Building - Construction Workभवन - रखरखाव का कार्य
Zoneअंचल
Divisionमंडल
Categoryश्रेणी
Work Typeकार्य का प्रकार
S. No.क्र. सं. Name of Workकार्य का नाम Date of Startकार्य आरम्भ करने की तिथि Date of Completionकार्य समाप्त करने की तिथि Cost
(In Lac)
Expenditure
(In Lac)
Progress Agency Status Viewदेखें
1 Civil work and Internal E.I. work 24/04/2007 23/07/2009 300221271.00 Globe Civil Project Pvt. Ltd. Detail Report
Graph / Photo
2 C/o 700 Beds Indira Gandhi Hospital at Sector-9, Dwakra, New Delhi on turn-key basis 27/08/2014 26/02/2017 54511.43 0.00 (Jan'21) 93.00 % (Jan'21) Larson & Toubro Limited Internal finishing and external development works are under progress. Detail Report
Graph / Photo
3 Construction of New Block For Medicine, Maternity And Advanced Pediatric Centre ( Composite Steel plus RCC framed 2B plus G plus 22 Storyed building At LN Hospital including internal water supply, Sanitary installation, External Development works, Dr 04/11/2020 03/05/2023 46552.58 Swadeshi Civil Infrastructure Pvt. Ltd., 302, DLF Tower B Jasola, New Delhi-110025 Foundation work is in progress. Slab casting is in progress. Detail Report
Graph / Photo
4 CONSTRUCTION OF NEW HOSPITAL AT SIRASPUR, NEW DELHI (ON EPC MODE -I) INCLUDING ALL CIVIL, ELECTRICAL, MECHANICAL, HORTICULTURE AND MEDICAL SERVICES. 10/08/2020 09/05/2023 38439.53 410.72 (Apr'21) 0.00 (Apr'21) Ramacivil India Construction Private Limited Progress slow down due to Covid-19 Epademic. Detail Report
Graph / Photo
5 Construction of Hospital at Madipur, New Delhi 11/11/2020 10/11/2022 26970.58 Ramacivil India Construction Private Limited Upto 2nd floor slab casted. 3rd floor & 4th floor is in progress. Masonary and finishing works in progress. Detail Report
Graph / Photo
6 Construction of Hospital at Jwalapuri, New Delhi 07/08/2020 06/08/2022 26950.37 0.00 (Nov'20) 3.00 % (Nov'20) Parnika Commercial and Estates Pvt. Ltd. 3rd floor level slab, shuttering and reinforcement in progress. Masonary work in basement and GF is in progress. Detail Report
Graph / Photo
7 C/o East Delhi Campus of Guru Gobind Singh Indraprastha University at Surajmal Vihar, Shahdara, Delhi SH Co Academic Bldg, Auditorium Bldg, Sports Hall, Boys, Girls, Teachers Hostel, Type II III IV and V Qtrs ic Ext Dev. works, Int Elect Inst, Ext Lighting, lifts, fire fighting system, fire alarm with PA System, D.G. Sets, Elect Sub Stn, HVAC works 09/08/2017 09/11/2019 23127.43 0.00 (Jan'21) 78.00 % (Jan'21) NKG Infrastructure Limited Physical Progress of the work is 87%. Detail Report
Graph / Photo
8 C/o Stage-I of Phase-II, Delhi Technological University at Bawana Road, Delhi (SH: C/o Academic Blocks AB-3 & AB-4, Boys Hostel H-5 & Girls Hostels HG-5 & HG-6 and all external and internal services including external development and landscaping, and allied civil and E&M works). 23/09/2019 23/12/2020 22769.91 0.00 (Jan'21) 5.00 % (Jan'21) SAM India Builtwell Progress of work is 81% Detail Report
Graph / Photo
9 Additional and Remodeling Work for Cancer Block, Maternity Block and Screening OPD At Satyawadi Raja Harish Chandra Hospital, Narela For Delhi Govt. (Delhi) 09/08/2020 08/05/2023 21785.66 33.95 (Jul'21) 0.00 (Jul'21) Parnika Commercial and Estates Pvt. Ltd. Work in progress Detail Report
Graph / Photo
10 Construction of 144 Nos Temporary Courtroom in the existing court complexes of Saket Stilt plus 3 Tis Hazari Stilt plus G plus 3 and Karkardooma G plus 4 04/10/2019 03/07/2020 14316.00 0.00 (Jan'21) 62.00 % (Jan'21) Quality Buildcon Pvt. Ltd. Work is in progress at all the three sites. In Karkardooma, the structure work upto 3rd floor level completed and part 4th level slab also casted. Activities pertaining to providing of internal walls, electrical conduits, fire fighting lines, fire paint, HVAC and other related activities in progress. The work of creating sample rooms for Court room, Judges chamber, PA room and Alhmad room etc. also taken up. The columns for 4th floor & terrace level also erected and fixing of deck sheet at remaining portion of 4th floor level in progress. In Saket, Bolck-1: Casting of Grade slab, 1st floor & 2nd floor slab completed. Erection of 3rd stage columns in progress. Fabrication and erection of beams and columns from 3rd to 5th floor also in progress. Block-2 (near lockup block): Casting of Grade slab, 1st floor & 2nd floor slab completed. Erection of 3rd stage columns in progress. Fabrication and erection of beams and columns from 3rd to 5th floor also in progress. In Tis Hazari, the casting of slab upto X-- 7 grade completed and now placing of reinforcement at 2nd floor level in progress. The fixing of beams at 2nd & 3rd floor level completed and is in progress at 1st floor level. Casting of Grade slab and plinth beams at ground floor level complete except toilet block and pump room area. All the beams upto 3rd floor level fabricated and available at site. Fabrication of 4th stage columns (upto floor 5 level) also started and erection work to be taken up shortly. Detail Report
Graph / Photo
11 Addition & Remodelling work for Bhagwan Mahavir Hospital at Pitampura Delhi including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. 10/12/2019 01/06/2020 13992.80 Kamladitya Construction Private Limited Work in progress Detail Report
Graph / Photo
12 Construction of New Building S Block for Delhi High Court on 2.74 acre land at Bapa Nagar Zakir Hussein Marg New Delhi SH C o RCC framed structure Building including water supply sanitary Electrical installation and E&M Services 02/03/2017 01/09/2019 13770.69 13916.36 (Oct'21) 0.00 (Oct'21) Swadeshi Civil Infrastructure Pvt. Ltd., 302, DLF Tower B Jasola, New Delhi-110025 Work in progress Detail Report
Graph / Photo
13 Construction of Hospital Block at Guru Gobind Singh Govt. Hospital located at Raghubir Nagar, New Delhi 18/10/2019 10/04/2021 13447.15 0.00 (Jan'21) 18.00 % (Jan'21) Roshan Real Estate Pvt Ltd. Work is under progress. Detail Report
Graph / Photo
14 Construction of Mother and Child Block and Screening OPD Block at Dr. Baba Saheb Ambedkar Hospital at Rohini, Delhi, including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. 04/03/2020 03/09/2021 10708.84 186.88 (Jul'21) 0.00 (Jul'21) Quality Buildcon Pvt. Ltd. work in progress Detail Report
Graph / Photo
15 SKV Madanpur Khadar, School ID: 1925062 14/01/2019 10/10/2019 7836.66 7414.73 (Oct'21) 0.00 (Oct'21) BCC DEVELOPERS AND PROMOTERS PVT LTD work is in progress Detail Report
Graph / Photo
16 Construction of Pucca School Buildings (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Govt. School Desu Colony (DTL) Janakpuri New Delhi (Package - 4). SH : Civil & Electrical work. 15/05/2021 14/05/2022 7689.40 B. L. INFRA PROJECTS PVT. LTD. Work is in progress. Detail Report
Graph / Photo
17 Construction of Pucca School Buildings (G+3) with Ancillary Facilities including internal water supply, sanitary installation, internal electrical installation and development of site at GGSSS No. 2 Uttam Nagar, New Delhi (Package - 4). SH : Civil & Electrical work. 15/05/2021 14/05/2022 7689.40 M/S BL Infrastructure Projects Pvt.Ltd Work in progress. Detail Report
Graph / Photo
18 C/o Trauma Centre and Utility Block at Sanjay Gandhi Memorial Hospital at Mangolpuri, Delhi, including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. 04/09/2019 03/03/2021 7122.09 96.24 (Jul'21) 0.00 (Jul'21) PNSC Infrastructure Pvt. Ltd work in progress. Detail Report
Graph / Photo
19 Construction of (G+3) Pucca School Buildings at Tehkhand 18/07/2021 17/07/2022 7047.98 PNSC Infrastructure Pvt. Ltd (i) Work has been awarded to contractor. (ii) Hon'ble PWD Minister has approved Architectural Drawings in the meeting on 23.08.2021 (iii)Submission drgs for DUAC/Fire/Local body are under preparation. (iv) Structural design : Str. drawing are under preparation. Detail Report
Graph / Photo
20 Construction of proposed New Buildings for expansion of Rao Tula Ram Memorial Govt. Hospital at Jaffarpur, Delhi. 06/08/2019 29/10/2020 6563.40 0.00 (Jan'21) 15.00 % (Jan'21) PNSC Infrastructure Pvt. Ltd Work is under progress. Detail Report
Graph / Photo
21 Jaunapur, Site –II (Aya Nagar) New Delhi 110047 18/07/2021 17/07/2022 6137.90 0.30 (Feb'21) 0.00 (Feb'21) PNSC Infrastructure Pvt. Ltd (i). Work has been awarded to contractor. (ii) Architectural Drawing : Revised drgs are under preparation as per direction of Hon'ble PWD Minister. (iii) Structural design : Str. drawing will be prepared after approval of Architectural drawing by competent authority. (iv). DUAC /Fire approval: Drgs will be uploaded online after approval of Architectural drawing by competent authority. Detail Report
Graph / Photo
22 C/o of 316 Nos. Additional SPS Class rooms, MP Hall, Labs, toilets and Staircases i/c internal water supply, sanitary installation, development of site and fire fighting arrangements etc. at GBSSS E Block Sultanpuri (School ID 1412086), SKV H Block Sultanpuri (School ID 1412029), Govt. (Co-ed) Sec. School Sultanpur Majra (School ID 1412016), SKV Block-Q, Mangolpuri (School ID 141208). (Package-VIII). 14/01/2019 09/11/2019 5752.21 4704.65 (Oct'21) 98.00 % (Oct'21) SPG Infraprojects Private Limited Work in progress Detail Report
Graph / Photo
23 C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 288 nos. SPS type class rooms, Libraries, Toilets, Labs & 4 Nos. M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. under Education M. Division (West) at GBSSS Shadi Khampur, SKV Shadi Khampur, GBSSS West Patel Nagar, GGSSS West Patel Nagar & SBV West Patel Nagar New Delhi [Package-I]. 13/01/2019 23/12/2019 5688.38 1285.91 (Feb'21) 0.00 (Feb'21) Winner Construction Pvt. Ltd. Work is in progress. Detail Report
Graph / Photo
24 C/o 316 Nos Additional SPS Classrooms Labs, M.P. Hall, Toilets and Staircases, internal water supply, sanitary installations, drainage, electrical installation, development of site and fire-fighting arrangements etc. in SV- Kailash Enclave(School ID 1411005), GGSSS-Anandvas (School ID 1411038),GGSSS A-Block Saraswati Vihar (School ID 1411042) and GGSSS, Kohat Enclave, Anandvas (School ID 1411046). (Package-4) 14/01/2019 09/11/2019 5653.04 4924.83 (Oct'21) 92.00 % (Oct'21) SPG Infraprojects Private Limited Work in progress Detail Report
Graph / Photo
25 C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 296 nos. SPS type class rooms, Libraries, Toilets, Labs & 3 Nos. M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. under Education M. Division (West) at SBV Ashok Nagar, GGSSS Ashok Nagar, SBV Subhash Nagar, GBSSS Rajouri Garden Extn., SKV Rajouri Garden Extn., SKV Rajouri Garden Main., SKV-No.2 Tagore Garden, GBSSS Tagore Garden New Delhi [Package-L] 13/01/2019 23/12/2019 5485.49 2230.53 (Sep'21) 0.00 (Sep'21) A. K. Mehta & Co. Work is in progress. Detail Report
Graph / Photo
26 GGSSS No. 1, Molarband School ID : 1925401 14/01/2019 10/10/2019 5268.41 5270.71 (Oct'21) 0.00 (Oct'21) Subham Builders work is in progress Detail Report
Graph / Photo
27 GGSSS Tajpur Pahari, School ID : 1925359 14/01/2019 10/10/2019 5139.81 4587.02 (Oct'21) 0.00 (Oct'21) Subham Builders work is in progress Detail Report
Graph / Photo
28 C/o 272 Nos. Additional SPS Class rooms i/c MP Hall, labs, toilets and Staircases, internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. Sector-16 Rohini (School ID: 1413070), GGSSS Sector-1 Avantika Rohini (School ID :1413069) & Sarvodaya Co-ed. Vidyalaya Sector-2 Rohini (School ID : 1413027) (Package-3) 14/01/2019 09/11/2019 4874.05 2849.32 (Oct'21) 79.00 % (Oct'21) Shri kamal singh Work in progress Detail Report
Graph / Photo
29 C/o of 244 Nos. Additional SPS Class rooms, MP Hall, Labs, toilets and Staircases i/c internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. at SKV Kanjhawala(School ID 1413025) , SV Jaunti ( School ID 1413181) and Govt. Co- ed Sr. Sec. School Nizampur (School ID 1413009 ) ( Package -09 ) 20/01/2019 15/11/2019 4603.38 2092.87 (Oct'21) 72.00 % (Oct'21) Sh. Kamal Singh Work in progress Detail Report
Graph / Photo
30 GGSSS No. 1, East of Kailash, School ID: 1924032 23/01/2019 19/10/2019 4586.20 3830.28 (Oct'21) 0.00 (Oct'21) IQBAL CONSTRUCTION CO. work is in progress Detail Report
Graph / Photo
31 SKV New Friends Colony, School ID 1925033 23/01/2019 19/10/2019 4224.32 3231.04 (Oct'21) 0.00 (Oct'21) Subham Builders work is in progress Detail Report
Graph / Photo
32 Co 232 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 12 13/01/2019 09/10/2019 4150.23 4577.98 (Oct'21) 0.00 (Oct'21) K.B.G. Engineers

Work in progress.

Detail Report
Graph / Photo
33 C/o of 236 Nos. Additional SPS Class rooms, MP Hall, Labs, Toilets and Staircases i/c internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. at Rani Khera S (Co-ed) ( School ID 1412095), SBV Sawada Ghevra (School ID 1413323 ) and SV Ghevra (School ID 1413003) (Package -10) 20/01/2019 16/10/2019 4125.76 3772.34 (Oct'21) 95.00 % (Oct'21) M/s K.B.G. Engineers Work in progress Detail Report
Graph / Photo
34 C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 208 nos. SPS type class rooms, Libraries, Toilets, Labs & 2 No. M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. under Education M. Division (West) at GGSSS No-2 Uttam Nagar, SKV Uttam Nagar, G(Co-Ed)SS Vikas Nagar & GBSSS KG-I/III Vikaspuri New Delhi [Package-E]. 18/01/2019 13/12/2019 3891.02 1555.41 (Mar'21) 0.00 (Mar'21) Aadhar Stumbh Township Pvt. Ltd. Work is in progress. Detail Report
Graph / Photo
35 C/o 204 Nos. Additional SPS Class rooms including Labs, M.P. Hall, Toilets and Staircases, internal water supply, sanitary installations, drainage, electrical installation, development of site and fire fighting arrangements etc. at GBSSS, Prashant Vihar (ID- 1413016) and Govt. Co-ed Sr. Sec. School Sector -08 Rohini Delhi (ID- 1413027) (Package -V). 20/01/2019 16/10/2019 3731.99 4119.94 (Oct'21) 0.00 (Oct'21) M/s K.B.G. Engineers Work completed Detail Report
Graph / Photo
36 Co 212 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 3 16/03/2019 10/12/2019 3708.98 4463.46 (Oct'21) 0.00 (Oct'21) M/s K B G Engineers

Work in progress.

Detail Report
Graph / Photo
37 Const 182 Nos. of additional SPS class rooms (Package-C) 17/03/2019 11/12/2019 3699.32 2627.30 (Nov'21) 0.00 (Nov'21) SPS Infrabuild Pvt. Ltd. Work is in Progress. Detail Report
Graph / Photo
38 Const 190 Nos. of additional SPS class rooms in various schools under East and North East Education Division, PW 24/12/2018 19/09/2019 3675.76 2267.78 (Oct'21) 0.00 (Oct'21) RAMA Contractor Development Work is in Progress. Detail Report
Graph / Photo
39 Const 180 Nos. of additional SPS class rooms (Package-B) 17/03/2019 11/12/2019 3636.43 1288.27 (Aug'21) 0.00 (Aug'21) RAMA Contractor Work is in Progress. Detail Report
Graph / Photo
40 SKV Begumpur, School ID: 1923057 23/01/2019 19/10/2019 3607.51 2258.57 (Oct'21) 0.00 (Oct'21) Subham Builders work is in progress Detail Report
Graph / Photo
41 Const 174 Nos. of additional SPS class rooms in various schools (Package-E) 17/03/2019 11/12/2019 3553.31 15317.01 (Oct'21) 0.00 (Oct'21) SPS Infrabuild Pvt. Ltd. Finishing & Development Work is in Progress. Detail Report
Graph / Photo
42 Up gradation and Construction of an additional multi- story building in the premise of Forensic Science Laboratory, Rohini, Delhi. 14/11/2019 13/02/2021 3541.69 Tewatia Construction Pvt. Ltd. work in progress Detail Report
Graph / Photo
43 C/o 232 Nos. of additional SPS class rooms in various schools under North Education Division, PWD Delhi including internal & external water supply, sanitary installation, electrical installations, development of site and fire fighting system etc. (Package - 9) 17/03/2019 11/12/2019 3526.08 4298.32 (Oct'21) 0.00 (Oct'21) Satish Chand & Rajesh Kumar Pvt. Ltd.

Work in progress.

Detail Report
Graph / Photo
44 Const 184 Nos. of additional SPS class rooms in various schools under East and North East Education Division, PW 17/03/2019 11/12/2019 3455.84 15317.01 (Oct'21) 0.00 (Oct'21) RAMA Contractor Work is in Progress. Detail Report
Graph / Photo
45 C/o of 196 Nos. Additional SPS Class rooms, MP Hall, Labs, toilets and Staircases including internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. at SKV Nithari (School ID 1412093) and GGSSS Mubarakpur Dabas (School ID 1412133 ).(Package VI) 20/01/2019 16/10/2019 3448.67 4318.41 (Oct'21) 0.00 (Oct'21) K.B.G.Engineers Work completed Detail Report
Graph / Photo
46 Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II.(Package-F) 27/01/2019 23/10/2019 3347.23 2919.67 (Oct'21) 0.00 (Oct'21) BCC DEVELOPERS AND PROMOTERS PVT LTD Work in progress. Detail Report
Graph / Photo
47 Co 180 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 10 17/03/2019 11/12/2019 3304.27 3840.46 (Oct'21) 0.00 (Oct'21) Tewatia Construction Pvt. Ltd.

