S. No.क्र. सं. | Name of Workकार्य का नाम | Date of Startकार्य आरम्भ करने की तिथि | Date of Completionकार्य समाप्त करने की तिथि | Cost (In Lac) |
Expenditure (In Lac) |
Progress | Agency | Status | Viewदेखें |
---|---|---|---|---|---|---|---|---|---|
1 | Civil work and Internal E.I. work | 24/04/2007 | 23/07/2009 | 300221271.00 | Globe Civil Project Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
2 | C/o 700 Beds Indira Gandhi Hospital at Sector-9, Dwakra, New Delhi on turn-key basis | 27/08/2014 | 26/02/2017 | 54511.43 | 0.00 (Jan'21) | 93.00 % (Jan'21) | Larson & Toubro Limited | Internal finishing work like Granite flooring, Granite dado, Cement plaster, Ceramic wall tile, Vitrified flooring tile, False ceiling, underdeck insulation, Door frame & shutter is in progress. External finishes work like M.S. Backup structure, Dry stone Cladding work, Structural Glazing work is in progress. Apart from above S.S. Railing work, vinyl flooring base preparation, Mortuary block fabrication & erection work in progress. Various medical & non-medical services are required for completion. R.P.E. submitted for accord of A/A & E/S. |
Detail Report
Graph / Photo |
3 | Construction of New Block For Medicine, Maternity And Advanced Pediatric Centre ( Composite Steel plus RCC framed 2B plus G plus 22 Storyed building At LN Hospital including internal water supply, Sanitary installation, External Development works, Dr | 04/11/2020 | 03/05/2023 | 46552.58 | Swadeshi Civil Infrastructure Pvt. Ltd., 302, DLF Tower B Jasola, New Delhi-110025 | Execution of D-wall is under progress. |
Detail Report
Graph / Photo |
||
4 | CONSTRUCTION OF NEW HOSPITAL AT SIRASPUR, NEW DELHI (ON EPC MODE -I) INCLUDING ALL CIVIL, ELECTRICAL, MECHANICAL, HORTICULTURE AND MEDICAL SERVICES. | 10/08/2020 | 09/05/2023 | 38439.53 | Ramacivil India Construction Private Limited | work in progress |
Detail Report
Graph / Photo |
||
5 | Construction of Hospital at Madipur, New Delhi | 11/11/2020 | 10/11/2022 | 26970.58 | Ramacivil India Construction Private Limited | Excavation, PCC & water proofing membrane work in progress. |
Detail Report
Graph / Photo |
||
6 | Construction of Hospital at Jwalapuri, New Delhi | 07/08/2020 | 06/08/2022 | 26950.37 | 0.00 (Nov'20) | 3.00 % (Nov'20) | Parnika Commercial and Estates Pvt. Ltd. | Cutting binding & RCC for raft and colomn. Laying of water proofing membrane. |
Detail Report
Graph / Photo |
7 | C/o East Delhi Campus of Guru Gobind Singh Indraprastha University at Surajmal Vihar, Shahdara, Delhi SH Co Academic Bldg, Auditorium Bldg, Sports Hall, Boys, Girls, Teachers Hostel, Type II III IV and V Qtrs ic Ext Dev. works, Int Elect Inst, Ext Lighting, lifts, fire fighting system, fire alarm with PA System, D.G. Sets, Elect Sub Stn, HVAC works | 09/08/2017 | 09/11/2019 | 23127.43 | 0.00 (Jan'21) | 78.00 % (Jan'21) | NKG Infrastructure Limited | Physical Progress of the work is 82%. |
Detail Report
Graph / Photo |
8 | C/o Stage-I of Phase-II, Delhi Technological University at Bawana Road, Delhi (SH: C/o Academic Blocks AB-3 & AB-4, Boys Hostel H-5 & Girls Hostels HG-5 & HG-6 and all external and internal services including external development and landscaping, and allied civil and E&M works). | 23/09/2019 | 23/12/2020 | 22769.91 | 0.00 (Jan'21) | 5.00 % (Jan'21) | SAM India Builtwell | Progress of work is 55% |
Detail Report
Graph / Photo |
9 | Additional and Remodeling Work for Cancer Block, Maternity Block and Screening OPD At Satyawadi Raja Harish Chandra Hospital, Narela For Delhi Govt. (Delhi) | 09/08/2020 | 08/05/2023 | 21785.66 | Parnika Commercial and Estates Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
||
10 | Construction of 144 Nos Temporary Courtroom in the existing court complexes of Saket Stilt plus 3 Tis Hazari Stilt plus G plus 3 and Karkardooma G plus 4 | 04/10/2019 | 03/07/2020 | 14316.00 | 0.00 (Jan'21) | 62.00 % (Jan'21) | Quality Buildcon Pvt. Ltd. | Work is in progress at all the three sites. In Karkardooma, the structure work upto 3rd floor level completed and part 4th level slab also casted. Activities pertaining to providing of internal walls, electrical conduits, fire fighting lines, fire paint, HVAC and other related activities in progress. The work of creating sample rooms for Court room, Judges chamber, PA room and Alhmad room etc. also taken up. The columns for 4th floor & terrace level also erected and fixing of deck sheet at remaining portion of 4th floor level in progress. In Saket, Bolck-1: Casting of Grade slab, 1st floor & 2nd floor slab completed. Erection of 3rd stage columns in progress. Fabrication and erection of beams and columns from 3rd to 5th floor also in progress. Block-2 (near lockup block): Casting of Grade slab, 1st floor & 2nd floor slab completed. Erection of 3rd stage columns in progress. Fabrication and erection of beams and columns from 3rd to 5th floor also in progress. In Tis Hazari, the casting of slab upto X-- 7 grade completed and now placing of reinforcement at 2nd floor level in progress. The fixing of beams at 2nd & 3rd floor level completed and is in progress at 1st floor level. Casting of Grade slab and plinth beams at ground floor level complete except toilet block and pump room area. All the beams upto 3rd floor level fabricated and available at site. Fabrication of 4th stage columns (upto floor 5 level) also started and erection work to be taken up shortly. |
Detail Report
Graph / Photo |
11 | Addition & Remodelling work for Bhagwan Mahavir Hospital at Pitampura Delhi including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. | 10/12/2019 | 01/06/2020 | 13992.80 | Kamladitya Construction Private Limited | Work in progress |
Detail Report
Graph / Photo |
||
12 | Construction of New Building S Block for Delhi High Court on 2.74 acre land at Bapa Nagar Zakir Hussein Marg New Delhi SH C o RCC framed structure Building including water supply sanitary Electrical installation and E&M Services | 02/03/2017 | 01/09/2019 | 13770.69 | 12311.35 (Mar'21) | 0.00 (Mar'21) | Swadeshi Civil Infrastructure Pvt. Ltd., 302, DLF Tower B Jasola, New Delhi-110025 | Work in progress |
Detail Report
Graph / Photo |
13 | Construction of Hospital Block at Guru Gobind Singh Govt. Hospital located at Raghubir Nagar, New Delhi | 18/10/2019 | 10/04/2021 | 13447.15 | 0.00 (Jan'21) | 18.00 % (Jan'21) | Roshan Real Estate Pvt Ltd. | Work is under progress. |
Detail Report
Graph / Photo |
14 | Construction of Mother and Child Block and Screening OPD Block at Dr. Baba Saheb Ambedkar Hospital at Rohini, Delhi, including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. | 04/03/2020 | 03/09/2021 | 10708.84 | Quality Buildcon Pvt. Ltd. | work in progress |
Detail Report
Graph / Photo |
||
15 | SKV Madanpur Khadar, School ID: 1925062 | 14/01/2019 | 10/10/2019 | 7836.66 | 0.00 (Mar'21) | 75.00 % (Mar'21) | BCC DEVELOPERS AND PROMOTERS PVT LTD | Work is in progress |
Detail Report
Graph / Photo |
16 | C/o Trauma Centre and Utility Block at Sanjay Gandhi Memorial Hospital at Mangolpuri, Delhi, including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. | 04/09/2019 | 03/03/2021 | 7122.09 | PNSC Infrastructure Pvt. Ltd | work in progress. |
Detail Report
Graph / Photo |
||
17 | Construction of proposed New Buildings for expansion of Rao Tula Ram Memorial Govt. Hospital at Jaffarpur, Delhi. | 06/08/2019 | 29/10/2020 | 6563.40 | 0.00 (Jan'21) | 15.00 % (Jan'21) | PNSC Infrastructure Pvt. Ltd | Work is under progress. |
Detail Report
Graph / Photo |
18 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 324 nos. SPS type class rooms, Libraries, Toilets, Labs & 2 Nos. M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. under Edu. M. Division (West) at GGSSS No. 1 Khyala, SKV No. 2 Khyala, SBV Chand Nagar, Govt. (Co-Ed) S. S. J. J. Colony Raghubir Nagar & GGSSS J.J. Colony Raghubir Nagar New Delhi [Package-A]. | 13/01/2019 | 23/12/2019 | 6019.45 | 7180.66 (Jan'21) | 81.00 % (Jan'21) | SPG Infraprojects Private Limited | Work is in progress. |
Detail Report
Graph / Photo |
19 | C/o of 316 Nos. Additional SPS Class rooms, MP Hall, Labs, toilets and Staircases i/c internal water supply, sanitary installation, development of site and fire fighting arrangements etc. at GBSSS E Block Sultanpuri (School ID 1412086), SKV H Block Sultanpuri (School ID 1412029), Govt. (Co-ed) Sec. School Sultanpur Majra (School ID 1412016), SKV Block-Q, Mangolpuri (School ID 141208). (Package-VIII). | 14/01/2019 | 09/11/2019 | 5752.21 | 0.00 (Mar'21) | 87.00 % (Mar'21) | SPG Infraprojects Private Limited | Work in progress |
Detail Report
Graph / Photo |
20 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 288 nos. SPS type class rooms, Libraries, Toilets, Labs & 4 Nos. M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. under Education M. Division (West) at GBSSS Shadi Khampur, SKV Shadi Khampur, GBSSS West Patel Nagar, GGSSS West Patel Nagar & SBV West Patel Nagar New Delhi [Package-I]. | 13/01/2019 | 23/12/2019 | 5688.38 | 1535.90 (Jan'21) | 61.00 % (Jan'21) | Winner Construction Pvt. Ltd. | Work is in progress. |
Detail Report
Graph / Photo |
21 | C/o 316 Nos Additional SPS Classrooms Labs, M.P. Hall, Toilets and Staircases, internal water supply, sanitary installations, drainage, electrical installation, development of site and fire-fighting arrangements etc. in SV- Kailash Enclave(School ID 1411005), GGSSS-Anandvas (School ID 1411038),GGSSS A-Block Saraswati Vihar (School ID 1411042) and GGSSS, Kohat Enclave, Anandvas (School ID 1411046). (Package-4) | 14/01/2019 | 09/11/2019 | 5653.04 | 3954.15 (Mar'21) | 82.00 % (Mar'21) | SPG Infraprojects Private Limited | Work in progress |
Detail Report
Graph / Photo |
22 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 304 nos. SPS type class rooms, Libraries, Toilets, Labs & 2 Nos. M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. under Education M. Division (West) at SKV Ranhaula, Govt. (Co-Ed) SS Hiran Kudna, SKV Nilothi, SKV Jwalapuri Amalwas, Govt. (Co-ed) SS Ranhaula Kunwar Singh Nagar & GSKV Shiv Ram Park Nangloi at New Delhi [Package-D]. | 13/01/2019 | 23/12/2019 | 5561.05 | 0.00 (Jan'21) | 97.00 % (Jan'21) | B. L. Infra Projects Pvt. Ltd. | Work is in progress. |
Detail Report
Graph / Photo |
23 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 296 nos. SPS type class rooms, Libraries, Toilets, Labs & 3 Nos. M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. under Education M. Division (West) at SBV Ashok Nagar, GGSSS Ashok Nagar, SBV Subhash Nagar, GBSSS Rajouri Garden Extn., SKV Rajouri Garden Extn., SKV Rajouri Garden Main., SKV-No.2 Tagore Garden, GBSSS Tagore Garden New Delhi [Package-L] | 13/01/2019 | 23/12/2019 | 5485.49 | 4611.46 (Jan'21) | 74.00 % (Jan'21) | A. K. Mehta & Co. | Work is in progress. |
Detail Report
Graph / Photo |
24 | GGSSS No. 1, Molarband School ID : 1925401 | 14/01/2019 | 10/10/2019 | 5268.41 | 0.00 (Mar'21) | 48.00 % (Mar'21) | Subham Builders | Work is in progress |
Detail Report
Graph / Photo |
25 | GGSSS Tajpur Pahari, School ID : 1925359 | 14/01/2019 | 10/10/2019 | 5139.81 | 0.00 (Mar'21) | 53.00 % (Mar'21) | Subham Builders | Work is in progress |
Detail Report
Graph / Photo |
26 | C/o 272 Nos. Additional SPS Class rooms i/c MP Hall, labs, toilets and Staircases, internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. Sector-16 Rohini (School ID: 1413070), GGSSS Sector-1 Avantika Rohini (School ID :1413069) & Sarvodaya Co-ed. Vidyalaya Sector-2 Rohini (School ID : 1413027) (Package-3) | 14/01/2019 | 09/11/2019 | 4874.05 | 2114.44 (Mar'21) | 60.00 % (Mar'21) | Shri kamal singh | Work in progress |
Detail Report
Graph / Photo |
27 | C/o of 244 Nos. Additional SPS Class rooms, MP Hall, Labs, toilets and Staircases i/c internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. at SKV Kanjhawala(School ID 1413025) , SV Jaunti ( School ID 1413181) and Govt. Co- ed Sr. Sec. School Nizampur (School ID 1413009 ) ( Package -09 ) | 20/01/2019 | 15/11/2019 | 4603.38 | 1495.28 (Mar'21) | 56.00 % (Mar'21) | Sh. Kamal Singh | Work in progress |
Detail Report
Graph / Photo |
28 | GGSSS No. 1, East of Kailash, School ID: 1924032 | 23/01/2019 | 19/10/2019 | 4586.20 | 0.00 (Mar'21) | 88.00 % (Mar'21) | IQBAL CONSTRUCTION CO. | Work is in progress |
Detail Report
Graph / Photo |
29 | SKV New Friends Colony, School ID 1925033 | 23/01/2019 | 19/10/2019 | 4224.32 | 0.00 (Mar'21) | 94.00 % (Mar'21) | Subham Builders | Work is in progress |
Detail Report
Graph / Photo |
30 | Co 232 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 12 | 13/01/2019 | 09/10/2019 | 4150.23 | 0.00 (Mar'21) | 92.00 % (Mar'21) | K.B.G. Engineers | Work in progress. |
Detail Report
Graph / Photo |
31 | C/o of 236 Nos. Additional SPS Class rooms, MP Hall, Labs, Toilets and Staircases i/c internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. at Rani Khera S (Co-ed) ( School ID 1412095), SBV Sawada Ghevra (School ID 1413323 ) and SV Ghevra (School ID 1413003) (Package -10) | 20/01/2019 | 16/10/2019 | 4125.76 | 2605.23 (Mar'21) | 84.00 % (Mar'21) | M/s K.B.G. Engineers | Work in progress |
Detail Report
Graph / Photo |
32 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 208 nos. SPS type class rooms, Libraries, Toilets, Labs & 2 No. M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. under Education M. Division (West) at GGSSS No-2 Uttam Nagar, SKV Uttam Nagar, G(Co-Ed)SS Vikas Nagar & GBSSS KG-I/III Vikaspuri New Delhi [Package-E]. | 18/01/2019 | 13/12/2019 | 3891.02 | 0.00 (Jan'21) | 76.00 % (Jan'21) | Aadhar Stumbh Township Pvt. Ltd. | Work is in progress. |
Detail Report
Graph / Photo |
33 | C/o 204 Nos. Additional SPS Class rooms including Labs, M.P. Hall, Toilets and Staircases, internal water supply, sanitary installations, drainage, electrical installation, development of site and fire fighting arrangements etc. at GBSSS, Prashant Vihar (ID- 1413016) and Govt. Co-ed Sr. Sec. School Sector -08 Rohini Delhi (ID- 1413027) (Package -V). | 20/01/2019 | 16/10/2019 | 3731.99 | 0.00 (Mar'21) | 89.00 % (Mar'21) | M/s K.B.G. Engineers | Work in progress |
Detail Report
Graph / Photo |
34 | Co 212 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 3 | 16/03/2019 | 10/12/2019 | 3708.98 | 2321.34 (Mar'21) | 65.00 % (Mar'21) | M/s K B G Engineers | Work in progress. |
Detail Report
Graph / Photo |
35 | Const 182 Nos. of additional SPS class rooms (Package-C) | 17/03/2019 | 11/12/2019 | 3699.32 | 2205.21 (Feb'21) | 0.00 (Feb'21) | SPS Infrabuild Pvt. Ltd. | Work is in Progress. |
Detail Report
Graph / Photo |
36 | Const 190 Nos. of additional SPS class rooms in various schools under East and North East Education Division, PW | 24/12/2018 | 19/09/2019 | 3675.76 | 13098.31 (Feb'21) | 0.00 (Feb'21) | RAMA Contractor | Work is in Progress. |
Detail Report
Graph / Photo |
37 | Const 180 Nos. of additional SPS class rooms (Package-B) | 17/03/2019 | 11/12/2019 | 3636.43 | 1146.09 (Nov'20) | 0.00 (Nov'20) | RAMA Contractor | Work is in Progress. |
Detail Report
Graph / Photo |
38 | SKV Begumpur, School ID: 1923057 | 23/01/2019 | 19/10/2019 | 3607.51 | 0.00 (Mar'21) | 53.00 % (Mar'21) | Subham Builders | Work is in progress |
Detail Report
Graph / Photo |
39 | Const 174 Nos. of additional SPS class rooms in various schools (Package-E) | 17/03/2019 | 11/12/2019 | 3553.31 | 12491.60 (Nov'20) | 0.00 (Nov'20) | SPS Infrabuild Pvt. Ltd. | Work is in Progress. |
Detail Report
Graph / Photo |
40 | Up gradation and Construction of an additional multi- story building in the premise of Forensic Science Laboratory, Rohini, Delhi. | 14/11/2019 | 13/02/2021 | 3541.69 | Tewatia Construction Pvt. Ltd. | work in progress |
Detail Report
Graph / Photo |
||
41 | C/o 232 Nos. of additional SPS class rooms in various schools under North Education Division, PWD Delhi including internal & external water supply, sanitary installation, electrical installations, development of site and fire fighting system etc. (Package - 9) | 17/03/2019 | 11/12/2019 | 3526.08 | 2096.20 (Mar'21) | 86.00 % (Mar'21) | Satish Chand & Rajesh Kumar Pvt. Ltd. | Work in progress. |
Detail Report
Graph / Photo |
42 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 192 nos. SPS type class rooms, Libraries, Toilets, Labs & 2 Nos. M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc, under Education M. Division (West) at SBV No.1 Tilak Nagar, SBV No.2 Tilak Nagar, GGSSS No.1 Tilak Nagar, SKV No. 3 Tilak Nagar & SBV Block-A Vikaspuri New Delhi [Package-J]. | 13/01/2019 | 09/10/2019 | 3522.95 | 0.00 (Jan'21) | 94.00 % (Jan'21) | Tewatia Construction Pvt. Ltd. | Work is in progress. |
Detail Report
Graph / Photo |
43 | Const 184 Nos. of additional SPS class rooms in various schools under East and North East Education Division, PW | 17/03/2019 | 11/12/2019 | 3455.84 | 12491.60 (Nov'20) | 0.00 (Nov'20) | RAMA Contractor | Work is in Progress. |
Detail Report
Graph / Photo |
44 | C/o of 196 Nos. Additional SPS Class rooms, MP Hall, Labs, toilets and Staircases including internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. at SKV Nithari (School ID 1412093) and GGSSS Mubarakpur Dabas (School ID 1412133 ).(Package VI) | 20/01/2019 | 16/10/2019 | 3448.67 | 3578.03 (Mar'21) | 97.00 % (Mar'21) | K.B.G.Engineers | Work in progress |
