|
|
Road taken by PWD (Year): | Road handed over to other Deptt: |
Length of Road (Km.): | 0.88 | No. of Lanes: | 2 | Lane Lentgh (Km.): | 1.76 |
Date of Last to Last Resurfacing(M/Y): | Right of Way: | 18.00 |
Main C.W. built thickness & specification of layer: |
Electrical |
No of Poles: | 31 | No of Fittings: | 31 | |