Work in Progress.

Detail Report
Graph / Photo
48 Co 196 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 2 20/01/2019 16/10/2019 3303.39 4132.98 (Aug'21) 95.00 % (Aug'21) Tewatia Construction Pvt. Ltd. Work in progress. Detail Report
Graph / Photo
49 C/o of 172 Nos. Additional SPS Class rooms, MP Hall, Labs, toilets and Staircases including internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. at SKV Sector 20, Rohini Ext. Pooth Kalan (School ID 1412084) GGSSS Block D Sultanpuri (School ID 1412088 ) and GGSSS P- Block Sultanpuri (School ID 1412019). (Package-VII) 14/01/2019 10/10/2019 3101.08 3031.31 (Oct'21) 99.30 % (Oct'21) The Krishna Construction Co. Work in progress Detail Report
Graph / Photo
50 Co 180 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 6 20/01/2019 16/10/2019 3051.32 3034.45 (Oct'21) 0.00 (Oct'21) M/s K B G Engineers

Work in progress.

Detail Report
Graph / Photo
51 SKV Sangam Vihar J Block Sch. ID 1923346 17/03/2019 11/12/2019 3002.10 0.00 (Sep'21) 41.00 % (Sep'21) Devinder Singh Work is in progress Detail Report
Graph / Photo
52 Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Dariyapur Kalan, Delhi 30/05/2020 29/05/2021 2936.58 757.47 (Oct'21) 0.00 (Oct'21) Tewatia Construction Pvt. Ltd.

Casting of Terrace floor slab of Block-E & F completed. Casting of 2nd floor slab in Block-D completed. Casting of ground floor column of Block-A & B completed. Partition work with bricks in progress.

Detail Report
Graph / Photo
53 Construction of Pucca School Building G plus 3 with ancillary facilities including internal water supply sanitary installation, internal electrical installation and development of sites RWHS STP etc at Sector 05 Rohini Delhi 29/05/2020 28/05/2021 2931.78 698.93 (Oct'21) 35.00 % (Oct'21) The Krishna Construction Co. Work in progress Detail Report
Graph / Photo
54 SH Co 169 Nos. of additional SPS class rooms at Sarvodaya Co.Ed SSS Munirka Sch. ID 1719125 G Co.ed MS C4 Vasant Vihar Sch. ID 1720174 SV Vasant Vihar Sch. ID 1720024 and G Co.Ed SV, Sector 13 R.K.Puram Sch. ID 1719130 under Education Maint. SW 17/10/2019 12/07/2020 2849.35 864.15 (Oct'21) 0.00 (Oct'21) A. K. Builders work in progress. Detail Report
Graph / Photo
55 SBV Yogi Arvind, School ID: 1923005 14/01/2019 10/10/2019 2844.79 2842.08 (Oct'21) 0.00 (Oct'21) Devinder Singh work is in progress Detail Report
Graph / Photo
56 C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 148 nos. SPS type class rooms, Libraries, Toilets, Labs & 2 Nos. M.P. Hall etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. under Education M. Division (West) at SKV No. 2 Madipur, GGSSS No. 1 Madipur, SV(Co.Ed.) A-2 Paschim vihar, SV(Co-Ed) New Multan Nagar New Delhi [Package-C]. 13/01/2019 09/10/2019 2816.66 1277.70 (Mar'21) 0.00 (Mar'21) Tewatia Construction Pvt. Ltd. Work is in progress. Detail Report
Graph / Photo
57 Expansion / Remodeling of Deep Chand Bandhu Govt. Hospital at Kokiwala Bagh, Ashok Vihar, Delhi. Including water supply, sanitary, drainage and electrical works etc. 28/06/2019 22/06/2020 2806.33 Roshan Real Estate Pvt Ltd. Work in progress Detail Report
Graph / Photo
58 C/o 168 Nos. Additional SPS Class rooms i/c MP Hall, labs, toilets and Staircases, STP, internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangements etc. at SKV No.-2 Shakurpur (ID-1411030) (Package-2) 15/01/2019 11/10/2019 2788.70 1682.36 (Oct'21) 91.00 % (Oct'21) RAMA Contractor Work in progress Detail Report
Graph / Photo
59 Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at Libaspur, Delhi 30/05/2020 29/05/2021 2653.59 1027.07 (Oct'21) 0.00 (Oct'21) Tewatia Construction Pvt. Ltd.

Work in progress.

Detail Report
Graph / Photo
60 Construction of 161 Nos Additional SPS Classrooms in DOE Schools GGSSS No 1 Tukhmirpur Delhi 1104262 44 Class rooms GGSSS No. 2 Tukhmirpur Delhi 1104419 36 Class rooms and GSKV Khajuri Khas Delhi 1104022 81 Class rooms including Laboratory staircase 12/07/2021 06/06/2022 2642.87 Rajiv Aggarwal Tender was awarded on 02.07.2021. Site is handed over to the contractor on 23.08.2021 after getting. But site work could not be started due to non handing over of site because late approval of dismantling from the competent authority on 18.08.2021 and further non handling over of site by the school due to non-shifting of vaccination centre. Contractor requested to close the agreement under clause 3A. His request was accepted by the competent authority on dt. 23.09.2021 and P.G. has been released on dt. 30.09.2021. Tender will be recalled after getting permission of tree cutting. Detail Report
Graph / Photo
61 Construction of Pucca School building (G+3) with ancillary facilities including internal water supply, sanitary installations, internal electrical installation and development of site, RWHS, STP, Furniture etc at Sector 18, Rohini. (SH: Civil and Electrical Composite Work). 23/05/2020 23/05/2021 2606.13 166.63 (Oct'21) 45.00 % (Oct'21) Tewatia Construction Pvt. Ltd. Work in progress Detail Report
Graph / Photo
62 Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II. SH: C/o 148 Nos. of additional SPS class rooms at GBSSS, J.J Camp, Naraina (School ID-1720015) & SBV, Nairana (School ID-1720002) & SBV under Education Maintenance South West Division, PWD Delhi including internal & external water supply, sanitary installation, electrical installations, development of site and fire fighting system etc. (Package-E). 15/01/2019 11/09/2019 2578.40 2483.63 (Oct'21) 0.00 (Oct'21) Raghav Engineers Work in progress. Detail Report
Graph / Photo
63 Co 148 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 13 13/01/2019 09/09/2019 2518.71 2623.80 (Oct'21) 0.00 (Oct'21) Pawan Kumar

Work in progress.

Detail Report
Graph / Photo
64 SKV Hari Nagar, Ashram, School ID : 1924043 14/01/2019 10/09/2019 2464.23 1348.18 (Oct'21) 0.00 (Oct'21) Reliance Elektrik works work is in progress Detail Report
Graph / Photo
65 Co 136 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 1 20/01/2019 16/09/2019 2420.66 2068.12 (Oct'21) 0.00 (Oct'21) M C Constructions Company

Work in Progress.

Detail Report
Graph / Photo
66 Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II. SH: C/o 162 Nos. of additional SPS class rooms at G Co.Ed.SS, Sec-16A, Dwarka (School ID-1821242), Shahid Captain Amit Verma Govt. S(Co.Ed)V, Inderpuri (School ID-1720121) & SKV, Rajnagar-I (School ID-1824027) under Education Maintenance South West Division, PWD Delhi including internal & external water supply, sanitary installation, electrical installations, development of site and fire fighting system etc. (Package-H) 19/12/2018 15/08/2019 2420.05 2390.60 (Oct'21) 0.00 (Oct'21) Multi Tech Construction Co. Work in progress. Detail Report
Graph / Photo
67 Co 152 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi including int. and ext. water supply, fire fighting system etc. Pkg 5 08/12/2018 04/08/2019 2395.22 2798.61 (Oct'21) 0.00 (Oct'21) RAJIV AGGARWAL

Work in progress.

Detail Report
Graph / Photo
68 Construction of conventional Bus Depot no. I & II on ground floor at Sector A-1, A-4, Narela, Delhi 23/08/2021 22/05/2022 2373.12 M/s PK Gupta & Co. The work has been awarded. Electric connection from TPDDL is pending. Earth Work is in progress. Detail Report
Graph / Photo
69 Co 124 Nos of additional SPS classrooms at various schools under North Education Division PWD Delhi including internal external water supply....... Package-11 17/01/2019 13/09/2019 2349.00 2869.26 (Oct'21) 0.00 (Oct'21) M/s Munshi Ram Kharbanda

Work in progress.

Detail Report
Graph / Photo
70 SBV Jonapur, School ID: 1923359 08/12/2018 04/08/2019 2342.87 240.39 (Oct'21) 0.00 (Oct'21) Reliance Elektrik works work is in progress Detail Report
Graph / Photo
71 SKV (Gargi) Green Park Extension, School ID: 1925032 08/12/2018 04/08/2019 2319.71 2588.73 (Oct'21) 0.00 (Oct'21) Devinder Singh work is in progress Detail Report
Graph / Photo
72 RPVV Lajpat Nagar, School ID : 1925334 08/12/2018 04/08/2019 2303.62 1946.41 (Oct'21) 0.00 (Oct'21) Reliance Elektrik Works, work is in progress Detail Report
Graph / Photo
73 C/o 143 Nos. of additional SPS class rooms at G(co.ed)SSS, Pochanpur (School ID-1821037) , SBV Bijwasan (Bharthal) (School ID-1821032)& GGSSS Bijwasan Bharthal Road, (School ID-1821035) under Education Maintenance SouthWest Division, PWD Delhi. (Package-G) 15/01/2019 11/09/2019 2237.55 2729.92 (Oct'21) 0.00 (Oct'21) JAP BUILDCON PRIVATE LIMITED Work in Progress Detail Report
Graph / Photo
74 C/o Additional SPS Class rooms in various schools under Priority-II. SH : C/o 148 nos. SPS type class rooms, Libraries, Toilets & Labs etc. including internal & external water supply, sanitary installation, electrical installation, firefighting system and development of site etc. at Govt. Schools SKV No. 2 C-Block Janakpuri, GGSSS No. 2 A-Block Janakpuri, SV(Co. Ed.) L-Block Hari Nagar, GBSSS Site-2 Clock Tower Hari Nagar New Delhi [Package-K]. 07/12/2018 04/08/2019 2234.81 1456.80 (Oct'21) 0.00 (Oct'21) Multi Tech Construction Co. Work is in progress. Detail Report
Graph / Photo
75 C o 138 Nos Addl SPS Classrooms in GGSSS Rani Bagh Sch ID 1411043 GGSSS Trinagar Narang Colony Sch ID 1411037 ic Lab staircases toilets and ramps internal water supply sanitary installations internal electrification and fire fighting arrangements 01/03/2019 26/09/2019 2120.02 0.00 (Oct'21) 90.00 % (Oct'21) The Krishna Construction Co. Work in progress Detail Report
Graph / Photo
76 S.K.V. Andrews Ganj, School ID : 1924033 08/12/2018 04/08/2019 2112.37 2057.58 (Oct'21) 0.00 (Oct'21) Devinder Singh work is in progress Detail Report
Graph / Photo
77 Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priorty II. 15/01/2019 11/09/2019 2001.74 1990.16 (Oct'21) 0.00 (Oct'21) M/S Sunehari Bagh Builders Pvt. Ltd. Work in progress. Detail Report
Graph / Photo
78 GGSSS Dera Village School ID: 1923023 08/12/2018 04/08/2019 1877.31 1254.05 (Sep'21) 0.00 (Sep'21) Varun Gupta & Co. In progress Detail Report
Graph / Photo
79 Construction of Govt Sr Sec Pucca School building G plus 3 with ancillary facilities including internal water supply internal electrical installation sanitary installations development of site STP and RWH etc at Sector 27 Rohini. 31/05/2020 30/05/2021 1874.70 0.00 (Oct'21) 2.00 % (Oct'21) SSP Promoters and Builders Private Limited Excavation and lean concrete in progress. DUAC approval is awaited. Detail Report
Graph / Photo
80 Furniture Work RECALL 04/11/2019 18/12/2019 1858.08 6.26 (Sep'21) 0.00 (Sep'21) Rajdhani Furnitures PVT. LTD. Detail Report
Graph / Photo
81 Co. 104 Nos of addl SPS classrooms at various schools under North Edu. Divn, PWD, Delhi incl int. and external water supply fire fighting system etc. Pkg 7 14/01/2019 10/09/2019 1812.55 2090.05 (Aug'21) 92.00 % (Aug'21) Raghav Engineers

Work in progress.

Detail Report
Graph / Photo
82 Const. of 112 Nos. addl SPS classrooms GGSS, Mukundpur Village Sch. ID 1207230 - 36 Nos., GBSSS Bakhtawarpur Sch. ID 1309266 -56 Nos. incl. 01 No. M.P Hall Equi. to 08 Nos. Class Rooms and SV Lancer Road Sch. ID 1207032 -20 Nos. under North Edu. Divn 08/06/2019 02/02/2020 1799.01 0.00 (Aug'21) 68.00 % (Aug'21) C. PARKASHAN Co.

Work in progress

Detail Report
Graph / Photo
83 C/o of 104 Nos. Additional SPS Class rooms, Labs, toilets and Staircases i/c internal water supply, sanitary installation, drainage, electrical installation, development of site and fire fighting arrangments etc. at SBV Keshav Puram (ID-1411029), SKV Keshav Puram A Block (ID-1411021) & SKV Bharat Nagar (ID-1411031). (Package-I) 29/12/2018 26/07/2019 1743.19 2099.89 (Oct'21) 78.00 % (Oct'21) AMAR CONSTRUCTION COMPANY Work in progress Detail Report
Graph / Photo
84 Development of Synthetic Athletic Track with Football field and Synthetic Hockey Turf in Rajiv Gandhi Sports Complex Singhu Delhi 08/03/2021 02/11/2021 1583.17 Shiv Naresh Sports Pvt. Ltd., E-23, Karampura. New Delhi-110015 Hockey field is ready for BM, BC work. In synthetic track, GSB laying work in progress. Structural work for change room (Boys & Girls), UG tank in progress. Physical Progress is 17% Detail Report
Graph / Photo
85 Construction of 92 Nos Additional SPS Classrooms in SV Co ed Sector 7 Rohini School ID 1411074 including Laboratory staircases toilets and ramps internal water supply sanitary installations Internal electrification and fire fighting arrangements 30/12/2019 24/10/2020 1502.95 0.00 (Oct'21) 85.00 % (Oct'21) S.D.CONSTRUCTION COMPANY Work in progress Detail Report
Graph / Photo
86 Construction of Residential Hostel at Chhatrasal Stadium, Model Town, Delhi. (SH: Const. of Hostel Building inc. Ext. Dev. works Internal Elect. Installation External Lighting lifts firefighting system fire alarm with PASystem CCTV Audio video system HVAC works 24/02/2021 23/05/2022 1374.16 M.C. Construction Architectural drawings are being revised by Senior Architect. Work can be taken up after receipt of revised drawings. However, the agency has requested for foreclosure of the agreement. Detail Report
Graph / Photo
87 Construction of pucca school building Four Storeyed with ancillary facilities incl. internal water supply, sanitary inst., internal elect. Inst. and dev. of site at GSSS (Co ed) at Rana Pratap Bagh, Delhi 30/05/2020 29/05/2021 1335.04 617.42 (Oct'21) 0.00 (Oct'21) The Krishna Construction Co.

' Structure work of building completed, Plaster work, brick, granite work, B/wall work in progress.

