Majnu Ka Tila at Road No. 45 under Sub. Division-1 of Division C&ND-Roads, New Delhi. 2nd CALL 2022.05.03 2022.08.02 54.58 Aditya Construction Detail Report
Graph / Photo
94 AR and Mo to various roads under Sub Division 21 SWR-II PWD dg 2018 19. SH Repair of drain and footpath on Peer Baba Road ID 1218 Bindapur New Delhi. 2019.02.11 2019.05.11 52.63 BLG Innovations work in progress Detail Report
Graph / Photo
95 Construction of Central Verge with R.C.C. crash barriers at Dharam Marg under Sub Division WR-11, Division WR-1 during 2022-23 2022.10.08 2022.12.06 52.49 Kulwant Singh Detail Report
Graph / Photo
96 Improvement of Central Verge on Road No. 66 from 1st Metro Pillar (Seelampur side) to Moujpur Chowk Red light. 2019.06.30 2019.07.29 52.35 65.96 (Dec'21) 0.00 (Dec'21) Ravinder Kumar Work in progress. Detail Report
Graph / Photo
97 Construction of R.C.C. central verge on August Kranti Marg (ID-16) from Sirifort Red Light to Panchsheel Flyover under Sub Division-I of Division South Road-II, PWD Delhi, during 2022-23. 2023.03.07 2023.05.06 49.40 Pawan Kumar Jha Work in Progress Detail Report
Graph / Photo
98 Construction of RCC drain slab and Improvement of footpath at Prince apartment road under Sub-Division East Road-IV of East Road Division, PWD during 2023-24. 2023.06.01 2023.08.29 49.35 Sandeep Kumar Detail Report
Graph / Photo
99 Comprehensive maintenance of various roads under SRD Project Division-I, Sub Division-II PWD, New Delhi during 2019-20. (SH- Misc. Repair Work.) 2019.03.18 2020.03.17 48.71 42.68 (Mar'21) 0.00 (Mar'21) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
100 Construction of RCC drain in front of Qutub Minar Metro Station from 100 foota road to culvert on Anuvrat Marg (ID-1198) under Sub Division -III of Division South Road-II, PWD, New Delhi during 2021-22 2022.03.18 2022.06.17 46.27 AMOCON Work in Progress Detail Report
Graph / Photo
101 Beautification of T-Junction at August Kranti Marg upto Entry of Asiad Games Village and Entry of Shahpur Jat Village under Sub Division-I of Division South Road-II, PWD, during 2021-22 2022.04.16 2022.05.15 45.93 56.14 (Dec'22) 0.00 (Dec'22) Sanjay Enterprises Work in Progress Detail Report
Graph / Photo
102 Providing & laying Stone Matrix Asphalt (SMA) on Lajwanti Flyover under PWD Division WR-1, Sub Division WR-11, New Delhi dg. 2022-23. 2023.06.07 2023.07.07 45.64 SBG INFRACON PRIVATE LIMITED Detail Report
Graph / Photo
103 Providing and fixing of Automation system of rainy water pumps installed at various under passes of Sub Division M-3513 Sindhora Kalan Delhi under the head, improvement of PWD roads (5054) 2022.05.07 2022.07.06 45.10 47.65 (Aug'22) 0.00 (Aug'22) B.D. Electrocom Pvt. Ltd. Detail Report
Graph / Photo
104 Providing and Fixing M.S. Railings on loni Road from Durgapuri chowk to Loni Gole chakkar under (North East) Road Division. 2019.06.30 2019.07.29 43.93 54.01 (Dec'21) 0.00 (Dec'21) Sandeep Kumar Work in progress. Detail Report
Graph / Photo
105 A/R and M/O various roads under SRD Division-I, Sub-Division-II, PWD, New Delhi dg. 2018-19. (SH-Repair/renovation of footpath/carriageway of Kotla road.) 2018.10.05 2018.11.19 43.03 7.53 (Oct'22) 0.00 (Oct'22) A.R Infrastructure Work in progress Detail Report
Graph / Photo
106 Construction of RCC drain & footpath at road from Sunday Chowk to DDA road in Sector-20, Rohini under Sub Division NWR-23, PWD Division NWR-2 during 2022-23. 2023.04.22 2023.07.20 39.08 Sohan Lal Chhitoria and Sons Detail Report
Graph / Photo
107 Raising of Existing RCC drain walls of big drain with provision of inspection chambers at Mukarba Chowk under Sub-Division NR-14, NorthRoad Division, PWD, Delhi (Balance work) 2022.05.14 2022.06.13 39.05 22.21 (Jul'22) 0.00 (Jul'22) Nurul Hak Detail Report
Graph / Photo
108 AR and Mo to various roads under PWD Division South West Road II New Delhi during 2019-20 SH Providing services of Clerk Computer Operators and MTS for Division Office 2019.08.01 2020.07.30 38.51 15.79 (Aug'20) 0.00 (Aug'20) M/s Trendy Security Services WORK IN PROGRESS Detail Report
Graph / Photo
109 Development of Khajuri Chowk for making left turn free of smooth flow of traffic under PWD Sub Division M-2134. 2019.12.31 2020.03.29 38.44 46.40 (Sep'22) 0.00 (Sep'22) Maan Builders Detail Report
Graph / Photo
110 AR and MO various roads under Project Circle PWD New Delhi during 2019 20 SH Security Guards for various offices under Project Circle SRD Project Division I and Sub Division I II and III 2019.09.29 2020.09.28 37.87 73.61 (Jan'22) 0.00 (Jan'22) Star security & Placement Services Detail Report
Graph / Photo
111 Providing and Placing Jersey type barrier at Captain javed Ali Marg and Road No.70 under sub div M-2114, New Delhi dg 2021-22. (Modified and IInd Call) 2022.05.22 2022.07.20 37.79 43.51 (Sep'22) 0.00 (Sep'22) M. T. Builders Detail Report
Graph / Photo
