Circular
S.No. Date Description Download
1 17-01-2020 List of Development /Construction works – regarding General Elections to Legislative Assembly of NCT of Delhi, 2020 Download
2 15-01-2020 Modified Policy / revised Standard Operating Procedure (SOP's) w.r.t. Road Restoration and Grant of Online Permision of Road Digging through PDM Software. Download
3 13-01-2020 Transfer & Posting of Junior Engineer(Civil) Download
4 09-01-2020 Transfer & Posting of Senior Accounts Officers. Download
5 09-01-2020 Required the list of works under progress as well as the works going to start in near future. Download
6 08-01-2020 Transfer & Posting of Sh. Ramakant Prasad, as Senior Architect(Projects). Download
7 07-01-2020 Implementation of Model Code of Conduct- General Election to Legislative Assembly of NCT of Delhi, 2020- Regarding Download
8 06-01-2020 Transfer & Posting of Junior Engineer(Electrical) Download
9 02-01-2020 Compliance of Hon'ble Supreme Court of India order in WP(C) No. 13029/1985, titled M.C. Mehta Vs UOI & Ors. Download
10 02-01-2020 Transfer/Posting Of Executive Engineer(Civil) Download
11 02-01-2020 Transfer/Posting Of Sh. Ashwini Kumar Deshwal, Assistant Director (Hort.) Download
12 01-01-2020 Advisory regarding Quality Aspects on PWD,GNCTD works. Download
13 31-12-2019 Payment to Contractual/Outsourced Employees. Download
14 31-12-2019 A/A and E/S for Expansion & Remodeling of Dr. Hedgewar Arogya Sansthan from 200 bedded to 550 bedded Hospital at the cost of Rs 210.24 Crore (Revised) Download
15 31-12-2019 Administrative approval and Expenditure sanction for Construction of new Hospital at Siraspur at the cost of Rs 487.54 (Revised) Download
16 31-12-2019 Transfer/Posting Of Sh. Rama Shankar Dubey, Office Suprintendent Download
17 30-12-2019 Joseph A.I (Sr. Accounts Officer) shall stand relieved from 31.12.2019 (A/N) Download
18 24-12-2019 Transfer/Posting Of Assistant Engineer(Elect.) Download
19 24-12-2019 Transfer/Posting Of Assistant Engineer(Elect.) Download
20 23-12-2019 Minimum wages Download
21 23-12-2019 Transfer/Posting Of Executive Engineer(Civil) Download
22 23-12-2019 Transfer/Posting Of Assistant Engineer(Civil) Download
23 23-12-2019 Transfer/Posting Of Assistant Engineer(Civil) Download
24 23-12-2019 Extension of Flyover from Ashram Flyover to DND Flyover. SH FOBs, Ramps, Footpath, Road Work include Road Signage, Street Light Works, Drainage & allied Works. Download
25 20-12-2019 Transfer/ Posting of Office Superintendents Download
26 19-12-2019 Implentation of the RTI Act 2005/SPIOs & FAAs in O/o E-in-C, PWD, GNCTD. Download
27 19-12-2019 Transfer & Posting of Finance Officers Download
28 19-12-2019 Composition of Review Committee in respect of Group "B" (Gazetted) Officers. Download
29 19-12-2019 Furnishing of status report regarding disbursement of arrears of minimum wages at enhanced rates for the month of October, 2019, disbursement f wages at enhanced rates for the month of November, 2019 and disbursement of bonus as per bonus advisory dated 15.10.2019 issued by Labour Department in respect of outsourced staff. Download
30 18-12-2019 Forwarding of various PUCs received from different Deptts./Agencies. Download
31 18-12-2019 Implentation of the RTI Act 2005/SPIOs & FAAs in PWD, GNCTD Download
32 18-12-2019 Transfer & Posting of Senior Draftsman(Civil). Download
33 18-12-2019 Transfer & Posting of Draftsman(Civil). Download
34 18-12-2019 Transfer & Posting of Junior Engineer(Electrical) Download
35 18-12-2019 Allotment List of Type-IV for the Month of December 2019 Download
36 18-12-2019 Allotment List of Type-III for the month of December 2019 Download
37 18-12-2019 Allotment List of Type-III for the month of December 2019 Download
38 18-12-2019 Allotment List of Type-I for the month of December 2019 Download
39 18-12-2019 Allotment List of Type-II for the Month of December 2019 Download
40 18-12-2019 Allotment List of Type-I for the month of December 2019 Download
41 17-12-2019 Periodical review under FR 56(j)/56(i) and Rule 48 of CCS (Pension) Rules, 1972 in r/o Group A & B officers of PWD, GNCTD. Reg. Download
42 16-12-2019 Safai Karmacharis Expressing concerns over the Sewer Deaths in Delhi. Download
43 16-12-2019 Review of Mechanism to Ensure Probity of Government Servants- Strengthening of Administration - Periodical review under FR 56(j)/FR 56(I) and Rule 48 of CCS (Pension) Rule 1972. Download