Detail Report
Graph / Photo
88 C/o 700 Beds Indira Gandhi Hospital at Sector-9, Dwarka, New Delhi (SH: Providing and Placing of Medical Furnitures at Indira Gandhi Hospital, Dwarka, New Delhi) 11/07/2021 23/09/2021 1244.16 Godrej & Boyce Mfg. Co. Ltd. Work is under progress. Detail Report
Graph / Photo
89 GGSS No. 3 Sec IV, Ambedkar Nagar 03/03/2016 15/07/2016 1212.87 Devinder Singh completed Detail Report
Graph / Photo
90 C/o 700 Beds Indira Gandhi Hospital at Sector-9, Dwarka, New Delhi (SH: Providing and Placing of Non-Medical Furnitures at Indira Gandhi Hospital, Dwarka, New Delhi). 11/07/2021 23/09/2021 1118.83 M/s Rajdhani Furnitures Pvt. Ltd. Work is under progress. Detail Report
Graph / Photo
91 Construction of 60 Nos G plus 3 SPS class rooms including internal and external water supply sanitary installations electrical installations development of site fire fighting system at Veer Sawarkar Arogya Sansthan, Karawal Nagar in District North 31/12/2019 25/10/2020 1112.81 197.86 (Oct'21) 0.00 (Oct'21) Mathra Dass Ahuja & Sons Work completed Detail Report
Graph / Photo
92 Construction of 60 Nos Addl SPS Classrooms in Govt Co Ed MS Punjab Khore School ID 1413075 GGSSS including Laboratory staircases toilets and ramps internal water supply sanitary installations internal electrification and fire fighting arrangements 05/01/2020 30/10/2020 991.24 0.00 (Oct'21) 96.00 % (Oct'21) M/s Satish Builders Work in progress Detail Report
Graph / Photo
93 "Up-gradation/EOR of 802 Nos. Type-B, C & D at Timarpur Delhi. (SH:- Package-II of 410 Nos. Flats consisting of 320 Nos. Type-B, from 361 to 680 and 90 Nos. Type-C Flats) Civil Work. " 04/04/2013 03/10/2014 908.74 Devinder Singh Work Completed. Final bill yet to be submitted by agency. Detail Report
Graph / Photo
94 "Upgradation / EOR of 802 Nos. Type-B, C & D at Timarpur, Delhi. (SH:- Package-I of 392 Nos. Flats consisting of 360 Nos. Type-B, from 1 to 360 and 32 Nos. Type-D Flats) Civil Work " 04/04/2013 03/10/2014 903.01 Devinder Singh Work Completed. Final bill yet to be submitted by agency. Detail Report
Graph / Photo
95 Conversion of existing Cinder Athletic Track into 400 metres 8 lane Synthetic Athletic Track at Sports Complex located within the premises of Government Boys Sarvodaya Vidyalaya Pehladpur Delhi 04/01/2020 30/08/2020 895.64 0.00 (Jan'21) 85.00 % (Jan'21) Shiv Naresh Sports Pvt. Ltd., E-23, Karampura. New Delhi-110015 Work Completed Detail Report
Graph / Photo
96 Construction of SPS Engineering office block, Girls and Boys Hostel for Foreign Students including internal electrification in NSUT Campus, Sector-3, Dwarka, New Delhi. 23/12/2019 19/06/2020 890.74 0.00 (Sep'20) 5.00 % (Sep'20) MANISH BUILDWELL Work is almost completed Detail Report
Graph / Photo
97 Construction of 55 Nos. Aam Admi Mohalla Clinic at various locations under South-East (M), Circle, New Delhi during 2018-19. 15/12/2018 12/06/2019 827.90 290.07 (Oct'19) 17.00 % (Oct'19) S. P. Construction Work in progress Detail Report
Graph / Photo
98 Construction of Blind Hostel 96 Seated at Bal Sadan Timarpur Delhi SH Civil and Electrical work 11/01/2019 10/01/2020 786.44 1056.49 (Jul'21) 0.00 (Jul'21) MANISH BUILDWELL Detail Report
Graph / Photo
99 Construction of Girls Hostel at Kalindi College, East Patel Nagar, New Delhi during 2017-18. SH Civil Works Electrical Works 16/01/2018 15/01/2019 731.25 216.46 (Mar'20) 0.00 (Mar'20) PRAGATI ENTERPRISES Detail Report
Graph / Photo
100 Co 44 Nos Addl SPS Classrooms in GGMS at Sec 24 Rohini Sch ID 1413316 in lieu of SV Wazirpur Village ic Lab. staircases toilets and ramps internal water supply sanitary installations internal electrification and fire fighting arrangements Recall 31/05/2020 03/03/2021 597.86 697.75 (Oct'21) 0.00 (Oct'21) SUSHIL BUILDWELL PRIVATE LIMITED Work completed Detail Report
Graph / Photo
101 Construction of 30 Nos. Aam Admi Mohalla Clinic at various places under south building (M) Division/South District. 10/01/2019 08/07/2019 585.53 91.21 (Mar'21) 0.00 (Mar'21) P S ASSOCIATES work in progress Detail Report
Graph / Photo
102 Providing and Fixing Customized Furniture and Interior works 24/09/2020 22/11/2020 533.13 0.00 (Jan'21) 15.00 % (Jan'21) M/s Rajasthan Decorators Work is in progress Detail Report
Graph / Photo
103 Construction of 30 Nos. Aam Aadmi Mohalla Clinic (Primary Health Centre) at various places under West Building Division-1, West Maintenance Circle in Assembly Constituency Mundka (AC-08), Nangloi( Full Name of work mention in NIT) 19/12/2018 18/04/2019 505.78 183.84 (Mar'20) 0.00 (Mar'20) Gee Internationals Detail Report
Graph / Photo
104 Construction of Synthetic Hockey Court at Vivekanand College, Vivek Vihar, Delhi 03/01/2020 30/06/2020 490.76 0.00 (Mar'21) 69.00 % (Mar'21) Chadha Sports (Regd.), 109, Bhagat Singh Market, New Delhi-110001 Final bill under process. Detail Report
Graph / Photo
105 Co New Teaching block in DIET at Daryaganj New Delhi Sh Phase I having Lab, Library faculty room etc ic connecting staircase Civil and Electrical Work 06/06/2019 05/03/2020 485.59 352.96 (Oct'21) 0.00 (Oct'21) KALYAN CHANDRA GOYAL & CO. Detail Report
Graph / Photo
106 Construction of 30 Nos Aam Aadmi Mohalla Clinic Primary Health Centre at various places under North Building Division North Maintenance Circle in Assembly Constituency Narela Badli Adarsh Nagar and Bawana Civil Electrical 29/12/2018 27/04/2019 482.18 0.00 (Sep'20) 90.00 % (Sep'20) Jasvir Singh Shokeen Work in progress (90%) Detail Report
Graph / Photo
107 Construction of Old Age Home including Electrical Work at BG–6, Paschim Vihar, Delhi. (Composite Work). 28/06/2018 27/06/2019 479.58 424.28 (Mar'21) 0.00 (Mar'21) KALYAN CHANDRA GOYAL & CO. Work in progress 75%, Work is slow in Progress due to Covid-19 Detail Report
Graph / Photo
108 Supplying, Installation, Testing and Commissioning of HVAC and Mechanical Ventilation system. (HVAC Package-2 30/09/2014 26/05/2015 474.90 61.36 (May'19) 0.00 (May'19) Work completed on 31/12/2017 final payment yet to be made Detail Report
Graph / Photo
109 Up gradation of one staff room, each at 951 School under Delhi Govt. (SH: - 123 Nos. of staff rooms under West Maintenance Circle). 30/03/2019 29/06/2019 433.89 171.66 (Feb'20) 0.00 (Feb'20) Sham Lal Gupta & Sons Detail Report
Graph / Photo
110 Construction of Wrestling Hall at Village Mitraon Delhi 29/12/2019 25/06/2020 363.93 0.00 (Jan'21) 26.00 % (Jan'21) SAHIL GOYAL Structual work except roofing completed. Internal Plaster, granite cladding work in progress. Physical progress is 60% Detail Report
Graph / Photo
111 Building work i/c Water Supply, Sanitary installation,Development Work and providing EI & Fire fighting system 26/05/2015 25/05/2016 316.66 Sudesh Kumar Work Suspended due to non-receipt of funds from Client Department. Detail Report
Graph / Photo
112 Construction of Aam Aadmi Mohalla Clinic (Primary Health Centre) at various places under North East Circle, PWD, Delhi 27/12/2018 26/04/2019 296.85 335.77 (Aug'21) 0.00 (Aug'21) Ram Krishan Yudhister Parkash

work completed

Detail Report
Graph / Photo
113 Construction of 21 nos. Aam Aadmi Mohalla Clinic (Primary Health Centres) at various places in the jurisdiction of Shahdara Circle, PWD, Delhi (Civil and Electrical Work). 28/02/2019 27/06/2019 294.21 56.14 (Sep'21) 0.00 (Sep'21) AASRA Martech Pvt.Ltd. Work in progress. Detail Report
Graph / Photo
114 Civil and Electrical work. 05/05/2019 04/03/2020 292.64 Dheeraj Singh & Company Work just awarded Detail Report
Graph / Photo
115 Construction of Police post at Bharola Village Delhi 15/11/2019 15/07/2020 289.91 Sham Lal Gupta & Sons work completed Detail Report
Graph / Photo
116 Construction of G4 storey Police Post including Rain Water Harvesting Tank Underground water tank and development work at Sanjay Gandhi Transport Nagar Delhi Civil and Electrical 08/11/2019 07/07/2020 289.50 33.28 (Jan'21) 0.00 (Jan'21) Sagar Construction work is in progress (22%) Detail Report
Graph / Photo
117 Construction of 200 mtrs. Athletic Track normal size Swimming Pool, Basket ball, Volley Ball & Kabaddi Court, Toilet Block/Change room (for Boys & Girls) including E & M Services with in the Premises of Govt. Boys Sr. Sec School, Bakhtawarpur, Delhi.( SH: Package-B : C/o 200 metre Athletic Track Basket Ball Volley Ball Kabaddi Court and Boundary wall etc including E and M works. 17/09/2020 16/03/2021 286.80 0.00 (Jan'21) 10.00 % (Jan'21) Shiv Naresh Sports Pvt. Ltd., E-23, Karampura. New Delhi-110015 Athletic Synthetic track, volley ball Court and Kabaddi Court Completed. Boundary wall, foothpath and grassing work in progress. Physical Progress is 90%. Detail Report
Graph / Photo
118 Construction prefab hut for HQ at PTS Wazirabad, Delhi 21/07/2018 20/11/2018 285.56 Aliyan Constaruction Company

work completed

Detail Report
Graph / Photo
119 Conversion of existing normal size swimming pool within the premises of Shaheed Amir Chand Sarvodaya Vidyalaya Ludlow Castle No 2 Sham Nath Marg, Delhi into all weather swimming pool 23/12/2020 20/06/2021 262.79 Maa Narayan Constuction Co. Structural work for change room, machine room, coach room in progress. Work of raising of level of swimming pool under progress. Physical progress is 28%. Detail Report
Graph / Photo
120 EOR/REPAIR OF BUILDING OF PS, M, N, O, P, Q and R BLOCK QTRS. AND REPLACEMENT OF DAMAGED G.I./C.I. PIPE LINE, ALL/FLOOR TILES OF P, Q and R BLOCKS IN PC MODEL TOWN, DELHI. (SH CIVIL and ELECTRICAL WORK). 01/11/2018 01/07/2019 201.92 158.30 (Mar'20) 0.00 (Mar'20) Pooja Construction

ok

Detail Report
Graph / Photo
121 Construction of Normal Size Swimming Pool within the Premises of Shaheed Captain Haniffuddin Sarvodaya Kanya Vidyalaya Mayur Vihar Phase 1, Pocket 4, Delhi 110091 16/03/2019 15/09/2019 182.18 0.00 (Dec'20) 72.00 % (Dec'20) Anish Ahmed Final bill under process. Detail Report
Graph / Photo
122 Vertical Extension of Teaching Block No.1 of B.R. Ambedkar College, Wazirabad Road, Delhi 16/01/2018 15/07/2018 172.40 114.27 (Oct'20) 0.00 (Oct'20) JABIR HUSSAIN

work completed

Detail Report
Graph / Photo
123 Providing and Installing Fire Fighting, Fire Alarm system and Public Address system 10/08/2014 09/04/2015 155.31 Detail Report
Graph / Photo
124 Construction of Gymnastic Hall at SBV Moti Nagar Delhi 11/01/2020 09/07/2020 147.53 0.00 (Aug'20) 2.00 % (Aug'20) Aniket Enterprises Work is held up as vaccination camp for Covid is under operation in the approach to the site. Steps are being taken to foreclose the agreement. Detail Report
Graph / Photo
125 Construction and Commissioning of Mohalla Clinics at various places in North-East Delhi under the Jurisdiction of PWD Sub- Division M-2221 (2nd call). 25/01/2019 24/05/2019 140.44 216.46 (Oct'21) 0.00 (Oct'21) Uma Shankar work in progress Detail Report
Graph / Photo
126 Construction and setup the Nursery Pre-School in 15 No. FIFTEEN NOS. Sarvodaya Vidyalayas, Delhi Govt. School under Division West Building-I, PWD, New Delhi during 2018-19. SH Civil and Electrical Work.PWD, New Delhi during 2017-18. SH Civil and El 12/09/2018 11/01/2019 140.01 Satyam Construction Co. Detail Report
Graph / Photo
127 Construction of SPS building and boundary wall for Training cum Production Centre at Indira Nagar Azadpur Delhi 33 Civil and Electrical Work 08/03/2020 04/09/2020 137.37 A R Construction Co. Work in progress. (The agency has submitted structural drawings for proof check by SE, NMC) SE, NMC suggested the modification and agency has bee asked to submit vetted drawing from 3rd party incorporating the modification. Detail Report
Graph / Photo
128 Construction of prefab hut for HQ of Meghalaya Police along with development work located at PTS Wazirabad, Delhi 15/07/2018 14/11/2018 134.50 110.06 (Oct'19) 0.00 (Oct'19) Aliyan Constaruction Company

work completed

Detail Report
Graph / Photo
129 Extension and Renovation of office space at the 1st Floor of LG s Secretariat, Raj Niwas, Delhi-54. (SH Civil and Electrical Work ). 14/10/2018 10/02/2019 133.59 179.19 (Feb'21) 0.00 (Feb'21) Munzareen Ahmd

ok

Detail Report
Graph / Photo
130 Construction and setup the Nursery Pre-School in 13 No.THIRTEEN NOS. Sarvodaya Vidyalayas Delhi Govt. School under West Building-I, PWD, New Delhi during 2018-19. SH Civil and Electrical Work. 28/02/2019 28/06/2019 117.55 77.24 (Jan'20) 0.00 (Jan'20) krishna construction co Detail Report
Graph / Photo
131 Renovation and Interior works for Rouse Avenue Court Complex at DDU Marg, New Delhi. (SH :- Providing and fixing work stations, Cabin partitions, Office furniture and interior finishing and Electrical works for DSLSA.) 06/08/2021 05/10/2021 112.91 Millennium Furniture Work is in progress Detail Report
Graph / Photo
132 Changes in infrastructure of CHB to develop it as OHB Model Home.(Civil and Electrical work) 24/10/2019 23/02/2020 112.72 Vashistha and Sons Construction Co PAN Number: ANFV6477F 9 Methapur , New Delhi - 110044 Detail Report
Graph / Photo
133 Making the Building disable friendly under Accessible India campaign at RTRM Hospital Jaffarpur Kalan New Delhi. 01/06/2020 27/11/2020 106.37 0.00 (Jan'21) 30.00 % (Jan'21) Aliyan Constaruction Company Work is under progress. Detail Report
Graph / Photo
134 Construction of SPS Type Main Store and demolition of old PWD enquiry office. 04/02/2019 03/08/2019 103.91 55.03 (Mar'20) 0.00 (Mar'20) ASHOK MALIK Detail Report
Graph / Photo
135 Providing and supplying tree planters in various places, New Delhi under MLA LAD Fund Scheme 04/11/2019 18/12/2019 91.97 91.97 (Mar'21) 0.00 (Mar'21) Rajeshwar Dayal Pandey Detail Report
Graph / Photo
136 Providing and replacement, up-gradation and comprehensive maintenance of UPS and TVSS system at LBS Hospital, Khichripur, Delhi. 31/05/2019 30/07/2019 86.23 POWER HOUSE work completed Detail Report
Graph / Photo
137 Construction of Shed with Boxing Ring at Sports Complex, East Vinod Nagar, Delhi 08/05/2017 04/09/2017 84.89 19.39 (Jul'20) 0.00 (Jul'20) Anish Ahmed Work in Progress Detail Report
Graph / Photo
138 Providing and Fixing of compactors in Hall No 2 of Original Branch situated in the basement of A Block of Delhi High Court New Delhi 25/05/2021 23/07/2021 83.82 66.62 (Oct'21) 0.00 (Oct'21) Rajdhani Furnitures PVT. LTD. work in progress Detail Report
Graph / Photo
139 Up-gradation of swimming pool and other misc. civil works including electrical work 11/08/2021 08/12/2021 83.39 M/s Tanishq Ions In Progress. Detail Report
Graph / Photo
140 AR and MO to Various Delhi Govt. Buildings under Division West Building-1, Tihar, New Delhi. During 2019-20. SH Providing services of Computer Operator, Clerk, Peon, Dak Messenger 28/08/2019 27/08/2020 77.50 10.35 (Mar'20) 0.00 (Mar'20) Good Luck Enterprises Detail Report
Graph / Photo
141 Development of sports facilities at Govt. Girls Sr. Sec School, Jhilmil Colony, Delhi. (SH: C/o Table Tennis Room, Gymnastic Room and other miscellaneous works). 23/09/2019 22/01/2020 77.45 0.00 (Dec'20) 97.00 % (Dec'20) K.P. Singh & Co. Final bill under process. Detail Report
Graph / Photo
142 Renovation of Library Block of IGDTUW, Kashmere Gate under SRD Division-I, Sub-Division-III, New Delhi.(SH-Civil and Electrical works). 09/07/2018 08/01/2019 75.80 61.12 (Jan'20) 0.00 (Jan'20) Kamal Construction Co. Work in progress Detail Report
Graph / Photo
143 Changes in Infrastructure of Model Home to convert it as CHB and JJB in front of Building (Civil and Electrical work). 24/10/2019 23/01/2020 71.13 AJAY CONSTRUCTION CO. Detail Report
Graph / Photo
144 Providing and laying RMC in the campus of N, J1, J2, J3, K, L and M Block at Sujan Singh Park, New Delhi under MLA LAD Fund Scheme. 27/10/2019 07/12/2019 70.87 79.44 (May'21) 0.00 (May'21) Gyanchand Detail Report
Graph / Photo
145 Augmentation of Old and Outlived Sub-Station equipments at LBSH, Khichripur, Delhi Sub Head S.I. T.C. of Substation Equipments 13/10/2018 12/04/2019 69.44 35.42 (Mar'19) 50.00 % (Mar'19) Ajay M/c Tools work in progress ( 2nd RA ) Detail Report
Graph / Photo
146 Replacement of existing 3 Nos 26 Passenger cum bed lift at CNBC, Geeta Colony, Delhi. 01/08/2018 30/04/2019 69.00 18.02 (Nov'18) 35.00 % (Nov'18) Johnson Lift Pvt Ltd Work in progress (3RD RA 600525 Detail Report
Graph / Photo
147 Construction of 10 Nos FRP Gazebo rubens and 06 Nos of porta cabin Chaupal at various places of New Delhi Constituency AC40, under MLA LAD Fund Scheme 26/11/2019 24/01/2020 68.77 34.11 (Nov'20) 0.00 (Nov'20) Tripurari Prasad Singh Detail Report
Graph / Photo
148 C/o SPS Type New M.P. Hall at SBV, Subhash Nagar, New Delhi. 07/03/2019 06/07/2019 68.63 Vinay Shanker Detail Report
Graph / Photo
149 SH Repairing to plaster and water proofing treatment of roofs to prevent seepage i c re-strengthened to roof of barracks in various wards 21/12/2018 20/04/2019 66.46 53.94 (Mar'20) 0.00 (Mar'20) Ashok Kumar Detail Report
Graph / Photo
150 Construction of Recreation Hall at PTS, Wazirabad, Delhi 16/02/2019 15/06/2019 63.80 81.48 (Mar'21) 0.00 (Mar'21) Shekhar