Detail Report
Graph / Photo |
45 | Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II.(Package-F) | 27/01/2019 | 23/10/2019 | 3347.23 | 1995.62 (Feb'21) | 64.00 % (Feb'21) | BCC DEVELOPERS AND PROMOTERS PVT LTD | Work in progress. |
Detail Report
Graph / Photo |
46 | Co 180 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 10 | 17/03/2019 | 11/12/2019 | 3304.27 | 2521.33 (Mar'21) | 72.00 % (Mar'21) | Tewatia Construction Pvt. Ltd. | Work in Progress. |
Detail Report
Graph / Photo |
47 | Co 196 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 2 | 20/01/2019 | 16/10/2019 | 3303.39 | 3466.89 (Mar'21) | 0.00 (Mar'21) | Tewatia Construction Pvt. Ltd. | Work in progress. |
Detail Report
Graph / Photo |
48 | C/o of 172 Nos. Additional SPS Class rooms, MP Hall, Labs, toilets and Staircases including internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. at SKV Sector 20, Rohini Ext. Pooth Kalan (School ID 1412084) GGSSS Block D Sultanpuri (School ID 1412088 ) and GGSSS P- Block Sultanpuri (School ID 1412019). (Package-VII) | 14/01/2019 | 10/10/2019 | 3101.08 | 2186.81 (Mar'21) | 91.00 % (Mar'21) | The Krishna Construction Co. | Work in progress |
Detail Report
Graph / Photo |
49 | Co 180 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 6 | 20/01/2019 | 16/10/2019 | 3051.32 | 2017.73 (Mar'21) | 89.00 % (Mar'21) | M/s K B G Engineers | Work in progress. |
Detail Report
Graph / Photo |
50 | SKV Sangam Vihar J Block Sch. ID 1923346 | 17/03/2019 | 11/12/2019 | 3002.10 | 0.00 (Mar'21) | 28.00 % (Mar'21) | Devinder Singh | In progress |
Detail Report
Graph / Photo |
51 | Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Dariyapur Kalan, Delhi | 30/05/2020 | 29/05/2021 | 2936.58 | 0.00 (Mar'21) | 13.00 % (Mar'21) | Tewatia Construction Pvt. Ltd. | Casting of footing in progress. |
Detail Report
Graph / Photo |
52 | Construction of Pucca School Building G plus 3 with ancillary facilities including internal water supply sanitary installation, internal electrical installation and development of sites RWHS STP etc at Sector 05 Rohini Delhi | 29/05/2020 | 28/05/2021 | 2931.78 | 0.00 (Mar'21) | 7.00 % (Mar'21) | The Krishna Construction Co. | Work in progress |
Detail Report
Graph / Photo |
53 | SH Co 169 Nos. of additional SPS class rooms at Sarvodaya Co.Ed SSS Munirka Sch. ID 1719125 G Co.ed MS C4 Vasant Vihar Sch. ID 1720174 SV Vasant Vihar Sch. ID 1720024 and G Co.Ed SV, Sector 13 R.K.Puram Sch. ID 1719130 under Education Maint. SW | 17/10/2019 | 12/07/2020 | 2849.35 | 2.19 (Feb'21) | 1.13 % (Feb'21) | A. K. Builders | work in progress. |
Detail Report
Graph / Photo |
54 | SBV Yogi Arvind, School ID: 1923005 | 14/01/2019 | 10/10/2019 | 2844.79 | 0.00 (Mar'21) | 65.00 % (Mar'21) | Devinder Singh | Work is in progress |
Detail Report
Graph / Photo |
55 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 148 nos. SPS type class rooms, Libraries, Toilets, Labs & 2 Nos. M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. under Education M. Division (West) at SKV No. 2 Madipur, GGSSS No. 1 Madipur, SV(Co.Ed.) A-2 Paschim vihar, SV(Co-Ed) New Multan Nagar New Delhi [Package-C]. | 13/01/2019 | 09/10/2019 | 2816.66 | 0.00 (Jan'21) | 81.00 % (Jan'21) | Tewatia Construction Pvt. Ltd. | Work is in progress. |
Detail Report
Graph / Photo |
56 | Expansion / Remodeling of Deep Chand Bandhu Govt. Hospital at Kokiwala Bagh, Ashok Vihar, Delhi. Including water supply, sanitary, drainage and electrical works etc. | 28/06/2019 | 22/06/2020 | 2806.33 | Roshan Real Estate Pvt Ltd. | Work started |
Detail Report
Graph / Photo |
||
57 | C/o 168 Nos. Additional SPS Class rooms i/c MP Hall, labs, toilets and Staircases, STP, internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. at SKV No.-2 Shakurpur (ID-1411030) (Package-2) | 15/01/2019 | 11/10/2019 | 2788.70 | 1129.07 (Mar'21) | 51.00 % (Mar'21) | RAMA Contractor | Work in progress |
Detail Report
Graph / Photo |
58 | Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Libaspur, Delhi | 30/05/2020 | 29/05/2021 | 2653.59 | 0.00 (Mar'21) | 18.00 % (Mar'21) | Tewatia Construction Pvt. Ltd. | Work in progress. |
Detail Report
Graph / Photo |
59 | Construction of Pucca School building (G+3) with ancillary facilities including internal water supply, sanitary installations, internal electrical installation and development of site, RWHS, STP, Furniture etc at Sector 18, Rohini. (SH: Civil and Electrical Composite Work). | 23/05/2020 | 23/05/2021 | 2606.13 | 0.00 (Feb'21) | 4.00 % (Feb'21) | Tewatia Construction Pvt. Ltd. | Work in progress |
Detail Report
Graph / Photo |
60 | Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II. SH: C/o 148 Nos. of additional SPS class rooms at GBSSS, J.J Camp, Naraina (School ID-1720015) & SBV, Nairana (School ID-1720002) & SBV under Education Maintenance South West Division, PWD Delhi including internal & external water supply, sanitary installation, electrical installations, development of site and fire fighting system etc. (Package-E). | 15/01/2019 | 11/09/2019 | 2578.40 | 2008.49 (Feb'21) | 90.00 % (Feb'21) | Raghav Engineers | Work in progress. |
Detail Report
Graph / Photo |
61 | Construction of two Cluster Bus Depots including boundary wall at Sector-37, Rohini, Delhi. | 06/10/2018 | 31/08/2019 | 2553.10 | 0.00 (Mar'21) | 94.00 % (Mar'21) | Ramacivil India Construction Private Limited | Boundary wall, Admn. block, Restroom, Toilet block & Workshop block and Hard standing works are in progress. |
Detail Report
Graph / Photo |
62 | Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II. | 15/01/2019 | 11/09/2019 | 2524.95 | 2553.99 (Feb'21) | 99.00 % (Feb'21) | ARIHANTBUILDERS | Work in progress |
Detail Report
Graph / Photo |
63 | Co 148 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 13 | 13/01/2019 | 09/09/2019 | 2518.71 | 1375.08 (Mar'21) | 70.00 % (Mar'21) | Pawan Kumar | Work in progress. |
Detail Report
Graph / Photo |
64 | SKV Hari Nagar, Ashram, School ID : 1924043 | 14/01/2019 | 10/09/2019 | 2464.23 | 0.00 (Mar'21) | 38.00 % (Mar'21) | Reliance Elektrik works | Work is in progress |
Detail Report
Graph / Photo |
65 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 144 nos. SPS type class rooms, Libraries, Toilets, Labs & 1 no M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. at Govt. Schools SKV Basai Darapur, Govt. Co-Ed SSS Industrial Area Karampura & SKV Ranjit Nagar New Delhi [Package-H]. | 09/01/2019 | 05/09/2019 | 2458.51 | 0.00 (Jan'21) | 86.00 % (Jan'21) | ARIHANTBUILDERS | Work is in progress. |
Detail Report
Graph / Photo |
66 | Co 136 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 1 | 20/01/2019 | 16/09/2019 | 2420.66 | 0.00 (Mar'21) | 67.00 % (Mar'21) | M C Constructions Company | Work in Progress. |
Detail Report
Graph / Photo |
67 | Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II. SH: C/o 162 Nos. of additional SPS class rooms at G Co.Ed.SS, Sec-16A, Dwarka (School ID-1821242), Shahid Captain Amit Verma Govt. S(Co.Ed)V, Inderpuri (School ID-1720121) & SKV, Rajnagar-I (School ID-1824027) under Education Maintenance South West Division, PWD Delhi including internal & external water supply, sanitary installation, electrical installations, development of site and fire fighting system etc. (Package-H) | 19/12/2018 | 15/08/2019 | 2420.05 | 1828.68 (Feb'21) | 90.50 % (Feb'21) | Multi Tech Construction Co. | Work in progress. |
Detail Report
Graph / Photo |
68 | Co 152 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 5 | 08/12/2018 | 04/08/2019 | 2395.22 | 1980.93 (Mar'21) | 92.00 % (Mar'21) | RAJIV AGGARWAL | Work in progress. |
Detail Report
Graph / Photo |
69 | Co 124 Nos of additional SPS classrooms at various schools under North Education Division PWD Delhi including internal external water supply....... Package-11 | 17/01/2019 | 13/09/2019 | 2349.00 | 2119.64 (Mar'21) | 82.00 % (Mar'21) | M/s Munshi Ram Kharbanda | Work in progress. |
Detail Report
Graph / Photo |
70 | SBV Jonapur, School ID: 1923359 | 08/12/2018 | 04/08/2019 | 2342.87 | 0.00 (Feb'21) | 62.00 % (Feb'21) | Reliance Elektrik works | In progress |
Detail Report
Graph / Photo |
71 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 136 nos. SPS type class rooms, Libraries, Toilets, Labs & 1 no M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. at S.V. East Punjabi Bagh, GBSSS No. 1 Punjabi Bagh, SKV No-2 Punjabi Bagh New Delhi [Package-B]. | 09/01/2019 | 06/09/2019 | 2337.95 | 1952.54 (Feb'21) | 0.00 (Feb'21) | Satya Narain | Work is in progress. |
Detail Report
Graph / Photo |
72 | SKV (Gargi) Green Park Extension, School ID: 1925032 | 08/12/2018 | 04/08/2019 | 2319.71 | 0.00 (Mar'21) | 89.00 % (Mar'21) | Devinder Singh | Work is in progress |
Detail Report
Graph / Photo |
73 | RPVV Lajpat Nagar, School ID : 1925334 | 08/12/2018 | 04/08/2019 | 2303.62 | 0.00 (Mar'21) | 68.00 % (Mar'21) | Reliance Elektrik Works, | Work is in progress |
Detail Report
Graph / Photo |
74 | C/o 143 Nos. of additional SPS class rooms at G(co.ed)SSS, Pochanpur (School ID-1821037) , SBV Bijwasan (Bharthal) (School ID-1821032)& GGSSS Bijwasan Bharthal Road, (School ID-1821035) under Education Maintenance SouthWest Division, PWD Delhi. (Package-G) | 15/01/2019 | 11/09/2019 | 2237.55 | 2238.31 (Feb'21) | 90.00 % (Feb'21) | JAP BUILDCON PRIVATE LIMITED | Work in Progress |
Detail Report
Graph / Photo |
75 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 148 nos. SPS type class rooms, Libraries, Toilets & Labs etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. at Govt. Schools SKV No. 2 C-Block Janakpuri, GGSSS No. 2 A-Block Janakpuri, SV(Co. Ed.) L-Block Hari Nagar, GBSSS Site-2 Clock Tower Hari Nagar New Delhi [Package-K]. | 07/12/2018 | 04/08/2019 | 2234.81 | 0.00 (Jan'21) | 90.00 % (Jan'21) | Multi Tech Construction Co. | Work is in progress. |
Detail Report
Graph / Photo |
76 | Construction of DTC Bus Depot at Ghumanhera | 18/05/2018 | 17/11/2018 | 2161.87 | 790.60 (Feb'21) | 0.00 (Feb'21) | Satya Narain | nearly completed. |
Detail Report
Graph / Photo |
77 | C o 138 Nos Addl SPS Classrooms in GGSSS Rani Bagh Sch ID 1411043 GGSSS Trinagar Narang Colony Sch ID 1411037 ic Lab staircases toilets and ramps internal water supply sanitary installations internal electrification and fire fighting arrangements | 01/03/2019 | 26/09/2019 | 2120.02 | 1239.34 (Mar'21) | 72.00 % (Mar'21) | The Krishna Construction Co. | Work in progress |
Detail Report
Graph / Photo |
78 | Co 132 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 4 | 08/12/2018 | 04/08/2019 | 2115.52 | 2041.98 (Mar'21) | 91.00 % (Mar'21) | Rajiv Aggarwal | Work in progress. |
Detail Report
Graph / Photo |
79 | S.K.V. Andrews Ganj, School ID : 1924033 | 08/12/2018 | 04/08/2019 | 2112.37 | 0.00 (Mar'21) | 99.00 % (Mar'21) | Devinder Singh | Work is in progress |
Detail Report
Graph / Photo |
80 | Construction of Pucca School building (G+3) with ancillary facilities including internal water supply, sanitary installations, internal electrical installation and development of site , RWHS, STP etc at Ladpur Village (SH:- Civil & Electrical composite work). | 29/05/2020 | 28/05/2021 | 2053.72 | Shree construction Co | Foreclosed vide this office letter no. 1374-H dated 31.12.2020 |
Detail Report
Graph / Photo |
||
81 | Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II. | 15/01/2019 | 11/09/2019 | 2001.74 | 1123.58 (Feb'21) | 66.00 % (Feb'21) | M/S Sunehari Bagh Builders Pvt. Ltd. | Work in progress. |
Detail Report
Graph / Photo |
82 | GGSSS Dera Village School ID: 1923023 | 08/12/2018 | 04/08/2019 | 1877.31 | 844.70 (Feb'21) | 63.00 % (Feb'21) | Varun Gupta & Co. | In progress |
Detail Report
Graph / Photo |
83 | Construction of Govt Sr Sec Pucca School building G plus 3 with ancillary facilities including internal water supply internal electrical installation sanitary installations development of site STP and RWH etc at Sector 27 Rohini. | 31/05/2020 | 30/05/2021 | 1874.70 | 0.00 (Feb'21) | 2.00 % (Feb'21) | SSP Promoters and Builders Private Limited | Work in progress |
Detail Report
Graph / Photo |
84 | Furniture Work RECALL | 04/11/2019 | 18/12/2019 | 1858.08 | Rajdhani Furnitures PVT. LTD. |
Detail Report
Graph / Photo |
|||
85 | Co. 104 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi incl int. and external water supply fire fighting system etc. Pkg 7 | 14/01/2019 | 10/09/2019 | 1812.55 | 0.00 (Mar'21) | 86.00 % (Mar'21) | Raghav Engineers | Work in progress |
Detail Report
Graph / Photo |
86 | Const. of 112 Nos. addl SPS classrooms GGSS, Mukundpur Village Sch. ID 1207230 - 36 Nos., GBSSS Bakhtawarpur Sch. ID 1309266 -56 Nos. incl. 01 No. M.P Hall Equi. to 08 Nos. Class Rooms and SV Lancer Road Sch. ID 1207032 -20 Nos. under North Edu. Divn | 08/06/2019 | 02/02/2020 | 1799.01 | 1269.55 (Mar'21) | 63.00 % (Mar'21) | C. PARKASHAN Co. | Work in progress |
Detail Report
Graph / Photo |
87 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 104 nos. SPS type class rooms, Libraries, Toilets, Labs & 1 no M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. at SKV Sultan Puri Road, Nangloi, SKV B-3 Paschim Vihar New Delhi [Package-F]. | 09/01/2019 | 06/09/2019 | 1782.55 | 0.00 (Jan'21) | 98.00 % (Jan'21) | Satya Narain | Work is in progress. |
Detail Report
Graph / Photo |
88 | C/o of 104 Nos. Additional SPS Class rooms, Labs, toilets and Staircases i/c internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangments etc. at SBV Keshav Puram (ID-1411029), SKV Keshav Puram A Block (ID-1411021) & SKV Bharat Nagar (ID-1411031). (Package-I) | 29/12/2018 | 26/07/2019 | 1743.19 | 1398.76 (Mar'21) | 61.00 % (Mar'21) | AMAR CONSTRUCTION COMPANY | Work in progress |
Detail Report
Graph / Photo |
89 | C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 88 nos. SPS type class rooms, Libraries, Toilets, Labs & 1 no M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. at SV Jaidev Park, SBV Moti Nagar & SKV Moti Nagar New Delhi [Package-G]. | 09/01/2019 | 06/08/2019 | 1637.88 | 0.00 (Jan'21) | 89.00 % (Jan'21) | Y D Builders and hotels pvt. ltd | Work is in progress. |
Detail Report
Graph / Photo |
90 | Development of Synthetic Athletic Track with Football field and Synthetic Hockey Turf in Rajiv Gandhi Sports Complex Singhu Delhi | 08/03/2021 | 02/11/2021 | 1583.17 | Shiv Naresh Sports Pvt. Ltd., E-23, Karampura. New Delhi-110015 | Financial bids openend & approved. PG letter issued to the agency on 27.02.2021, PG in form of Bank Guarantee submitted by the agency on 03.03.2021 & same is under verification from Bank. |
Detail Report
Graph / Photo |
||
91 | Construction of 92 Nos Additional SPS Classrooms in SV Co ed Sector 7 Rohini School ID 1411074 including Laboratory staircases toilets and ramps internal water supply sanitary installations Internal electrification and fire fighting arrangements | 30/12/2019 | 24/10/2020 | 1502.95 | 770.67 (Mar'21) | 55.00 % (Mar'21) | S.D.CONSTRUCTION COMPANY | Work in progress |
Detail Report
Graph / Photo |
92 | Construction of Residential Hostel at Chhatrasal Stadium, Model Town, Delhi. (SH: Const. of Hostel Building inc. Ext. Dev. works Internal Elect. Installation External Lighting lifts firefighting system fire alarm with PASystem CCTV Audio video system HVAC works | 24/02/2021 | 23/05/2022 | 1374.16 | M.C. Construction | Tender Under scrutiny |
Detail Report
Graph / Photo |
||
93 | C/o 80 Nos. of additional SPS class rooms at SKV Banger, Prahalad Pur (Sch. Id-1310032) under North Education Division, PWD Delhi including internal & external water supply, sanitary installation, electrical installations, development of site and fire fighting system etc. (Package -8) | 13/01/2019 | 10/08/2019 | 1354.81 | 1724.01 (Mar'21) | 99.00 % (Mar'21) | Shree construction Co | Work in progress. |
Detail Report
Graph / Photo |
94 | Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at GSSS (Co ed) at Rana Pratap Bagh, Delhi | 30/05/2020 | 29/05/2021 | 1335.04 | 176.01 (Mar'21) | 25.00 % (Mar'21) | The Krishna Construction Co. | Foundation work & Plinth beam completed, column to 1st floor completed, reinforcement of 1st floor beam, 1st floor slab work in progress. |
Detail Report
Graph / Photo |
95 | GGSS No. 3 Sec IV, Ambedkar Nagar | 03/03/2016 | 15/07/2016 | 1212.87 | Devinder Singh | completed |
Detail Report
Graph / Photo |
||
96 | Construction of 60 Nos G plus 3 SPS class rooms including internal and external water supply sanitary installations electrical installations development of site fire fighting system at Veer Sawarkar Arogya Sansthan, Karawal Nagar in District North | 31/12/2019 | 25/10/2020 | 1112.81 | 149.62 (Nov'20) | 0.00 (Nov'20) | Mathra Dass Ahuja & Sons | "Block-A : (16 Rooms) : Structure completed, finishing works are in progress. Block-B :(12 Rooms) : Structure completed, finishing works are in progress. Block-C : (20 Rooms) : Terrace floor is in progress. Block-D : (12 Rooms): 3rd floor beam is in progress. Kota stone flooring, Granite flooring, internal / External finishing and GRC tile work is in progress. |