112 Provision for Rain Water Harvesting Systems in SKV Bulbuli Khana Matia Mahal, SBV No. 1 (UM) Jama Masjid and GGSSS Pataudi House Darya Ganj under SRD Project Division-I, Sub-Division-III, PWD, Delhi. 2018.11.09 2019.01.08 37.49 36.01 (Nov'20) 0.00 (Nov'20) Ved Pal work in progress Detail Report
Graph / Photo
113 Road Restoration on various roads under Sub Division NWR-22, Division NWR-2, PWD, Delhi dg. 2022-23 2022.06.13 2022.12.09 36.66 45.31 (Dec'22) 0.00 (Dec'22) Jitender Singh Detail Report
Graph / Photo
114 AR and MO various roads under Division SWR-II, PWD Delhi during 2019-20. SH Improvement of drain by laying 600 mm dia NP3 pipe Hospital and BSES side from Rawta Morh to Jafferpur Engineering College in Prithvi Singh Dagar Marg 2019.09.03 2019.12.01 36.30 Ashok Kumar Rathi work not started Detail Report
Graph / Photo
115 Construction of RCC drain at Lancer School Road Sector-14, Rohini form Mehta Jewelers to Agarwal Dharamshala under sub Division NWR23. 2023.04.21 2023.06.19 36.21 Friends Construction Detail Report
Graph / Photo
116 Modification of berm portion at various roads in Sultanpuri Majra under Sub-Division NWR-21, Division NWR-2, New Delhi 2022.09.04 2022.11.03 36.09 15.51 (Mar'23) 0.00 (Mar'23) Jitendra Singh Detail Report
Graph / Photo
117 Uplifting of Central Verge on Main Road from Cambridge School to CTC at Sri Niwas Puri under Sub Div. R- 11 of Division South East Road -1. 2022.07.06 2022.10.03 35.65 35.00 (Mar'23) 0.00 (Mar'23) AMOCON Detail Report
Graph / Photo
118 AR Mo various roads under PWD Division SWR II during 2018 19 SH Miscellaneous Repair work of drain path of Section II under Sub Division II New Delhi. 2019.03.12 2019.07.09 35.27 H.P Builders Pvt Ltd WORK foreclosed Detail Report
Graph / Photo
119 Providing and Placing Jersey type barrier at Captain javed Ali Marg and Road No.70 under sub div M-2114, New Delhi dg 2021-22. (Modified and 1st Call) 2022.03.20 2022.05.18 35.11 Anmol Infratech Private Limited Detail Report
Graph / Photo
120 Providing and Placing Jersey type barrier at Captain javed Ali Marg and Road No.70 under sub div M-2114, New Delhi dg 2021-22 2021.12.09 2022.02.06 34.31 Sirohi Construction Co Detail Report
Graph / Photo
121 AR and Mo various roads under Division South West Road II PWD dg 2018-19 SH Providing and Installation of Sewerage Pump at Different Vulnerable Location under Sub Division III. 2019.02.07 2020.02.02 33.55 24.99 (Aug'19) 0.00 (Aug'19) Tripurari Prasad Singh work complted Detail Report
Graph / Photo
122 Improvement of Multi Model integration System at Welcome, East Azad Nagar, and Krishna Nagar Metro station under M-2111 dg. 2021-22. (IInd Call) 2022.05.14 2022.07.12 33.51 33.37 (Dec'22) 0.00 (Dec'22) Avtar Builders Detail Report
Graph / Photo
123 Improvement of Inner roads of Shiva Apartment at Road No.30, Paschim Vihar, Delhi. (Balance Work) 2022.05.16 2022.08.15 27.54 18.56 (Sep'22) 0.00 (Sep'22) Jitender Singh Detail Report
Graph / Photo
124 Renovation work in Kothi No. 3, Behind DCP Office Complex, Central Distt. Darya Ganj, under SRD Division-I, Sub-Division-III, PWD, New Delhi-110002. 2018.06.02 2018.11.01 27.48 34.29 (Jun'19) 0.00 (Jun'19) Manohar Lal Sharma Work in porgress Detail Report
Graph / Photo
125 Remodeling of Drain on Road No. 236 towards Samaj Kalyan Society under Sub Division WR-14 Division WR-1 during 2021-22.(Revised) 2022.04.22 2022.06.20 26.90 33.52 (May'23) 0.00 (May'23) Jeetender Kumar Verma Detail Report
Graph / Photo
126 A/R and M/O various road under PWD SRD Project Division-I, PWD, New Delhi dg. 2018-19. (SH-Provision of two nos. yellow coloured maintenance van with required labour and T and P for day to day maintenance of roads). 2018.11.26 2019.11.25 25.46 12.62 (Oct'19) 0.00 (Oct'19) RANJIT CONSTRUCTION COMPANY work in progress Detail Report
Graph / Photo
127 A/R and M/O various Roads under SRD Project Sub-Division-III/SRD Project Division-II, PWD, New Delhi during 2017-18. 2017.11.22 2018.01.05 24.68 Shiv Shakti Enterprises DETERMINED Detail Report
Graph / Photo
128 AR and Mo various roads under Division South West Road II PWD dg 2018 19 SH Providing of Maintenance Van with required labours T and P for day to day upkeeping maintenance of roads under Sub Div III Jaffarpur Section. 2019.02.13 2020.02.12 24.14 23.98 (May'22) 0.00 (May'22) Bishwa Mohan Jha work in progress Detail Report
Graph / Photo
129 A/R & M/O to various Roads under SRD Project Division-II, New Delhi dg. 2017-18. SH: Monsoon preparation works. 2017.05.31 2017.09.27 22.46 Kashi Nath Jha completed Detail Report
Graph / Photo
130 A/R and M/O various roads under SRD Division, PWD, New Delhi, During 2018-19. (SH-Desilting of road side water drain/ sewer line by manual and super sucker machine on Various roads, under Sub Division-II.) 2019.03.10 2019.09.09 20.87 33.58 (Aug'20) 0.00 (Aug'20) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
131 Construction of Footpath and other relevant work in Shahdara Road and Bholanath Nagar Road under sub division M-2113 Delhi. 2022.06.19 2022.08.17 20.73 Ram Kirpal Singh Detail Report