work completed

Detail Report
Graph / Photo
151 A/R & M/O to Rouse Avenue Court Complex at DDU Marg, New Delhi During 2021-22. (SH: Providing Mechanized House Keeping Services). 19/08/2021 18/04/2022 63.32 ARMOUR SECURITY INDIA PVT LTD Work is in progress Detail Report
Graph / Photo
152 SITC of ETP (Effluent Treatment Plant) 28/04/2015 27/07/2015 59.53 Mgrow Techno System Pvt. Ltd. Detail Report
Graph / Photo
153 A/R & M/O to Rouse Avenue Court Complex at DDU Marg, New Delhi During 2021-22. (SH :- Deploying Persons for Safety of Govt. Properties). 25/08/2021 24/02/2022 56.53 4050 RAVI RAJ SINGH SECURITY AGENCY work is in progress Detail Report
Graph / Photo
154 Misc repair work under SRD Project Division I Sub Division III PWD New Delhi Recall 23/09/2019 22/03/2020 56.09 70.01 (Feb'21) 0.00 (Feb'21) KAMAAL CONSTRUCTION CO. Detail Report
Graph / Photo
155 EOR to Police Station, Vikas puri, New Delhi. SH Water proofing treatment of roofs, Renovation of toilets, Replacement of damaged C.I and G.I pipe lines. Tile flooring in rooms and corridors, raising of boundary wall and other misc repair works 15/10/2018 14/02/2019 56.04 51.27 (Sep'19) 0.00 (Sep'19) Tubya Construction Detail Report
Graph / Photo
156 AA to SKV No. 01 Gandhi Nagar Delhi dg 2018 19 17/03/2019 16/07/2019 55.57 32.21 (Jun'20) 0.00 (Jun'20) Arif 90% work in progress Detail Report
Graph / Photo
157 EOR to DAP Line, Vikas Puri, New Delhi. SH Construction replacement of damaged sewer lines of Vikas Puri, Police Lines and residential Complex 3rd battalion, Delhi Armed Police Delhi 20/07/2018 19/11/2018 55.08 12.19 (Dec'19) 0.00 (Dec'19) Tubya Construction Detail Report
Graph / Photo
158 Making casting of factory made modular cupboard with fire retardant and boiling water proof Board in Court rooms North East District of KKD Court Complex Delhi 21/11/2021 18/02/2022 54.92 Millennium Furniture Detail Report
Graph / Photo
159 A EOR to Co of toilet block septic tank parking shed renovation of principal rooms GBSSS Katewara B Repair renovation toilet block at GSBV Prahladpur Banger C PF wall tiles false ceiling MS gate railing flush door misc work at RSGSKV Bawana Delhi 16/11/2019 15/03/2020 54.51 Batra Constructions work is in progress (35%) Detail Report
Graph / Photo
160 Providing and fixing door, window, Floor tile, kota stone flooring, wall tile, chajja etc except toilet portion. 02/07/2020 20/10/2020 54.33 52.89 (Jan'21) 0.00 (Jan'21) Dharambir Singh work in progress (80%) Detail Report
Graph / Photo
161 Re construction of collapsed boundary wall of school of about 28 metres length in North west side at Govt Co ed SSS Barwala Delhi 110039 School Id1310161 Bldg Id13101377 EOR Id20182296 25/11/2019 23/01/2020 54.06 50.20 (Nov'20) 0.00 (Nov'20) HARI RAM VERMA work is in progress (88%) Detail Report
Graph / Photo
162 Raising of boundary wall on back side of the school, Grit wash on boundary wall renovation of multipurpose hall and misc work 23/12/2019 20/04/2020 53.77 43.28 (Nov'20) 0.00 (Nov'20) Jeetender Kumar Verma work is in progress (80%) Detail Report
Graph / Photo
163 Re construction of damaged tilted of length approx 330.00mtr. boundary wall at Rajiv Gandhi Stadium, Bawana, Delhi 02/07/2021 30/09/2021 53.76 AJAY KUMAR work progress Detail Report
Graph / Photo
164 Re-Construction of 8 nos. Servants Quarters (Type-I) including development at Session House,2 North End Road, Delhi (SH Civil and Electrical Works) 02/08/2019 02/04/2020 53.74 D.S. Construction Co

ok

Detail Report
Graph / Photo
165 Construction of SPS Structure 4 Storey for ITI at Ranhola Delhi, Erection of MS fire escape stair fire resistant doors cement concrete pavement and other miscellaneous works 04/07/2021 01/10/2021 53.22 Nurul Hak Tender Cancel. Detail Report
Graph / Photo
166 Civil and Electrical Works. 13/06/2019 12/09/2019 51.83 15.96 (Nov'20) 0.00 (Nov'20) Abhikalp Constructions Syndicate

work in progress

Detail Report
Graph / Photo
167 Construction of 5 nos arch shaped FRP pergola, 4 nos FRP porta cabin and 25 nos FRP Security Cabin at various places of New Delhi constituency AC 40 under MLA LAD Scheme 26/11/2019 24/01/2020 51.22 5.46 (Mar'20) 0.00 (Mar'20) Tripurari Prasad Singh Detail Report
Graph / Photo
168 Construction of SPS Structure 4 Storey for ITI at Ranhola Delhi. (SH: Erection of MS fire escape stair fire resistant doors cement concrete pavement and other miscellaneous works 15/02/2021 15/05/2021 51.05 BHUPESH KUMAR Tender cancelled. Detail Report
Graph / Photo
169 Repair of old building wall, roof and floor, Grit wash plaster, sewerline, repair of stair case, replacement of windows. 18/11/2019 16/04/2020 50.60 51.80 (Nov'20) 0.00 (Nov'20) Saeed Builders No works since previous month Detail Report
Graph / Photo
170 Replacement of Carpets in Courts of A block Extension block and wooden texture laminated flooring in Chambers of Extension block at Delhi High Court New Delh 27/06/2017 26/07/2017 50.20 Bansal Builder Agreement closed PG forfeited Detail Report
Graph / Photo
171 C o Boundary wall finished with GRC Tile MS grills Concertina coil MS Gate and security guard room for proposed Govt Sr Sec School at PSP 10 Industrial area Phase V Kirari Rohini Delhi 29/07/2021 28/10/2021 49.75 0.25 (Oct'21) 15.00 % (Oct'21) Deepa Engineering Co. Work in progress Detail Report
Graph / Photo
172 Grit Wash and Internal Finishing for ABIT main building and exterior and internal finishing of workshop 02/11/2020 01/05/2021 49.46 Irshad Ahmed Work in progress 1% Detail Report
Graph / Photo
173 Providing Creche at Multi Level Car Parking Ground Floor Delhi High Court New Delhi SH Composite Work 08/01/2021 08/03/2021 48.59 40.28 (Aug'21) 0.00 (Aug'21) SHREE PAL SINGH Work in progress Detail Report
Graph / Photo
174 Upgradation of Type V Judges flats No. 401 601 701 and 702 and Servant Qtrs. 401 601 701 and 702 at Karkardooma Court Complex Delhi. (Civil and Electrical Work) 05/10/2021 02/04/2022 46.05 Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 Detail Report
Graph / Photo
175 Providing Services of labour for day to day maintenance of colony. 15/09/2020 14/07/2021 45.28 Mazid Hussain Work in progress Detail Report
Graph / Photo
176 Providing and fixing Fire Check door fitting in SVBPGH 20/03/2021 19/04/2021 45.28 Amodh Construction Work is Progress Detail Report
Graph / Photo
177 Providing mandatory fire provisions including fire check doors and repair of fire fighting system at Pt.M.M.M. Hospital, Malviya Nagar, New Delhi. (Civil works)z 07/03/2021 10/04/2021 43.62 Sohan Lal Chhitoria and Sons Work in progress Detail Report
Graph / Photo
178 SITC of Building Management System 12/09/2020 11/03/2021 43.49 130.52 (Jan'21) 50.00 % (Jan'21) Digital Controls & Automation Material supplied by the firm. Installation work in progress. Detail Report
Graph / Photo
179 Solar water heating system 14/02/2015 14/05/2015 43.42 M.S. Associates . Detail Report
Graph / Photo
180 EOR to Govt. Boys Senior Secondary School, Tagore garden, New Delhi. SH Kota flooring in rooms, sheet doors, guniting works, RMC in approach area and other misc. works 21/07/2018 19/10/2018 42.01 Bagga Enterprises Detail Report
Graph / Photo
181 (1) Renovation of Surgery Emergency ward at room no. 149 and supporting rooms at Accidental & Emergency Block at GTB Hospital, Shahdara, Delhi (2) Renovation of Room No. 331, 332 & 338 in Administratvei Block 3rd Floor at GTB Hospital, Shahdara, Delhi. (SH: Providing Electrical and Civil Works) 07/07/2017 02/01/2018 41.98 12.42 (Mar'19) 30.00 % (Mar'19) RCC Enterprises Work completed Detail Report
Graph / Photo
182 Construction of parking shed for students and staff and fixing new aluminium windows in corridor of ground floor 1st floor 2nd floor 3rd floor and rooms along with vension blinds at ITI Narela Delhi 40 03/07/2020 02/11/2020 41.45 17.43 (Nov'20) 0.00 (Nov'20) Aayan Construction Co. Work in progress Detail Report
Graph / Photo
183 A/R and M/O Delhi High Court, New Delhi dg. 2021-22 (SH: Providing services of plumbing, carpentry jobs etc.) 01/08/2021 31/07/2022 40.87 6.81 (Oct'21) 0.00 (Oct'21) TRENDY SECURITY SERVICES Work in progress Detail Report
Graph / Photo
184 AR and MO to 252 DA Flats and 72 DA Flats, I.T.I Jail Road, Fire Stations Dy. Labour Commissioner Office and other Govt. Bldgs, under Sub Division WB-14 dg 2018-19. SH Providing services of labour for day to day maintenance 12/09/2018 12/09/2019 40.82 19.05 (Feb'20) 0.00 (Feb'20) Pristine management and allied services Detail Report
Graph / Photo
185 Improvement of lighting in various OTs at GTB Hospital Complex, Shahdara, Delhi. 03/03/2019 02/05/2019 40.46 19.10 (May'19) 0.00 (May'19) CARONA ELECTRICALS Work completed Detail Report
Graph / Photo
186 Supplying and replacement of 2 Nos. outlive water cooled 115 TR reciprocating type Chiller Unit with 120 TR Capacity screw type chiller unit at JPCH Shastri Park, Delhi 26/11/2018 25/03/2019 40.39 32.21 (May'19) 0.00 (May'19) Blue Star Limited Work completed Detail Report
Graph / Photo
187 Toilets renovation works 09/07/2021 06/10/2021 40.06 Saeed Builders In progress. Detail Report
Graph / Photo
188 Repairing of 4x420 TR and 1x150 TR capacity central AC plant installed at RGSS Hospital, Tahirpur, Delhi 16/09/2018 15/11/2018 37.82 45.88 (May'19) 0.00 (May'19) SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. Work In Progress (2ND RA 2445663) Detail Report
Graph / Photo
189 EOR in Sanjay Gandhi Memorial Hospital, Delhi. (SH Construction of Badminton Court, Fixing of grill gate, rain water harvesting well to recharge ground water and other misc. works). 28/08/2019 27/11/2019 37.39 SUSHIL KUMAR work is in slow progress Detail Report
Graph / Photo
190 Maintenance and repair work at Mandoli Jail Delhi-110093. During year 2021-22 SH Attending Day-to-Day complaint in Mandoli Jail complex and residential area including Supply of Material Horti. Operation cleaning of water tank and Operation and maint. of 850 KLD STP 10/06/2021 07/10/2021 36.54 MANOMAY Work is in progress Detail Report
Graph / Photo
191 Connecting of corridors, flooring in main building, widening of path, widening of gate, door on staircases, repair of rain water harvesting system and other miscellaneous work at SKV, Moti Nagar. 10/10/2018 09/01/2019 36.52 8.53 (Mar'20) 0.00 (Mar'20) ASH NARAYAN SINGH Detail Report
Graph / Photo
192 CO of Toilet for primary wing support staff visitor and attached toilet to principal room renovation of water tank platform and toilet repairing of b wall and other misc civil works 15/08/2020 14/12/2020 34.45 CSM CONSTRUCTION Detail Report
Graph / Photo
193 EOR to Central Jail No. 1, 2, 3, 6, 8 & 9, Tihar, New Delhi. (SH:- Mechanized cleaning of underground & overhead RCC / PVC water storage tanks). Tender ID 188903 02/04/2020 01/04/2021 34.01 Royal Construction Detail Report
Graph / Photo
194 Construction of Resource Centre for Children with Disabilities at A-2 Sarvodaya Vidyalaya (Co-Ed), Paschim Vihar, New Delhi (Civil Work) 09/01/2021 08/05/2021 33.98 6.58 (Mar'21) 0.00 (Mar'21) IKRAMUDDIN Work in progress 25% Detail Report
Graph / Photo
195 Construction work including internal Electrical installation in Akhara at NPL,Kingsway Camp, Delhi. 30/10/2018 28/01/2019 33.95 8.52 (Oct'19) 0.00 (Oct'19) Saeed Builders

ok

Detail Report
Graph / Photo
196 Providing and laying interlocking paver block and RMC in the campus of Police Colony at Tilak Marg, New Delhi under MLA LAD Fund Scheme. 27/10/2019 25/12/2019 33.92 22.42 (Jan'21) 0.00 (Jan'21) Gyanchand Detail Report
Graph / Photo
197 Construction of Casualty Block at Lal Bahadur Shastri Hospital, Khichripur, Delhi. Sub Head Providing ductable type air conditioning system 09/07/2019 08/10/2019 33.85 SKYLINE AIRCONDITIONING ENGINEERS PVT.LTD. work in Progress 6th RA 18182135 Detail Report
Graph / Photo
198 Providing, installation, testing, and commissioning of Code Blue System (NCS) for Old and New block at MAIDS, New Delhi 11/08/2019 10/11/2019 33.77 Med Freshe Pvt. Ltd. Work in progress Med Freshe Pvt. Ltd. Detail Report
Graph / Photo
199 AR and MO Delhi High Court New Delhi during 2021 22 SH Repair renovation and modification of work station and table at various places in Delhi High Court New Delhi 15/06/2021 14/06/2022 33.38 17.74 (Sep'21) 0.00 (Sep'21) R L WADHWA work in progress Detail Report
Graph / Photo
200 Addition/Alteration works in DII/1, DII/2, DII/3, DII/5, DII/6, DII/7 & DII/8 at Court Lane, Delhi during 2014-15. (SH:- Misc. Civil work in flats No. DII/1, DII/3 & DII/8) & Providing & fixing Kitchen Cabinets DII/1, DII/2, DII/3, DII/5, DII/6, DII/7 & DII/8. 11/08/2014 06/02/2015 32.94 Aslam Builders Final Bill Submitted in Division office Detail Report
Graph / Photo
201 Re construction of damaged boundary wall at GBSSS, Katewara, Delhi 39 (School Id 1310010) (Bldg Id 13101008) (EOR ID 20163317) 02/07/2021 30/09/2021 32.92 Sageer Ahmad Work in Progress Detail Report
Graph / Photo
202 Construction of Rain Water Harvesting Pit inside HLTB Complex Tahirpur Delhi 21/11/2021 18/02/2022 32.74 Sushil Kumar Detail Report
Graph / Photo
203 Providing and fixing retro reflective informatory sign boards at various location of New Delhi constituency AC40 under MLA LAD Fund Scheme 25/10/2019 22/01/2020 32.70 12.66 (Mar'21) 0.00 (Mar'21) Rajesh Kumar Gupta Detail Report
Graph / Photo
204 Construction of Porta Cabin for PWD Sub Divn. Office of Civil and Electrical including enquiries of both and Development of lab collection centre and shed covering 06/01/2021 05/04/2021 31.62 0.00 (Jan'21) 5.00 % (Jan'21) Nation Star Enterprises Work is under progress. Detail Report
Graph / Photo
205 Installation of hard drawn wire fabric at D Block and B Block residential quarters for monkey protection in Fire Station Connaught Place New Delhi. 08/02/2019 07/03/2019 31.58 39.47 (Jul'19) 90.00 % (Jul'19) Vasdev Work in progress Detail Report
Graph / Photo
206 Renovation of Kotwali Building at Chandni Chowk, Police Station under SRD Division-I, Sub-Division-III, PWD, New Delhi. 25/06/2018 24/10/2018 31.39 0.00 (Feb'19) 39.16 % (Feb'19) Kamal Construction Co. Work Completed and final bill paid Detail Report
Graph / Photo
207 Providing and fixing modular partition panel and supplying furniture for extension of administrative block at RTRM Hospital, Jaffarpur Kalan, New Delhi 22/10/2021 20/12/2021 31.27 GEEKEN SEATING COLLECTION PVT. LTD. Work is under progress. Detail Report
Graph / Photo
208 AR and MO Delhi High Court New Delhi dg 2021 22 SH Providing services of plumbing carpentry jobs etc 09/07/2021 08/07/2022 31.07 Krishna Kumar Work in progress Detail Report
Graph / Photo
209 Providing & fixing electrical panel and cabling for VRV system in 4th, 5th & 6th block at RGSS Hospital at Tahirpur, Delhi 27/03/2015 26/04/2015 31.02 Perfect Air Conditioning & Electricals Detail Report
Graph / Photo
210 Providing and fixing door, window, Floor tile, kota stone flooring, wall tile, chajja etc i/c toilet portion. 30/07/2020 02/11/2020 30.96 0.00 (Oct'20) 85.00 % (Oct'20) Laxmi Narayan work in progress (60%) Detail Report
Graph / Photo
211 SITC of additional CCTV and allied equipment at GTB Hospital, Shahdara, Delhi 16/10/2018 15/12/2018 30.64 15.29 (Feb'19) 50.00 % (Feb'19) San Infotech Services work in progress 2nd RA 1696099 Detail Report
Graph / Photo
212 Providing and fixing furniture at Ground Floor and 1st Floor 15/08/2021 29/08/2021 30.45 DURIAN INDUSTRIES LIMITED In progress. Detail Report
Graph / Photo
213 C/o approach road. Phase-II. 01/11/2019 30/12/2019 30.03 28.70 (Mar'20) 0.00 (Mar'20) Asif work is in progress (95%) Detail Report
Graph / Photo
214 Comprehensive Maintenance of Old Saint Stephens College Building Kashmere Gate, CPO Building, Old Court Building, NCC Offices Buildings, Novelty Fire Station, Fire Station Jama Masjid, Disability Commissioner Office, Lok Nayak Setu Office Compl 17/11/2019 16/11/2020 29.01 36.24 (Feb'21) 0.00 (Feb'21) K.P. Singh & Co. Detail Report
Graph / Photo
215 False ceiling work in Ward Area 23/05/2021 22/07/2021 28.86 Royal Construction Co. work is progress Detail Report
Graph / Photo
216 (A) Replacement of damaged C.I and G.I Pipes. (B) Supply of Material. (C) Providing for services of Day to Day maintenance. 29/05/2020 23/01/2021 27.31 13.96 (Jan'21) 0.00 (Jan'21) Mazid Hussain Work in progress (90%) Detail Report
Graph / Photo
217 Rehabilitation work in Police Station at Chandni Mahal, Asaf Ali Road, Delhi. 29/09/2019 26/03/2020 27.08 33.83 (Mar'21) 0.00 (Mar'21) Shah Pandya & Shot Crete Detail Report
Graph / Photo
218 Up gradation of toilets and guniting work in ITC lab and class rooms. Phase III 28/12/2019 26/04/2020 26.66 7.74 (Mar'20) 0.00 (Mar'20) HARI RAM VERMA Work In progress (85%) Detail Report
Graph / Photo
219 Running and maintenance of UPS at GTB Hospital, Complex, Shahdara, Delhi. Sub Head Comprehensive maintenance of Emerson make 2x200KVA UPS systems 25/02/2019 24/02/2022 26.03 POWER HOUSE Work In Progress (2ND RA 618590 ).. Detail Report
Graph / Photo
220 Construction of yard for Malkhana of Police Station Chandni Mahal, Darya Ganj under SRD Division-I, Sub-Division-III, New Delhi. 30/07/2018 29/10/2018 25.67 23.27 (Sep'19) 0.00 (Sep'19) Krishan Kumar Work in progress Detail Report
Graph / Photo
221 Providing Materials and Manpower for day to day maintenance including miscellaneous repair works in the building 26/05/2020 24/05/2021 24.70 0.00 (Jan'21) 70.00 % (Jan'21) KRISHAN KUMAR MISHRA Work is in progress Detail Report
Graph / Photo
222 EOR to Police Colony, Tilak Nagar, New Delhi. SH Renovation of existing rooms and provision of multipurpose hall 27/06/2018 26/09/2018 23.05 12.24 (Dec'19) 0.00 (Dec'19) Adorn associates Detail Report
Graph / Photo
223 Providing and laying bituminous concrete surface at BR Campus, Race course, New Delhi under MLA LAD fund Scheme. 3rd CALL 26/11/2019 25/12/2019 22.88 25.04 (Nov'21) 0.00 (Nov'21) Rajesh Kumar Gupta Detail Report
Graph / Photo
224 Development Cricket ground football field and chain link fencing at newly taken over plot for sports complex at village kair in the Assembly constituency Najafgarh, Delhi. (SH: Comprehensive maintenance of cricket ground for one year) 01/04/2021 31/03/2022 22.80 Devender Pal Singh work in progress Detail Report
Graph / Photo
225 S.I.T.C of air conditioning system for Medicine and ENT OPD Section at JPC Hospital, Shastri Park, Delhi. 21/07/2018 20/09/2018 22.52 M/s Pneumatic Engineering Services Work completed Detail Report
Graph / Photo
226 Construction of Portacabin for additional space of camp office over the Garrage at Bunglow No 2, 8 Raj Niwas Marg Delhi 04/04/2019 03/06/2019 22.38 26.50 (Feb'20) 0.00 (Feb'20) Mohd Arshad Detail Report
Graph / Photo
227 Providing and fixing of overhead water tank in LCB I II A Block Medical Health Centre and Administrative Block Delhi High Court New Delhi 24/09/2021 22/12/2021 22.29 KRISHAN KUMAR MISHRA Work in progress Detail Report
Graph / Photo
228 Renovation of B Voc Labs 20/05/2019 19/08/2019 22.14 M.Y Construction 40% Work could not start due to electrical tender not in force. Detail Report
Graph / Photo
229 Supplying and replacement of Outlived Air Handling Units at JPCH Shastri Park, Delhi 22/07/2019 21/09/2019 21.72 US Engineers