Detail Report
Graph / Photo |
97 | Construction of 60 Nos Addl SPS Classrooms in Govt Co Ed MS Punjab Khore School ID 1413075 GGSSS including Laboratory staircases toilets and ramps internal water supply sanitary installations internal electrification and fire fighting arrangements | 05/01/2020 | 30/10/2020 | 991.24 | 778.71 (Mar'21) | 78.00 % (Mar'21) | M/s Satish Builders | Work in progress |
Detail Report
Graph / Photo |
98 | "Up-gradation/EOR of 802 Nos. Type-B, C & D at Timarpur Delhi. (SH:- Package-II of 410 Nos. Flats consisting of 320 Nos. Type-B, from 361 to 680 and 90 Nos. Type-C Flats) Civil Work. " | 04/04/2013 | 03/10/2014 | 908.74 | Devinder Singh | Work Completed. Final bill yet to be submitted by agency. |
Detail Report
Graph / Photo |
||
99 | "Upgradation / EOR of 802 Nos. Type-B, C & D at Timarpur, Delhi. (SH:- Package-I of 392 Nos. Flats consisting of 360 Nos. Type-B, from 1 to 360 and 32 Nos. Type-D Flats) Civil Work " | 04/04/2013 | 03/10/2014 | 903.01 | Devinder Singh | Work Completed. Final bill yet to be submitted by agency. |
Detail Report
Graph / Photo |
||
100 | Conversion of existing Cinder Athletic Track into 400 metres 8 lane Synthetic Athletic Track at Sports Complex located within the premises of Government Boys Sarvodaya Vidyalaya Pehladpur Delhi | 04/01/2020 | 30/08/2020 | 895.64 | 0.00 (Jan'21) | 85.00 % (Jan'21) | Shiv Naresh Sports Pvt. Ltd., E-23, Karampura. New Delhi-110015 | Synthetic track including marking of lane has been got completed. All accessories related with work has also been installed. Road work has also been got completed. Finishing of stonework on compound wall is yet to be done. Certificate from IAAF authorities is awaited. Physical progress is 99%. |
Detail Report
Graph / Photo |
101 | Construction of SPS Engineering office block, Girls and Boys Hostel for Foreign Students including internal electrification in NSUT Campus, Sector-3, Dwarka, New Delhi. | 23/12/2019 | 19/06/2020 | 890.74 | 0.00 (Sep'20) | 5.00 % (Sep'20) | MANISH BUILDWELL | Work in progress 85% |
Detail Report
Graph / Photo |
102 | Construction of 55 Nos. Aam Admi Mohalla Clinic at various locations under South-East (M), Circle, New Delhi during 2018-19. | 15/12/2018 | 12/06/2019 | 827.90 | 290.07 (Oct'19) | 17.00 % (Oct'19) | S. P. Construction | Work in progress |
Detail Report
Graph / Photo |
103 | Construction of Blind Hostel 96 Seated at Bal Sadan Timarpur Delhi SH Civil and Electrical work | 11/01/2019 | 10/01/2020 | 786.44 | 989.84 (Mar'21) | 0.00 (Mar'21) | MANISH BUILDWELL |
Detail Report
Graph / Photo |
|
104 | Construction of Girls Hostel at Kalindi College, East Patel Nagar, New Delhi during 2017-18. SH Civil Works Electrical Works | 16/01/2018 | 15/01/2019 | 731.25 | 216.46 (Mar'20) | 0.00 (Mar'20) | PRAGATI ENTERPRISES |
Detail Report
Graph / Photo |
|
105 | Co 44 Nos Addl SPS Classrooms in GGMS at Sec 24 Rohini Sch ID 1413316 in lieu of SV Wazirpur Village ic Lab. staircases toilets and ramps internal water supply sanitary installations internal electrification and fire fighting arrangements Recall | 31/05/2020 | 03/03/2021 | 597.86 | 556.72 (Mar'21) | 76.00 % (Mar'21) | SUSHIL BUILDWELL PRIVATE LIMITED | Work in progress |
Detail Report
Graph / Photo |
106 | Construction of 30 Nos. Aam Admi Mohalla Clinic at various places under south building (M) Division/South District. | 10/01/2019 | 08/07/2019 | 585.53 | 91.21 (Mar'21) | 0.00 (Mar'21) | P S ASSOCIATES | work in progress |
Detail Report
Graph / Photo |
107 | Providing and Fixing Customized Furniture and Interior works | 24/09/2020 | 22/11/2020 | 533.13 | 0.00 (Jan'21) | 15.00 % (Jan'21) | M/s Rajasthan Decorators | Work is in progress |
Detail Report
Graph / Photo |
108 | Construction of 30 Nos. Aam Aadmi Mohalla Clinic (Primary Health Centre) at various places under West Building Division-1, West Maintenance Circle in Assembly Constituency Mundka (AC-08), Nangloi( Full Name of work mention in NIT) | 19/12/2018 | 18/04/2019 | 505.78 | 183.84 (Mar'20) | 0.00 (Mar'20) | Gee Internationals |
Detail Report
Graph / Photo |
|
109 | Construction of Synthetic Hockey Court at Vivekanand College, Vivek Vihar, Delhi | 03/01/2020 | 30/06/2020 | 490.76 | 0.00 (Mar'21) | 69.00 % (Mar'21) | Chadha Sports (Regd.), 109, Bhagat Singh Market, New Delhi-110001 | Physical Progress of the work is 90%. |
Detail Report
Graph / Photo |
110 | Co New Teaching block in DIET at Daryaganj New Delhi Sh Phase I having Lab, Library faculty room etc ic connecting staircase Civil and Electrical Work | 06/06/2019 | 05/03/2020 | 485.59 | 232.38 (Mar'21) | 0.00 (Mar'21) | KALYAN CHANDRA GOYAL & CO. |
Detail Report
Graph / Photo |
|
111 | Construction of 30 Nos Aam Aadmi Mohalla Clinic Primary Health Centre at various places under North Building Division North Maintenance Circle in Assembly Constituency Narela Badli Adarsh Nagar and Bawana Civil Electrical | 29/12/2018 | 27/04/2019 | 482.18 | 0.00 (Sep'20) | 90.00 % (Sep'20) | Jasvir Singh Shokeen | Work in progress (90%) |
Detail Report
Graph / Photo |
112 | Construction of Old Age Home including Electrical Work at BG–6, Paschim Vihar, Delhi. (Composite Work). | 28/06/2018 | 27/06/2019 | 479.58 | 424.28 (Mar'21) | 0.00 (Mar'21) | KALYAN CHANDRA GOYAL & CO. | Work in progress 75%, Work is slow in Progress due to Covid-19 |
Detail Report
Graph / Photo |
113 | Supplying, Installation, Testing and Commissioning of HVAC and Mechanical Ventilation system. (HVAC Package-2 | 30/09/2014 | 26/05/2015 | 474.90 | 61.36 (May'19) | 0.00 (May'19) | Work completed on 31/12/2017 final payment yet to be made |
Detail Report
Graph / Photo |
|
114 | Up gradation of one staff room, each at 951 School under Delhi Govt. (SH: - 123 Nos. of staff rooms under West Maintenance Circle). | 30/03/2019 | 29/06/2019 | 433.89 | 171.66 (Feb'20) | 0.00 (Feb'20) | Sham Lal Gupta & Sons |
Detail Report
Graph / Photo |
|
115 | Construction of Wrestling Hall at Village Mitraon Delhi | 29/12/2019 | 25/06/2020 | 363.93 | 0.00 (Jan'21) | 26.00 % (Jan'21) | SAHIL GOYAL | Casting of all footings has been completed. Work is suffered for shifting of electric pole which is in the alignment of the building. The same has been shifted by BSES. Now, plinth beam, Top beam column & steel built up columns completed. Earth work in filling erection & Fabricationof tublar truss and brick work in super structure is in progress. Physical Progress is 35% |
Detail Report
Graph / Photo |
116 | Building work i/c Water Supply, Sanitary installation,Development Work and providing EI & Fire fighting system | 26/05/2015 | 25/05/2016 | 316.66 | Sudesh Kumar | Work Suspended due to non-receipt of funds from Client Department. |
Detail Report
Graph / Photo |
||
117 | Construction of Aam Aadmi Mohalla Clinic (Primary Health Centre) at various places under North East Circle, PWD, Delhi | 27/12/2018 | 26/04/2019 | 296.85 | 332.69 (Mar'21) | 0.00 (Mar'21) | Ram Krishan Yudhister Parkash | work completed |
Detail Report
Graph / Photo |
118 | Construction of 21 nos. Aam Aadmi Mohalla Clinic (Primary Health Centres) at various places in the jurisdiction of Shahdara Circle, PWD, Delhi (Civil and Electrical Work). | 28/02/2019 | 27/06/2019 | 294.21 | 42.34 (Mar'21) | 0.00 (Mar'21) | AASRA Martech Pvt.Ltd. | Work in progress. |
Detail Report
Graph / Photo |
119 | Civil and Electrical work. | 05/05/2019 | 04/03/2020 | 292.64 | Dheeraj Singh & Company | Work just awarded |
Detail Report
Graph / Photo |
||
120 | Construction of Police post at Bharola Village Delhi | 15/11/2019 | 15/07/2020 | 289.91 | Sham Lal Gupta & Sons | work is in progress (0%) |
Detail Report
Graph / Photo |
||
121 | Construction of G4 storey Police Post including Rain Water Harvesting Tank Underground water tank and development work at Sanjay Gandhi Transport Nagar Delhi Civil and Electrical | 08/11/2019 | 07/07/2020 | 289.50 | 33.28 (Jan'21) | 0.00 (Jan'21) | Sagar Construction | work is in progress (22%) |
Detail Report
Graph / Photo |
122 | Construction of 200 mtrs. Athletic Track normal size Swimming Pool, Basket ball, Volley Ball & Kabaddi Court, Toilet Block/Change room (for Boys & Girls) including E & M Services with in the Premises of Govt. Boys Sr. Sec School, Bakhtawarpur, Delhi.( SH: Package-B : C/o 200 metre Athletic Track Basket Ball Volley Ball Kabaddi Court and Boundary wall etc including E and M works. | 17/09/2020 | 16/03/2021 | 286.80 | 0.00 (Jan'21) | 10.00 % (Jan'21) | Shiv Naresh Sports Pvt. Ltd., E-23, Karampura. New Delhi-110015 | Track, Volleyball ground GSB & WMM completed. Kabbaddi Ground Flooring PCC & footpath work is in progress. Tree cutting charges deposited. Tree cutting permission expected in first week of April. Physical process is 25% |
Detail Report
Graph / Photo |
123 | Construction prefab hut for HQ at PTS Wazirabad, Delhi | 21/07/2018 | 20/11/2018 | 285.56 | Aliyan Constaruction Company | work completed |
Detail Report
Graph / Photo |
||
124 | Conversion of existing normal size swimming pool within the premises of Shaheed Amir Chand Sarvodaya Vidyalaya Ludlow Castle No 2 Sham Nath Marg, Delhi into all weather swimming pool | 23/12/2020 | 20/06/2021 | 262.79 | Maa Narayan Constuction Co. | Work awarded |
Detail Report
Graph / Photo |
||
125 | EOR/REPAIR OF BUILDING OF PS, M, N, O, P, Q and R BLOCK QTRS. AND REPLACEMENT OF DAMAGED G.I./C.I. PIPE LINE, ALL/FLOOR TILES OF P, Q and R BLOCKS IN PC MODEL TOWN, DELHI. (SH CIVIL and ELECTRICAL WORK). | 01/11/2018 | 01/07/2019 | 201.92 | 158.30 (Mar'20) | 0.00 (Mar'20) | Pooja Construction | ok |
Detail Report
Graph / Photo |
126 | Construction of Normal Size Swimming Pool within the Premises of Shaheed Captain Haniffuddin Sarvodaya Kanya Vidyalaya Mayur Vihar Phase 1, Pocket 4, Delhi 110091 | 16/03/2019 | 15/09/2019 | 182.18 | 0.00 (Dec'20) | 72.00 % (Dec'20) | Anish Ahmed | RPE under scrutiny. |
Detail Report
Graph / Photo |
127 | Vertical Extension of Teaching Block No.1 of B.R. Ambedkar College, Wazirabad Road, Delhi | 16/01/2018 | 15/07/2018 | 172.40 | 114.27 (Oct'20) | 0.00 (Oct'20) | JABIR HUSSAIN | work completed |
Detail Report
Graph / Photo |
128 | Providing and Installing Fire Fighting, Fire Alarm system and Public Address system | 10/08/2014 | 09/04/2015 | 155.31 |
Detail Report
Graph / Photo |
||||
129 | Construction of Gymnastic Hall at SBV Moti Nagar Delhi | 11/01/2020 | 09/07/2020 | 147.53 | 0.00 (Aug'20) | 2.00 % (Aug'20) | Aniket Enterprises | Physical progress of the work is 15%. |
Detail Report
Graph / Photo |
130 | Construction and Commissioning of Mohalla Clinics at various places in North-East Delhi under the Jurisdiction of PWD Sub- Division M-2221 (2nd call). | 25/01/2019 | 24/05/2019 | 140.44 | 208.86 (Mar'21) | 0.00 (Mar'21) | Uma Shankar | work in progress |
Detail Report
Graph / Photo |
131 | Construction and setup the Nursery Pre-School in 15 No. FIFTEEN NOS. Sarvodaya Vidyalayas, Delhi Govt. School under Division West Building-I, PWD, New Delhi during 2018-19. SH Civil and Electrical Work.PWD, New Delhi during 2017-18. SH Civil and El | 12/09/2018 | 11/01/2019 | 140.01 | Satyam Construction Co. |
Detail Report
Graph / Photo |
|||
132 | Construction of SPS building and boundary wall for Training cum Production Centre at Indira Nagar Azadpur Delhi 33 Civil and Electrical Work | 08/03/2020 | 04/09/2020 | 137.37 | A R Construction Co. | Work in progress. (The agency has submitted structural drawings for proof check by SE, NMC) SE, NMC suggested the modification and agency has bee asked to submit vetted drawing from 3rd party incorporating the modification. |
Detail Report
Graph / Photo |
||
133 | Construction of prefab hut for HQ of Meghalaya Police along with development work located at PTS Wazirabad, Delhi | 15/07/2018 | 14/11/2018 | 134.50 | 110.06 (Oct'19) | 0.00 (Oct'19) | Aliyan Constaruction Company | work completed |
Detail Report
Graph / Photo |
134 | Extension and Renovation of office space at the 1st Floor of LG s Secretariat, Raj Niwas, Delhi-54. (SH Civil and Electrical Work ). | 14/10/2018 | 10/02/2019 | 133.59 | 179.19 (Feb'21) | 0.00 (Feb'21) | Munzareen Ahmd | ok |
Detail Report
Graph / Photo |
135 | Construction and setup the Nursery Pre-School in 13 No.THIRTEEN NOS. Sarvodaya Vidyalayas Delhi Govt. School under West Building-I, PWD, New Delhi during 2018-19. SH Civil and Electrical Work. | 28/02/2019 | 28/06/2019 | 117.55 | 77.24 (Jan'20) | 0.00 (Jan'20) | krishna construction co |
Detail Report
Graph / Photo |
|
136 | Changes in infrastructure of CHB to develop it as OHB Model Home.(Civil and Electrical work) | 24/10/2019 | 23/02/2020 | 112.72 | Vashistha and Sons Construction Co PAN Number: ANFV6477F 9 Methapur , New Delhi - 110044 |
Detail Report
Graph / Photo |
|||
137 | Making the Building disable friendly under Accessible India campaign at RTRM Hospital Jaffarpur Kalan New Delhi. | 01/06/2020 | 27/11/2020 | 106.37 | 0.00 (Jan'21) | 30.00 % (Jan'21) | Aliyan Constaruction Company | Work is under progress. |
Detail Report
Graph / Photo |
138 | Construction of SPS Type Main Store and demolition of old PWD enquiry office. | 04/02/2019 | 03/08/2019 | 103.91 | 55.03 (Mar'20) | 0.00 (Mar'20) | ASHOK MALIK |
Detail Report
Graph / Photo |
|
139 | Construction of boundary wall, main gates, guard rooms etc. for vacant land at K Block Jahangir puri, Delhi. | 21/12/2019 | 18/05/2020 | 102.07 | 54.12 (Mar'21) | 75.00 % (Mar'21) | Saeed Builders | Work in progress. |
Detail Report
Graph / Photo |
140 | Providing and supplying tree planters in various places, New Delhi under MLA LAD Fund Scheme | 04/11/2019 | 18/12/2019 | 91.97 | 91.97 (Mar'21) | 0.00 (Mar'21) | Rajeshwar Dayal Pandey |
Detail Report
Graph / Photo |
|
141 | Providing and replacement, up-gradation and comprehensive maintenance of UPS and TVSS system at LBS Hospital, Khichripur, Delhi. | 31/05/2019 | 30/07/2019 | 86.23 | POWER HOUSE | work completed |
Detail Report
Graph / Photo |
||
142 | Construction of Shed with Boxing Ring at Sports Complex, East Vinod Nagar, Delhi | 08/05/2017 | 04/09/2017 | 84.89 | 19.39 (Jul'20) | 0.00 (Jul'20) | Anish Ahmed | Work in Progress |
Detail Report
Graph / Photo |
143 | AR and MO to Various Delhi Govt. Buildings under Division West Building-1, Tihar, New Delhi. During 2019-20. SH Providing services of Computer Operator, Clerk, Peon, Dak Messenger | 28/08/2019 | 27/08/2020 | 77.50 | 10.35 (Mar'20) | 0.00 (Mar'20) | Good Luck Enterprises |
Detail Report
Graph / Photo |
|
144 | Development of sports facilities at Govt. Girls Sr. Sec School, Jhilmil Colony, Delhi. (SH: C/o Table Tennis Room, Gymnastic Room and other miscellaneous works). | 23/09/2019 | 22/01/2020 | 77.45 | 0.00 (Dec'20) | 97.00 % (Dec'20) | K.P. Singh & Co. | Work completed. |
Detail Report
Graph / Photo |
145 | Renovation of Library Block of IGDTUW, Kashmere Gate under SRD Division-I, Sub-Division-III, New Delhi.(SH-Civil and Electrical works). | 09/07/2018 | 08/01/2019 | 75.80 | 61.12 (Jan'20) | 0.00 (Jan'20) | Kamal Construction Co. | Work in progress |
Detail Report
Graph / Photo |
146 | Changes in Infrastructure of Model Home to convert it as CHB and JJB in front of Building (Civil and Electrical work). | 24/10/2019 | 23/01/2020 | 71.13 | AJAY CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|||
147 | Providing and laying RMC in the campus of N, J1, J2, J3, K, L and M Block at Sujan Singh Park, New Delhi under MLA LAD Fund Scheme. | 27/10/2019 | 07/12/2019 | 70.87 | 44.70 (Mar'20) | 0.00 (Mar'20) | Gyanchand |
Detail Report
Graph / Photo |
|
148 | Augmentation of Old and Outlived Sub-Station equipments at LBSH, Khichripur, Delhi Sub Head S.I. T.C. of Substation Equipments | 13/10/2018 | 12/04/2019 | 69.44 | 35.42 (Mar'19) | 50.00 % (Mar'19) | Ajay M/c Tools | work in progress ( 2nd RA ) |
Detail Report
Graph / Photo |
149 | Replacement of existing 3 Nos 26 Passenger cum bed lift at CNBC, Geeta Colony, Delhi. | 01/08/2018 | 30/04/2019 | 69.00 | 18.02 (Nov'18) | 35.00 % (Nov'18) | Johnson Lift Pvt Ltd | Work in progress (3RD RA 600525 |
Detail Report
Graph / Photo |
150 | Construction of 10 Nos FRP Gazebo rubens and 06 Nos of porta cabin Chaupal at various places of New Delhi Constituency AC40, under MLA LAD Fund Scheme | 26/11/2019 | 24/01/2020 | 68.77 | 34.11 (Nov'20) | 0.00 (Nov'20) | Tripurari Prasad Singh |
Detail Report
Graph / Photo |
|
151 | C/o SPS Type New M.P. Hall at SBV, Subhash Nagar, New Delhi. | 07/03/2019 | 06/07/2019 | 68.63 | Vinay Shanker |
Detail Report
Graph / Photo |
|||
152 | SH Repairing to plaster and water proofing treatment of roofs to prevent seepage i c re-strengthened to roof of barracks in various wards | 21/12/2018 | 20/04/2019 | 66.46 | 53.94 (Mar'20) | 0.00 (Mar'20) | Ashok Kumar |
Detail Report
Graph / Photo |
|
153 | Construction of Recreation Hall at PTS, Wazirabad, Delhi | 16/02/2019 | 15/06/2019 | 63.80 | 81.48 (Mar'21) | 0.00 (Mar'21) | Shekhar | work completed |
Detail Report
Graph / Photo |
154 | SITC of ETP (Effluent Treatment Plant) | 28/04/2015 | 27/07/2015 | 59.53 | Mgrow Techno System Pvt. Ltd. |
Detail Report
Graph / Photo |
|||