Graph / Photo
132 Construction of RCC drain under Sub Division M-2112 during 2022-23. (SH:- Remodeling of drain B-Block Vivek vihar Near DDA Market and Vivek Vihar Pump House). 2022.05.15 2022.08.12 20.16 21.66 (Nov'22) 0.00 (Nov'22) BASAU CONSTRUCTION (INDIA) Detail Report
Graph / Photo
133 A/R and M/O other PWD roads under SRD Division-I, Sub-Division-I, PWD, New Delhi dg. 2018-19 (SH-Repairing of footpath and other Misc. work at Gokhle Road) 2019.03.18 2019.07.17 19.92 25.06 (Jun'23) 0.00 (Jun'23) TKN Developers work in progress Detail Report
Graph / Photo
134 A/R and M/O to various roads under SRD Project Division-I during 2016-17 (SH-Laying of storm water pipe and reconstruction of footpath near Gurudwara side gate to Mata Sundri College on Mata Sundri Road Kotla Road around Gurudwara). 2017.06.02 2017.09.01 19.82 0.00 (Mar'18) 24.61 % (Mar'18) Satyam Construction Company Detail Report
Graph / Photo
135 Construction of Culverts and missing drain at Tanga Stand Road under Sub Division M2114, New Delhi during 2022-23. 2022.09.23 2022.11.21 19.76 Praveen Kumar Detail Report
Graph / Photo
136 Remodeling of Culvert from Sai Chowk to Radha Krishna Mandir under Sub Div. M-2114 dg. 2021-22 2022.03.19 2022.06.16 19.68 25.81 (Jul'22) 0.00 (Jul'22) Anish Verma Detail Report
Graph / Photo
137 A/R and M/O various roads under SRD Division-I, Sub-Division-II, PWD, New Delhi during 2018-19. (SH- Repairing of damaged Footpath, Central Verge and Main Carriageway at Asaf Ali Road.) 2019.03.18 2019.06.17 19.62 24.40 (Nov'19) 0.00 (Nov'19) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
138 Road Restoration of various roads cut by TPDDL, BSES, Airtel, Jio and DJB under Sub Division NWR-24 (Section-II), PWD Division NWR-2 dg. 2021-22. (Re-call) 2022.05.02 2022.06.15 19.26 24.66 (Sep'22) 0.00 (Sep'22) J.S. Construction Co. Detail Report
Graph / Photo
139 Re-surfacing of CNG East Side Road near Q-Pocket, Dilshad Garden under sub Div M-2114 dg 2022-23. 2023.02.23 2023.03.24 18.92 AVCONS CONTRACTS Detail Report
Graph / Photo
140 A/R and M/O various roads under SRD Division, PWD, New Delhi, During 2018-19. (SH-Desilting of road side water drain/ sewer line by manual and super sucker machine on Various roads, under Sub Division-I.) 2019.03.10 2019.09.09 18.54 23.10 (Mar'20) 0.00 (Mar'20) Shiva Construction work in progress Detail Report
Graph / Photo
141 Construction of missing drain at various location under Sub-Division M-2114 during 2022-23. 2022.12.23 2023.02.20 18.53 9.12 (Feb'23) 0.00 (Feb'23) NARANIYA CONSTRUCTION. CO. Detail Report
Graph / Photo
142 A/R and M/O various roads under SRD Division-I, Sub-Division-II, PWD, New Delhi during 2018-19. (SH- Repairing of damaged Footpath, NMV Lanes and Planters in front of LNJP Hospital at JLN Marg) 2019.03.18 2019.06.17 17.56 21.01 (Jan'20) 0.00 (Jan'20) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
143 A/R and M/O to other PWD roads under SRD Division-I, New Delhi dg. 2018-19 (SH- Repairing of footpath and other Misc. work at Zorawar Singh Marg under Sub Division-I) 2019.02.26 2019.03.25 17.56 21.83 (Sep'19) 0.00 (Sep'19) Sirohi Construction Co work in progress Detail Report
Graph / Photo
144 Renovation of office of Commission for Protection of Child Rights, GNCT Delhi in ISBT Building Kashmere Gate under SRD Division-I, Sub-Division-III, PWD, New Delhi. 2019.02.26 2019.05.25 17.37 12.48 (Feb'20) 0.00 (Feb'20) SUDHIR KUMAR SHARMA work in progress Detail Report
Graph / Photo
145 P/L RMC at deepressed berm portions and laying of kerb stone at centre verge of Vedic Marg 2022.04.28 2022.06.26 17.13 SHRI KRISHNA CONSTRUCTION COMPANY Detail Report
Graph / Photo
146 Construction of missing drain at Manav Ashray Road under Section-II of Sub-Division East Road-II of Division East Road, PWD during 2022-23. 2023.05.16 2023.07.14 16.69 Sandeep Kumar Detail Report
Graph / Photo
147 A/R and M/O various roads under SRD Project Division-I, Sub-Division-II, PWD, New Delhi during 2018-19. (SH-Improvement of footpath, drainage and main carriageway at Mirdard Road.) 2019.03.18 2019.06.17 16.55 20.33 (Nov'19) 0.00 (Nov'19) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
148 Providing and laying of M.S. pipe line with sump and pump house near Sanjay Enclave Mall Road Extension (Mukarba Chowk), Jahangirpuri for disposal of excessive water under Sub Division NR-12 2022.03.25 2022.04.23 16.16 18.63 (Oct'22) 0.00 (Oct'22) Sanjay Kaura Detail Report
Graph / Photo
149 Provision of rooms and security fencing at Division office East Road/(M-212) Under Akshardham flyover. 2023.05.24 2023.07.22 15.11 SHIVAM BUILDERS Detail Report
Graph / Photo
150 Construction of new planters from Vidya Vihar to Police Line at ORR-26 and C/o brick drain near B-Block Mangolpuri Delhi under Sub Division NWR-25, PWD Division NWR-2 dg. 2022-23. 2022.07.16 2022.09.15 14.96 25.71 (Mar'23) 0.00 (Mar'23) Sanjay Kaura Detail Report
Graph / Photo