Tender is in process

Detail Report
Graph / Photo
230 Providing and Fixing of MS tubular Window with Acrylic plastic Sheet 14/11/2019 12/03/2020 21.53 26.89 (Mar'21) 0.00 (Mar'21) KAMAAL CONSTRUCTION CO. Detail Report
Graph / Photo
231 Development of front portion road parking in side of gates Display Boards arrangement of wooden CB in barracks RCC Slab in store cooler stand flag post feeder pillar pump room and RWH etc at Fire Station Sanjay Gandhi Transport Nagar Delhi 29/07/2021 26/10/2021 21.52 Sudesh Kumar V.P.O Work in Progress Detail Report
Graph / Photo
232 "Addition / Alteration of Roop Nagar fire station Delhi. (SH:- Ready Mix concrete, Renovation of Toilet and other Misc. work.) " 08/10/2015 07/01/2016 19.71 Jabir Husain Final Bill not submitted by the Agency Detail Report
Graph / Photo
233 AR and MO Delhi High Court New Delhi during 2021 22 SH Strengthing and structural repair and shotcreting work on seepaged RCC Wall portions etc at DMRC under ground car parking level 6 24/09/2021 07/11/2021 19.22 Sunny Guniting Company Work in progress Detail Report
Graph / Photo
234 Renovation of toilets in J K and L Block at Karkardooma Court Delhi Balance work 06/11/2021 03/02/2022 18.82 Phoenix Constructions Detail Report
Graph / Photo
235 SITC of Water softerner and treatment equipment 27/01/2015 26/07/2015 18.59 Passim Water Services .. Detail Report
Graph / Photo
236 Renovation of Reporter Branch and Legislation Branch at Delhi Vidhan Sabha 01/05/2020 31/07/2020 18.20 HPS Enterprises

Work in Progress

Detail Report
Graph / Photo
237 Const. of office building for Sub Division III SRD Project Divn I at Road No. 47 near Metro Pillar No. 29, Kashmere Gate, Delhi 23/09/2019 21/12/2019 17.04 21.26 (Jul'20) 0.00 (Jul'20) K.P. Singh & Co. Detail Report
Graph / Photo
238 Construction of New Shed over main stage of Control Room in Central Jail No. 2, Tihar, New Delhi. 15/07/2017 20/07/2017 16.86 Bagga Enterprises Detail Report
Graph / Photo
239 Repair/Renovation of the garage at H-Block of Delhi Commission for Women, Vikas Bhawan, I.P. Estate, New Delhi. 01/08/2016 30/09/2016 16.80 0.00 (Aug'16) 10.00 % (Aug'16) Sanendra Kumar Work in progress Detail Report
Graph / Photo
240 Repair and Renovation of Auditorium in Shahed Bhai Bal Mukand Govt. Sarvodaya Vidyalaya at Shankaracharya Marg, Delhi, during 2015-16 23/10/2015 22/01/2016 16.78 Munzareen Ahmed Final Bill not submitted by the Agency Detail Report
Graph / Photo
241 EOR to Sarvodaya Kanya Vidyalaya, Hari Nagar, Clock Tower, New Delhi. SH Provision of Rain Water Harvesting System 06/09/2018 05/11/2018 16.77 23.50 (Mar'20) 0.00 (Mar'20) Kishan singhal Detail Report
Graph / Photo
242 Construction of Conference Hall and Waiting/Reception Hall in Office of Commissioner for Persons with Disabilities at Mata Sundari Road under SRD Division-I, Sub-Division-III, PWD, New Delhi. (SH-Civil Renovation Work). 09/08/2018 08/11/2018 16.72 15.33 (Oct'19) 5.60 % (Oct'19) Intkhab Alam Work in progress Detail Report
Graph / Photo
243 EOR to Central Jail No. 4, Tihar, New Delhi. SH Improvement of covering of stage at chakkar. 01/02/2019 30/04/2019 16.39 20.64 (Mar'20) 0.00 (Mar'20) SUSHIL ENGINEERING WORKS Detail Report
Graph / Photo
244 A/R & M/O GNEC, New Delhi. dg. 2016-17 (SH: Up-Keeping and maintenance of services of GNEC and providing and service of computer operator, Dak Messenger, plumber, carpenter, mason sewerman etc under HMD (Central) SD-3) 13/04/2017 12/10/2017 16.04 7.45 (Mar'19) 46.00 % (Mar'19) Anup Enterprises Detail Report
Graph / Photo
245 Miscellaneous requisite work in Central Jail No 11, 12, 13, 14, 15 and 16 in Prison Complex Mandoli, Delhi- 110093 15/10/2020 11/02/2021 15.37 0.00 (Dec'20) 22.00 % (Dec'20) M/s Manomay Work is in progress Detail Report
Graph / Photo
246 SH- Kota stone flooring, repair to boundary wall including grit plaster and concertina wire fencing, repair and maintenance of toilets, P F steel windows, renewing broken glass panes with polycarbonate sheet etc. 07/11/2018 04/02/2019 15.26 Prashant Construction Co. , PAN: AIDPA3845Q, Address: C-4/5,KABIR NAGAR, DELHI-110094 in progress. Detail Report
Graph / Photo
247 Providing and supplying plastic moulded table in porta cabins reading room at various places of New Delhi Constituency AC40 under MLA LAD Fund Scheme. 25/10/2019 08/12/2019 15.17 DECOR MODULAR SYSTEM PVT LTD Detail Report
Graph / Photo
248 Upkeep Service 05/10/2019 04/10/2020 15.15 18.80 (Feb'21) 0.00 (Feb'21) Ashish Gupta Detail Report
Graph / Photo
249 AR and MO Various Buildings under Sub Division WB-15, Sunder Apartment, New Delhi. During 2018-19. SH Providing labour for day to day maintenance and watch and ward in 32 Nos. Type IV and 32 Nos.Type V, Fire Station at Paschim Vihar, JawalaPuri, Jwal 06/10/2018 05/08/2019 14.64 8.96 (Aug'19) 0.00 (Aug'19) Universal Security & Placement Services (Regd.) Detail Report
Graph / Photo
250 Construction of Casualty Block at Lal Bahadur Shastri Hospital, Khichripur, Delhi. Sub Head Providing Electrical Installation work 22/07/2019 21/09/2019 14.54 Sangeeta Electricals 1st RA 729827 Detail Report
Graph / Photo
251 Providing barrier free environment for disable persons. 21/09/2020 20/03/2021 14.49 ARIF, Jahangirpuri, Delhi Work in progress 10% Detail Report
Graph / Photo
252 Construction of 2 Nos Rain water harvesting system 25/11/2019 22/02/2020 14.36 8.89 (Jul'20) 0.00 (Jul'20) Shamshad Ahmed work is in progress (70%) Detail Report
Graph / Photo
253 Renovation work of kitchen area, Stage work, interlocking tile work, misc repair work in Old community centre and Shri Ram Park 25/11/2019 23/01/2020 14.35 12.82 (Aug'20) 0.00 (Aug'20) Sageer Ahmad work is in progress (60%) Detail Report
Graph / Photo
254 P/F of Kota stone PVC tank sitting platform near statue and other major misc works 25/11/2019 22/02/2020 14.03 7.90 (Sep'20) 0.00 (Sep'20) M H Builders work is in progress (75%) Detail Report
Graph / Photo
255 Construction of steel staircase with passage for making approach to library, lift and second floor room, renovation of college canteen, water proofing treatment on roof with APP and broken tile, false ceiling and aluminium partition work in library a 13/01/2020 12/03/2020 13.98 17.43 (Sep'20) 0.00 (Sep'20) Saeed Builders work in progress 60%. Work heldup due to lockdown Detail Report
Graph / Photo
256 Special repair to EI work in Mandoli Prison Complex, Delhi 15/03/2021 13/05/2021 13.93 Neeraj Kumar Show Cause Notice Issued to Contractor. Detail Report
Graph / Photo
257 Construction of Underground sump at ITI Jija Bai for Women, Sirifort, New Delhi (Civil and Electrical work) 23/10/2021 22/12/2021 13.91 SHRI DATTA KRUPA ENTER PRISES Detail Report
Graph / Photo
258 Construction of permanent shed on pavement near Gyne OPD registration 18/08/2020 17/10/2020 13.73 SS Enterprises work in progress. Detail Report
Graph / Photo
259 Providing renovation repair of toilet, ramps, railing, tactile tiles, signage etc. to make school building and environment barrier free and accessible. EOR ID 20191350. 02/07/2020 17/08/2020 13.62 Laxmi Narayan Work in progress (40%) Detail Report
Graph / Photo
260 Providing and installation of 10 Nos. passenger lift in Four Storey Building at DIPSAR, M.B. Road New Delhi. 25/06/2019 24/08/2019 13.59 Sanjeev Kumar Goel work in progress Detail Report
Graph / Photo
261 EOR to Govt. Sarvodaya Kanya Vidyalaya a S.P. Road, Nangloi, New Delhi. SH Providing new gate for main entrance, near activity room, providing and fixing grill in front of primary section providing shed for water through near primary section 02/04/2018 15/09/2030 13.58 L V Enterprises Detail Report
Graph / Photo
262 "EOR to Sarvodaya Bal Vidyalaya, Timarpur, Delhi-54, dg. 2014-15 (SH:- Repairing of roof and toilets ( SSH:- Repair and Renovation of staircase and other misc repair) " 23/10/2015 22/12/2015 13.57 Jabir Husain Final Bill not submitted by the Agency Detail Report
Graph / Photo
263 Providing UPS supply in DGHS (HQ) for computer Network (LAN) at Karkardooma, Delhi. (SH: EI works). 06/04/2018 05/06/2018 13.57 6.60 (Jan'19) 40.00 % (Jan'19) Aas Electric Co. Work in Progress ( 1st RA 659060 Detail Report
Graph / Photo
264 P/L of Bituminous concrete of 40/50 mm compacted thickness with bitumen of grade VG-30. (Through MLA Fund) 16/11/2019 16/12/2019 13.56 Laxmi Narayan Work yet not started. Tender is to be foreclosed & re invited bid new TS. Detail Report
Graph / Photo
265 Repairing work to already installed Rain Water Harvesting Systems to make them functional in 7 Nos. Schools of NB-11, Delhi. 03/01/2020 03/04/2020 13.50 Shyam Sunder, PAN: CHLPS5692A Work In progress (30%) Detail Report
Graph / Photo
266 Shifting of X Ray machine at Gate No 6 and provision of porta cabin at gate No 6 and covering of vehicle session at gate No 03 20/05/2019 03/07/2019 13.40 13.90 (Jan'20) 0.00 (Jan'20) Rajeev Kumar site not available for work 60% Detail Report
Graph / Photo
267 Renovation of gents and ladies toilet and guniting of ceiling of ground, 1st, 4th, 5th and 6th floor of I block, College of Art at Tilak Marg, New Delhi 14/11/2019 11/02/2020 13.30 14.80 (Mar'21) 0.00 (Mar'21) Amiruddin Detail Report
Graph / Photo
268 Miscellaneous EI work in various Jails of Mandoli Prison Complex, Delhi 31/03/2021 30/06/2021 13.30 BHS Pump Specialist WORK IN PROGRESS Detail Report
Graph / Photo
269 Construction of Porta Cabin for storage purpose on Terrace of Family Court, Saket, New Delhi. 26/06/2019 25/07/2019 13.07 8.01 (Mar'21) 0.00 (Mar'21) P S ASSOCIATES work in progress Detail Report
Graph / Photo
270 Rehabilitation of distress open staircase at Admn. Block. Conversion of Existing class room into PG s Accommodation. Balance work of PG s Accommodation. 17/09/2020 05/12/2020 12.59 sabur alam Work is Progress Detail Report
Graph / Photo
271 Rehabilitation of distress open staircase at Admn. Block. (ii) Conversion of Existing class room into PGs Accommodation. Balance 17/09/2020 05/12/2020 12.59 sabur alam Work in progress. Detail Report
Graph / Photo
272 Setting up of Dining Hall at HLTB Complex, Tahirpur, Delhi under KKD Court Divn.. M-231 dg. 18-19. 10/02/2019 10/05/2019 12.52 13.79 (Jan'20) 0.00 (Jan'20) Daya Sagar Sharma work in progress Detail Report
Graph / Photo
273 Construction of Rain Water Harvesting Structure at GBSS Mukherjee Nagar under Sub division M-3211(N), Delhi. 09/02/2019 10/05/2019 12.31 Hare Ram Singh

ok

Detail Report
Graph / Photo
274 Installation of Rain Water Harvesting system at Sarvodaya bal vidyalaya, Fatehpur Beri, New Delhi (School ID 1923014, Building ID 19231036, EOR ID 20172367). 03/03/2019 02/05/2019 12.15 10.84 (Nov'20) 0.00 (Nov'20) RECKONN work in progress Detail Report
Graph / Photo
275 AR and MO Fire Stations, Hari Nagar, Janak Puri under Sub Division WB-14. During 2018-19. SH Repair misc. civil works 10/09/2018 02/09/2019 11.82 Arif Detail Report
Graph / Photo
276 Replacement of existing damaged carpet of Assembly hall, MLA lounge I and II at Vidhan Sabha, Delhi. 17/07/2017 15/08/2017 11.77 14.00 (Oct'20) 0.00 (Oct'20) Vijay Furnitures