155 | Misc repair work under SRD Project Division I Sub Division III PWD New Delhi Recall | 23/09/2019 | 22/03/2020 | 56.09 | 70.01 (Feb'21) | 0.00 (Feb'21) | KAMAAL CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
156 | EOR to Police Station, Vikas puri, New Delhi. SH Water proofing treatment of roofs, Renovation of toilets, Replacement of damaged C.I and G.I pipe lines. Tile flooring in rooms and corridors, raising of boundary wall and other misc repair works | 15/10/2018 | 14/02/2019 | 56.04 | 51.27 (Sep'19) | 0.00 (Sep'19) | Tubya Construction |
Detail Report
Graph / Photo |
|
157 | AA to SKV No. 01 Gandhi Nagar Delhi dg 2018 19 | 17/03/2019 | 16/07/2019 | 55.57 | 32.21 (Jun'20) | 0.00 (Jun'20) | Arif | 90% work in progress |
Detail Report
Graph / Photo |
158 | EOR to DAP Line, Vikas Puri, New Delhi. SH Construction replacement of damaged sewer lines of Vikas Puri, Police Lines and residential Complex 3rd battalion, Delhi Armed Police Delhi | 20/07/2018 | 19/11/2018 | 55.08 | 12.19 (Dec'19) | 0.00 (Dec'19) | Tubya Construction |
Detail Report
Graph / Photo |
|
159 | A EOR to Co of toilet block septic tank parking shed renovation of principal rooms GBSSS Katewara B Repair renovation toilet block at GSBV Prahladpur Banger C PF wall tiles false ceiling MS gate railing flush door misc work at RSGSKV Bawana Delhi | 16/11/2019 | 15/03/2020 | 54.51 | Batra Constructions | work is in progress (35%) |
Detail Report
Graph / Photo |
||
160 | Providing and fixing door, window, Floor tile, kota stone flooring, wall tile, chajja etc except toilet portion. | 02/07/2020 | 20/10/2020 | 54.33 | 52.89 (Jan'21) | 0.00 (Jan'21) | Dharambir Singh | work in progress (80%) |
Detail Report
Graph / Photo |
161 | Re construction of collapsed boundary wall of school of about 28 metres length in North west side at Govt Co ed SSS Barwala Delhi 110039 School Id1310161 Bldg Id13101377 EOR Id20182296 | 25/11/2019 | 23/01/2020 | 54.06 | 50.20 (Nov'20) | 0.00 (Nov'20) | HARI RAM VERMA | work is in progress (88%) |
Detail Report
Graph / Photo |
162 | Raising of boundary wall on back side of the school, Grit wash on boundary wall renovation of multipurpose hall and misc work | 23/12/2019 | 20/04/2020 | 53.77 | 43.28 (Nov'20) | 0.00 (Nov'20) | Jeetender Kumar Verma | work is in progress (80%) |
Detail Report
Graph / Photo |
163 | Re-Construction of 8 nos. Servants Quarters (Type-I) including development at Session House,2 North End Road, Delhi (SH Civil and Electrical Works) | 02/08/2019 | 02/04/2020 | 53.74 | D.S. Construction Co | ok |
Detail Report
Graph / Photo |
||
164 | Civil and Electrical Works. | 13/06/2019 | 12/09/2019 | 51.83 | 15.96 (Nov'20) | 0.00 (Nov'20) | Abhikalp Constructions Syndicate | work in progress |
Detail Report
Graph / Photo |
165 | Construction of 5 nos arch shaped FRP pergola, 4 nos FRP porta cabin and 25 nos FRP Security Cabin at various places of New Delhi constituency AC 40 under MLA LAD Scheme | 26/11/2019 | 24/01/2020 | 51.22 | 5.46 (Mar'20) | 0.00 (Mar'20) | Tripurari Prasad Singh |
Detail Report
Graph / Photo |
|
166 | Construction of SPS Structure 4 Storey for ITI at Ranhola Delhi. (SH: Erection of MS fire escape stair fire resistant doors cement concrete pavement and other miscellaneous works | 15/02/2021 | 15/05/2021 | 51.05 | BHUPESH KUMAR | Tender uploaded. |
Detail Report
Graph / Photo |
||
167 | Repair of old building wall, roof and floor, Grit wash plaster, sewerline, repair of stair case, replacement of windows. | 18/11/2019 | 16/04/2020 | 50.60 | 51.80 (Nov'20) | 0.00 (Nov'20) | Saeed Builders | No works since previous month |
Detail Report
Graph / Photo |
168 | Replacement of Carpets in Courts of A block Extension block and wooden texture laminated flooring in Chambers of Extension block at Delhi High Court New Delh | 27/06/2017 | 26/07/2017 | 50.20 | Bansal Builder | Agreement closed PG forfeited |
Detail Report
Graph / Photo |
||
169 | Grit Wash and Internal Finishing for ABIT main building and exterior and internal finishing of workshop | 02/11/2020 | 01/05/2021 | 49.46 | Irshad Ahmed | Work in progress 1% |
Detail Report
Graph / Photo |
||
170 | Providing Creche at Multi Level Car Parking Ground Floor Delhi High Court New Delhi SH Composite Work | 08/01/2021 | 08/03/2021 | 48.59 | 14.96 (Mar'21) | 0.00 (Mar'21) | SHREE PAL SINGH | Work in progress |
Detail Report
Graph / Photo |
171 | Providing Services of labour for day to day maintenance of colony. | 15/09/2020 | 14/07/2021 | 45.28 | Mazid Hussain | Work in progress |
Detail Report
Graph / Photo |
||
172 | SITC of Building Management System | 12/09/2020 | 11/03/2021 | 43.49 | 130.52 (Jan'21) | 50.00 % (Jan'21) | Digital Controls & Automation | Work in progress |
Detail Report
Graph / Photo |
173 | Solar water heating system | 14/02/2015 | 14/05/2015 | 43.42 | M.S. Associates | ... |
Detail Report
Graph / Photo |
||
174 | Miscellaneous Civil Works | 13/08/2020 | 11/09/2020 | 42.87 | 0.00 (Jan'21) | 95.00 % (Jan'21) | M/s Gejwal Construction Company | Work is in progress |
Detail Report
Graph / Photo |
175 | EOR to Govt. Boys Senior Secondary School, Tagore garden, New Delhi. SH Kota flooring in rooms, sheet doors, guniting works, RMC in approach area and other misc. works | 21/07/2018 | 19/10/2018 | 42.01 | Bagga Enterprises |
Detail Report
Graph / Photo |
|||
176 | (1) Renovation of Surgery Emergency ward at room no. 149 and supporting rooms at Accidental & Emergency Block at GTB Hospital, Shahdara, Delhi (2) Renovation of Room No. 331, 332 & 338 in Administratvei Block 3rd Floor at GTB Hospital, Shahdara, Delhi. (SH: Providing Electrical and Civil Works) | 07/07/2017 | 02/01/2018 | 41.98 | 12.42 (Mar'19) | 30.00 % (Mar'19) | RCC Enterprises | Work completed |
Detail Report
Graph / Photo |
177 | Construction of parking shed for students and staff and fixing new aluminium windows in corridor of ground floor 1st floor 2nd floor 3rd floor and rooms along with vension blinds at ITI Narela Delhi 40 | 03/07/2020 | 02/11/2020 | 41.45 | 17.43 (Nov'20) | 0.00 (Nov'20) | Aayan Construction Co. | Work in progress |
Detail Report
Graph / Photo |
178 | AR and MO to 252 DA Flats and 72 DA Flats, I.T.I Jail Road, Fire Stations Dy. Labour Commissioner Office and other Govt. Bldgs, under Sub Division WB-14 dg 2018-19. SH Providing services of labour for day to day maintenance | 12/09/2018 | 12/09/2019 | 40.82 | 19.05 (Feb'20) | 0.00 (Feb'20) | Pristine management and allied services |
Detail Report
Graph / Photo |
|
179 | Improvement of lighting in various OTs at GTB Hospital Complex, Shahdara, Delhi. | 03/03/2019 | 02/05/2019 | 40.46 | 19.10 (May'19) | 0.00 (May'19) | CARONA ELECTRICALS | Work completed |
Detail Report
Graph / Photo |
180 | Supplying and replacement of 2 Nos. outlive water cooled 115 TR reciprocating type Chiller Unit with 120 TR Capacity screw type chiller unit at JPCH Shastri Park, Delhi | 26/11/2018 | 25/03/2019 | 40.39 | 32.21 (May'19) | 0.00 (May'19) | Blue Star Limited | Work completed |
Detail Report
Graph / Photo |
181 | Repairing of 4x420 TR and 1x150 TR capacity central AC plant installed at RGSS Hospital, Tahirpur, Delhi | 16/09/2018 | 15/11/2018 | 37.82 | 45.88 (May'19) | 0.00 (May'19) | SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. | Work In Progress (2ND RA 2445663) |
Detail Report
Graph / Photo |
182 | Connecting of corridors, flooring in main building, widening of path, widening of gate, door on staircases, repair of rain water harvesting system and other miscellaneous work at SKV, Moti Nagar. | 10/10/2018 | 09/01/2019 | 36.52 | 8.53 (Mar'20) | 0.00 (Mar'20) | ASH NARAYAN SINGH |
Detail Report
Graph / Photo |
|
183 | CO of Toilet for primary wing support staff visitor and attached toilet to principal room renovation of water tank platform and toilet repairing of b wall and other misc civil works | 15/08/2020 | 14/12/2020 | 34.45 | CSM CONSTRUCTION |
Detail Report
Graph / Photo |
|||
184 | EOR to Central Jail No. 1, 2, 3, 6, 8 & 9, Tihar, New Delhi. (SH:- Mechanized cleaning of underground & overhead RCC / PVC water storage tanks). Tender ID 188903 | 02/04/2020 | 01/04/2021 | 34.01 | Royal Construction |
Detail Report
Graph / Photo |
|||
185 | Construction of Resource Centre for Children with Disabilities at A-2 Sarvodaya Vidyalaya (Co-Ed), Paschim Vihar, New Delhi (Civil Work) | 09/01/2021 | 08/05/2021 | 33.98 | 6.58 (Mar'21) | 0.00 (Mar'21) | IKRAMUDDIN | Work in progress 25% |
Detail Report
Graph / Photo |
186 | Construction work including internal Electrical installation in Akhara at NPL,Kingsway Camp, Delhi. | 30/10/2018 | 28/01/2019 | 33.95 | 8.52 (Oct'19) | 0.00 (Oct'19) | Saeed Builders | ok |
Detail Report
Graph / Photo |
187 | Providing and laying interlocking paver block and RMC in the campus of Police Colony at Tilak Marg, New Delhi under MLA LAD Fund Scheme. | 27/10/2019 | 25/12/2019 | 33.92 | 22.42 (Jan'21) | 0.00 (Jan'21) | Gyanchand |
Detail Report
Graph / Photo |
|
188 | Construction of Casualty Block at Lal Bahadur Shastri Hospital, Khichripur, Delhi. Sub Head Providing ductable type air conditioning system | 09/07/2019 | 08/10/2019 | 33.85 | SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. | work in Progress 6th RA 18182135 |
Detail Report
Graph / Photo |
||
189 | Providing, installation, testing, and commissioning of Code Blue System (NCS) for Old and New block at MAIDS, New Delhi | 11/08/2019 | 10/11/2019 | 33.77 | Med Freshe Pvt. Ltd. | Work in progress Med Freshe Pvt. Ltd. |
Detail Report
Graph / Photo |
||
190 | Addition/Alteration works in DII/1, DII/2, DII/3, DII/5, DII/6, DII/7 & DII/8 at Court Lane, Delhi during 2014-15. (SH:- Misc. Civil work in flats No. DII/1, DII/3 & DII/8) & Providing & fixing Kitchen Cabinets DII/1, DII/2, DII/3, DII/5, DII/6, DII/7 & DII/8. | 11/08/2014 | 06/02/2015 | 32.94 | Aslam Builders | Final Bill Submitted in Division office |
Detail Report
Graph / Photo |
||
191 | Providing and fixing retro reflective informatory sign boards at various location of New Delhi constituency AC40 under MLA LAD Fund Scheme | 25/10/2019 | 22/01/2020 | 32.70 | 12.66 (Mar'21) | 0.00 (Mar'21) | Rajesh Kumar Gupta |
Detail Report
Graph / Photo |
|
192 | Attending Day-to-Day complaint in Mandoli Jail complex and resi. area including Supply of Material Horti Operation cleaning of water tank and Operation and maint of 850 KLD STP | 05/02/2021 | 05/04/2021 | 32.04 | 0.00 (Jan'21) | 10.00 % (Jan'21) | M/s Gejwal Construction Company | Work is in progress |
Detail Report
Graph / Photo |
193 | Construction of Porta Cabin for PWD Sub Divn. Office of Civil and Electrical including enquiries of both and Development of lab collection centre and shed covering | 06/01/2021 | 05/04/2021 | 31.62 | 0.00 (Jan'21) | 5.00 % (Jan'21) | Nation Star Enterprises | Work is under progress. |
Detail Report
Graph / Photo |
194 | Installation of hard drawn wire fabric at D Block and B Block residential quarters for monkey protection in Fire Station Connaught Place New Delhi. | 08/02/2019 | 07/03/2019 | 31.58 | 39.47 (Jul'19) | 90.00 % (Jul'19) | Vasdev | Work in progress |
Detail Report
Graph / Photo |
195 | Renovation of Kotwali Building at Chandni Chowk, Police Station under SRD Division-I, Sub-Division-III, PWD, New Delhi. | 25/06/2018 | 24/10/2018 | 31.39 | 0.00 (Feb'19) | 39.16 % (Feb'19) | Kamal Construction Co. | Work Completed and final bill paid |
Detail Report
Graph / Photo |
196 | Providing & fixing electrical panel and cabling for VRV system in 4th, 5th & 6th block at RGSS Hospital at Tahirpur, Delhi | 27/03/2015 | 26/04/2015 | 31.02 | Perfect Air Conditioning & Electricals |
Detail Report
Graph / Photo |
|||
197 | Providing and fixing door, window, Floor tile, kota stone flooring, wall tile, chajja etc i/c toilet portion. | 30/07/2020 | 02/11/2020 | 30.96 | 0.00 (Oct'20) | 85.00 % (Oct'20) | Laxmi Narayan | work in progress (60%) |
Detail Report
Graph / Photo |
198 | SITC of additional CCTV and allied equipment at GTB Hospital, Shahdara, Delhi | 16/10/2018 | 15/12/2018 | 30.64 | 15.29 (Feb'19) | 50.00 % (Feb'19) | San Infotech Services | work in progress 2nd RA 1696099 |
Detail Report
Graph / Photo |
199 | C/o approach road. Phase-II. | 01/11/2019 | 30/12/2019 | 30.03 | 28.70 (Mar'20) | 0.00 (Mar'20) | Asif | work is in progress (95%) |
Detail Report
Graph / Photo |
200 | Comprehensive Maintenance of Old Saint Stephens College Building Kashmere Gate, CPO Building, Old Court Building, NCC Offices Buildings, Novelty Fire Station, Fire Station Jama Masjid, Disability Commissioner Office, Lok Nayak Setu Office Compl | 17/11/2019 | 16/11/2020 | 29.01 | 36.24 (Feb'21) | 0.00 (Feb'21) | K.P. Singh & Co. |
Detail Report
Graph / Photo |
|
201 | (A) Replacement of damaged C.I and G.I Pipes. (B) Supply of Material. (C) Providing for services of Day to Day maintenance. | 29/05/2020 | 23/01/2021 | 27.31 | 13.96 (Jan'21) | 0.00 (Jan'21) | Mazid Hussain | Work in progress (90%) |
Detail Report
Graph / Photo |
202 | Rehabilitation work in Police Station at Chandni Mahal, Asaf Ali Road, Delhi. | 29/09/2019 | 26/03/2020 | 27.08 | 33.83 (Mar'21) | 0.00 (Mar'21) | Shah Pandya & Shot Crete |
Detail Report
Graph / Photo |
|
203 | Up gradation of toilets and guniting work in ITC lab and class rooms. Phase III | 28/12/2019 | 26/04/2020 | 26.66 | 7.74 (Mar'20) | 0.00 (Mar'20) | HARI RAM VERMA | Work In progress (85%) |
Detail Report
Graph / Photo |
204 | Running and maintenance of UPS at GTB Hospital, Complex, Shahdara, Delhi. Sub Head Comprehensive maintenance of Emerson make 2x200KVA UPS systems | 25/02/2019 | 24/02/2022 | 26.03 | POWER HOUSE | Work In Progress (2ND RA 618590 ).. |
Detail Report
Graph / Photo |
||
205 | Construction of yard for Malkhana of Police Station Chandni Mahal, Darya Ganj under SRD Division-I, Sub-Division-III, New Delhi. | 30/07/2018 | 29/10/2018 | 25.67 | 23.27 (Sep'19) | 0.00 (Sep'19) | Krishan Kumar | Work in progress |
Detail Report
Graph / Photo |
206 | Providing Materials and Manpower for day to day maintenance including miscellaneous repair works in the building | 26/05/2020 | 24/05/2021 | 24.70 | 0.00 (Jan'21) | 70.00 % (Jan'21) | KRISHAN KUMAR MISHRA | Work is in progress |
Detail Report
Graph / Photo |
207 | EOR to Police Colony, Tilak Nagar, New Delhi. SH Renovation of existing rooms and provision of multipurpose hall | 27/06/2018 | 26/09/2018 | 23.05 | 12.24 (Dec'19) | 0.00 (Dec'19) | Adorn associates |
Detail Report
Graph / Photo |
|
208 | Providing and laying bituminous concrete surface at BR Campus, Race course, New Delhi under MLA LAD fund Scheme. 3rd CALL | 26/11/2019 | 25/12/2019 | 22.88 | 10.29 (Aug'20) | 0.00 (Aug'20) | Rajesh Kumar Gupta |
Detail Report
Graph / Photo |
|
209 | Development Cricket ground football field and chain link fencing at newly taken over plot for sports complex at village kair in the Assembly constituency Najafgarh, Delhi. (SH: Comprehensive maintenance of cricket ground for one year) | 01/04/2021 | 31/03/2023 | 22.80 | Devender Pal Singh | Tender uploaded |
Detail Report
Graph / Photo |
||
210 | S.I.T.C of air conditioning system for Medicine and ENT OPD Section at JPC Hospital, Shastri Park, Delhi. | 21/07/2018 | 20/09/2018 | 22.52 | M/s Pneumatic Engineering Services | Work completed |
Detail Report
Graph / Photo |
||
211 | Construction of Portacabin for additional space of camp office over the Garrage at Bunglow No 2, 8 Raj Niwas Marg Delhi | 04/04/2019 | 03/06/2019 | 22.38 | 26.50 (Feb'20) | 0.00 (Feb'20) | Mohd Arshad |
Detail Report
Graph / Photo |
|
212 | Renovation of B Voc Labs | 20/05/2019 | 19/08/2019 | 22.14 | M.Y Construction | 40% Work could not start due to electrical tender not in force. |
Detail Report
Graph / Photo |
||
213 | Supplying and replacement of Outlived Air Handling Units at JPCH Shastri Park, Delhi | 22/07/2019 | 21/09/2019 | 21.72 | US Engineers | Tender is in process |
Detail Report
Graph / Photo |
||
214 | Providing and Fixing of MS tubular Window with Acrylic plastic Sheet | 14/11/2019 | 12/03/2020 | 21.53 | 26.89 (Mar'21) | 0.00 (Mar'21) | KAMAAL CONSTRUCTION CO. |
Detail Report
Graph / Photo |
|
215 | "Addition / Alteration of Roop Nagar fire station Delhi. (SH:- Ready Mix concrete, Renovation of Toilet and other Misc. work.) " | 08/10/2015 | 07/01/2016 | 19.71 | Jabir Husain | Final Bill not submitted by the Agency |
Detail Report
Graph / Photo |
||
216 | SITC of Water softerner and treatment equipment | 27/01/2015 | 26/07/2015 | 18.59 | Passim Water Services | ... |
Detail Report
Graph / Photo |
||
217 | Renovation of Reporter Branch and Legislation Branch at Delhi Vidhan Sabha | 01/05/2020 | 31/07/2020 | 18.20 | HPS Enterprises | Work in Progress |
Detail Report
Graph / Photo |
||
218 | Const. of office building for Sub Division III SRD Project Divn I at Road No. 47 near Metro Pillar No. 29, Kashmere Gate, Delhi | 23/09/2019 | 21/12/2019 | 17.04 | 21.26 (Jul'20) | 0.00 (Jul'20) | K.P. Singh & Co. |
Detail Report
Graph / Photo |
|
219 | Construction of New Shed over main stage of Control Room in Central Jail No. 2, Tihar, New Delhi. | 15/07/2017 | 20/07/2017 | 16.86 | Bagga Enterprises |
Detail Report
Graph / Photo |
|||