151 A/R and M/O various Roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Laying of non pressure NP-2 class (light duty) R.C.C. pipes on Pahari Dhiraj road.) 2018.03.05 2018.05.03 14.77 Surender Singh Chahal Foreclosed on 18.12.2018 Detail Report
Graph / Photo
152 Construction of footpath at road from Chetak Appt. to New modern Appt. Rohini, Sector-2 under PWD Division NWR-2, Sub Division NWR-23 during 2021-22 2022.04.27 2022.06.26 14.13 16.96 (Jul'22) 0.00 (Jul'22) Dharambir Singh Detail Report
Graph / Photo
153 A/R and M/O to various roads under SRD Division-I, PWD, New Delhi during 2018-19.(SH-Providing and fixing Bollards and other Misc. works at N.S. Marg) 2018.11.30 2019.01.29 13.82 17.01 (Nov'19) 0.00 (Nov'19) M/s. Satyam Construction work in progress Detail Report
Graph / Photo
154 A/R & M/O to various road under PWD SRD Project Division-I, dg. 2016-17 (SH: Provision of yellow coloured maintenance van with required labour with T&P to attend day to day maintenance under Sub Division-I). 2017.06.02 2018.06.01 13.40 0.00 (Aug'18) 10.16 % (Aug'18) RANJIT CONSTRUCTION COMPANY Work completed and final bill paid Detail Report
Graph / Photo
155 A/R M/O Old Saint Stephon College building at K.Gate Building, C.P.O Building, Old Court Building, N.C.C offices buildings, N.C.C offices buildings Chabi Ganj, Novelty Fire Station, Fire Station Jama Masjid, Disability Commissioner office, Nayak Se 2018.11.08 2019.11.07 11.61 12.58 (Jan'20) 0.00 (Jan'20) ANSHUL SINGH WORK IN PROGRESS Detail Report
Graph / Photo
156 Providing of Rain Water Harvesting System at Mayapuri Road and Nangloi-Najafgarh Road under PWD Division West Road-1 2022.07.18 2022.08.16 11.15 13.60 (Jun'23) 0.00 (Jun'23) Mradul Pratap Singh Detail Report
Graph / Photo
157 Providing and Fixing MS Railing along Chirag Delhi Nallah under Sub Division-IV of Division South Road-II, PWD, New Delhi. 2023.03.14 2023.04.13 10.37 Ram Nihor Work in Progress Detail Report
Graph / Photo
158 Construction of Drain from YC Electrical Vehicle Shop to Subhash Nagar Drain on 100’ Road Patel Chowk Road under Sub-Div. WR-15, Division West-Road -1. dg. 2022-23 2022.05.27 2022.09.23 9.05 3.51 (May'23) 0.00 (May'23) Sanjay Enterprises Detail Report
Graph / Photo
159 A/R & M/O various road under division M-442 during 2014-15 (Disposal of malba from various roads) 2014.05.31 2015.03.30 8.94 B.M. & Sons                                                 Detail Report
Graph / Photo
160 A/R and M/O various PWD roads under SRD Division-I, PWD, New Delhi during 2019-20 (SH- Supply of Material for various roads under Sub Division-I) 2019.08.11 2019.08.25 8.88 5.06 (Sep'19) 0.00 (Sep'19) Akhil Siani Detail Report
Graph / Photo
161 A/R and M/O various road under SRD Project Division-I, Sub-Division-I, PWD, New Delhi dg. 2019-20 (SH- Providing and installation of height guage on both side for restriction of heavy vehicles movement at Pul Mithai Bridge and Pul Duffr in Bridge at 2019.07.02 2019.08.01 8.77 10.92 (Mar'21) 0.00 (Mar'21) TKN Developers Detail Report
Graph / Photo
162 A/R and M/O to various roads under SRD Project Sub-Division-II/SRD Project Division-II, PWD, New Delhi during 2017-18. SH Painting of Kerb Stone and central Verge. 2018.02.09 2018.08.08 8.20 3.77 (Mar'22) 0.00 (Mar'22) Mudassir Husain A letter has been written for proposal to rescind the work. Detail Report
Graph / Photo
163 A/R and M/O PWD Roads under SRD Division-I, Sub-Division-I, PWD, New Delhi during 2018-19. (SH-Providing water tanker with Hydraulic Jet Facilities for day to day cleaning of kerb stone, crash barrier, footpath, railling, plants and planter etc.) 2018.06.02 2018.12.01 7.20 17.90 (Oct'19) 0.00 (Oct'19) Akhil Siani Work in progress Detail Report
Graph / Photo
164 A/R and M/O Old Saint Stephon College building at K.Gate Building C.P.O Building, Old Court Building, N.C.C offices buildings N.C.C offices buildings Chabi Ganj Novelty Fire Station Fire Station Jama Masjid Disability Commissioner office Lok Naya 2018.11.09 2019.11.08 6.74 Kamal Construction Co. work in progress Detail Report
Graph / Photo
165 Road Restoration (balance work) B-Block Road, Mangolpuri cut by Delhi Jal Board 2022.06.12 2022.06.26 6.43 Sanjay Kaura Detail Report
Graph / Photo
166 Providing and operating mobile maintenance vehicle under Sub Division M-2 under section - 1 and section-2. 2019.07.29 2019.09.26 6.35 7.76 (Dec'19) 0.00 (Dec'19) Ashok Kumar Rathi P.G. letter issued Detail Report
Graph / Photo
167 A/R & M/O various Road under Sub-Division M-2113 during 2019-20. (SH: Improvement of Road No. 57 near Swarn Cinema Culvert.). 2020.05.28 2020.06.26 6.27 6.12 (May'21) 0.00 (May'21) Nation Star Enterprises work in progress Detail Report
Graph / Photo
168 Desilting of Sump well of Shakti Nagar, Sawan Park, Roshanara Bagh i/c Repairing of Pump, all around the year 2022.06.12 2023.06.11 5.89 4.15 (Mar'23) 0.00 (Mar'23) Kuldeep Traders Detail Report
Graph / Photo