ok

Detail Report
Graph / Photo
277 Providing and fixing down comer and manually operated electronic FA system 19/09/2019 18/10/2019 11.18 0.00 (Jan'21) 98.00 % (Jan'21) M/s Royale Meridian India Pvt Ltd Work in progress Detail Report
Graph / Photo
278 EOR to SKV Bakhtawarpur, Delhi 110036. (A) Construction of parking shed and toe wall around gardening area.) (B) Dismantling Over Head Water tank platform. 06/01/2020 06/03/2020 11.13 VAKIL AHMAD Work In progress (80%) Detail Report
Graph / Photo
279 Provision for Rain Water Harvesting Systems in Govt. Girls Sec. School (Urdu Medium) Lambi Gali, Hauz Qazi under SRD Division-I, Sub-Division-III, PWD, New Delhi dg. 2018-19. 11/07/2019 10/09/2019 11.10 1.62 (Mar'21) 0.00 (Mar'21) Shakur Ahmed & Sons Detail Report
Graph / Photo
280 Construction of room at 1st floor on existing store room and misc. renovation work at JJB-I, Sewa Kutir Complex, Kingsway Camp, Delhi. 09/06/2016 08/08/2016 11.10 0.00 (Apr'17) 85.00 % (Apr'17) Nafees Ahamed Work in progress Detail Report
Graph / Photo
281 Provision for Rain Water Harvesting System in Sarvodaya Kanya Vidyalaya No. 1 (Hindi Medium) at Jama Masjid, Delhi dg. 18-19 (School ID-2127024.) under SRD Division-I, Sub-Division-III, PWD, New Delhi 11/03/2019 10/05/2019 11.09 13.85 (Mar'20) 0.00 (Mar'20) Mohd. Asad work in progress Detail Report
Graph / Photo
282 Operation and Maintenance of STP Plant of 180 KLD 27/07/2020 26/07/2022 10.91 0.00 (Jan'21) 25.00 % (Jan'21) M/s Parasar Electricals & Refrigeration Work is in progress Detail Report
Graph / Photo
283 Construction of Old Age Home at Kanti Nagar Installation of fire doors in the building 04/03/2021 02/04/2021 10.22 11.71 (Aug'21) 0.00 (Aug'21) A. V. ENTERPRISES In progress. Detail Report
Graph / Photo
284 Construction of office Rooms 2 Nos for Junior Engineer Electrical and Horticulture Staff and walking track at the park 10/12/2019 08/02/2020 10.02 8.95 (Feb'21) 0.00 (Feb'21) Mateen Ahmad work is in progress (80%) Detail Report
Graph / Photo
285 Upgradation/Renovation of Two rooms of HQ branch, Directorate of Education at Ground Floor of Old Patrachar Building, Timarpur Delhi-54. 24/04/2016 22/06/2016 10.01 Krishan Kumar Site not made available by the Client Detail Report
Graph / Photo
286 Construction one no additional toilet at 14/2 Tilak Marg and Renovation of kitchen, toilets and other civil miscellaneous repair works at 36 Ashoka Road under SRD Project Division-I, Sub-Division-IV, PWD, New Delhi 11/08/2019 10/10/2019 9.97 11.78 (Nov'20) 0.00 (Nov'20) Sher Singh Detail Report
Graph / Photo
287 Provision for Rain Water Harvesting System in Govt Girls Sr Sec School at Gali Baraf Wali Kinari Bazar Delhi during 2018 19 School ID-1208023 under SRD Division I Sub-Division III PWD New Delhi 11/07/2019 10/09/2019 8.86 8.84 (Mar'20) 0.00 (Mar'20) Shakur Ahmed & Sons Detail Report
Graph / Photo
288 Provision for Rain Water Harvesting System in Sarvodaya Kanya Vidyalaya No. 2 at Zeenat Mahal, Lal Kuan, Delhi (School ID-2127179) under SRD Division-I, Sub-Division-III, PWD, New Delhi 14/07/2019 13/09/2019 8.76 Shakur Ahmed & Sons Detail Report
Graph / Photo
289 Providing Services of Inspection Vehicle for Chief Engineer Other Projects Zone and Division office 08/08/2020 07/08/2021 8.73 0.00 (Jan'21) 50.00 % (Jan'21) Nisha Travels Work is in progress Detail Report
Graph / Photo
290 Providing services of plumbing, carpentry jobs etc RECALL 04/11/2019 03/11/2020 8.68 8.68 (Mar'21) 0.00 (Mar'21) Good Luck Enterprises Detail Report
Graph / Photo
291 Disposal of malba building rubbish and C and D waste etc. from proposed Karkardooma Court site at FC-17 Karkardooma Delhi to the approved municipal dumping ground 07/05/2021 05/06/2021 8.37 Surender Singh Work is in progress Detail Report
Graph / Photo
292 AR and MO to ITI for women Tilak Nagar, ITI Hari Nagar Jail Road Labour Commissioner Office, Hari Nagar, New Delhi. During 2018-19. SH Repair and finishing work 04/06/2018 03/06/2019 8.35 KAILASH CHANDRA AND SONS Detail Report
Graph / Photo
293 A R and M O to 405 DA Flats Kalyanvas Delhi 91 dg 2018 19 18/06/2018 14/06/2019 8.03 5.04 (Nov'20) 0.00 (Nov'20) SABUR ALAM work in progress 40% Detail Report
Graph / Photo
294 A/R and M/O to I.G.D.T.U.W. at Kashmere Gate, Delhi During 2018-19. (SH-Upkeep Service). 25/09/2018 24/09/2019 8.01 1.56 (Jan'20) 0.00 (Jan'20) Ashish Gupta Work in progress Detail Report
Graph / Photo
295 Provision for Rain Water Harvesting System in Sarvodaya Bal Vidyalaya at Pataudi House, Darya Ganj, Delhi (School ID-2127003.) under SRD Division-I, Sub-Division-III, PWD, New Delhi 25/06/2019 24/08/2019 7.90 6.08 (Nov'19) 0.00 (Nov'19) SUDHIR KUMAR SHARMA Detail Report
Graph / Photo
296 Furniture work 25/10/2019 08/12/2019 7.84 7.84 (Mar'21) 0.00 (Mar'21) DURIAN INDUSTRIES LIMITED Detail Report
Graph / Photo
297 Construction of public toilet near mortuary, providing shed for blood bank and other misc. works. 18/03/2020 17/05/2020 7.80 Sudhakar Samal work in progress Detail Report
Graph / Photo
298 Provision for Rain Water Harvesting System in Govt. Boys Sr. Sec. School No. 2 (Hindi Medium) at Jama Msjid, Delhi (School ID-2127006.) under SRD Division-I, Sub-Division-III, PWD, New Delhi 25/06/2019 24/08/2019 7.66 6.42 (Jan'20) 0.00 (Jan'20) SUDHIR KUMAR SHARMA Detail Report
Graph / Photo
299 Preparation of one room of 2nd and 3rd floor in front of lift gallery and replacement of gallery window of I Block, College of Art at Tilak Marg, New Delhi 14/11/2019 12/01/2020 7.35 9.10 (Feb'21) 0.00 (Feb'21) Amiruddin Detail Report
Graph / Photo
300 Installation of rain water harvesting system 02/06/2018 01/08/2018 7.23 6.04 (Jul'19) 0.00 (Jul'19) Mohd Akram work in progress 70% Detail Report
Graph / Photo
301 A/R and M/O I.G.D.T.U.W. at Kashmere Gate, Delhi During 2018-19. (SH-Repair and Renovation work of University Staff Quarters at IGDTUW, Kashmere Gate under SRD Division-I, Sub-Division-III, PWD, New Delhi). 29/03/2019 28/06/2019 7.01 Prithvi creation work in progress Detail Report
Graph / Photo
302 ARMO of E & M Services in Children Home at Alipur, Delhi (SH: Operation of Sub-Station and DG Set 30/05/2017 29/05/2018 6.87 Parmar Electrical

Completed/In Progress

Detail Report
Graph / Photo
303 Providing and renovation /repair of ramps, railing, tactile tiles signage etc. to make school building and environment barrier free and accessible for CWSN. 03/07/2020 02/10/2020 6.87 ARIF, Jahangirpuri, Delhi Work in progress (40%) Detail Report
Graph / Photo
304 Renovation of D Block 1st Floor MP Hall 28/11/2019 26/01/2020 6.80 6.89 (Sep'20) 0.00 (Sep'20) Mohd Amjad Detail Report
Graph / Photo
305 Operation and Maintenance of 3x110 TR Capacity HVAC System and Servicing Overhauling and Comprehensive running maintenance of WTAC, Water coolers and Split AC units 01/04/2019 31/12/2019 6.53 7.48 (May'20) 0.00 (May'20) M/s Naj Refrigeration & Air Conditioning Works Detail Report
Graph / Photo
306 Renovation of DDE Office and Staff Room. 05/01/2020 06/03/2020 6.24 ARIF, Jahangirpuri, Delhi Work not allowed by Principal Date. Detail Report
Graph / Photo
307 "EOR to SKV Magazine Road, Majnu ka Tila, Delhi dg. 2014-15 (SH:- Changing of Asbestos sheet and other misc works at Primary wing) " 18/10/2015 17/11/2015 5.90 K.P. Singh & Co. Final Bill not submitted by the Agency Detail Report
Graph / Photo
308 Erection of shed near ETP at ASBGH 20/03/2021 19/04/2021 5.84 ASHWANI SHARMA Work is Progress Detail Report
Graph / Photo
309 Raising of boundary wall of Lal quarter Kidwai Nagar residential area under MLA LAD Fund Scheme RECALL 04/11/2019 18/12/2019 5.60 4.89 (Sep'20) 0.00 (Sep'20) B P Rai and Sons Detail Report
Graph / Photo
310 Providing and fixing of overhead water tank in LCB III Delhi High Court New Delhi 12/08/2021 10/09/2021 5.48 KRISHAN KUMAR MISHRA Work in progress Detail Report
Graph / Photo
311 AR MO to DAP Line, Vikas Puri, New Delhi. During 2018-19. SH Cleaning and opening of blocked chocked sewerage system inside the campus by Super Sucker Machine and disilting of storm water pipe drains. 13/10/2018 12/02/2019 5.46 RichCon Engineering Company Detail Report
Graph / Photo
312 Anti termite treatment of Hostel building and P F commercial ply and Mattress on beds of Hostel block Ist recall 21/11/2021 19/01/2022 5.42 Verma Pesticides & Pest Control Services Pvt. Ltd. Detail Report
Graph / Photo
313 C/o District Court Complex at Plot No. 8, Shastri Park, Delhi During 2020-21 9 (SH:Deploying Persons for Safety of Government Properties). 03/10/2020 02/10/2021 5.41 0.00 (Jan'21) 33.00 % (Jan'21) Star security & Placement Services Work is in progress Detail Report
Graph / Photo
314 Barrier free and accessible building for disabled persons. 31/07/2020 30/09/2020 5.38 Laxmi Narayan Work in progress 40% Detail Report
Graph / Photo
315 Operation and maintenance of E and M services at Police Housing Complex, Mandoli Delhi 09/07/2021 08/10/2021 5.25 Ashish Gupta Work completed, bill pending Detail Report
Graph / Photo
316 Construction of Rain water Harvesting System at Govt Boys Sr Secondary School Dev Nagar New Delhi Building ID 21281284 30/05/2019 13/07/2019 5.19 4.90 (Jan'20) 0.00 (Jan'20) Prem Sagar Work completed final bill paid Detail Report
Graph / Photo
317 Providing renovation repairof ramps railing tactile tiles signage etc to make school building and environment barrier free and accessible EOR ID 20182544 29/05/2020 28/07/2020 5.08 Suresh Ray work in progress (5%) Detail Report
Graph / Photo
318 Maintenance of PCs and their accessories in Health Maintenance Division Office (S-W) and all Sub Divisions under this Division office. 27/01/2020 26/01/2021 5.04 STAR COMPUTER SYSTEMS The Tender has been Cancel. Detail Report
Graph / Photo
319 Construction of Rain water Harvesting System in Sarovodya Kanya Vidyalaya Baba Ram Dev at Prasad Nagar New Delhi Building ID 21281295 30/05/2019 13/07/2019 4.97 5.56 (Nov'19) 0.00 (Nov'19) Prem Sagar Bill paid Detail Report
Graph / Photo
320 Renovation work at Session House, 2 North End Road, Delhi, SH Providing doors, cup boards, false ceiling and other misc. works. 08/06/2019 07/08/2019 4.97 6.25 (Sep'19) 0.00 (Sep'19) Mool Chand

ok

Detail Report
Graph / Photo
321 Construction of additional SPS type classrooms in Govt Schools Directorate of Education under Priority II SH Providing inspection vehicle for the office of Executive Engineer Edu M Division C and ND at Vikas Bhawan II Civil Lines New Delhi 110054 05/09/2019 04/09/2020 4.82 0.00 (Jan'20) 100.00 % (Jan'20) Surender Singh Chahal work completed Detail Report
Graph / Photo
322 E.O.R. to repair and replacement of sewer line, rain water disposal line and other misc. repair work in Police Station, Darya Ganj, Delhi dg. 2018-19 (SH- Improvement of drainage system under SRD Division-I, Sub-Division-III, PWD, New Delhi). 26/02/2019 25/04/2019 4.59 5.27 (Jun'19) 0.00 (Jun'19) Prashant Gupta work in progress Detail Report
Graph / Photo
323 Construction of tubewell at Govt. Girls Senior Secondary School, West Patel Nagar, New Delhi. 14/03/2019 13/06/2019 4.50 ATUL SHARMA Detail Report
Graph / Photo
324 Anti termite treatment of Hostel building and PF commercial ply and Mattress on beds of Hostel block 29/09/2021 27/11/2021 4.41 Vashistha and Sons Construction Co PAN Number: ANFV6477F 9 Methapur , New Delhi - 110044 Detail Report
Graph / Photo
325 Making barrier free for accessibility of disabled persons at PCR Colony, Model Town II, Delhi 03/07/2020 02/08/2020 4.39 2.85 (Dec'20) 0.00 (Dec'20) Anshikha Enterprises work in progress (65%) Detail Report
Graph / Photo
326 EOR to Police Colony, Rajinder Nagar, New Delhi during 2018-19.(SH- Covering of open drain in Police Colony). 30/05/2018 28/07/2018 4.37 5.48 (Aug'19) 0.00 (Aug'19) G.S construction wip Detail Report
Graph / Photo
327 Misc. civil repair work 15/09/2019 14/12/2019 4.36 5.44 (Oct'21) 0.00 (Oct'21) Shabbi Abbas Detail Report
Graph / Photo
328 Rain Water Harvesting structure at Rajokari Institute of Technology Rajokari New Delhi 04/02/2021 20/03/2021 4.33 BANSIWAL CONSTRUCTION COMPANY 100% work completed. Detail Report
Graph / Photo
329 Cons. of toilet in front of SCP Canteen and Requirement of bathroom and toilet in Community Centre. 23/03/2020 22/05/2020 4.12 5.14 (Mar'21) 0.00 (Mar'21) Panchu ram Detail Report
Graph / Photo
330 RMO of water coolers , Split or Window or Ductable ACs installed at Lawyers block , Utility Block , Lockup building and Main Court Building at District Court Complex saket New delhi -110017. 03/02/2019 02/02/2020 3.91 1.61 (Jul'19) 0.00 (Jul'19) ARORA ELECTRICAL WORKS Detail Report
Graph / Photo
331 EOR to National Law University, Sec-14, under Sub Div-III, SWBMD, New Delhi during 2018-19.(SH- Cleaning of sewerline by using super sucker machine). 05/06/2018 02/09/2018 3.81 3.81 (Dec'18) 70.00 % (Dec'18) Surender Singh Chahal work in progress Detail Report
Graph / Photo
332 Misc. civil repair works. 25/02/2019 25/04/2019 3.73 4.73 (Mar'21) 0.00 (Mar'21) Harsh Heights Pvt Ltd Work in progress. Detail Report
Graph / Photo
333 Replacement of broken kota stone flooring and wooden racks, false ceiling and white washing of MFA final year Sculpture Studio, College of Art at Tilak Marg, New Delhi 15/11/2019 14/12/2019 3.73 4.31 (Apr'21) 0.00 (Apr'21) Sher Singh Detail Report
Graph / Photo
334 Conversion of Garrage No 4 for Staff Accommodation at Bunglow No 3, 8 Raj Niwas Marg, Delhi dg. 2016-17. (SH:- Civil Work). 13/08/2016 01/09/2016 3.49 0.00 (Aug'16) 90.00 % (Aug'16) Work Completed Detail Report
Graph / Photo
335 Cleaning of Sewerline of Residential Building and Non Residential Building and repair in AAMC 14/11/2020 13/01/2021 3.47 UR Construction Work in Progress 10% Detail Report
Graph / Photo
336 A/R and M/O to AUD, Kashmere Gate, Delhi dg - 2015 -16( Finishing work) 26/11/2015 15/12/2015 3.19 Mohd Israil & Sons final bill and labour licence etc. Not submitted by the agency. Detail Report
Graph / Photo
337 Provision of Security Guard for Watch and ward at Old Age Home, Chattarpur under Sub Division-II, PTS Malviya Nagar, New Delhi during 2019-20. 21/06/2019 20/06/2020 3.05 3.05 (Mar'21) 0.00 (Mar'21) Universal Security & Placement Services (Regd.) work in progress Detail Report
Graph / Photo
338 Providing of work stations and file racks in the office of the Financial Commissioner at 5- Sham Nath Marg. Delhi. 30/06/2016 13/08/2016 2.73 0.00 (Apr'17) 50.00 % (Apr'17) work in progress Detail Report
Graph / Photo
339 A/R and M/O to I.G.D.T.U.W. at Kashmere Gate under Sub-Division-III, SRD Division-I, PWD, New Delhi During 2017-18 (SH-Specialized waterproofing treatment in the profile sheet gutter of workshop behind MAE Block). 21/04/2018 20/05/2018 2.62 0.00 (Jul'18) 2.90 % (Jul'18) Garg Waterproofing Company Work Completed and final bill paid Detail Report
Graph / Photo
340 Installation of 1 no. bore well at Fire Station, Tahirpur Delhi dg. 2021 22. Civil and Electrical Works 21/11/2021 20/12/2021 2.16 Sudesh Jain Detail Report
Graph / Photo
341 A/R and M/O other PWD Roads under SRD Division -I, PWD, New Delhi during 2019-20. (SH- Painting of Kerb Stones on various roads for Independence Day under Sub Division-II.) 13/08/2019 27/08/2019 2.06 2.27 (Nov'19) 0.00 (Nov'19) MOHD AFTAB Detail Report
Graph / Photo
342 A/R & M/O to residensial building type -IV flats (duplex) at Maharaja lane. Dg.2015-16.( SH: Internal and External finishing of type-IV flats). 26/11/2015 25/12/2015 1.99 Mohd Israil & Sons final bill and labour licence etc. Not submitted by the agency. Detail Report
Graph / Photo
343 A/A to RCL Tahirpur Sunder Nagri, Delhi during 2021-22.SH:- Providing and erecting permanent barricading around the dangerous buildings in Kasturba Kustha Ashram Tahirpur Delhi 03/09/2021 02/10/2021 1.95 Sanjeev Kumar In progress. Detail Report
Graph / Photo
344 Provision of New gate and laying C.C path at the entrance of VSKV Old Seemapuri 04/09/2021 03/10/2021 1.85 Sanjeev Kumar Detail Report
Graph / Photo
345 Hiring of New Digital Photocopier Machine Model Sharp AR-6020N New Model on Rental basis with ADE Duplex Printer and Scanner 05/09/2021 04/09/2023 1.81 Frank Copier Pvt. Ltd. Detail Report
Graph / Photo
346 Photocopy, Scanning/ Digital Color Printing Job 21/02/2019 20/02/2020 1.02 0.00 (Jan'21) 87.20 % (Jan'21) Durga Electro State work is in progress Detail Report
Graph / Photo
347 Soil investigation and bearing capacity of soil 19/08/2021 28/08/2021 0.50 Allied Engineers Detail Report
Graph / Photo
348 Providing and fixing fire Check door in DDU Hospital 11/03/2021 10/04/2021 R U Enterprise Work is Progress Detail Report
Graph / Photo
349 Remodeling of Existing Casualty Block at L.N Hospital Block, New Delhi. 15/12/2019 14/03/2021 MIA Construction Pvt. Ltd. work in progress Detail Report
Graph / Photo
350 Providing and fixing PVC doors in bathrooms in qtrs. in place of old damaged ones. 18/09/2014 17/10/2014 Detail Report
Graph / Photo
351 Replacement of Damaged roof of Sub Divn. Office M-233. 11/11/2014 10/12/2014 35.49 (Aug'21) 0.00 (Aug'21) Detail Report
Graph / Photo
352 Cleaning of sewer line, manhole & gully traps etc. 22/12/2014 21/01/2015 Detail Report
Graph / Photo
353 Providing and fixing door in toilet at G.G.S.S.S. Vasundhara Enclave Delhi School ID-1002185. 24/01/2015 23/02/2015 M. N. Construction Co. Detail Report
Graph / Photo
354 Repair of toilet roof at Rajkiya Sarvodaya Kanya Vidyalaya Kalyan Puri Delhi. 08/01/2015 07/02/2015 M. N. Construction Co. Detail Report
Graph / Photo
355 Providing and fixing polycarbonate in available. 19/12/2014 18/01/2015 Detail Report
Graph / Photo
356 Providing and fixing door & window shutters in pooling booth centre at GGSSS Kondli Gharoli. 06/02/2015 20/02/2015 Detail Report
Graph / Photo
357 Wall tile and other misc. civil work in Sports Complex at East Vinod Nagar. 27/02/2015 26/03/2015 Detail Report
Graph / Photo
358 Providing & fixing door and installation of PVC overhead tank for fire safety. 17/01/2015 -- Detail Report
Graph / Photo
359 Misc. Civil Works. 16/03/2015 30/03/2015 Shekhar Detail Report
Graph / Photo
360 Providing ramps in Schools & miscellenious works. 12/02/2015 26/02/2015 Detail Report
Graph / Photo
361 P/F Floor tile & broken tile. 20/11/2015 12/12/2015 Detail Report
Graph / Photo
362 Providing and laying cement concrete. 12/03/2015 25/03/2015 Indal Yadav Detail Report
Graph / Photo
363 Providing railing for Park. 23/11/2015 05/12/2015 Detail Report
Graph / Photo
364 Providing calcium silicate false ceiling & HRD fabrication in opening balcony at second floor. 16/09/2014 15/10/2014 Detail Report
Graph / Photo
365 Finishing of exterior wall in 20 nos. CBI flats. 08/12/2014 26/12/2014 Pradeep Kumar Sharma Detail Report
Graph / Photo
366 P/F Manhole cover & Drain cover. 08/01/2015 07/02/2015 M. N. Construction Co. Detail Report
Graph / Photo
367 Providing Security Guard for watch and ward for Sub Divn. Office & Vacant Flats at Mayur Vihar Ph-II and Division Office. 18/08/2014 01/01/2015 Detail Report
Graph / Photo
368 Repair of toilet roof at Rajkiya Sarvodaya Kanya Vidyalaya Kondli Delhi-110091. 08/01/2015 04/02/2015 Detail Report
Graph / Photo
369 Providing services of labour for day to day maintenance under Sub-Division M-2334. 31/05/2014 -- Detail Report
Graph / Photo
370 Repairing of aluminium doors & Shutters. 19/08/2014 03/09/2014 Detail Report
Graph / Photo
371 Providing and laying RCC drain cover in open surface drain in basement. 16/08/2014 15/09/2014 2.58 (Mar'21) 0.00 (Mar'21) Detail Report
Graph / Photo
372 Improvement of Open Space in Circle Office & Division Office. 06/02/2015 -- Rajeev Sharma Detail Report
Graph / Photo
373 Misc. work at RSKV Mayur Vihar Ph-1 Pkt-IV. 17/01/2015 16/02/2015 Pradeep Kumar Sharma Detail Report
Graph / Photo
374 Providing and fixing FRP door shutters in place of old damaged flush door shutters. 18/09/2014 17/10/2014 Detail Report
Graph / Photo
375 Providing and fixing Acrylic sheet in windows, kerb stone, painting work and misc. civil work. 08/02/2015 08/03/2015 Detail Report
Graph / Photo
376 Repair to damaged windows, renewing glass panes with acrylic plastic sheet & signage work. 06/02/2015 15/03/2015 Detail Report
Graph / Photo
377 Water proofing treatment of first floor toilet. 15/12/2014 14/01/2015 Detail Report
Graph / Photo
378 D G Set 30/01/2015 29/07/2015 16.61 (May'19) 0.00 (May'19) Supernova Engineers Limited . Detail Report
Graph / Photo
379 Lift work 20/12/2014 27/11/2015 Johnson Lifts Pvt. Ltd. work in progress. Detail Report
Graph / Photo
380 Sub-station work 02/02/2015 01/08/2015 S.L. Electromech Pvt. Ltd. . Detail Report
Graph / Photo
381 UPS System 23/01/2015 22/06/2015 Labotech completed Detail Report
Graph / Photo
382 200 Kwp Solar PV Plant 13/05/2015 12/10/2015 progress Detail Report
Graph / Photo
383 Fire fighting and Water supply pumps 13/01/2015 30/07/2015 Royale Meridian (India ) Pvt. Ltd. . Detail Report
Graph / Photo
384 Fire Alarm system 06/12/2014 07/10/2015 Electroquip Ltd. . Detail Report
Graph / Photo
385 Energy Management System 26/04/2015 25/07/2015 . Detail Report
Graph / Photo
386 Modular OT 25/05/2015 24/11/2015 . Detail Report
Graph / Photo
387 IP Based CCTV 27/03/2015 26/08/2015 . Detail Report
Graph / Photo
388 ETP System 27/01/2015 26/07/2015 Texol Engineers . Detail Report
Graph / Photo
389 IP based LAN & voice communication system 21/03/2015 20/08/2015 Tacker Technologies Pvt. Ltd. . Detail Report
Graph / Photo
390 EOR to SSA Building at DIET, Darya Ganj, Delhi. (SH:- False Ceiling, Kota Flooring, Wall tiles etc.) 09/06/2016 08/08/2016 K.P. Singh & Co. Site not handed over by DIET Detail Report
Graph / Photo
391 Renovation of D.D.E. office by changing sanitary & plumbing fixtures in office toilet and internal finishing works 04/07/2016 03/09/2016 0.00 (Aug'16) 40.00 % (Aug'16) Work completed Detail Report
Graph / Photo
392 Construction of Double storeyed SPS type rooms for Cal lab,Library,Science labs,toilet for HOS & staff at Govt. Co.Ed.Edn.Dichaon Kalan,New Delhi. 18/12/2017 15/06/2019 34.21 (Jun'19) 100.00 % (Jun'19) work in progress. Detail Report
Graph / Photo
393 Re-boring of Tubewell at Bijwasan (Bharthal), SBV-1821032, New Delhi. 25/06/2016 24/07/2016 WORK RESCIENED. Detail Report
Graph / Photo
394 C/o Boundary wall on the newly taken over plot at village Dera Mandi, New Delhi. 25/03/2016 24/07/2016 0.00 (Aug'16) 75.00 % (Aug'16) DOSE PERTAIN TO THIS DIVISION Detail Report
Graph / Photo
395 Arrangement of Drinking water facility by bore well at GBSSS No. 1, Khanpur, New Delhi. (School ID : 1923020) 10/05/2016 09/06/2016 0.00 (Jul'16) 50.00 % (Jul'16) Tender re-call and date of opening 24-09-2016 Detail Report
Graph / Photo
396 EOR to Raja Ram Mohan Rai, Hauz Rani, New Delhi. (SH: laying of one borewell & installation of 1 Nos. R.O. System 23/05/2016 23/06/2016 0.00 (Jul'16) 70.00 % (Jul'16) Dose not pertain to this Division Detail Report
Graph / Photo
397 EOR to Govt.Sarvodaya Vidyalaya Gokhle Marg School,No.2,Mori Gate,Delhi. 15/04/2016 14/10/2016 0.00 (Jul'16) 10.00 % (Jul'16) Completed Detail Report
Graph / Photo
398 EOR to slabs beams, coloums chajjas by short creting replacement of old & damaged roof treatment and other misc repair work at Sarvodaya Kanya Vidyala,Ahataa Kedara Idgah road Delhi. 15/04/2016 14/07/2016 0.00 (Jul'16) 15.00 % (Jul'16) Completed Detail Report
Graph / Photo
399 Improvement of ground with drainage system and providing paver blocks, kota stone flooring in classroom & varandah, repair to boundary wall & other Misc. work at Idhgh road-GGSS 05/04/2016 04/06/2016 0.00 (Jul'16) 80.00 % (Jul'16) Completed Detail Report
Graph / Photo
400 Providin gand fixing interlocking tiles, polycarbonate sheet and green board in classrooms. 17/01/2016 30/04/2016 0.00 (Jul'16) 80.00 % (Jul'16) polycarbonate Detail Report
Graph / Photo
401 providing rain water harvesting Pit, laying interlocking paver block in the ground and raising of boundary wall of Govt., Girls Sr. Sec. School. 01/05/2016 30/06/2016 0.00 (Jul'16) 0.01 % (Jul'16)