220 | Repair/Renovation of the garage at H-Block of Delhi Commission for Women, Vikas Bhawan, I.P. Estate, New Delhi. | 01/08/2016 | 30/09/2016 | 16.80 | 0.00 (Aug'16) | 10.00 % (Aug'16) | Sanendra Kumar | Work in progress |
Detail Report
Graph / Photo |
221 | Repair and Renovation of Auditorium in Shahed Bhai Bal Mukand Govt. Sarvodaya Vidyalaya at Shankaracharya Marg, Delhi, during 2015-16 | 23/10/2015 | 22/01/2016 | 16.78 | Munzareen Ahmed | Final Bill not submitted by the Agency |
Detail Report
Graph / Photo |
||
222 | EOR to Sarvodaya Kanya Vidyalaya, Hari Nagar, Clock Tower, New Delhi. SH Provision of Rain Water Harvesting System | 06/09/2018 | 05/11/2018 | 16.77 | 23.50 (Mar'20) | 0.00 (Mar'20) | Kishan singhal |
Detail Report
Graph / Photo |
|
223 | Construction of Conference Hall and Waiting/Reception Hall in Office of Commissioner for Persons with Disabilities at Mata Sundari Road under SRD Division-I, Sub-Division-III, PWD, New Delhi. (SH-Civil Renovation Work). | 09/08/2018 | 08/11/2018 | 16.72 | 15.33 (Oct'19) | 5.60 % (Oct'19) | Intkhab Alam | Work in progress |
Detail Report
Graph / Photo |
224 | EOR to Central Jail No. 4, Tihar, New Delhi. SH Improvement of covering of stage at chakkar. | 01/02/2019 | 30/04/2019 | 16.39 | 20.64 (Mar'20) | 0.00 (Mar'20) | SUSHIL ENGINEERING WORKS |
Detail Report
Graph / Photo |
|
225 | A/R & M/O GNEC, New Delhi. dg. 2016-17 (SH: Up-Keeping and maintenance of services of GNEC and providing and service of computer operator, Dak Messenger, plumber, carpenter, mason sewerman etc under HMD (Central) SD-3) | 13/04/2017 | 12/10/2017 | 16.04 | 7.45 (Mar'19) | 46.00 % (Mar'19) | Anup Enterprises |
Detail Report
Graph / Photo |
|
226 | Miscellaneous requisite work in Central Jail No 11, 12, 13, 14, 15 and 16 in Prison Complex Mandoli, Delhi- 110093 | 15/10/2020 | 11/02/2021 | 15.37 | 0.00 (Dec'20) | 22.00 % (Dec'20) | M/s Manomay | Work is in progress |
Detail Report
Graph / Photo |
227 | Providing and laying Flushing and water supply line al-round at Police housing campus Delhi-110093 (Balance work) | 05/02/2021 | 05/04/2021 | 15.34 | Himanshu Saini | The contractor forfeited the PG and work is 2nd call. |
Detail Report
Graph / Photo |
||
228 | SH- Kota stone flooring, repair to boundary wall including grit plaster and concertina wire fencing, repair and maintenance of toilets, P F steel windows, renewing broken glass panes with polycarbonate sheet etc. | 07/11/2018 | 04/02/2019 | 15.26 | Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 | in progress. |
Detail Report
Graph / Photo |
||
229 | Providing and supplying plastic moulded table in porta cabins reading room at various places of New Delhi Constituency AC40 under MLA LAD Fund Scheme. | 25/10/2019 | 08/12/2019 | 15.17 | DECOR MODULAR SYSTEM PVT LTD |
Detail Report
Graph / Photo |
|||
230 | Upkeep Service | 05/10/2019 | 04/10/2020 | 15.15 | 18.80 (Feb'21) | 0.00 (Feb'21) | Ashish Gupta |
Detail Report
Graph / Photo |
|
231 | AR and MO Various Buildings under Sub Division WB-15, Sunder Apartment, New Delhi. During 2018-19. SH Providing labour for day to day maintenance and watch and ward in 32 Nos. Type IV and 32 Nos.Type V, Fire Station at Paschim Vihar, JawalaPuri, Jwal | 06/10/2018 | 05/08/2019 | 14.64 | 8.96 (Aug'19) | 0.00 (Aug'19) | Universal Security & Placement Services (Regd.) |
Detail Report
Graph / Photo |
|
232 | Construction of Casualty Block at Lal Bahadur Shastri Hospital, Khichripur, Delhi. Sub Head Providing Electrical Installation work | 22/07/2019 | 21/09/2019 | 14.54 | Sangeeta Electricals | 1st RA 729827 |
Detail Report
Graph / Photo |
||
233 | Providing barrier free environment for disable persons. | 21/09/2020 | 20/03/2021 | 14.49 | ARIF, Jahangirpuri, Delhi | Work in progress 10% |
Detail Report
Graph / Photo |
||
234 | Construction of 2 Nos Rain water harvesting system | 25/11/2019 | 22/02/2020 | 14.36 | 8.89 (Jul'20) | 0.00 (Jul'20) | Shamshad Ahmed | work is in progress (70%) |
Detail Report
Graph / Photo |
235 | Renovation work of kitchen area, Stage work, interlocking tile work, misc repair work in Old community centre and Shri Ram Park | 25/11/2019 | 23/01/2020 | 14.35 | 12.82 (Aug'20) | 0.00 (Aug'20) | Sageer Ahmad | work is in progress (60%) |
Detail Report
Graph / Photo |
236 | SITC of Emergency Call Bell System in CJ 13 and CJ 15 Mandoli Prisons Delhi | 13/03/2021 | 11/05/2021 | 14.10 | M/s TOPAZ SERVICES CORPORATION | award letter issued |
Detail Report
Graph / Photo |
||
237 | P/F of Kota stone PVC tank sitting platform near statue and other major misc works | 25/11/2019 | 22/02/2020 | 14.03 | 7.90 (Sep'20) | 0.00 (Sep'20) | M H Builders | work is in progress (75%) |
Detail Report
Graph / Photo |
238 | Construction of steel staircase with passage for making approach to library, lift and second floor room, renovation of college canteen, water proofing treatment on roof with APP and broken tile, false ceiling and aluminium partition work in library a | 13/01/2020 | 12/03/2020 | 13.98 | 17.43 (Sep'20) | 0.00 (Sep'20) | Saeed Builders | work in progress 60%. Work heldup due to lockdown |
Detail Report
Graph / Photo |
239 | Special repair to EI work in Mandoli Prison Complex, Delhi | 15/03/2021 | 13/05/2021 | 13.93 | Neeraj Kumar | PG ISSUED |
Detail Report
Graph / Photo |
||
240 | Construction of permanent shed on pavement near Gyne OPD registration | 18/08/2020 | 17/10/2020 | 13.73 | SS Enterprises | work in progress. |
Detail Report
Graph / Photo |
||
241 | Providing renovation repair of toilet, ramps, railing, tactile tiles, signage etc. to make school building and environment barrier free and accessible. EOR ID 20191350. | 02/07/2020 | 17/08/2020 | 13.62 | Laxmi Narayan | Work in progress (40%) |
Detail Report
Graph / Photo |
||
242 | Providing and installation of 10 Nos. passenger lift in Four Storey Building at DIPSAR, M.B. Road New Delhi. | 25/06/2019 | 24/08/2019 | 13.59 | Sanjeev Kumar Goel | work in progress |
Detail Report
Graph / Photo |
||
243 | EOR to Govt. Sarvodaya Kanya Vidyalaya a S.P. Road, Nangloi, New Delhi. SH Providing new gate for main entrance, near activity room, providing and fixing grill in front of primary section providing shed for water through near primary section | 02/04/2018 | 15/09/2030 | 13.58 | L V Enterprises |
Detail Report
Graph / Photo |
|||
244 | "EOR to Sarvodaya Bal Vidyalaya, Timarpur, Delhi-54, dg. 2014-15 (SH:- Repairing of roof and toilets ( SSH:- Repair and Renovation of staircase and other misc repair) " | 23/10/2015 | 22/12/2015 | 13.57 | Jabir Husain | Final Bill not submitted by the Agency |
Detail Report
Graph / Photo |
||
245 | Providing UPS supply in DGHS (HQ) for computer Network (LAN) at Karkardooma, Delhi. (SH: EI works). | 06/04/2018 | 05/06/2018 | 13.57 | 6.60 (Jan'19) | 40.00 % (Jan'19) | Aas Electric Co. | Work in Progress ( 1st RA 659060 |
Detail Report
Graph / Photo |
246 | P/L of Bituminous concrete of 40/50 mm compacted thickness with bitumen of grade VG-30. (Through MLA Fund) | 16/11/2019 | 16/12/2019 | 13.56 | Laxmi Narayan | Work yet not started. Tender is to be foreclosed & re invited bid new TS. |
Detail Report
Graph / Photo |
||
247 | Repairing work to already installed Rain Water Harvesting Systems to make them functional in 7 Nos. Schools of NB-11, Delhi. | 03/01/2020 | 03/04/2020 | 13.50 | Shyam Sunder, PAN: CHLPS5692A | Work In progress (30%) |
Detail Report
Graph / Photo |
||
248 | Shifting of X Ray machine at Gate No 6 and provision of porta cabin at gate No 6 and covering of vehicle session at gate No 03 | 20/05/2019 | 03/07/2019 | 13.40 | 13.90 (Jan'20) | 0.00 (Jan'20) | Rajeev Kumar | site not available for work 60% |
Detail Report
Graph / Photo |
249 | Renovation of gents and ladies toilet and guniting of ceiling of ground, 1st, 4th, 5th and 6th floor of I block, College of Art at Tilak Marg, New Delhi | 14/11/2019 | 11/02/2020 | 13.30 | 14.80 (Mar'21) | 0.00 (Mar'21) | Amiruddin |
Detail Report
Graph / Photo |
|
250 | Miscellaneous EI work in various Jails of Mandoli Prison Complex, Delhi | 31/03/2021 | 30/06/2021 | 13.30 | BHS Pump Specialist | tender called |
Detail Report
Graph / Photo |
||
251 | Construction of Porta Cabin for storage purpose on Terrace of Family Court, Saket, New Delhi. | 26/06/2019 | 25/07/2019 | 13.07 | 8.01 (Mar'21) | 0.00 (Mar'21) | P S ASSOCIATES | work in progress |
Detail Report
Graph / Photo |
252 | Rehabilitation of distress open staircase at Admn. Block. (ii) Conversion of Existing class room into PGs Accommodation. Balance | 17/09/2020 | 05/12/2020 | 12.59 | sabur alam | Work in progress. |
Detail Report
Graph / Photo |
||
253 | Rehabilitation of distress open staircase at Admn. Block. Conversion of Existing class room into PG s Accommodation. Balance work of PG s Accommodation. | 17/09/2020 | 05/12/2020 | 12.59 | sabur alam | Work is Progress |
Detail Report
Graph / Photo |
||
254 | Setting up of Dining Hall at HLTB Complex, Tahirpur, Delhi under KKD Court Divn.. M-231 dg. 18-19. | 10/02/2019 | 10/05/2019 | 12.52 | 13.79 (Jan'20) | 0.00 (Jan'20) | Daya Sagar Sharma | work in progress |
Detail Report
Graph / Photo |
255 | Construction of Rain Water Harvesting Structure at GBSS Mukherjee Nagar under Sub division M-3211(N), Delhi. | 09/02/2019 | 10/05/2019 | 12.31 | Hare Ram Singh | ok |
Detail Report
Graph / Photo |
||
256 | Installation of Rain Water Harvesting system at Sarvodaya bal vidyalaya, Fatehpur Beri, New Delhi (School ID 1923014, Building ID 19231036, EOR ID 20172367). | 03/03/2019 | 02/05/2019 | 12.15 | 10.84 (Nov'20) | 0.00 (Nov'20) | RECKONN | work in progress |
Detail Report
Graph / Photo |
257 | AR and MO Fire Stations, Hari Nagar, Janak Puri under Sub Division WB-14. During 2018-19. SH Repair misc. civil works | 10/09/2018 | 02/09/2019 | 11.82 | Arif |
Detail Report
Graph / Photo |
|||
258 | Replacement of existing damaged carpet of Assembly hall, MLA lounge I and II at Vidhan Sabha, Delhi. | 17/07/2017 | 15/08/2017 | 11.77 | 14.00 (Oct'20) | 0.00 (Oct'20) | Vijay Furnitures | * |
Detail Report
Graph / Photo |
259 | Providing and fixing down comer and manually operated electronic FA system | 19/09/2019 | 18/10/2019 | 11.18 | 0.00 (Jan'21) | 98.00 % (Jan'21) | M/s Royale Meridian India Pvt Ltd | Work in progress |
Detail Report
Graph / Photo |
260 | EOR to SKV Bakhtawarpur, Delhi 110036. (A) Construction of parking shed and toe wall around gardening area.) (B) Dismantling Over Head Water tank platform. | 06/01/2020 | 06/03/2020 | 11.13 | VAKIL AHMAD | Work In progress (80%) |
Detail Report
Graph / Photo |
||
261 | Provision for Rain Water Harvesting Systems in Govt. Girls Sec. School (Urdu Medium) Lambi Gali, Hauz Qazi under SRD Division-I, Sub-Division-III, PWD, New Delhi dg. 2018-19. | 11/07/2019 | 10/09/2019 | 11.10 | 1.62 (Mar'21) | 0.00 (Mar'21) | Shakur Ahmed & Sons |
Detail Report
Graph / Photo |
|
262 | Construction of room at 1st floor on existing store room and misc. renovation work at JJB-I, Sewa Kutir Complex, Kingsway Camp, Delhi. | 09/06/2016 | 08/08/2016 | 11.10 | 0.00 (Apr'17) | 85.00 % (Apr'17) | Nafees Ahamed | Work in progress |
Detail Report
Graph / Photo |
263 | Provision for Rain Water Harvesting System in Sarvodaya Kanya Vidyalaya No. 1 (Hindi Medium) at Jama Masjid, Delhi dg. 18-19 (School ID-2127024.) under SRD Division-I, Sub-Division-III, PWD, New Delhi | 11/03/2019 | 10/05/2019 | 11.09 | 13.85 (Mar'20) | 0.00 (Mar'20) | Mohd. Asad | work in progress |
Detail Report
Graph / Photo |
264 | Repair and Renovation works | 21/11/2018 | 19/01/2019 | 11.00 | 6.86 (May'19) | 0.00 (May'19) | Daya Sagar Sharma | Work in progress |
Detail Report
Graph / Photo |
265 | Operation and Maintenance of STP Plant of 180 KLD | 27/07/2020 | 26/07/2022 | 10.91 | 0.00 (Jan'21) | 25.00 % (Jan'21) | M/s Parasar Electricals & Refrigeration | Work is in progress |
Detail Report
Graph / Photo |
266 | Construction of Old Age Home at Kanti Nagar Installation of fire doors in the building | 04/03/2021 | 02/04/2021 | 10.22 | A. V. ENTERPRISES | just awarded. |
Detail Report
Graph / Photo |
||
267 | Construction of office Rooms 2 Nos for Junior Engineer Electrical and Horticulture Staff and walking track at the park | 10/12/2019 | 08/02/2020 | 10.02 | 8.95 (Feb'21) | 0.00 (Feb'21) | Mateen Ahmad | work is in progress (80%) |
Detail Report
Graph / Photo |
268 | Upgradation/Renovation of Two rooms of HQ branch, Directorate of Education at Ground Floor of Old Patrachar Building, Timarpur Delhi-54. | 24/04/2016 | 22/06/2016 | 10.01 | Krishan Kumar | Site not made available by the Client |
Detail Report
Graph / Photo |
||
269 | Construction one no additional toilet at 14/2 Tilak Marg and Renovation of kitchen, toilets and other civil miscellaneous repair works at 36 Ashoka Road under SRD Project Division-I, Sub-Division-IV, PWD, New Delhi | 11/08/2019 | 10/10/2019 | 9.97 | 11.78 (Nov'20) | 0.00 (Nov'20) | Sher Singh |
Detail Report
Graph / Photo |
|
270 | Provision for Rain Water Harvesting System in Govt Girls Sr Sec School at Gali Baraf Wali Kinari Bazar Delhi during 2018 19 School ID-1208023 under SRD Division I Sub-Division III PWD New Delhi | 11/07/2019 | 10/09/2019 | 8.86 | 8.84 (Mar'20) | 0.00 (Mar'20) | Shakur Ahmed & Sons |
Detail Report
Graph / Photo |
|
271 | Provision for Rain Water Harvesting System in Sarvodaya Kanya Vidyalaya No. 2 at Zeenat Mahal, Lal Kuan, Delhi (School ID-2127179) under SRD Division-I, Sub-Division-III, PWD, New Delhi | 14/07/2019 | 13/09/2019 | 8.76 | Shakur Ahmed & Sons |
Detail Report
Graph / Photo |
|||
272 | Providing Services of Inspection Vehicle for Chief Engineer Other Projects Zone and Division office | 08/08/2020 | 07/08/2021 | 8.73 | 0.00 (Jan'21) | 50.00 % (Jan'21) | Nisha Travels | Work is in progress |
Detail Report
Graph / Photo |
273 | Providing services of plumbing, carpentry jobs etc RECALL | 04/11/2019 | 03/11/2020 | 8.68 | 8.68 (Mar'21) | 0.00 (Mar'21) | Good Luck Enterprises |
Detail Report
Graph / Photo |
|
274 | AR and MO to ITI for women Tilak Nagar, ITI Hari Nagar Jail Road Labour Commissioner Office, Hari Nagar, New Delhi. During 2018-19. SH Repair and finishing work | 04/06/2018 | 03/06/2019 | 8.35 | KAILASH CHANDRA AND SONS |
Detail Report
Graph / Photo |
|||
275 | A R and M O to 405 DA Flats Kalyanvas Delhi 91 dg 2018 19 | 18/06/2018 | 14/06/2019 | 8.03 | 5.04 (Nov'20) | 0.00 (Nov'20) | SABUR ALAM | work in progress 40% |
Detail Report
Graph / Photo |
276 | A/R and M/O to I.G.D.T.U.W. at Kashmere Gate, Delhi During 2018-19. (SH-Upkeep Service). | 25/09/2018 | 24/09/2019 | 8.01 | 1.56 (Jan'20) | 0.00 (Jan'20) | Ashish Gupta | Work in progress |
Detail Report
Graph / Photo |
277 | Provision for Rain Water Harvesting System in Sarvodaya Bal Vidyalaya at Pataudi House, Darya Ganj, Delhi (School ID-2127003.) under SRD Division-I, Sub-Division-III, PWD, New Delhi | 25/06/2019 | 24/08/2019 | 7.90 | 6.08 (Nov'19) | 0.00 (Nov'19) | SUDHIR KUMAR SHARMA |
Detail Report
Graph / Photo |
|
278 | Furniture work | 25/10/2019 | 08/12/2019 | 7.84 | 7.84 (Mar'21) | 0.00 (Mar'21) | DURIAN INDUSTRIES LIMITED |
Detail Report
Graph / Photo |
|
279 | Provision for Rain Water Harvesting System in Govt. Boys Sr. Sec. School No. 2 (Hindi Medium) at Jama Msjid, Delhi (School ID-2127006.) under SRD Division-I, Sub-Division-III, PWD, New Delhi | 25/06/2019 | 24/08/2019 | 7.66 | 6.42 (Jan'20) | 0.00 (Jan'20) | SUDHIR KUMAR SHARMA |
Detail Report
Graph / Photo |
|
280 | Providing and fixing Signage board in various place at L.N. Hospital, New Delhi. | 10/09/2020 | 06/06/2021 | 7.57 | Shrayash Enterprises | Work in progress. |
Detail Report
Graph / Photo |
||
281 | Preparation of one room of 2nd and 3rd floor in front of lift gallery and replacement of gallery window of I Block, College of Art at Tilak Marg, New Delhi | 14/11/2019 | 12/01/2020 | 7.35 | 9.10 (Feb'21) | 0.00 (Feb'21) | Amiruddin |
Detail Report
Graph / Photo |
|
282 | Installation of rain water harvesting system | 02/06/2018 | 01/08/2018 | 7.23 | 6.04 (Jul'19) | 0.00 (Jul'19) | Mohd Akram | work in progress 70% |
Detail Report
Graph / Photo |
283 | A/R and M/O I.G.D.T.U.W. at Kashmere Gate, Delhi During 2018-19. (SH-Repair and Renovation work of University Staff Quarters at IGDTUW, Kashmere Gate under SRD Division-I, Sub-Division-III, PWD, New Delhi). | 29/03/2019 | 28/06/2019 | 7.01 | Prithvi creation | work in progress |
Detail Report
Graph / Photo |
||
284 | Providing and renovation /repair of ramps, railing, tactile tiles signage etc. to make school building and environment barrier free and accessible for CWSN. | 03/07/2020 | 02/10/2020 | 6.87 | ARIF, Jahangirpuri, Delhi | Work in progress (40%) |
Detail Report
Graph / Photo |
||
285 | ARMO of E & M Services in Children Home at Alipur, Delhi (SH: Operation of Sub-Station and DG Set | 30/05/2017 | 29/05/2018 | 6.87 | Parmar Electrical | Completed/In Progress |
Detail Report
Graph / Photo |
||
286 | Renovation of D Block 1st Floor MP Hall | 28/11/2019 | 26/01/2020 | 6.80 | 6.89 (Sep'20) | 0.00 (Sep'20) | Mohd Amjad |
Detail Report
Graph / Photo |
|
287 | Operation and Maintenance of 3x110 TR Capacity HVAC System and Servicing Overhauling and Comprehensive running maintenance of WTAC, Water coolers and Split AC units | 01/04/2019 | 31/12/2019 | 6.53 | 7.48 (May'20) | 0.00 (May'20) | M/s Naj Refrigeration & Air Conditioning Works |