169 A/R and M/O other PWD Roads under SRD Division -I, PWD, New Delhi during 2019-20. (SH- Painting of Kerb Stones on various roads before Independence Day under Sub Division-I.) 2019.08.13 2019.08.27 4.45 5.20 (Nov'19) 0.00 (Nov'19) Mohd Arshad Detail Report
Graph / Photo
170 A/R and M/O to various roads under SRD Project Division-I, New Delhi dg. 2019-20 (SH-Providing services of diesel pumps for removing water logging during rains, under Sub Division-II) 2019.07.02 2019.10.08 3.86 Tripurari Prasad Singh Detail Report
Graph / Photo
171 A/R and M/O to various roads under SRD Project Division-I, PWD, New Delhi during 2018-19. (SH- Providing photocopy machine with operator for the office of SE (Project) and EE, SRD-I). 2019.03.18 2020.03.17 3.21 4.01 (Dec'20) 0.00 (Dec'20) Akhil Siani work in progress Detail Report
Graph / Photo
172 A/R &M/O Various Roads under Shahdara Roads Civil Divn PWD during 2020-21. (SH Repair and maintenance of EPABX, KTS, Push button Phone, Plan & Inverter in sub division, Division & Circle office (M-21).) 2020.08.06 2021.08.05 3.07 3.82 (Mar'22) 0.00 (Mar'22) Sagar Systems Work in Progress Detail Report
Graph / Photo
173 AR and MO Various Road under Sub Division M 2111 during 2018 19 SH Providing Height Restricting Barrier for Seelampur Flyover SECTION I 2018.06.05 2018.07.04 1.92 1.08 (Jul'22) 0.00 (Jul'22) DASHRATH KUMAR WORK FORECLOSED Detail Report
Graph / Photo
174 Annual Maintenance of office equipments and its allied items in Office of Superintending Engineer Project, Office of Executive Engineer, SRD Project Division I and Office of Assistant Engineer I, II, III and IV PWD, New Delhi Dg. 2019 20 2019.09.28 2020.02.27 1.01 0.67 (Mar'22) 0.00 (Mar'22) A.N. TECHNOLOGIES Detail Report
Graph / Photo
175 Supply, Installation, Testing and Commissioning and Comprehensive maintenance and operation of 6 Nos. 13 Passenger Capacity Lifts (Machine Room less) 2012.01.08 -- Detail Report
Graph / Photo
176 AR and MO various roads under PWD Sub Divn I SWR II during 2016-17 SH Desilting of Drains under Section-I Pankha Road Area New Delhi 2017.06.09 2017.12.05 Work foreclosed on 18/10/2017 Detail Report
Graph / Photo
177 Brick Masonary drain and footpath at Hans Raj Gupta Marg 2014.05.29 2014.10.28 0.00 (Mar'17) 85.00 % (Mar'17) Work is to be foreclosed after connecting with R Block drain. Detail Report
Graph / Photo
178 Construction of back to back u turn on road no. 13 A G.D. Birla Marg, Sarita Vihar, New Delhi 2016.02.20 2016.04.19 0.00 (Feb'17) 50.00 % (Feb'17) Plan showing modified location of U turn as per the demand of local RWA submitted to UTTIPEC for approval Detail Report
Graph / Photo
179 Laying of 1000 mm dia RCC pipe along road no. 13 for disconnection of storm water drain from sewer line to open drain on both side at Tughlakabad Extn, Kalkaji New Delhi 2016.09.05 2016.10.04 30.73 (Mar'17) 35.00 % (Mar'17) Work is held up due to non reciept of permission from Delhi Traffic Police Detail Report
Graph / Photo
180 Strengthening of road surface of Outer Ring Road from Modi Mill to Chirag Delhi (Masjid Moth). 2018.05.27 2018.07.26 436.54 (Apr'19) 73.00 % (Apr'19) - Detail Report
Graph / Photo
181 Providing and laying RMC in berm portion and repairing of footpath of Hansraj Sethi Marg and Kanshi Ram Takkar Marg 2018.05.03 2018.06.02 90% Detail Report
Graph / Photo
182 Re development of planter area for the prevention from the encroachment pollution unauthorised parking ease of movement of public and traffic jam etc at Guru Ravidass Marg under Division SER 2 2018.05.17 2018.08.16 61.76 (Apr'19) 96.00 % (Apr'19) - Detail Report
Graph / Photo
183 AR and MO Various Road under Sub Division M 2113 During 2018 19 SH Repairing of Drain at Babarpur Road SECTION II 2018.08.07 2018.10.05 Duplicate Work Detail Report
Graph / Photo
184 Hiring of inspection vehicle for EE SER 2 2018.06.17 2019.06.16 4.53 (May'19) 77.00 % (May'19) 95% Detail Report
Graph / Photo
185 Providing and running diesel pump set 2018.07.01 2018.09.30 2.27 (Jun'19) 0.00 (Jun'19) 100% Detail Report
Graph / Photo
186 Raising of manhole cover and making connection to the old drain with manhole chambers 2018.07.17 2018.08.16 Work is in progress. Detail Report
Graph / Photo
187 A R and M O various road under Sub Division M 2113 during 2018 19 SH Covering of drain of Babarpur Road after necessary misc repair work SECTION II Balance Work RECALL 2018.10.28 2019.02.24 Work in progress Detail Report
Graph / Photo
188 Providing services for special inspection, analysis of existing structure, conducting tests and preparation of remedial measures report including Bill of Quantities (BOQ) for Repair and Rehabilitation of Seelampur Flyover Delhi 2019.02.18 2019.05.18

Work in progress

Detail Report
Graph / Photo
189 Providing and fixing M.S. Grill on footpath near FOB at Sarita Vihar Mathura Road 2018.09.13 2018.10.28 5% Detail Report
Graph / Photo