work in progress

Detail Report
Graph / Photo
402 E.O.R. to G.G.S.S.S at C block Dilshad Garden Delhi 10/04/2016 09/06/2016 0.00 (Jul'16) 0.01 % (Jul'16)

Estimate re-submitted to SE(N) vide letter No.23(05)/EE(N)/DB/PWD/15-16/ 2270

Detail Report
Graph / Photo
403 Construction of new boundary wall 24/04/2016 20/07/2016 21.77 (May'17) 100.00 % (May'17) Detail Report
Graph / Photo
404 Repair and renovation of toilets 17/06/2016 15/08/2016 0.00 (Sep'16) 91.00 % (Sep'16)

Detailed estimate under process.

Detail Report
Graph / Photo
405 Renovation of Classrooms, Corridor, Principal Room & Staff Room. 16/06/2016 13/09/2016 0.00 (Sep'16) 53.00 % (Sep'16)

T.S. under process.

Detail Report
Graph / Photo
406 Construction of SPS type 01 No M.P. Hall, 01 No. Dining Hall with Kitchen, 2 Nos.Guest room, garrage for two vehicle and 2 Nos. Dormitory at 1st floor on under construction single storied dormitories and construction of approach road for Nehru Yuva Kendra, Alipur, Delhi 12/09/2016 11/05/2017 Work stopped by client deptt vide their letter No-NYKS/Construction work/Admin/2016-17/693 dated 09.03.2017. No response from client about restart of work. The contractor is approaching for closure of agmt. Now the clint has permitted to re-start the work and work has been re-started on 25.07.2018. but progress is slow. Detail Report
Graph / Photo
407 C/o New Block for Medicaine, Maternity and advance pediatric centre at L.N.Hospital 04/11/2020 03/05/2023 Foundation work is in progress. Slab casting is in progress. Detail Report
Graph / Photo
408 Acoustic work. 02/02/2018 01/04/2018 67.40 (Jul'18) 100.00 % (Jul'18) work in progress Detail Report
Graph / Photo
409 A/R and M/O to Residential and Non Residential building under Building Maintenance Sub Division (SW) - 4, PWD, B-6, NCC Building, Safdarjung Enclave, New Delhi during 2018-19.(SH Engaging labour for Day to Day Maintenance). 17/05/2018 16/05/2019 94.01 (Mar'20) 0.00 (Mar'20) WORK IN PROGRESS Detail Report
Graph / Photo
410 A/R and M/O to residential and Non residential Building under Sub Div-II of SWBMD at ITI Campus, Pusa, New Delhi during 2018-19.(Sh- Misc repair work and finishing work in quarters). 23/05/2018 21/11/2018 14.29 (Jul'19) 0.00 (Jul'19) work in progress. Detail Report
Graph / Photo
411 Acoustic treatment system and renovation of multipurpose hall. 20/10/2017 17/01/2018 40.27 (Nov'21) 0.00 (Nov'21) 65% (Work is delayed due to ongoing electrical work as well as Covid-19) Detail Report
Graph / Photo
412 Re-boring of Tubewell at Bijwasan (Bharthal), SBV-1821032, New Delhi. 16/10/2016 15/11/2016 forfeited Detail Report
Graph / Photo
413 Installation of R.O System at Dr. Ambedkar Nagar ,Sector-V , No-2-GGSSS-1923050. 20/08/2016 15/09/2016 0.00 (Aug'16) 0.01 % (Aug'16) work completed Detail Report
Graph / Photo
414 C/o toilet attached to office & providing safety cage for water tank at Kothi No. 115 (Dy. Chairman Dialouge Commissioner) Daryaganj, Delhi. 03/06/2017 02/07/2017 Work In Progress. Detail Report
Graph / Photo
415 Renvoation of CCTV Camera PWD office at 13th Floor, MSO Building New Delhi 18/07/2016 17/09/2016 Work In Progress Detail Report
Graph / Photo
416 Mechanized housekeeping services for Internal and external areas of MSO Building, Delhi, dg, 2016-17 02/04/2017 01/03/2019 31.08 (Feb'20) 0.00 (Feb'20) Work In Progress Detail Report
Graph / Photo
417 Repair and renovation work in Bomb Disposal squad & summon warrant Cell building, crime & railways at Yamuna Bazar, Delhi . 10/06/2016 09/08/2016 Work In Progress Detail Report
Graph / Photo
418 C/o 20 Nos. SPS type class rooms including toilet blocks, staircase and electrical installations, fan etc. at Sarvodaya (Co-ed) Sr. Sec. School, Netaji Nagar, (School I.D.) 1719102, Building I.D. 17191327). New Delhi 04/11/2014 30/09/2015 85% Work is in Progress Detail Report
Graph / Photo
419 Up gradation to Delhi Govt. D-II Flats, Vasant Kunj, New Delhi. 05/02/2017 04/08/2017 100.57 (Jul'18) 100.00 % (Jul'18) completed Detail Report
Graph / Photo
420 Providing Services of Security Guard at T.V. Branch Enquiry Office 10/04/2017 09/04/2018 2.52 (Apr'18) 90.00 % (Apr'18) Work completed Detail Report
Graph / Photo
421 RMO Eand M Services at GNEC, New Delhi SH Comprehensive Maintenance of Aquaguard Water Dispenser with Inbuilt RO and UV Purifier 19/03/2017 18/03/2019 Work in Progress Detail Report
Graph / Photo
422 AR and MO to District Court Resid. Complex Saket, ND-18-19 (SH Cleaning, mopping of common area, like lift lobby, staircase, basement, community centre, footpath area, terrace, servant qtr. etc. by mopping machine at Resid. Complex Saket Court, ND). 25/09/2018 24/09/2019 0.49 (Nov'18) 25.00 % (Nov'18) work in progress Detail Report
Graph / Photo
423 A/R and M/O to Educational Building under SWBMD, B-6, NCC Building, Safdarjung Enclave, New Delhi during 2018-19. (Sh -Internal and external finishing and other misc works). 03/08/2018 01/10/2018 WORK IN PROGRESS Detail Report
Graph / Photo
424 Comprehensive Maintenance , Operation of Multi Level underground parking along with associated Electrical , Mechanical services installed at Delhi High Court, Sher Shah Suri Marg, New Delhi dg. 2018-19. 02/11/2018 01/11/2019 214.77 (Sep'19) 0.00 (Sep'19) Work in progress Detail Report
Graph / Photo
425 Construction of Boundary wall at Sayurpur Village, New Delhi. (SH- Providing fixing grills and concertina coil at boundary wall). 10/07/2018 09/09/2018 work in progress Detail Report
Graph / Photo
426 REMODELLING AND UPGRADING OF EXISTING DEEP CHAND BANDHU HOSPITAL AT KOKIWALA BAGH, ASHOK VIHAR, PH-IV, DELHI. 28/06/2019 22/06/2020 0.00 (Mar'19) 0.01 % (Mar'19) Agency has gone in the arbitration. work in progress Detail Report
Graph / Photo
427 SKV Radhey Shyam Park (School Id- 1003153) 17/03/2019 11/12/2019 RCC Structure of Block A and Block B is complete. External GRC Tile work is in progress. Flooring Plastering and other miscellaneous work has been taken up. Detail Report
Graph / Photo
428 SKV Shanker Nagar (School Id- 1003026) 17/03/2019 11/12/2019 0.00 (Jan'21) 25.00 % (Jan'21) Structure work completed. Finishing & Development works are under progress. Detail Report
Graph / Photo
429 RPVV Gandhi Nagar (School Id- 1003261) 17/03/2019 11/12/2019 12491.60 (Nov'20) 0.00 (Nov'20) In Block-C, Structure work, flooring work including corridor are completed & other miscellaneous works are under progress. In Block-D, structure work is completed except mumty and water platform and flooring & misc. work is under progress. Detail Report
Graph / Photo
430 SBV, Rajgarh Colony (School Id- 1001110) 17/03/2019 11/12/2019 0.00 (Apr'19) 0.50 % (Apr'19) Plaster of MP Hall is under progress. In Block-C, Flooring work of MP Hall is under progress. Plaster work of MP Hall is in progress. Brick work in Block-C is in progress. Flooring work of rooms is in progress. Detail Report
Graph / Photo
431 GGSSS Mayur Vihar Ph-3 (Kondali Gharauli) (School Id- 1002352) 17/03/2019 11/12/2019 0.00 (Jan'21) 1.00 % (Jan'21) Brick work at 3rd floor level is under progress. Cement Plaster at 3rd floor is under progress. Flooring work is under progress at 3rd floor level. Fixing of Window & T-iron frame at 3rd floor level is under progress. RCC work in Mumty slab and in water tank slab has been completed. RCC work at terrace level of lift block is completed. GRC Tile work and Ceramic tile work in toilet is in progress. Detail Report
Graph / Photo
432 SKV Patparganj (School Id- 1002031) 17/03/2019 11/12/2019 12491.60 (Nov'20) 0.00 (Nov'20) Casting of Beam at 2nd floor level completed. Laying of ISMB and Angle at 2nd floor completed. Brick work at Ground Floor is in progress. R.C.C work at 3rd floor level beams completed. Laying of Red Stones is in progress. Detail Report
Graph / Photo
433 GGSSS Khichripur (School Id- 1002037) 17/03/2019 11/12/2019 0.00 (Jan'21) 30.00 % (Jan'21) Block-A : (20 rooms) : Structure work complete and internal finishing is in progress. Block-B : (24 Rooms) : Structure work complete and internal finishing is in progress. Block-C : (28 Rooms) : Structure work complete and internal finishing is in progress. Block-D : (4 Rooms) : Excavation of foundation completed & laying of PCC in progress. Fixing of door shutter & windows and fixing of S.S railing is in progress. Detail Report
Graph / Photo
434 AR and MO to Delhi Sachivalaya at IG Stadium Complex New Delhi dg 2018 19 10/11/2018 09/05/2019 1.02 (Jul'19) 0.00 (Jul'19) Work in Progress 95% Detail Report
Graph / Photo
435 SKV Vishwas Nagar (School Id- 1001196) 24/12/2018 19/09/2019 0.00 (Apr'19) 2.00 % (Apr'19) Structure work of 44 Rooms completed and internal & external finishing, lift work above plinth, outer development work etc. are in progress. Detail Report
Graph / Photo
436 SKV Surajmal Vihar (School Id- 1001102) 24/12/2018 19/09/2019 Structure work of Block A (16 rooms) & B (12 rooms) completed; Internal & external finishing, development works are in progress. Detail Report
Graph / Photo
437 SKV, Kiran Vihar (School Id- 1001106) 24/12/2018 19/09/2019 RCC structure work completed. Internal & external finishing in progress in both the blocks. 1st floor slab of lift is in progress. Outer development work in progress. Detail Report
Graph / Photo
438 Govt. Co-ed SSS Preet Vihar (School Id- 1002351) 24/12/2018 19/09/2019 0.00 (Apr'19) 1.50 % (Apr'19) Structure work of (28 20) Rooms completed; internal & external finishing, development works are in progress in Block A and Block B. Detail Report
Graph / Photo
439 SKV Uttam Nagar (School ID - 1618057). 18/01/2019 13/12/2019 0.00 (Jan'21) 72.00 % (Jan'21) Work is in progress. Detail Report
Graph / Photo
440 G(Co.Ed.)SS Vikas Nagar (School ID - 1618057). 18/01/2019 13/12/2019 2547.07 (Feb'21) 0.00 (Feb'21) Work is in progress. Detail Report
Graph / Photo
441 GBSSS KG-I/II Vikaspuri (School ID - 1618015). 18/01/2019 13/12/2019 2547.07 (Feb'21) 0.00 (Feb'21) Work is in progress. Detail Report
Graph / Photo
442 GBSSS West Patel Nagar (School ID - 1516140). 13/01/2019 23/12/2019 0.00 (Oct'20) 37.00 % (Oct'20) Work is in progress. Detail Report
Graph / Photo
443 SBV West Patel Nagar (School ID - 1516143). 13/01/2019 23/12/2019 1867.59 (Mar'21) 0.00 (Mar'21) Work is in progress. Detail Report
Graph / Photo
444 GGSSS No. 2 A-Block Janakpuri (School ID - 1618064). 07/12/2018 04/08/2019 0.00 (Jan'21) 93.00 % (Jan'21) Work is in progress. Detail Report
Graph / Photo
445 S(Co. Ed.) Block-L Hari Nagar (School ID - 1514022). 07/12/2018 04/08/2019 0.00 (Jan'21) 87.00 % (Jan'21) Work is in progress. Detail Report
Graph / Photo
446 GBSSS Site-2 Clock Tower, Hari Nagar (School ID - 1514112). 07/12/2018 04/08/2019 0.00 (Jan'21) 85.00 % (Jan'21) Work is in progress. Detail Report
Graph / Photo
447 GGSSS Ashok Nagar (School ID - 1514018). 13/01/2019 23/12/2019 0.00 (Oct'20) 64.00 % (Oct'20) Work is in progress. Detail Report
Graph / Photo
448 SBV Subhash Nagar (School ID - 1515003). 13/01/2019 23/12/2019 6214.10 (Feb'21) 0.00 (Feb'21) Work is in progress. Detail Report
Graph / Photo
449 GBSSS Rajouri Garden Extn. (School ID - 1515018). 13/01/2019 23/12/2019 6214.10 (Feb'21) 0.00 (Feb'21) Work is in progress. Detail Report
Graph / Photo
450 SKV Rajouri Garden Extn. (School ID - 1515021). 13/01/2019 23/12/2019 6214.10 (Feb'21) 0.00 (Feb'21) Work is in progress. Detail Report
Graph / Photo
451 SKV Rajouri Garden Main (School ID - 1515022). 13/01/2019 23/12/2019 6214.10 (Feb'21) 0.00 (Feb'21) Work is in progress. Detail Report
Graph / Photo
452 SKV No. 2 Tarogre Garden (School ID - 1515025). 13/01/2019 23/12/2019 6214.10 (Feb'21) 0.00 (Feb'21) Work is in progress. Detail Report
Graph / Photo
453 GBSSS Tagore Garden (School ID - 1515139). 13/01/2019 23/12/2019 6214.10 (Feb'21) 0.00 (Feb'21) Work is in progress. Detail Report
Graph / Photo
454 EOR to Govt. Co-ed. Sr. Sec. School at Daulatpur and Govt. Co-ed. Sr. Sec. School at Malikpur, New Delhi. (Sh- C/o Rain Water Harvesting System). 04/03/2019 02/05/2019 69.90 (Aug'19) 0.00 (Aug'19) WORK IN PROGRESS Detail Report
Graph / Photo
455 GGSSS No. 2, Molarband School ID : 1925053 14/01/2019 10/10/2019 0.00 (Sep'21) 83.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
456 GGSSS No. 4, Molarband School ID : 1925400 14/01/2019 10/10/2019 0.00 (Sep'21) 75.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
457 S.K.V., Molarband School ID : 1925037 14/01/2019 10/10/2019 0.00 (Sep'21) 72.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
458 GGSSS DDA Flat, Kalkaji, Phase-II, School ID: 1925041 14/01/2019 10/10/2019 0.00 (Sep'21) 65.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
459 GGSSS No. 3, Badarpur, School ID : 1925248 14/01/2019 10/10/2019 0.00 (Sep'21) 87.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
460 GGSSS No. 3, Kalkaji School ID : 1925039 14/01/2019 10/10/2019 0.00 (Sep'21) 40.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