Detail Report
Graph / Photo |
|
288 | Renovation of DDE Office and Staff Room. | 05/01/2020 | 06/03/2020 | 6.24 | ARIF, Jahangirpuri, Delhi | Work not allowed by Principal Date. |
Detail Report
Graph / Photo |
||
289 | "EOR to SKV Magazine Road, Majnu ka Tila, Delhi dg. 2014-15 (SH:- Changing of Asbestos sheet and other misc works at Primary wing) " | 18/10/2015 | 17/11/2015 | 5.90 | K.P. Singh & Co. | Final Bill not submitted by the Agency |
Detail Report
Graph / Photo |
||
290 | Raising of boundary wall of Lal quarter Kidwai Nagar residential area under MLA LAD Fund Scheme RECALL | 04/11/2019 | 18/12/2019 | 5.60 | 4.89 (Sep'20) | 0.00 (Sep'20) | B P Rai and Sons |
Detail Report
Graph / Photo |
|
291 | AR MO to DAP Line, Vikas Puri, New Delhi. During 2018-19. SH Cleaning and opening of blocked chocked sewerage system inside the campus by Super Sucker Machine and disilting of storm water pipe drains. | 13/10/2018 | 12/02/2019 | 5.46 | RichCon Engineering Company |
Detail Report
Graph / Photo |
|||
292 | C/o District Court Complex at Plot No. 8, Shastri Park, Delhi During 2020-21 9 (SH:Deploying Persons for Safety of Government Properties). | 03/10/2020 | 02/10/2021 | 5.41 | 0.00 (Jan'21) | 33.00 % (Jan'21) | Star security & Placement Services | Work is in progress |
Detail Report
Graph / Photo |
293 | Providing inspection vehicles on hire charge basis One no. inspection vehicle for use in the office of Executive Engineer OPD-II and Two nos. inspection vehicles | 04/01/2021 | 03/07/2021 | 5.39 | 0.00 (Feb'21) | 20.00 % (Feb'21) | SKIEZS | Work is in progress |
Detail Report
Graph / Photo |
294 | Barrier free and accessible building for disabled persons. | 31/07/2020 | 30/09/2020 | 5.38 | Laxmi Narayan | Work in progress 40% |
Detail Report
Graph / Photo |
||
295 | Construction of Rain water Harvesting System at Govt Boys Sr Secondary School Dev Nagar New Delhi Building ID 21281284 | 30/05/2019 | 13/07/2019 | 5.19 | 4.90 (Jan'20) | 0.00 (Jan'20) | Prem Sagar | Work completed final bill paid |
Detail Report
Graph / Photo |
296 | Providing renovation repairof ramps railing tactile tiles signage etc to make school building and environment barrier free and accessible EOR ID 20182544 | 29/05/2020 | 28/07/2020 | 5.08 | Suresh Ray | work in progress (5%) |
Detail Report
Graph / Photo |
||
297 | Maintenance of PCs and their accessories in Health Maintenance Division Office (S-W) and all Sub Divisions under this Division office. | 27/01/2020 | 26/01/2021 | 5.04 | STAR COMPUTER SYSTEMS | The Tender has been Cancel. |
Detail Report
Graph / Photo |
||
298 | Construction of Rain water Harvesting System in Sarovodya Kanya Vidyalaya Baba Ram Dev at Prasad Nagar New Delhi Building ID 21281295 | 30/05/2019 | 13/07/2019 | 4.97 | 5.56 (Nov'19) | 0.00 (Nov'19) | Prem Sagar | Bill paid |
Detail Report
Graph / Photo |
299 | Renovation work at Session House, 2 North End Road, Delhi, SH Providing doors, cup boards, false ceiling and other misc. works. | 08/06/2019 | 07/08/2019 | 4.97 | 6.25 (Sep'19) | 0.00 (Sep'19) | Mool Chand | ok |
Detail Report
Graph / Photo |
300 | Construction of additional SPS type classrooms in Govt Schools Directorate of Education under Priority II SH Providing inspection vehicle for the office of Executive Engineer Edu M Division C and ND at Vikas Bhawan II Civil Lines New Delhi 110054 | 05/09/2019 | 04/09/2020 | 4.82 | 0.00 (Jan'20) | 100.00 % (Jan'20) | Surender Singh Chahal | work in progress |
Detail Report
Graph / Photo |
301 | Construction of 9981 Class Roooms 106 MP Halls, 328 Labs 204 Librarie Principal and Vice principal rooms Staffrooms and 1067 Toilet block including stair cases etc 12748 No equivalent classrooms in existing premises of Govt Schools in Govt | 22/01/2021 | 05/02/2021 | 4.81 | Kesari & Associates | work in progress |
Detail Report
Graph / Photo |
||
302 | E.O.R. to repair and replacement of sewer line, rain water disposal line and other misc. repair work in Police Station, Darya Ganj, Delhi dg. 2018-19 (SH- Improvement of drainage system under SRD Division-I, Sub-Division-III, PWD, New Delhi). | 26/02/2019 | 25/04/2019 | 4.59 | 5.27 (Jun'19) | 0.00 (Jun'19) | Prashant Gupta | work in progress |
Detail Report
Graph / Photo |
303 | Construction of tubewell at Govt. Girls Senior Secondary School, West Patel Nagar, New Delhi. | 14/03/2019 | 13/06/2019 | 4.50 | ATUL SHARMA |
Detail Report
Graph / Photo |
|||
304 | Making barrier free for accessibility of disabled persons at PCR Colony, Model Town II, Delhi | 03/07/2020 | 02/08/2020 | 4.39 | 2.85 (Dec'20) | 0.00 (Dec'20) | Anshikha Enterprises | work in progress (65%) |
Detail Report
Graph / Photo |
305 | EOR to Police Colony, Rajinder Nagar, New Delhi during 2018-19.(SH- Covering of open drain in Police Colony). | 30/05/2018 | 28/07/2018 | 4.37 | 5.48 (Aug'19) | 0.00 (Aug'19) | G.S construction | wip |
Detail Report
Graph / Photo |
306 | Misc. civil repair work | 15/09/2019 | 14/12/2019 | 4.36 | Shabbi Abbas |
Detail Report
Graph / Photo |
|||
307 | Rain Water Harvesting structure at Rajokari Institute of Technology Rajokari New Delhi | 04/02/2021 | 20/03/2021 | 4.33 | BANSIWAL CONSTRUCTION COMPANY | 100% work completed. |
Detail Report
Graph / Photo |
||
308 | Cons. of toilet in front of SCP Canteen and Requirement of bathroom and toilet in Community Centre. | 23/03/2020 | 22/05/2020 | 4.12 | 5.14 (Mar'21) | 0.00 (Mar'21) | Panchu ram |
Detail Report
Graph / Photo |
|
309 | RMO of water coolers , Split or Window or Ductable ACs installed at Lawyers block , Utility Block , Lockup building and Main Court Building at District Court Complex saket New delhi -110017. | 03/02/2019 | 02/02/2020 | 3.91 | 1.61 (Jul'19) | 0.00 (Jul'19) | ARORA ELECTRICAL WORKS |
Detail Report
Graph / Photo |
|
310 | EOR to National Law University, Sec-14, under Sub Div-III, SWBMD, New Delhi during 2018-19.(SH- Cleaning of sewerline by using super sucker machine). | 05/06/2018 | 02/09/2018 | 3.81 | 3.81 (Dec'18) | 70.00 % (Dec'18) | Surender Singh Chahal | work in progress |
Detail Report
Graph / Photo |
311 | Misc. civil repair works. | 25/02/2019 | 25/04/2019 | 3.73 | 4.73 (Mar'21) | 0.00 (Mar'21) | Harsh Heights Pvt Ltd | Work in progress. |
Detail Report
Graph / Photo |
312 | Replacement of broken kota stone flooring and wooden racks, false ceiling and white washing of MFA final year Sculpture Studio, College of Art at Tilak Marg, New Delhi | 15/11/2019 | 14/12/2019 | 3.73 | 3.53 (Sep'20) | 0.00 (Sep'20) | Sher Singh |
Detail Report
Graph / Photo |
|
313 | Conversion of Garrage No 4 for Staff Accommodation at Bunglow No 3, 8 Raj Niwas Marg, Delhi dg. 2016-17. (SH:- Civil Work). | 13/08/2016 | 01/09/2016 | 3.49 | 0.00 (Aug'16) | 90.00 % (Aug'16) | Work Completed |
Detail Report
Graph / Photo |
|
314 | Cleaning of Sewerline of Residential Building and Non Residential Building and repair in AAMC | 14/11/2020 | 13/01/2021 | 3.47 | UR Construction | Work in Progress 10% |
Detail Report
Graph / Photo |
||
315 | A/R and M/O to AUD, Kashmere Gate, Delhi dg - 2015 -16( Finishing work) | 26/11/2015 | 15/12/2015 | 3.19 | Mohd Israil & Sons | final bill and labour licence etc. Not submitted by the agency. |
Detail Report
Graph / Photo |
||
316 | Construction of boundary wall at Shastri Park court complex New Delhi (SH EI Work at the main gates and Guard Rooms) | 06/08/2019 | 05/11/2019 | 3.17 | 0.00 (Dec'20) | 99.00 % (Dec'20) | M/S RAKESH KUMAR ARYA | Work pending due to civil wing |
Detail Report
Graph / Photo |
317 | AMC of Computers,printer, UPS and Networking systems installed in the in Education Maint. Circle Unit 1, Unit 2, Division North PWD and its Sub-divisions | 11/07/2020 | 10/07/2021 | 3.07 | 0.42 (Mar'21) | 60.00 % (Mar'21) | Silicate Technologies Private Limited | Work in progress. |
Detail Report
Graph / Photo |
318 | Provision of Security Guard for Watch and ward at Old Age Home, Chattarpur under Sub Division-II, PTS Malviya Nagar, New Delhi during 2019-20. | 21/06/2019 | 20/06/2020 | 3.05 | 3.05 (Mar'21) | 0.00 (Mar'21) | Universal Security & Placement Services (Regd.) | work in progress |
Detail Report
Graph / Photo |
319 | Providing of work stations and file racks in the office of the Financial Commissioner at 5- Sham Nath Marg. Delhi. | 30/06/2016 | 13/08/2016 | 2.73 | 0.00 (Apr'17) | 50.00 % (Apr'17) | work in progress |
Detail Report
Graph / Photo |
|
320 | A/R and M/O to I.G.D.T.U.W. at Kashmere Gate under Sub-Division-III, SRD Division-I, PWD, New Delhi During 2017-18 (SH-Specialized waterproofing treatment in the profile sheet gutter of workshop behind MAE Block). | 21/04/2018 | 20/05/2018 | 2.62 | 0.00 (Jul'18) | 2.90 % (Jul'18) | Garg Waterproofing Company | Work Completed and final bill paid |
Detail Report
Graph / Photo |
321 | Miscellaneous electrical work at Rouse Avenue District Court Complex New Delhi | 26/03/2021 | 25/06/2021 | 2.60 | R. Diamond Enterprises | tender work in process |
Detail Report
Graph / Photo |
||
322 | A/R and M/O other PWD Roads under SRD Division -I, PWD, New Delhi during 2019-20. (SH- Painting of Kerb Stones on various roads for Independence Day under Sub Division-II.) | 13/08/2019 | 27/08/2019 | 2.06 | 2.27 (Nov'19) | 0.00 (Nov'19) | MOHD AFTAB |
Detail Report
Graph / Photo |
|
323 | A/R & M/O to residensial building type -IV flats (duplex) at Maharaja lane. Dg.2015-16.( SH: Internal and External finishing of type-IV flats). | 26/11/2015 | 25/12/2015 | 1.99 | Mohd Israil & Sons | final bill and labour licence etc. Not submitted by the agency. |
Detail Report
Graph / Photo |
||
324 | Soil Investigation. | 02/06/2018 | 17/06/2018 | 1.43 | M/S GEO Technical Consultants | work is in progress. |
Detail Report
Graph / Photo |
||
325 | Photocopy, Scanning/ Digital Color Printing Job | 21/02/2019 | 20/02/2020 | 1.02 | 0.00 (Jan'21) | 87.20 % (Jan'21) | Durga Electro State | work is in progress |
Detail Report
Graph / Photo |
326 | Providing service of Photocopier Machine on rental basis in the office ofExecutive Engineer, Health Project Division (Central), PWD, Lok Nayak Hospital, New Delhi | 24/10/2020 | 23/10/2021 | 0.37 | Continental Copier Co. | work in progress. |
Detail Report
Graph / Photo |
||
327 | Remodeling of Existing Casualty Block at L.N Hospital Block, New Delhi. | 15/12/2019 | 14/03/2021 | MIA Construction Pvt. Ltd. | work in progress |
Detail Report
Graph / Photo |
|||
328 | Providing and fixing PVC doors in bathrooms in qtrs. in place of old damaged ones. | 18/09/2014 | 17/10/2014 |
Detail Report
Graph / Photo |
|||||
329 | Replacement of Damaged roof of Sub Divn. Office M-233. | 11/11/2014 | 10/12/2014 |
Detail Report
Graph / Photo |
|||||
330 | Cleaning of sewer line, manhole & gully traps etc. | 22/12/2014 | 21/01/2015 |
Detail Report
Graph / Photo |
|||||
331 | Providing and fixing door in toilet at G.G.S.S.S. Vasundhara Enclave Delhi School ID-1002185. | 24/01/2015 | 23/02/2015 | M. N. Construction Co. |
Detail Report
Graph / Photo |
||||
332 | Repair of toilet roof at Rajkiya Sarvodaya Kanya Vidyalaya Kalyan Puri Delhi. | 08/01/2015 | 07/02/2015 | M. N. Construction Co. |
Detail Report
Graph / Photo |
||||
333 | Providing and fixing polycarbonate in available. | 19/12/2014 | 18/01/2015 |
Detail Report
Graph / Photo |
|||||
334 | Providing and fixing door & window shutters in pooling booth centre at GGSSS Kondli Gharoli. | 06/02/2015 | 20/02/2015 |
Detail Report
Graph / Photo |
|||||
335 | Wall tile and other misc. civil work in Sports Complex at East Vinod Nagar. | 27/02/2015 | 26/03/2015 |
Detail Report
Graph / Photo |
|||||
336 | Providing & fixing door and installation of PVC overhead tank for fire safety. | 17/01/2015 | -- |
Detail Report
Graph / Photo |
|||||
337 | Misc. Civil Works. | 16/03/2015 | 30/03/2015 | Shekhar |
Detail Report
Graph / Photo |
||||
338 | Providing ramps in Schools & miscellenious works. | 12/02/2015 | 26/02/2015 |
Detail Report
Graph / Photo |
|||||
339 | P/F Floor tile & broken tile. | 20/11/2015 | 12/12/2015 |
Detail Report
Graph / Photo |
|||||
340 | Providing and laying cement concrete. | 12/03/2015 | 25/03/2015 | Indal Yadav |
Detail Report
Graph / Photo |
||||
341 | Providing railing for Park. | 23/11/2015 | 05/12/2015 |
Detail Report
Graph / Photo |
|||||
342 | Providing calcium silicate false ceiling & HRD fabrication in opening balcony at second floor. | 16/09/2014 | 15/10/2014 |
Detail Report
Graph / Photo |
|||||
343 | Finishing of exterior wall in 20 nos. CBI flats. | 08/12/2014 | 26/12/2014 | Pradeep Kumar Sharma |
Detail Report
Graph / Photo |
||||
344 | P/F Manhole cover & Drain cover. | 08/01/2015 | 07/02/2015 | M. N. Construction Co. |
Detail Report
Graph / Photo |
||||
345 | Providing Security Guard for watch and ward for Sub Divn. Office & Vacant Flats at Mayur Vihar Ph-II and Division Office. | 18/08/2014 | 01/01/2015 |
Detail Report
Graph / Photo |
|||||
346 | Repair of toilet roof at Rajkiya Sarvodaya Kanya Vidyalaya Kondli Delhi-110091. | 08/01/2015 | 04/02/2015 |
Detail Report
Graph / Photo |
|||||
347 | Providing services of labour for day to day maintenance under Sub-Division M-2334. | 31/05/2014 | -- |
Detail Report
Graph / Photo |
|||||
348 | Repairing of aluminium doors & Shutters. | 19/08/2014 | 03/09/2014 |
Detail Report
Graph / Photo |
|||||
349 | Providing and laying RCC drain cover in open surface drain in basement. | 16/08/2014 | 15/09/2014 | 2.58 (Mar'21) | 0.00 (Mar'21) |
Detail Report
Graph / Photo |
|||
350 | Improvement of Open Space in Circle Office & Division Office. | 06/02/2015 | -- | Rajeev Sharma |
Detail Report
Graph / Photo |
||||
351 | Misc. work at RSKV Mayur Vihar Ph-1 Pkt-IV. | 17/01/2015 | 16/02/2015 | Pradeep Kumar Sharma |
Detail Report
Graph / Photo |
||||
352 | Providing and fixing FRP door shutters in place of old damaged flush door shutters. | 18/09/2014 | 17/10/2014 |
Detail Report
Graph / Photo |
|||||
353 | Providing and fixing Acrylic sheet in windows, kerb stone, painting work and misc. civil work. | 08/02/2015 | 08/03/2015 |
Detail Report
Graph / Photo |
|||||
354 | Repair to damaged windows, renewing glass panes with acrylic plastic sheet & signage work. | 06/02/2015 | 15/03/2015 |
Detail Report
Graph / Photo |
|||||
355 | Water proofing treatment of first floor toilet. | 15/12/2014 | 14/01/2015 |
Detail Report
Graph / Photo |
|||||
356 | D G Set | 30/01/2015 | 29/07/2015 | 16.61 (May'19) | 0.00 (May'19) | Supernova Engineers Limited | ... |
Detail Report
Graph / Photo |
|
357 | Lift work | 20/12/2014 | 27/11/2015 | Johnson Lifts Pvt. Ltd. | ... |
Detail Report
Graph / Photo |
|||
358 | Sub-station work | 02/02/2015 | 01/08/2015 | S.L. Electromech Pvt. Ltd. | ... |
Detail Report
Graph / Photo |
|||
359 | UPS System | 23/01/2015 | 22/06/2015 | Labotech | ... |
Detail Report
Graph / Photo |
|||
360 | 200 Kwp Solar PV Plant | 13/05/2015 | 12/10/2015 | ... |
Detail Report
Graph / Photo |
||||
361 | Fire fighting and Water supply pumps | 13/01/2015 | 30/07/2015 | Royale Meridian (India ) Pvt. Ltd. | ... |
Detail Report
Graph / Photo |
|||
362 | Fire Alarm system | 06/12/2014 | 07/10/2015 | Electroquip Ltd. | ... |
Detail Report
Graph / Photo |
|||
363 | Energy Management System | 26/04/2015 | 25/07/2015 | ... |
Detail Report
Graph / Photo |
||||
364 | Modular OT | 25/05/2015 | 24/11/2015 | ... |
Detail Report
Graph / Photo |
||||
365 | IP Based CCTV | 27/03/2015 | 26/08/2015 | ... |
Detail Report
Graph / Photo |
||||
366 | ETP System | 27/01/2015 | 26/07/2015 | Texol Engineers | ... |
Detail Report
Graph / Photo |
|||
367 | IP based LAN & voice communication system | 21/03/2015 | 20/08/2015 | Tacker Technologies Pvt. Ltd. | ... |
Detail Report
Graph / Photo |
|||
368 | EOR to SSA Building at DIET, Darya Ganj, Delhi. (SH:- False Ceiling, Kota Flooring, Wall tiles etc.) | 09/06/2016 | 08/08/2016 | K.P. Singh & Co. | Site not handed over by DIET |
Detail Report
Graph / Photo |
|||
369 | Renovation of D.D.E. office by changing sanitary & plumbing fixtures in office toilet and internal finishing works | 04/07/2016 | 03/09/2016 | 0.00 (Aug'16) | 40.00 % (Aug'16) | Work completed |
Detail Report
Graph / Photo |
||
370 | Construction of Double storeyed SPS type rooms for Cal lab,Library,Science labs,toilet for HOS & staff at Govt. Co.Ed.Edn.Dichaon Kalan,New Delhi. | 18/12/2017 | 15/06/2019 | 34.21 (Jun'19) | 100.00 % (Jun'19) | work in progress. |
Detail Report
Graph / Photo |
||
371 | Re-boring of Tubewell at Bijwasan (Bharthal), SBV-1821032, New Delhi. | 25/06/2016 | 24/07/2016 | WORK RESCIENED. |
Detail Report
Graph / Photo |
||||
372 | C/o Boundary wall on the newly taken over plot at village Dera Mandi, New Delhi. | 25/03/2016 | 24/07/2016 | 0.00 (Aug'16) | 75.00 % (Aug'16) | DOSE PERTAIN TO THIS DIVISION |
Detail Report
Graph / Photo |
||
373 | Arrangement of Drinking water facility by bore well at GBSSS No. 1, Khanpur, New Delhi. (School ID : 1923020) | 10/05/2016 | 09/06/2016 | 0.00 (Jul'16) | 50.00 % (Jul'16) | Tender re-call and date of opening 24-09-2016 |
Detail Report
Graph / Photo |
||