190 Providing services for special inspection, analysis of existing structure conducting tests and preparation of remedial measures report including BOQ for Repair and Rehabilitation of Seelampur Flyover Delhi 2019.02.18 2019.05.18 6.66 (Mar'23) 0.00 (Mar'23)

Work in progress

Detail Report
Graph / Photo
191 Supply of sand stone aggregate and Bitumen emulsion for all Sub Divisions 2018.12.17 2018.12.23 - Detail Report
Graph / Photo
192 Repair and beautification of kabootar chowk T Point of SA Road near Kalkaji Mandir and Hansraj Sethi Marg near Nehru Place 2018.12.31 2019.01.30 - Detail Report
Graph / Photo
193 Construction of toe wall near Tehkhand Depot 2018.12.31 2019.02.28 16.03 (Jun'19) 0.00 (Jun'19) - Detail Report
Graph / Photo
194 Raising and repair of footpath on Road No. 13 from Guru Ravi Dass Marg T Point to Crowne Plaza 2018.12.31 2019.01.30 - Detail Report
Graph / Photo
195 Improvement of kerb wall on Okhla Estate Marg (Road No 13) from Guru Ravi Dass Marg T Point to Aggarwal sweets 2019.02.25 2019.03.24 9.78 (May'19) 0.00 (May'19) The 60% work has been completed and the rest work is in progress. Detail Report
Graph / Photo
196 Provision of table top/speed breaker on PWD roads in GK-2. 2019.02.18 2019.03.01 - Detail Report
Graph / Photo
197 Improvement of kerb wall on Okhla Estate Marg (Road No 13) from Guru Ravi Dass Marg T Point to Aggarwal sweets. 2019.02.25 2019.03.26 The 60% work has been done.... Detail Report
Graph / Photo
198 Repair and Improvement of footpath from primary school lal Kuan to Suraj Kund crossing at MB Road. 2019.02.09 2019.04.08 - Detail Report
Graph / Photo
199 Restoration of SA Road, Hansraj Sethi Marg, Baba Fateh Singh Marg. 2019.03.01 2019.03.15 - Detail Report
Graph / Photo
200 Repair of service road at Pul Pehladpur. 2019.03.01 2019.05.31 - Detail Report
Graph / Photo
201 Construction of boundary wall near Giri Nagar, Maharaja Agarsen Marg. 2019.03.01 2019.04.30 - Detail Report
Graph / Photo
202 Providing and placing jersey barrier on Madanpur Khadar Road. 2019.03.02 2019.03.16 11.11 (Jun'19) 0.00 (Jun'19) - Detail Report
Graph / Photo
203 Providing and placing jersey barrier on Meethapur chowk in Jaitpur area. 2019.03.04 2019.03.18 0% Detail Report
Graph / Photo
204 Beautification of surrounding area near Delhi Institute of Tool Engineering at SA Road 2019.02.24 2019.03.25 10.84 (May'19) 0.00 (May'19) - Detail Report
Graph / Photo
205 Providing and laying RCC kerb stone at roundabout at Hansraj Sethi marg 2019.02.18 2019.03.19 - Detail Report
Graph / Photo
206 Repair and renovation of Sub Division office 2019.03.15 2019.04.13 The work is in progress.. Detail Report
Graph / Photo
207 Repair of footpath, Baba Fateh Singh Marg from SA Road to Guru Ravi Dass Marg 2019.03.18 2019.04.16 - Detail Report
Graph / Photo
208 Providing and laying RMC at berm portion of KPS Marg 2019.03.15 2019.04.13 - Detail Report
Graph / Photo
209 Providing and fixing of M.S. Railing at the footpath of Guru Ravi Dass Marg 2019.03.23 2019.04.21 75% Detail Report
Graph / Photo
210 Repair of damaged footpath and drain Guru Ravi Dass Marg from MB Road T Point to Road No. 13 Red Light 2019.04.14 2019.06.13 90% Detail Report
Graph / Photo
211 Repair of damage footpath Maharaja Agarsen Marg and Kanshi Ram Takkar Marg 2019.03.25 2019.04.24 - Detail Report
Graph / Photo
212 Repair of damage footpath KPS Marg 2019.03.25 2019.04.23 - Detail Report
Graph / Photo
213 Improvement of SA Road T Point Junction 2019.03.30 2019.05.28 - Detail Report
Graph / Photo
214 Providing and Fixing Speed Calming measures at Guru Govind Singh Marg, Maharishi Dayanand Marg, Outer Ring Road, Anuvrat Marg, Basant Kaur 2020.12.03 2021.03.02 49.92 (Jan'22) 0.00 (Jan'22) Work in Progress. Detail Report
Graph / Photo
215 Replacement of damaged W Beam metal Crash Barriers on MG Road under Sub-Division SR-15 2021.09.10 2021.10.09 PG forfeited final bill paid Detail Report
Graph / Photo
216 Providing and fixing signage board and repair of old signage board at SSN Marg various locations 2021.10.01 2021.11.29 PG forfeited Detail Report
Graph / Photo
217 Re-surfacing of Service Roads of Outer Ring Road from Chirag Delhi Flyover to Panchsheel Flyover cut by various agencies under Sub Division-4 of Division South Road-2, PWD during 2021-22 2021.10.02 2022.01.01 72.95 (Jul'22) 0.00 (Jul'22) Work in Progress. Detail Report
Graph / Photo
218 Rehabilitation and strengthening of Janak Setu Flyover in New Delhi (Balance Work) 2020.03.29 2020.09.29 34.04 (Jun'23) 0.00 (Jun'23)

Work in progress

Detail Report
Graph / Photo
219 Repair and Rehabilitation of Vehicular Under Pass (VUP) and its approaches and Approaches of three RoBs at PulMithai on SPM Marg, Delhi 2020.01.16 2020.10.15 40.81 (Apr'21) 0.00 (Apr'21)

Work in progress

Detail Report
Graph / Photo
220 Structural audit of flyovers of New Nizamuddin Flyover,Nehru Place Flyover,Sarita Vihar flyover,Andrews Ganj Flyover 2020.03.05 2021.05.28 45.00 (Mar'23) 0.00 (Mar'23)

Work in progress

Detail Report
Graph / Photo