461 SKV Mandi Village, School ID : 1923064 14/01/2019 10/10/2019 4970.22 (Oct'21) 0.00 (Oct'21) work is in progress Detail Report
Graph / Photo
462 SPM Sarvodaya Vidyalya Chittaranjan park, School ID: 1925060 14/01/2019 10/10/2019 0.00 (Sep'21) 87.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
463 SKV No. 2, East of Kailash, School ID: 1924027 23/01/2019 19/10/2019 0.00 (Sep'21) 93.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
464 GBSSS, No. 2, Kalkaji, , School ID: 1925011 23/01/2019 19/10/2019 0.00 (Sep'21) 52.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
465 GBSS, Garhi, Jharia Maria School ID : 1924042 23/01/2019 19/10/2019 0.00 (Sep'21) 82.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
466 SV(Co. Ed.) A-2, Paschim Vihar (School ID - 1617003). 13/01/2019 09/10/2019 2397.14 (Mar'21) 0.00 (Mar'21) Work is in progress. Detail Report
Graph / Photo
467 SV (Co. Ed.) B-4 New Multan Nagar (School ID - 1617007). 13/01/2019 09/10/2019 0.00 (Jan'21) 75.00 % (Jan'21) Work is in progress. Detail Report
Graph / Photo
468 SV Shahpur Jat, School ID: 1925333 08/12/2018 04/08/2019 0.00 (Sep'21) 95.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
469 S.B.V., Sadiq Nagar, School ID: 1924009 08/12/2018 04/08/2019 2936.63 (Oct'21) 0.00 (Oct'21) work is in progress Detail Report
Graph / Photo
470 SV Safdarjung Enclave, School ID: 1719106 08/12/2018 04/08/2019 0.00 (Sep'21) 99.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
471 SKV Hauzrani, School ID: 1923041 08/12/2018 04/08/2019 2905.71 (Oct'21) 0.00 (Oct'21) work is in progress Detail Report
Graph / Photo
472 GBSSS Dera Village School ID: 1923360 08/12/2018 04/08/2019 0.00 (Feb'21) 63.00 % (Feb'21) In progress Detail Report
Graph / Photo
473 Co-Ed. SSS Lajpat Nagar, School ID: 1925335 08/12/2018 04/08/2019 0.00 (Sep'21) 60.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
474 GBSSS Jungpura, School ID : 1924004 08/12/2018 04/08/2019 2753.85 (Oct'21) 0.00 (Oct'21) work is in progress Detail Report
Graph / Photo
475 GGSSS, DDA Flats, Phase II, Kalkaji, School ID: 1925045 14/01/2019 10/09/2019 0.00 (Sep'21) 56.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
476 Govt. Co.-Ed., Middle School, Sarai Kale Khan, Vidut Nagar, School ID: 1925418 14/01/2019 10/09/2019 0.00 (Sep'21) 40.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
477 SKV,, Jonapur- BNK, School ID: 1923003 08/12/2018 04/08/2019 0.00 (Sep'21) 65.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
478 GGSS, Begumpur, School ID: 1923072 23/01/2019 19/10/2019 0.00 (Sep'21) 28.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
479 Sarvodaya Co-ed Vidyalaya Sec-2, R K Puram, New delhi, School ID: 1719013 23/01/2019 19/10/2019 0.00 (Sep'21) 78.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
480 ATSBV, Chhattarpur 1923081 23/01/2019 19/10/2019 0.00 (Sep'21) 1.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
481 SKV Noor Nagar, School ID 1925035 23/01/2019 19/10/2019 0.00 (Sep'21) 45.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
482 GGSSS Jogabai, New Delhi School ID : 1925049 23/01/2019 19/10/2019 0.00 (Sep'21) 58.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
483 EOR to GBSSS Bijwasan, Govt. Sarvodaya Co-ed Sr. Sec. School Kitchner Road (Malcha Marg), DIET Sec-07 R.K. Puram etc New Delhi.(Sh- Construction of Rain Water Harvesting System). 22/02/2019 24/04/2019 47.84 (Jul'19) 80.00 % (Jul'19) WORK IN PROGRESS. Detail Report
Graph / Photo
484 S.K.V. A-Block, School ID : 1924025 14/01/2019 10/10/2019 0.00 (Aug'21) 95.00 % (Aug'21) Work is in progress Detail Report
Graph / Photo
485 S.K.V. C-Block, Defence Colony, School ID : 1924023 14/01/2019 10/10/2019 10492.08 (Sep'21) 93.00 % (Sep'21) in progress Detail Report
Graph / Photo
486 S.V. Jorbagh, School ID 2026005 14/01/2019 10/10/2019 10492.08 (Sep'21) 90.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
487 S.K.V. Rani Jhansi, School ID 1925031 14/01/2019 10/10/2019 0.00 (Sep'21) 99.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
488 GGSSS No. 2, Tughlakabad, Railway Colony, School ID 1925046 14/01/2019 10/10/2019 0.00 (Sep'21) 87.00 % (Sep'21) work is in progress Detail Report
Graph / Photo
489 GGSSS Tigri, School ID 1923080 14/01/2019 10/10/2019 4970.22 (Oct'21) 0.00 (Oct'21) work is in progress Detail Report
Graph / Photo
490 Ishani G- Block Saket, School ID 1923036 14/01/2019 10/10/2019 4970.22 (Oct'21) 0.00 (Oct'21) work is in progress Detail Report
Graph / Photo
491 SKV MB Road Pushp Vihar, School ID 1923071 14/01/2019 10/10/2019 4970.22 (Oct'21) 0.00 (Oct'21) work is in progress Detail Report
Graph / Photo
492 Construction of 30 Nos. Porta Cabin Aam Admi Mohalla Clinics under Sub division- I,II,III and IV under South West Building Maintenance Division New Delhi. (SH Civil works and Electrical works). 06/12/2018 02/08/2019 285.83 (Nov'20) 0.00 (Nov'20) WORK IN PROGRESS Detail Report
Graph / Photo
493 A PL paver block repair and renovation of room No 41 at SKV Khera Kalan BNN B PL APP treatment at roof of SBV Auchandi Delhi 05/11/2019 02/02/2020 0.00 (Sep'20) 50.00 % (Sep'20) work is in progress (60%) Detail Report
Graph / Photo
494 Construction of additional SPS type classrooms in Govt Schools Directorate of Education under Priority II 05/09/2019 04/09/2020 0.11 (Nov'19) 0.00 (Nov'19) work in progress Detail Report
Graph / Photo
495 Bhola Nath Nagar, No.3-GGSSS (ID : 1001023) (DIET BUILDING) 17/03/2019 11/12/2019 0.00 (Jan'21) 1.00 % (Jan'21) (i) (DIET BLOCK) Structure completed finishing in progress. MP Hall : Internal & External finishing in progress. Detail Report
Graph / Photo
496 Jhilmil Colony-SBV Avinash Chadda (ID: 1001105 ) (Addl. Rooms) 17/03/2019 11/12/2019 Tender was uploaded on the website and cancelled on 28.06.2021. Some changes proposed by the Hon'ble Dy. CM / PWD Minister and for want of approval of architectural drawings. Revised drawing approved on 23.08.2021. Detailed estimate amounting to Rs. 13,35,72,150/- submitted to PM Unit-1 office for T.S vide letter No. 20(T.S)/Edu. M/ E & NE/ PWD//1135 dt. 12.10.2021 Detail Report
Graph / Photo
497 Construction of G4 storey Police Post including Rain Water Harvesting Tank Underground water tank and development work at Sanjay Gandhi Transport Nagar Delhi Civil and Electrical 08/11/2019 07/07/2020 work is started Detail Report
Graph / Photo
498 Pumping out rainwater to avoid water logging at DC office complex,Weavers Complex Nand Nagri and SDM Court Seelampur Delhi. 30/06/2019 29/10/2019 5.86 (Jan'20) 0.00 (Jan'20)

work completed

Detail Report
Graph / Photo
499 Providing the services of Security Guard for day to day maintenance at D-II flats. 02/08/2019 01/08/2020 work in progress Detail Report
Graph / Photo
500 Providing security guards at Division Office M-222 (NE), Sub Division M-2222, Sub Division M-2221, Sub Division Office Loni Road and Division M-222 30/06/2019 29/05/2020 23.93 (Mar'21) 0.00 (Mar'21)

work completed

Detail Report
Graph / Photo
501 Attending day to day complaints 24/06/2019 23/06/2020 10.22 (Oct'20) 0.00 (Oct'20)

work completed

Detail Report
Graph / Photo
502 Construction of multipurpose court, levelling and preparing the layer of good earth on the play ground in Delhi Police Public School at PTS, Wazirabad, Delhi 30/06/2019 29/08/2019 26.71 (Mar'21) 0.00 (Mar'21)

work in progress

Detail Report
Graph / Photo
503 A/A in Sanjay Gandhi Memorial Hospital, Mangolpuri, Delhi. (SH Renovation of ENT OPD, OST Centre, CMO room in main casualty, patient toilet in ward-4, change of floor tiles in digital X-ray room and change of windows in physiotherapy department etc. 12/09/2019 09/01/2020 work is in slow progress Detail Report
Graph / Photo
504 External plaster work of Judges Flats Including tile work in over head water storage tank of block D AND E, Steel works and other Misc. work 24/10/2019 23/01/2020 work in progress Detail Report
Graph / Photo
505 External plaster work including painting. 16/06/2019 15/09/2019 work in progress Detail Report
Graph / Photo
506 Redevelopment of rain water harvesting pits and cleaning of storm water lines at Residential and Non-Residential Complex, Saket Court, New Delhi. 25/07/2019 24/09/2019 work in progress Detail Report
Graph / Photo
507 Reconstruction of collapsed boundary wall of CBD plot at Shahdara, Delhi owned by Urban Development Department. 24/07/2019 22/09/2021 in progress. Detail Report
Graph / Photo
508 Raising of main gate, C/o guard room, repair of ground water tank, providing and fixing IRC fabric jali inside the Class rooms etc. 30/06/2019 29/08/2019 1.60 (Mar'21) 0.00 (Mar'21)

work completed

Detail Report
Graph / Photo
509 Construction of Recreation Room, Coys room, Officers Quarters and Shed. 30/06/2019 29/08/2019 51.12 (Jul'20) 0.00 (Jul'20)

work completed

Detail Report
Graph / Photo
510 Construction of 2 nos.Viewers stand in Parade ground at PTS, Wazirabad, Delhi 30/06/2019 19/07/2019 8.39 (Jan'20) 0.00 (Jan'20)

work completed

Detail Report
Graph / Photo
511 Attending complaints of routine maintenance of service centre PTS, Wazirabad, Delhi. 30/06/2019 29/06/2020 7.20 (Mar'20) 0.00 (Mar'20)

work completed

Detail Report
Graph / Photo
512 Renovation of 10 Nos toilet blocks, Construction of 3 nos. R.C.C. tank of size 8 x 5 mtr. and 6 nos. M.S. grill gates. 30/06/2019 29/08/2019 52.31 (Aug'20) 0.00 (Aug'20)

work completed

Detail Report
Graph / Photo
513 Construction of additional SPS type classrooms in Govt. Schools, Directorate of Education, under Priority II. 05/09/2019 04/09/2020 685.61 (Oct'21) 0.00 (Oct'21) work in progress Detail Report
Graph / Photo
514 C/o SPS type additional class rooms under Priority II. 16/03/2019 10/12/2019 25159.43 (Feb'21) 0.00 (Feb'21) work in progress Detail Report
Graph / Photo
515 C/o Trauma Centre and Utility Block at SGMH at Mangolpuri, Delhi, including Water Supply, Sanitary Installations, Electrical Installation, HVAC, Low side, Fire Alarm, and Fire Fighting System etc. (Hiring of Photocopier Machine.) 04/09/2019 03/03/2021 work in progress Detail Report
Graph / Photo
516 C/o Pucca School Building (Four Storeyed) with ancillary facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Libaspur, Delhi. 30/05/2020 29/05/2021 0.00 (Aug'21) 27.00 % (Aug'21)

'Frame work completed in Part-A & Part-B. 1st floor slab constructed in Part-C. Ground floor column completed in Part-D & E. Other work like brick work, finishing work is in progress in Part-A & B.

Detail Report
Graph / Photo
517 C/o Pucca School Building (Four Storeyed) with ancillary facilities including internal water supply, sanitary installation, internal electrical installation and development of site at Daryapur kalan, Delhi. 30/05/2020 29/05/2021 0.00 (Aug'21) 25.00 % (Aug'21)

Casting of Terrace floor slab of Block-E & F completed. Casting of 1st floor in Block-D completed. Casting of plinth beam of Block-A & B completed. Partition work with bricks in progress.

Detail Report
Graph / Photo
518 C/O Pucca School Building (G+3) of Govt. Sr Sec. School (Co-Ed) at Rana Pratap Bagh (School ID: 13091907), Delhi.(SH: Main Civil Work). 02/09/2020 29/05/2021 0.00 (Jul'21) 31.00 % (Jul'21)

Structure work of building completed, Plaster work, brick, granite work, B/wall work in progress.

Detail Report
Graph / Photo
519 C/o Additional 176 SPS class rooms in existing premises including Labs, Library, Toilet blocks etc. under jurisdiction EO Zone 27 of DDE, Bulbuli Khana SKV (school ID: 2127021) and Kamla Market Zeenat Mahal- SKV No.1 (School IS: 2127014) Central & New Delhi. (Priority-2) 16/03/2019 10/12/2019 40404.76 (Oct'21) 0.00 (Oct'21) work in progress Detail Report
Graph / Photo
520 C/o 138 Nos. of additional SPS class rooms in various schools under Central and New Delhi, Education (M) Division, PWD including internal & external water supply, sanitary installation, electrical installations, development of site and fire fighting system etc. (Package - 2). 18/01/2019 14/09/2019 2072.75 (May'21) 0.00 (May'21) work in progress Detail Report
Graph / Photo
521 Hiring of Inspection Vehicle along with Driver in the office of Executive Engineer Health Project Division (East), PWD, Tahirpur, Delhi-110093 dg. 2019-20 02/03/2020 01/09/2020 Work completed. Detail Report
Graph / Photo
522 GGSSSS Chhatarpur 1923048 18/03/2019 11/12/2019 890.26 (Jul'21) 0.00 (Jul'21) Work is in progress Detail Report
Graph / Photo
523 Consultancy Services for Construction (on EPC mode) of New Block for expansion of Deen Dayal Upadhyay Govt. Hospital of Hari Nagar, Delhi. 28/05/2020 27/11/2022 WORK IN PROGRESS Detail Report
Graph / Photo
524 Construction of Residential Hostel at Chhatrasal Stadium, Model Town, Delhi. 24/02/2021 23/05/2022 Architectural drawings are being revised by Senior Architect. Work can be taken up after receipt of revised drawings. However, the agency has requested for foreclosure of the agreement. Detail Report