374 | EOR to Raja Ram Mohan Rai, Hauz Rani, New Delhi. (SH: laying of one borewell & installation of 1 Nos. R.O. System | 23/05/2016 | 23/06/2016 | 0.00 (Jul'16) | 70.00 % (Jul'16) | Dose not pertain to this Division |
Detail Report
Graph / Photo |
||
375 | EOR to Govt.Sarvodaya Vidyalaya Gokhle Marg School,No.2,Mori Gate,Delhi. | 15/04/2016 | 14/10/2016 | 0.00 (Jul'16) | 10.00 % (Jul'16) | Completed |
Detail Report
Graph / Photo |
||
376 | EOR to slabs beams, coloums chajjas by short creting replacement of old & damaged roof treatment and other misc repair work at Sarvodaya Kanya Vidyala,Ahataa Kedara Idgah road Delhi. | 15/04/2016 | 14/07/2016 | 0.00 (Jul'16) | 15.00 % (Jul'16) | Completed |
Detail Report
Graph / Photo |
||
377 | Improvement of ground with drainage system and providing paver blocks, kota stone flooring in classroom & varandah, repair to boundary wall & other Misc. work at Idhgh road-GGSS | 05/04/2016 | 04/06/2016 | 0.00 (Jul'16) | 80.00 % (Jul'16) | Completed |
Detail Report
Graph / Photo |
||
378 | Providin gand fixing interlocking tiles, polycarbonate sheet and green board in classrooms. | 17/01/2016 | 30/04/2016 | 0.00 (Jul'16) | 80.00 % (Jul'16) | polycarbonate |
Detail Report
Graph / Photo |
||
379 | Renovation of MP Hall. | 26/04/2016 | 24/06/2016 | 16.37 (Feb'21) | 0.00 (Feb'21) | Work recently awarded. |
Detail Report
Graph / Photo |
||
380 | Construction of water module. | 22/04/2016 | 20/06/2016 | 0.00 (Jul'16) | 0.01 % (Jul'16) | Work recently awarded. |
Detail Report
Graph / Photo |
||
381 | providing rain water harvesting Pit, laying interlocking paver block in the ground and raising of boundary wall of Govt., Girls Sr. Sec. School. | 01/05/2016 | 30/06/2016 | 0.00 (Jul'16) | 0.01 % (Jul'16) | work in progress |
Detail Report
Graph / Photo |
||
382 | E.O.R. to G.G.S.S.S at C block Dilshad Garden Delhi | 10/04/2016 | 09/06/2016 | 0.00 (Jul'16) | 0.01 % (Jul'16) | Estimate re-submitted to SE(N) vide letter No.23(05)/EE(N)/DB/PWD/15-16/ 2270 |
Detail Report
Graph / Photo |
||
383 | const. of New cycle stand, Dismantling of tin shed and rovision of free path from toilet to first gate. | 13/06/2016 | 12/07/2016 | 0.00 (Sep'16) | 11.00 % (Sep'16) | Work in porgress |
Detail Report
Graph / Photo |
||
384 | Renovation of M.P. Hall | 26/04/2016 | 04/06/2016 | 0.00 (Sep'16) | 66.00 % (Sep'16) | work in progress |
Detail Report
Graph / Photo |
||
385 | Construction of new boundary wall | 24/04/2016 | 20/07/2016 | 21.77 (May'17) | 100.00 % (May'17) |
Detail Report
Graph / Photo |
|||
386 | Renovation of M.P. Hall with Toilet Block of G.S.K.V at E Block, Nand Nagri, Delhi | 29/01/2016 | 28/05/2016 | 6.64 (Jan'18) | 100.00 % (Jan'18) | work in progress |
Detail Report
Graph / Photo |
||
387 | Development of ground and construction of stage at G.G.S.S. F-1, F-2 Block, Nand Nagri,Delhi School ID-1106026 | 14/04/2016 | 12/06/2016 | 5.75 (Feb'17) | 100.00 % (Feb'17) | Work in progress |
Detail Report
Graph / Photo |
||
388 | Renovation of Classrooms. | 07/05/2016 | 05/07/2016 | 0.00 (Sep'16) | 66.00 % (Sep'16) | Work in progress |
Detail Report
Graph / Photo |
||
389 | Repair of Basketball Court Flooring. | 06/05/2016 | 19/06/2016 | 0.00 (Sep'15) | 25.00 % (Sep'15) | site is not handed over to contractor since in the working areathe work of SPS |
Detail Report
Graph / Photo |
||
390 | Repair of boundary wall and toilets. | 06/05/2016 | 03/08/2016 | 0.00 (Sep'16) | 86.00 % (Sep'16) | Work in progress |
Detail Report
Graph / Photo |
||
391 | Providing Rain Water Harvesting pit, laying interlocking paver block in the ground and raising of boundary wall at Govt. Girls Sr. Sec. School at A Block, Nand Nagri, Delhi Building ID-11061019 | 10/06/2016 | 09/10/2016 | 0.00 (Sep'16) | 76.00 % (Sep'16) | work in progress |
Detail Report
Graph / Photo |
||
392 | Renovation of Principal Room, Staff Room and Laboratories. | 20/06/2016 | 18/08/2016 | 0.00 (Sep'16) | 71.00 % (Sep'16) | Work in progress |
Detail Report
Graph / Photo |
||
393 | Repair and renovation of toilets | 17/06/2016 | 15/08/2016 | 0.00 (Sep'16) | 91.00 % (Sep'16) | Detailed estimate under process. |
Detail Report
Graph / Photo |
||
394 | Renovation of Classrooms, Corridor, Principal Room & Staff Room. | 16/06/2016 | 13/09/2016 | 0.00 (Sep'16) | 53.00 % (Sep'16) | T.S. under process. |
Detail Report
Graph / Photo |
||
395 | Construction of SPS type 01 No M.P. Hall, 01 No. Dining Hall with Kitchen, 2 Nos.Guest room, garrage for two vehicle and 2 Nos. Dormitory at 1st floor on under construction single storied dormitories and construction of approach road for Nehru Yuva Kendra, Alipur, Delhi | 12/09/2016 | 11/05/2017 | Work stopped by client deptt vide their letter No-NYKS/Construction work/Admin/2016-17/693 dated 09.03.2017. No response from client about restart of work. The contractor is approaching for closure of agmt. Now the clint has permitted to re-start the work and work has been re-started on 25.07.2018. but progress is slow. |
Detail Report
Graph / Photo |
||||
396 | A/R and M/O to residential and Non residential Building under Sub Div-II of SWBMD at ITI Campus, Pusa, New Delhi during 2018-19.(Sh- Misc repair work and finishing work in quarters). | 23/05/2018 | 21/11/2018 | 14.29 (Jul'19) | 0.00 (Jul'19) | work in progress. |
Detail Report
Graph / Photo |
||
397 | A/R and M/O to Residential and Non Residential building under Building Maintenance Sub Division (SW) - 4, PWD, B-6, NCC Building, Safdarjung Enclave, New Delhi during 2018-19.(SH Engaging labour for Day to Day Maintenance). | 17/05/2018 | 16/05/2019 | 94.01 (Mar'20) | 0.00 (Mar'20) | WORK IN PROGRESS |
Detail Report
Graph / Photo |
||
398 | Acoustic work. | 02/02/2018 | 01/04/2018 | 67.40 (Jul'18) | 100.00 % (Jul'18) | work in progress |
Detail Report
Graph / Photo |
||
399 | C/o New Block for Medicaine, Maternity and advance pediatric centre at L.N.Hospital | 04/11/2020 | 03/05/2023 | Execution of D-wall is under progress. |
Detail Report
Graph / Photo |
||||
400 | Construction of new building (‘S’ Block) for Delhi High Court on 2.74 Acre Land at Bapa Nagar, Zakir Hussain Marg, New Delhi. (SH: Providing consultancy services for obtaining Green Building rating including day light simulation, Energy simulation, GRIHA rating certification and facilitation) | 01/01/2016 | 31/01/2016 | work in progress |
Detail Report
Graph / Photo |
||||
401 | Acoustic treatment system and renovation of multipurpose hall. | 20/10/2017 | 17/01/2018 | 9.27 (Jun'20) | 0.00 (Jun'20) | work in progress |
Detail Report
Graph / Photo |
||
402 | Re-boring of Tubewell at Bijwasan (Bharthal), SBV-1821032, New Delhi. | 16/10/2016 | 15/11/2016 | forfeited |
Detail Report
Graph / Photo |
||||
403 | Installation of R.O System at Dr. Ambedkar Nagar ,Sector-V , No-2-GGSSS-1923050. | 20/08/2016 | 15/09/2016 | 0.00 (Aug'16) | 0.01 % (Aug'16) | work completed |
Detail Report
Graph / Photo |
||
404 | C/o toilet attached to office & providing safety cage for water tank at Kothi No. 115 (Dy. Chairman Dialouge Commissioner) Daryaganj, Delhi. | 03/06/2017 | 02/07/2017 | Work In Progress. |
Detail Report
Graph / Photo |
||||
405 | Renvoation of CCTV Camera PWD office at 13th Floor, MSO Building New Delhi | 18/07/2016 | 17/09/2016 | Work In Progress |
Detail Report
Graph / Photo |
||||
406 | Mechanized housekeeping services for Internal and external areas of MSO Building, Delhi, dg, 2016-17 | 02/04/2017 | 01/03/2019 | 31.08 (Feb'20) | 0.00 (Feb'20) | Work In Progress |
Detail Report
Graph / Photo |
||
407 | Repair and renovation work in Bomb Disposal squad & summon warrant Cell building, crime & railways at Yamuna Bazar, Delhi . | 10/06/2016 | 09/08/2016 | Work In Progress |
Detail Report
Graph / Photo |
||||
408 | C/o 20 Nos. SPS type class rooms including toilet blocks, staircase and electrical installations, fan etc. at Sarvodaya (Co-ed) Sr. Sec. School, Netaji Nagar, (School I.D.) 1719102, Building I.D. 17191327). New Delhi | 04/11/2014 | 30/09/2015 | 85% Work is in Progress |
Detail Report
Graph / Photo |
||||
409 | Up gradation to Delhi Govt. D-II Flats, Vasant Kunj, New Delhi. | 05/02/2017 | 04/08/2017 | 100.57 (Jul'18) | 100.00 % (Jul'18) | completed |
Detail Report
Graph / Photo |
||
410 | Providing Services of Security Guard at T.V. Branch Enquiry Office | 10/04/2017 | 09/04/2018 | 2.52 (Apr'18) | 90.00 % (Apr'18) | Work completed |
Detail Report
Graph / Photo |
||
411 | RMO Eand M Services at GNEC, New Delhi SH Comprehensive Maintenance of Aquaguard Water Dispenser with Inbuilt RO and UV Purifier | 19/03/2017 | 18/03/2019 | Work in Progress |
Detail Report
Graph / Photo |
||||
412 | Comprehensive Maintenance , Operation of Multi Level underground parking along with associated Electrical , Mechanical services installed at Delhi High Court, Sher Shah Suri Marg, New Delhi dg. 2018-19. | 02/11/2018 | 01/11/2019 | 214.77 (Sep'19) | 0.00 (Sep'19) | Work in progress |
Detail Report
Graph / Photo |
||
413 | Construction of Boundary wall at Sayurpur Village, New Delhi. (SH- Providing fixing grills and concertina coil at boundary wall). | 10/07/2018 | 09/09/2018 | work in progress |
Detail Report
Graph / Photo |
||||
414 | A/R and M/O to Educational Building under SWBMD, B-6, NCC Building, Safdarjung Enclave, New Delhi during 2018-19. (Sh -Internal and external finishing and other misc works). | 03/08/2018 | 01/10/2018 | WORK IN PROGRESS |
Detail Report
Graph / Photo |
||||
415 | AR and MO to District Court Resid. Complex Saket, ND-18-19 (SH Cleaning, mopping of common area, like lift lobby, staircase, basement, community centre, footpath area, terrace, servant qtr. etc. by mopping machine at Resid. Complex Saket Court, ND). | 25/09/2018 | 24/09/2019 | 0.49 (Nov'18) | 25.00 % (Nov'18) | work in progress |
Detail Report
Graph / Photo |
||
416 | REMODELLING AND UPGRADING OF EXISTING DEEP CHAND BANDHU HOSPITAL AT KOKIWALA BAGH, ASHOK VIHAR, PH-IV, DELHI. | 28/06/2019 | 22/06/2020 | 0.00 (Mar'19) | 0.01 % (Mar'19) | Agency has gone in the arbitration. work in progress |
Detail Report
Graph / Photo |
||
417 | SKV Vishwas Nagar (School Id- 1001196) | 24/12/2018 | 19/09/2019 | 0.00 (Apr'19) | 2.00 % (Apr'19) | Structure work of 44 Rooms completed and internal & external finishing in toilets which is in progress, Lift work footing cast. Work of MP hall yet to start. |
Detail Report
Graph / Photo |
||
418 | SKV Surajmal Vihar (School Id- 1001102) | 24/12/2018 | 19/09/2019 | Structure work completed & mumty is in progress. Internal & external finishing in progress in Block A & B. Dismantling work not started for Block-C |
Detail Report
Graph / Photo |
||||
419 | SKV, Kiran Vihar (School Id- 1001106) | 24/12/2018 | 19/09/2019 | Terrace floor roof is in progress for both blocks A & B. Brick work in progress |
Detail Report
Graph / Photo |
||||
420 | Govt. Co-ed SSS Preet Vihar (School Id- 1002351) | 24/12/2018 | 19/09/2019 | 0.00 (Apr'19) | 1.50 % (Apr'19) | Structure work of 48 Rooms completed and internal & external finishing in progress. Work of MP hall yet to start. The site of MP Hall shall be made available for dismantling the single storied class rooms after handing over the 48 class rooms. |
Detail Report
Graph / Photo |
||
421 | S(Co. Ed.) Hiran Kundna (School ID - 1617006). | 13/01/2019 | 23/12/2019 | 0.00 (Jan'21) | 98.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
422 | G(Co. Ed.)SS Kunwar Singh Nagar Ranhaula (School ID - 1617214). | 13/01/2019 | 23/12/2019 | 0.00 (Jan'21) | 97.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
423 | SKV Uttam Nagar (School ID - 1618057). | 18/01/2019 | 13/12/2019 | 0.00 (Jan'21) | 72.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
424 | G(Co.Ed.)SS Vikas Nagar (School ID - 1618057). | 18/01/2019 | 13/12/2019 | 0.00 (Jan'21) | 40.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
425 | GBSSS KG-I/II Vikaspuri (School ID - 1618015). | 18/01/2019 | 13/12/2019 | 0.00 (Jan'21) | 78.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
426 | SBV Moti Nagar (School ID - 1516010). | 09/01/2019 | 06/08/2019 | 0.00 (Jan'21) | 87.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
427 | SKV Moti Nagar (School ID - 1516018). | 09/01/2019 | 06/08/2019 | 0.00 (Jan'21) | 92.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
428 | GBSSS West Patel Nagar (School ID - 1516140). | 13/01/2019 | 23/12/2019 | 0.00 (Oct'20) | 37.00 % (Oct'20) | Work is in progress. |
Detail Report
Graph / Photo |
||
429 | SBV West Patel Nagar (School ID - 1516143). | 13/01/2019 | 23/12/2019 | 1536.19 (Feb'21) | 0.00 (Feb'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
430 | GGSSSS No. I Tilak Nagar (School ID - 1514014). | 13/01/2019 | 09/10/2019 | 0.00 (Jan'21) | 89.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
431 | GGSSS No. 2 A-Block Janakpuri (School ID - 1618064). | 07/12/2018 | 04/08/2019 | 0.00 (Jan'21) | 93.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
432 | S(Co. Ed.) Block-L Hari Nagar (School ID - 1514022). | 07/12/2018 | 04/08/2019 | 0.00 (Jan'21) | 87.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
433 | GBSSS Site-2 Clock Tower, Hari Nagar (School ID - 1514112). | 07/12/2018 | 04/08/2019 | 0.00 (Jan'21) | 85.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
434 | GGSSS Ashok Nagar (School ID - 1514018). | 13/01/2019 | 23/12/2019 | 0.00 (Oct'20) | 64.00 % (Oct'20) | Work is in progress. |
Detail Report
Graph / Photo |
||
435 | SBV Subhash Nagar (School ID - 1515003). | 13/01/2019 | 23/12/2019 | 4611.46 (Jan'21) | 85.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
436 | GBSSS Rajouri Garden Extn. (School ID - 1515018). | 13/01/2019 | 23/12/2019 | 4611.46 (Jan'21) | 70.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
437 | SKV Rajouri Garden Extn. (School ID - 1515021). | 13/01/2019 | 23/12/2019 | 4611.46 (Jan'21) | 78.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
438 | SKV Rajouri Garden Main (School ID - 1515022). | 13/01/2019 | 23/12/2019 | 4611.46 (Jan'21) | 81.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
439 | SKV No. 2 Tarogre Garden (School ID - 1515025). | 13/01/2019 | 23/12/2019 | 4611.46 (Jan'21) | 66.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
440 | GBSSS Tagore Garden (School ID - 1515139). | 13/01/2019 | 23/12/2019 | 4611.46 (Jan'21) | 63.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
441 | EOR to Govt. Co-ed. Sr. Sec. School at Daulatpur and Govt. Co-ed. Sr. Sec. School at Malikpur, New Delhi. (Sh- C/o Rain Water Harvesting System). | 04/03/2019 | 02/05/2019 | 69.90 (Aug'19) | 0.00 (Aug'19) | WORK IN PROGRESS |
Detail Report
Graph / Photo |
||
442 | GGSSS No. 2, Molarband School ID : 1925053 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 73.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
443 | GGSSS No. 4, Molarband School ID : 1925400 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 65.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
444 | S.K.V., Molarband School ID : 1925037 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 62.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
445 | GGSSS DDA Flat, Kalkaji, Phase-II, School ID: 1925041 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 51.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
446 | GGSSS No. 3, Badarpur, School ID : 1925248 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 75.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
447 | GGSSS No. 3, Kalkaji School ID : 1925039 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 26.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
448 | SKV Mandi Village, School ID : 1923064 | 14/01/2019 | 10/10/2019 | 0.00 (Apr'21) | 42.00 % (Apr'21) | Work is in progress |
Detail Report
Graph / Photo |
||
449 | SPM Sarvodaya Vidyalya Chittaranjan park, School ID: 1925060 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 80.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
450 | SKV No. 2, East of Kailash, School ID: 1924027 | 23/01/2019 | 19/10/2019 | 0.00 (Mar'21) | 90.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
451 | GBSSS, No. 2, Kalkaji, , School ID: 1925011 | 23/01/2019 | 19/10/2019 | 0.00 (Mar'21) | 38.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
452 | GBSS, Garhi, Jharia Maria School ID : 1924042 | 23/01/2019 | 19/10/2019 | 0.00 (Mar'21) | 72.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
453 | SKV No. 2 Khyala (School ID - 1514013). | 13/01/2019 | 23/12/2019 | 7696.54 (Feb'21) | 0.00 (Feb'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
454 | SBV Chand Nagar (School ID - 1514110) | 13/01/2019 | 23/12/2019 | 0.00 (Oct'20) | 75.00 % (Oct'20) | Work is in progress. |
Detail Report
Graph / Photo |
||
455 | GGSSS J. J. Colony Raghubir Nagar (School ID - 1515030). | 13/01/2019 | 23/12/2019 | 0.00 (Oct'20) | 65.00 % (Oct'20) | Work is in progress. |
Detail Report
Graph / Photo |
||
456 | SV(Co. Ed.) A-2, Paschim Vihar (School ID - 1617003). | 13/01/2019 | 09/10/2019 | 0.00 (Jan'21) | 81.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
457 | SV (Co. Ed.) B-4 New Multan Nagar (School ID - 1617007). | 13/01/2019 | 09/10/2019 | 0.00 (Jan'21) | 75.00 % (Jan'21) | Work is in progress. |