221 Structural audit of flyovers of Tilak Nagar flyover near metro station,Punjabi Bagh Club flyover,Raja Garden Flyover,Tilak Nagar flyover near District Centre,Peera Garhi flyover 2020.03.05 2021.05.28

Work in progress

Detail Report
Graph / Photo
222 Raising of manhole height of storm water drain on Mathura road 2019.04.26 2019.06.10 0% Detail Report
Graph / Photo
223 Repair of footpath Outer Ring Road from Modi Mill to Kabootar Chowk and Providing and fixing carbonate sheet of FOB 2019.04.18 2019.05.17 The work is in progress... Detail Report
Graph / Photo
224 Supply and stacking of material 2019.04.09 2019.04.18 40% Detail Report
Graph / Photo
225 Repair of footpath Jaitpur Road. 2019.02.21 2019.04.20 95% Detail Report
Graph / Photo
226 Development of open space at SA Road from DJB UGR to MCD SLF 2019.04.16 2019.06.14 60% Detail Report
Graph / Photo
227 Providing watch and ward for Sub Division office 2019.03.15 2019.09.14 - Detail Report
Graph / Photo
228 Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on MB Road and Suraj Kund Road and 5 Nos cross culvert 2019.03.10 2019.10.05 - Detail Report
Graph / Photo
229 Mechanical desilting of road side storm water drain and sewer mixed drains by Super Sucker Machine on Guru Ravi Dass Marg, KPS Marg and DDA Market Road 2019.03.10 2019.10.05 - Detail Report
Graph / Photo
230 Mechanical desilting of road side storm water drain and sewer mixed drains by super sucker machine on Outer Ring Road, Hansraj Gupta Marg, R Block Road, Guru Nanak Market to Lala Lajpat Rai.. 2019.03.09 2019.10.04 - Detail Report
Graph / Photo
231 Providing and fixing 6 feet high M.S. Railing on central verge of MB Road 2019.03.23 2019.04.22 - Detail Report
Graph / Photo
232 Restoration of various roads under SRD Project Sub. Division II SRD Project Division II PWD New Delhi. SH Restoration of various road cuts by IGL and Vodafone at New Rohtak Road under Sub Division II tion of various road 2019.07.22 2019.10.19 Work in progress Detail Report
Graph / Photo
233 feasibility studies for the corridor network UG Tunnel and improvement of existing Dwarka Road from NH 8 to Dwarka 2019.12.28 2020.06.24 Work In progress. Detail Report
Graph / Photo
234 A R and M O to various roads under subdivision III SRD project division II Delhi dg 2018 19 SH Laying of NP 2 pipe repair of footpath at Hardhyan Singh road between road 3 to road no 4 pyare lal road between road no 3 to DB Gupta road and Guru Ravida 2019.08.16 2019.11.13 Work in progress Detail Report
Graph / Photo
235 Restoration of various roads under SRD Project Sub Division I of SRD Project Division II PWD dg 2019 20 SH Repair of roads and footpath cut by various utility services agencies 2019.08.06 2019.10.04 Work in progress Detail Report
Graph / Photo
236 Providing and fixing M. S. Grill at central verge from Chhawla Village to BDO office, at Najafgarh Bijwasan Road (ID 1173) under PWD division SWR-II, New Delhi. 2020.09.14 2020.10.13 WORK not started Detail Report
Graph / Photo
237 Repair/Renovation of office of Assistant Engineer-4, Sub Division SR-14 2022.07.20 2022.09.02 work in progress Detail Report
Graph / Photo
238 Providing services of Maintenance Vans for day to day repair work 2022.07.31 2024.07.30 work in progress Detail Report
Graph / Photo
239 Providing services of Maintenance Vans for day to day repair work 2022.07.31 2024.07.30 17.12 (May'23) 0.00 (May'23) work in progress Detail Report
Graph / Photo
240 Providing services of Maintenance Vans for day to day repair work 2022.07.30 2024.07.29 17.52 (May'23) 0.00 (May'23) work in progres Detail Report
Graph / Photo
241 Providing Commercial Inspection Vehicle for EE PWD, Division South Road-1 2022.06.01 2023.05.31 work in progress Detail Report
Graph / Photo
242 Restoration of Road and Footpath cut by DJB from Dhaan Mil to Anuvart Marg Red Light (100 Foota Road) under PWD Division South Road-1/Sub Division SR-12. 2022.06.13 2022.07.02 0.07 (Sep'22) 0.00 (Sep'22) work in progress Detail Report
Graph / Photo
243 Construction of footpath and drain on Asian Market Road, Saket under PWD Division South Road-1/Sub Division SR-14 dg. 2022-23. 2022.06.15 2022.07.29 50.00 (May'23) 0.00 (May'23) work in progress Detail Report
Graph / Photo
244 Providing and laying of Pipe drain from Dera More cut to Radha Swami Satsang Byas parking at SSN Marg under PWD Division South Road-1/Sub Division SR-12 dg. 2022-23 2022.06.15 2022.07.14 work in progress Detail Report
Graph / Photo
245 Construction of table top on T point of Pushp Vihar Sec-1 and Mandir Marg under PWD Division South Road-1 Sub Division SR -14 during 2022-23 2022.05.20 2022.06.18 12.76 (May'23) 0.00 (May'23) work in progress Detail Report
Graph / Photo
246 Desilting of drains 2022.04.05 2022.10.21 35.04 (May'23) 0.00 (May'23) work in progress Detail Report
Graph / Photo
247 Desilting of drains 2022.04.05 2022.10.21 42.81 (May'23) 0.00 (May'23) work in progress Detail Report
Graph / Photo