Detail Report
Graph / Photo |
||
458 | SV Shahpur Jat, School ID: 1925333 | 08/12/2018 | 04/08/2019 | 0.00 (Mar'21) | 93.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
459 | S.B.V., Sadiq Nagar, School ID: 1924009 | 08/12/2018 | 04/08/2019 | 0.00 (Mar'21) | 93.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
460 | SV Safdarjung Enclave, School ID: 1719106 | 08/12/2018 | 04/08/2019 | 0.00 (Mar'21) | 98.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
461 | SKV Hauzrani, School ID: 1923041 | 08/12/2018 | 04/08/2019 | 0.00 (Mar'21) | 90.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
462 | GBSSS Dera Village School ID: 1923360 | 08/12/2018 | 04/08/2019 | 0.00 (Feb'21) | 63.00 % (Feb'21) | In progress |
Detail Report
Graph / Photo |
||
463 | Co-Ed. SSS Lajpat Nagar, School ID: 1925335 | 08/12/2018 | 04/08/2019 | 0.00 (Mar'21) | 42.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
464 | GBSSS Jungpura, School ID : 1924004 | 08/12/2018 | 04/08/2019 | 0.00 (Mar'21) | 50.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
465 | GGSSS, DDA Flats, Phase II, Kalkaji, School ID: 1925045 | 14/01/2019 | 10/09/2019 | 0.00 (Mar'21) | 42.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
466 | Govt. Co.-Ed., Middle School, Sarai Kale Khan, Vidut Nagar, School ID: 1925418 | 14/01/2019 | 10/09/2019 | 0.00 (Mar'21) | 25.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
467 | SKV,, Jonapur- BNK, School ID: 1923003 | 08/12/2018 | 04/08/2019 | 0.00 (Feb'21) | 62.00 % (Feb'21) | In progress |
Detail Report
Graph / Photo |
||
468 | GGSS, Begumpur, School ID: 1923072 | 23/01/2019 | 19/10/2019 | 0.00 (Mar'21) | 1.00 % (Mar'21) | Building has been demolished and malba disposal is in progress |
Detail Report
Graph / Photo |
||
469 | Sarvodaya Co-ed Vidyalaya Sec-2, R K Puram, New delhi, School ID: 1719013 | 23/01/2019 | 19/10/2019 | 0.00 (Mar'21) | 57.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
470 | GBSSS Sec-3, R K Puram, School ID: 1719103 | 23/01/2019 | 19/10/2019 | 0.00 (Mar'21) | 1.00 % (Mar'21) | Site not handed over by the Education Department. |
Detail Report
Graph / Photo |
||
471 | SKV Noor Nagar, School ID 1925035 | 23/01/2019 | 19/10/2019 | 0.00 (Mar'21) | 13.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
472 | GGSSS Jogabai, New Delhi School ID : 1925049 | 23/01/2019 | 19/10/2019 | 0.00 (Mar'21) | 45.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
473 | EOR to GBSSS Bijwasan, Govt. Sarvodaya Co-ed Sr. Sec. School Kitchner Road (Malcha Marg), DIET Sec-07 R.K. Puram etc New Delhi.(Sh- Construction of Rain Water Harvesting System). | 22/02/2019 | 24/04/2019 | 47.84 (Jul'19) | 80.00 % (Jul'19) | WORK IN PROGRESS. |
Detail Report
Graph / Photo |
||
474 | S.K.V. A-Block, School ID : 1924025 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 84.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
475 | S.K.V. C-Block, Defence Colony, School ID : 1924023 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 78.00 % (Mar'21) | in progress |
Detail Report
Graph / Photo |
||
476 | S.V. Jorbagh, School ID 2026005 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 72.00 % (Mar'21) | work is in progress |
Detail Report
Graph / Photo |
||
477 | S.K.V. Rani Jhansi, School ID 1925031 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 98.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
478 | GGSSS No. 2, Tughlakabad, Railway Colony, School ID 1925046 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 83.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
479 | GGSSS Tigri, School ID 1923080 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 82.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
480 | Ishani G- Block Saket, School ID 1923036 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 88.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
481 | SKV MB Road Pushp Vihar, School ID 1923071 | 14/01/2019 | 10/10/2019 | 0.00 (Mar'21) | 87.00 % (Mar'21) | Work is in progress |
Detail Report
Graph / Photo |
||
482 | AR and MO to Delhi Sachivalaya at IG Stadium Complex New Delhi dg 2018 19 | 10/11/2018 | 09/05/2019 | 1.02 (Jul'19) | 0.00 (Jul'19) | Work in Progress 95% |
Detail Report
Graph / Photo |
||
483 | Construction of 30 Nos. Porta Cabin Aam Admi Mohalla Clinics under Sub division- I,II,III and IV under South West Building Maintenance Division New Delhi. (SH Civil works and Electrical works). | 06/12/2018 | 02/08/2019 | 285.83 (Nov'20) | 0.00 (Nov'20) | WORK IN PROGRESS |
Detail Report
Graph / Photo |
||
484 | Construction of additional SPS type classrooms in Govt Schools Directorate of Education under Priority II | 05/09/2019 | 04/09/2020 | 0.11 (Nov'19) | 0.00 (Nov'19) | work in progress |
Detail Report
Graph / Photo |
||
485 | A PL paver block repair and renovation of room No 41 at SKV Khera Kalan BNN B PL APP treatment at roof of SBV Auchandi Delhi | 05/11/2019 | 02/02/2020 | 0.00 (Sep'20) | 50.00 % (Sep'20) | work is in progress (60%) |
Detail Report
Graph / Photo |
||
486 | Pumping out rainwater to avoid water logging at DC office complex,Weavers Complex Nand Nagri and SDM Court Seelampur Delhi. | 30/06/2019 | 29/10/2019 | 5.86 (Jan'20) | 0.00 (Jan'20) | work completed |
Detail Report
Graph / Photo |
||
487 | Providing the services of Security Guard for day to day maintenance at D-II flats. | 02/08/2019 | 01/08/2020 | work in progress |
Detail Report
Graph / Photo |
||||
488 | Providing security guards at Division Office M-222 (NE), Sub Division M-2222, Sub Division M-2221, Sub Division Office Loni Road and Division M-222 | 30/06/2019 | 29/05/2020 | 23.93 (Mar'21) | 0.00 (Mar'21) | work completed |
Detail Report
Graph / Photo |
||
489 | Attending day to day complaints | 24/06/2019 | 23/06/2020 | 10.22 (Oct'20) | 0.00 (Oct'20) | work completed |
Detail Report
Graph / Photo |
||
490 | Construction of multipurpose court, levelling and preparing the layer of good earth on the play ground in Delhi Police Public School at PTS, Wazirabad, Delhi | 30/06/2019 | 29/08/2019 | 26.71 (Mar'21) | 0.00 (Mar'21) | work in progress |
Detail Report
Graph / Photo |
||
491 | Raising of main gate, C/o guard room, repair of ground water tank, providing and fixing IRC fabric jali inside the Class rooms etc. | 30/06/2019 | 29/08/2019 | 1.60 (Mar'21) | 0.00 (Mar'21) | work completed |
Detail Report
Graph / Photo |
||
492 | Construction of Recreation Room, Coys room, Officers Quarters and Shed. | 30/06/2019 | 29/08/2019 | 51.12 (Jul'20) | 0.00 (Jul'20) | work completed |
Detail Report
Graph / Photo |
||
493 | Construction of 2 nos.Viewers stand in Parade ground at PTS, Wazirabad, Delhi | 30/06/2019 | 19/07/2019 | 8.39 (Jan'20) | 0.00 (Jan'20) | work completed |
Detail Report
Graph / Photo |
||
494 | Attending complaints of routine maintenance of service centre PTS, Wazirabad, Delhi. | 30/06/2019 | 29/06/2020 | 7.20 (Mar'20) | 0.00 (Mar'20) | work completed |
Detail Report
Graph / Photo |
||
495 | Renovation of 10 Nos toilet blocks, Construction of 3 nos. R.C.C. tank of size 8 x 5 mtr. and 6 nos. M.S. grill gates. | 30/06/2019 | 29/08/2019 | 52.31 (Aug'20) | 0.00 (Aug'20) | work completed |
Detail Report
Graph / Photo |
||
496 | External plaster work of Judges Flats Including tile work in over head water storage tank of block D AND E, Steel works and other Misc. work | 24/10/2019 | 23/01/2020 | work in progress |
Detail Report
Graph / Photo |
||||
497 | External plaster work including painting. | 16/06/2019 | 15/09/2019 | work in progress |
Detail Report
Graph / Photo |
||||
498 | Redevelopment of rain water harvesting pits and cleaning of storm water lines at Residential and Non-Residential Complex, Saket Court, New Delhi. | 25/07/2019 | 24/09/2019 | work in progress |
Detail Report
Graph / Photo |
||||
499 | Reconstruction of collapsed boundary wall of CBD plot at Shahdara, Delhi owned by Urban Development Department. | 24/07/2019 | 22/09/2021 | in progress. |
Detail Report
Graph / Photo |
||||
500 | SKV Radhey Shyam Park (School Id- 1003153) | 17/03/2019 | 11/12/2019 | In Block A Part-I of 16 rooms structure complete and finishing in progress, Part-II, Terrace roof of 16 room has been cast and column of Mumty above is in progress. In Block B Part-I of 16 rooms structure complete and finishing in progress, Part-II, Mumty has been cast. MP hall earth work has started. Koba work is in progress. External GRC Tile work is in progress. |
Detail Report
Graph / Photo |
||||
501 | SKV Shanker Nagar (School Id- 1003026) | 17/03/2019 | 11/12/2019 | 0.00 (Jan'21) | 25.00 % (Jan'21) | Structure of 24 rooms complete. Plastering, Kota, Koba, Stair Case Granite & other miscellaneous work are under progress. |
Detail Report
Graph / Photo |
||
502 | RPVV Gandhi Nagar (School Id- 1003261) | 17/03/2019 | 11/12/2019 | 12491.60 (Nov'20) | 0.00 (Nov'20) | Structure of 48 rooms complete. Stair case granite, cladding, brick koba work and other miscellaneous works are under progress. 1st floor beam of 4 rooms and 1 lift has been cast. |
Detail Report
Graph / Photo |
||
503 | SBV, Rajgarh Colony (School Id- 1001110) | 17/03/2019 | 11/12/2019 | 0.00 (Apr'19) | 0.50 % (Apr'19) | RCC Structure is completed. Painting inside building is under progress and other miscellaneous work has been taken up. Ground floor column of MP hall has been cast. Raft of Block-C has been cast. |
Detail Report
Graph / Photo |
||
504 | SKV Kondali (Jija Bai) (School Id- 1002026) | 17/03/2019 | 11/12/2019 | 0.00 (Jan'21) | 81.00 % (Jan'21) | Polishing of Kota/Marble Stone is under progress. GRC Tile completed. Fixing of Poly Carbonate Sheet in Window completed. Painting inside classrooms is under progress. Plumbing work in toilets and sanitary fittings work completed. External development work is under progress. Laying of SW Pipe, construction of chamber completed. Construction of RCC Road work completed. Laying of Interlocking Paver Block and other development activities completed. |
Detail Report
Graph / Photo |
||
505 | GGSSS Mayur Vihar Ph-3 (Kondali Gharauli) (School Id- 1002352) | 17/03/2019 | 11/12/2019 | 0.00 (Jan'21) | 1.00 % (Jan'21) | Brick work at 2nd floor level is under progress. Cement Plaster at 1st floor is under progress. Flooring work is under progress at 2nd floor level. Fixing of Window & T-iron frame at 2nd floor level is under progress. Tiles have been procured for fixing in cladding. Reinforcement in columns from 3rd floor to terrace in Block-B is in progress. Casting of terrace floor beam in Block-A (RHS) under progress. |
Detail Report
Graph / Photo |
||
506 | SKV Patparganj (School Id- 1002031) | 17/03/2019 | 11/12/2019 | 12491.60 (Nov'20) | 0.00 (Nov'20) | RCC in columns from Ground Floor to 1st Floor is completed. Casting of Beam at 1st floor level completed. Reinforcement work in Column from 1st floor to 2nd floor is in progress. |
Detail Report
Graph / Photo |
||
507 | GGSSS Khichripur (School Id- 1002037) | 17/03/2019 | 11/12/2019 | 0.00 (Jan'21) | 30.00 % (Jan'21) | "Block-A : (20 rooms) : Terrace beam is in progress. Block-B : (24 Rooms) : Terrace beam is in progress. Block-C : (28 Rooms) : Column from third floor to terrace beam is in progress. Block-D : (4 Rooms) : Demolition of old structure in progress. Brick work, AAC block masonry, Plaster and fixing of door frame & windows work are in progress. " |
Detail Report
Graph / Photo |
||
508 | Bhola Nath Nagar, No.3-GGSSS (ID : 1001023) (DIET BUILDING) | 17/03/2019 | 11/12/2019 | 0.00 (Jan'21) | 1.00 % (Jan'21) | Second floor roof is in progress. |
Detail Report
Graph / Photo |
||
509 | Jhilmil Colony-SBV Avinash Chadda (ID: 1001105 ) (Addl. Rooms) | 17/03/2019 | 11/12/2019 | Preliminary Estimate amounting to Rs. 17,16,56,000/- for C/o 64 Nos. Additional SPS Class rooms in ACC SBV/GGSSS, Jhilmil colony, Delhi (ID : 1001105/1001111) was submitted to the Director of Education vide letter no. 23(49)/20/CE (Proj.)/PWD/Estimate/316 dt. 13.07.2020 (Copy enclosed), whose sanction is still awaited. Any action to call the tenders can only be started after receipt of the A/A & E/S or on any request made by Directorate of Education in anticipation of the same. The survey report for demolition of SPS Structure in the same school was also submitted vide this office letter no. 20(Survey report)/Edu M(E&NE)/PWD/DS/973 dt. 02.11.2020, which is also still awaited. Regarding taking up of the 64 Additional Class rooms in the ACC SBV/GGSSS, Jhilmil colony, Delhi, clear instructions may please be issued by the competent authority for calling the tenders in anticipation of A/A & E/S against the Preliminary estimate submitted. |
Detail Report
Graph / Photo |
||||
510 | Construction of G4 storey Police Post including Rain Water Harvesting Tank Underground water tank and development work at Sanjay Gandhi Transport Nagar Delhi Civil and Electrical | 08/11/2019 | 07/07/2020 | work is started |
Detail Report
Graph / Photo |
||||
511 | Consultancy Services for Construction (on EPC mode) of New Block for expansion of Deen Dayal Upadhyay Govt. Hospital of Hari Nagar, Delhi. | 28/05/2020 | 27/11/2022 | 1st RA Bill |
Detail Report
Graph / Photo |
||||
512 | C/o boundary wall of vacant land piece at Aya Nagar, New Delhi. | 18/05/2018 | 17/11/2018 | 63.30 (Feb'21) | 0.00 (Feb'21) | In progress |
Detail Report
Graph / Photo |
||
513 | C/o Additional 176 SPS class rooms in existing premises including Labs, Library, Toilet blocks etc. under jurisdiction EO Zone 27 of DDE, Bulbuli Khana SKV (school ID: 2127021) and Kamla Market Zeenat Mahal- SKV No.1 (School IS: 2127014) Central & New Delhi. (Priority-2) | 16/03/2019 | 10/12/2019 | 25159.43 (Feb'21) | 0.00 (Feb'21) | work in progress |
Detail Report
Graph / Photo |
||
514 | C/o 138 Nos. of additional SPS class rooms in various schools under Central and New Delhi, Education (M) Division, PWD including internal & external water supply, sanitary installation, electrical installations, development of site and fire fighting system etc. (Package - 2). | 18/01/2019 | 14/09/2019 | 25159.43 (Feb'21) | 0.00 (Feb'21) | work in progress |
Detail Report
Graph / Photo |
||
515 | Construction of 28 Nos. Additional SPS classrooms in Govt. Girls. Sr. Sec. School, Urdu Medium (School ID:- 2127025) at Chasma Building , Ballimaran, Delhi- | 29/09/2018 | 26/06/2019 | 267.49 (Mar'21) | 0.00 (Mar'21) | work in progress |
Detail Report
Graph / Photo |
||
516 | Construction of 28 Nos. Additional SPS classrooms in Govt. Girls. Sr. Sec. School, Urdu Medium (School ID:- 2127025) at Chasma Building , Ballimaran, Delhi- (SH:- SPS type building i/c Internal & External water supply, sanitary installation, ramp, electrical installation, development of site, fire fighting system & providing furniture etc. | 29/09/2018 | 26/06/2019 | 0.00 (Feb'20) | 100.00 % (Feb'20) | work in progress |
Detail Report
Graph / Photo |
||
517 | Hiring of Inspection Vehicle along with Driver in the office of Executive Engineer Health Project Division (East), PWD, Tahirpur, Delhi-110093 dg. 2019-20 | 02/03/2020 | 01/09/2020 | Work completed. |
Detail Report
Graph / Photo |
||||
518 | C/o Trauma Centre and Utility Block at SGMH at Mangolpuri, Delhi, including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. (Hiring of Photocopier Machine.) | 04/09/2019 | 03/03/2021 | work in progress |
Detail Report
Graph / Photo |
||||
519 | C/o Pucca School Building (Four Storeyed) with ancillary facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Libaspur, Delhi. | 30/05/2020 | 29/05/2021 | 0.00 (Mar'21) | 18.00 % (Mar'21) | Foundation/footing of 30% portion completed and remaining portion in progress. |
Detail Report
Graph / Photo |
||
520 | C/o Pucca School Building (Four Storeyed) with ancillary facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Daryapur kalan, Delhi. | 30/05/2020 | 29/05/2021 | 0.25 (Mar'21) | 13.00 % (Mar'21) | Casting of footing in progress. |
Detail Report
Graph / Photo |
||
521 | C/O Pucca School Building (G+3) of Govt. Sr Sec. School (Co-Ed) at Rana Pratap Bagh (School ID: 13091907), Delhi.(SH: Main Civil Work). | 02/09/2020 | 29/05/2021 | 0.00 (Mar'21) | 25.00 % (Mar'21) | Foundaton work completed. Plinth beam, column work in progress. |
Detail Report
Graph / Photo |
||
522 | Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priority II. | 05/09/2019 | 04/09/2020 | 612.63 (Mar'21) | 0.00 (Mar'21) | work in progress |
Detail Report
Graph / Photo |
||
523 | C/o SPS type additional class rooms under Priority II. | 16/03/2019 | 10/12/2019 | 25159.43 (Feb'21) | 0.00 (Feb'21) | work in progress |
Detail Report
Graph / Photo |
||
524 | Construction of boundary wall and Guard Room and Main Gate of site on vacant land at Salempur Majra, Delhi | 29/10/2020 | 26/01/2021 | 0.00 (Feb'21) | 20.00 % (Feb'21) | Work in progress. |
Detail Report
Graph / Photo |
||
525 | Watch and Ward of vacant land | 08/12/2020 | 11/07/2021 | work in progress |
Detail Report
Graph / Photo |
||||
526 | Replacement of existing water closet with single piece water closet set, P/F floor and wall tile in toilets, replacement of damaged window and misc. civil works | 18/11/2020 | 28/11/2020 |