248 Construction of RCC Drain on H-Block Road, Dakshinpuri, New Delhi under PWD Division South Road-1/Sub Division SR-11 2022.05.05 2022.07.03 26.14 (Mar'23) 0.00 (Mar'23) work in progress Detail Report
Graph / Photo
249 Making Disabled friendly footpath and repair of drain on MB Road under SR-11, PWD, New Delhi 2022.03.18 2022.05.01 61.83 (Feb'23) 0.00 (Feb'23) work in progress Detail Report
Graph / Photo
250 Repair of footpath at various locations on Nelson mandela road under Sub division V 2022.04.04 2022.06.03 Work in progress Detail Report
Graph / Photo
251 Strengthening of M. G. Road to Ghitorni Village Road & Improvement of footpath for accessibility of disable persons of M.G. Road to Ghitorni Village Road and provision of Jersey Barrier at Aaya Nagar Road under Sub-Division SR-15, Division South Road-1 at New Delhi 2023.02.17 2023.03.16 work in progress Detail Report
Graph / Photo
252 Removal of C & D waste and cleaning of Central Verge on M.G. Road. 2023.01.31 2023.02.14 work in progress Detail Report
Graph / Photo
253 Restoration of Road Cut by Delhi Jal Board and BSES on Mandi Road under PWD Division South Road-1/Sub-Division SR-13 during 2022-23. 2023.01.31 2023.03.30 work in progress Detail Report
Graph / Photo
254 Construction of new footpath, Repairing of existing footpath on Pankaj Juyal Marg & Birla Vidya Niketan Marg, Repair of boundary wall in front of Saket Court on Pankaj Juyal Marg and providing and placing jersey barrier on Press Enclave Road and Mandir Marg. 2023.02.04 2023.03.03 work in progress Detail Report
Graph / Photo
255 Disposal of C and D waste and unclaimed malba on Gadaipur Bandh Road 2023.03.01 2023.03.30 work in progress Detail Report
Graph / Photo
256 Maintenance and services of Computers Printers installed at Sub Divisions and Division SR-1 2022.07.25 2024.07.24 work in progress Detail Report
Graph / Photo
257 Road Marking, Thermoplastic paint, Synthetic enamel paint & repair of Footpath of NBCC Plaza Road, Family Court Road, Sheikh Sarai Road No.-1, Sheikh Sarai Road No. 2 and Main Road Sec-1, Pushp Vihar 2022.08.10 2022.08.24 22.10 (Feb'23) 0.00 (Feb'23) work in progress Detail Report
Graph / Photo
258 Construction of Shed with seating block Changing room Pump room and UGT tank at East Vinod Nagar sports complex Delhi 2022.12.14 2023.05.12 Work in progress. Detail Report
Graph / Photo
259 Providing services of watch and ward in all Sub Divisions and Circle office 2022.07.22 2023.07.21 19.18 (May'23) 0.00 (May'23) work in progress Detail Report
Graph / Photo
260 Thermoplastic Paint and Synthetic enamel paint 2022.08.11 2022.08.11 work in progress Detail Report
Graph / Photo
261 General repair & maintenance work 2022.10.14 2023.07.13 10.06 (May'23) 0.00 (May'23) work in progress Detail Report
Graph / Photo
262 Providing, running and maintaining Water Sprinkler Anti Smog Gun on hire basis at various locations 2022.10.06 2023.03.05 34.78 (Mar'23) 0.00 (Mar'23) work in progress Detail Report
Graph / Photo
263 Providing, running and maintaining Water Sprinkler Anti Smog Gun on hire basis at various locations 2022.10.06 2023.03.05 24.30 (Mar'23) 0.00 (Mar'23) work in progress Detail Report
Graph / Photo
264 Providing and Fixing Grass paver block on the unpaved area from Mandi Cut to Arjangarh on Left Hand Side on Acharya Shree Tulsi Marg (M.G.Road), NH-236. 2023.01.20 2023.02.18 work in progress Detail Report
Graph / Photo
265 Improvement of U-turn infront of SDM office on MB Road. 2022.11.05 2022.12.04 work in progress Detail Report
Graph / Photo
266 SH- Improvement of U-turn infront of SDM office on MB Road. 2022.11.05 2022.12.04 work in progress Detail Report
Graph / Photo
267 Construction of Shed with seating block, Changing room, Pump room and UGT tank at East Vinod Nagar sports complex, Delhi. 2022.12.14 2023.05.12 work in progress. Detail Report
Graph / Photo
268 Restoration of Road and Footpath due to shifting of electricity transformer (under Corridor 77) and Paving of unpaved area berm on road side Stretch under PWD Division South Road 1 Sub Division SR-12 dg 2022-23 2022.12.23 2023.03.22 work in progress Detail Report
Graph / Photo
269 Restoration of Road Cut by Delhi Jal Board on Mandi Road under PWD Division South Road-1/ Sub-Division SR-13 dg. 2022-23. 2022.12.23 2023.12.20 work in progress Detail Report
Graph / Photo
270 Improvement of Footpath and repair of existing Drain and Kerb Channel at various locations on SSN Marg 2022.12.21 2023.02.20 16.20 (May'23) 0.00 (May'23) work in progress Detail Report
Graph / Photo
271 Improvement of existing pipe drain and gradient of connecting drain near MCD School Aya Nagar 2022.12.30 2023.02.28 work in progress Detail Report
Graph / Photo
272 Repairing of damaged Non-motor-Vehicle Lane (NMV Lane) on both side of Aacharya Shree Tulsi Marg (M.G. Road 2022.12.30 2023.01.29 52.67 (May'23) 0.00 (May'23) work in progress Detail Report
Graph / Photo
273 Covering of Open Drains and provision of speed breaker on the roads 2022.12.30 2023.01.29 work in progress Detail Report