44 16-12-2019 Regarding Payment of New Minimum Wages and Arrear of D.A. applicable to Outsourced/ Contractual staff of PWD Download
45 16-12-2019 Transfer & Posting of Sh. Nikhil Soni, Assistant Architect Download
46 16-12-2019 Regarding issue of Cemtralized guidelines to all PWD units throughout Delhi for permitting M/s Presto Infosolutions Pvt. Ltd. New Delhi for installation of Wi-Fi equipments and laying of OFC on PWD on and around Street Light Poles. Download
47 13-12-2019 Inter-pool exchange of General Pool Residential Accommodation and Departmental Pool Residential Accommodation. Download
48 13-12-2019 Celebration of Constitution Day on 26th November,2019 and year-long activities on Citizens Duties from 26.11.2019 to 26.11.2020 Download
49 13-12-2019 Regarding issue of Centralized Guidelines to all PWD units throughtout Delhi for Permitting M/s Presto Infosolutions Pvt. Ltd. New Delhi for Installation of Wi-Fi Equipments and Laying of OFC on PWD onand around street light poles. Download
50 12-12-2019 Channel of Submission of Proposal of Service Matters of Officers/ officials of PWD Officers Posted in PWD from CPWD. Download
51 12-12-2019 Composition of Dispute Redressal Committee (for all claims in dispute) Download
52 06-12-2019 Guidelines on Memo Forwarding Arbitration awards for Consideration of E-in-C/Ministry/Secretariat. Download
53 06-12-2019 Transfer & Posting of Sh. P.K. Tripathi, as Director (Hort.) Download
54 04-12-2019 E-RTI Online Training Program Dated 11.12.2019 at 2:00 PM to 5:30 PM. Download
55 03-12-2019 Joining Report of PURSHOTTAAM DASS, Senior Draughtsman(C) Download
56 03-12-2019 "Annual Health Check-up Scheme" Download
57 03-12-2019 Transfer & Posting of Draftsman(Elect). Download
58 29-11-2019 Regarding to Pay New Minimum Wages and Arrear for Revised Minimum wages to Outsourced Staff in PWD. Download
59 29-11-2019 Forwarding of Various PUCs received form different Depts./ Agencies. Download
60 28-11-2019 Corrigendum-Transfer of Sh. Rup Lal, Executive Engineer(E) may be read as South West Health Electriccal Dicvision instead of South West Electrical Division. Download
61 28-11-2019 Cleaning Of Sewer line and Sewerage System-Safety Measures Regarding. Download
62 27-11-2019 Guidelines on Memo forwarding Tender for Consideration of RWAB/DWAB. Download
63 26-11-2019 Compliance for Hon'ble Supreme Court Writ Petition No. 13029/1985 regarding Air Pollution - Daily Report Download
64 22-11-2019 Transfer & Posting of Junior Engineer(Civil) Download
65 22-11-2019 Transfer & Posting of Junior Engineer(Electrical) Download
66 20-11-2019 Details of Pending Payment of Final Bills. Download
67 19-11-2019 Prohibitory Order u/s 144 CrPc Download
68 15-11-2019 Next Online Bidding for Type-I,II III & IV in December, 2019 Download
69 13-11-2019 Use of Dust Suppressants with Water Sprinkling to Control Road Dust. Download
70 11-11-2019 Disposal of C&D Waste Download
71 09-11-2019 Opening of Office on Holiday i.e. 10/11/2019 and 12/11/2019 Download
72 08-11-2019 Compliance for Hon'ble Supreme Court Writ Petition No. 13029/1985 regarding Air Pollution Download
73 07-11-2019 Payment of Bonus to Contract/Outsourced Workes/Employees engaged by PWD, Delhi under Payment of Bonus Act,1965-regarding. Download
74 05-11-2019 Transfer/ Posting of Office Superintendents Download
75 05-11-2019 Unauthorized Printing and Sale of Morth Specification for Road and Bridge Works and other IRC Codes & Specifications Download
76 05-11-2019 Review exercise undertaken under FR(56(j)/similar provisions-Furnishing of Information Regarding. Download
77 04-11-2019 Payment of Bonus to Contractual employees/workers. Download
78 04-11-2019 Compliance of Payment of Final Bill of Contractor Download
79 01-11-2019 Celebration of 58th PWD Day- Outstanding achievement and meritorious services rendered by the officers & staff of PWD for E-in-C Medal and Certificate of Merit. Download
80 31-10-2019 Transfer/Posting Assistant Accounts Officer Download
81 25-10-2019 Possibility of using available reinforcement bars from the site of World Class Skill Centre at Jonapur, Delhi. Download
82 25-10-2019 Transfer/Posting Of Executive Engineer(Civil) Download
83 23-10-2019 Transfer/Posting Of Executive Engineer(Elect.) Download
84 23-10-2019 Transfer/Posting Of Architect Download
85 22-10-2019 Transfer/Posting Of Executive Engineer(Civil) Download
86 21-10-2019 Transfer/Posting Of Assistant Engineer(Civil) Download
87 21-10-2019 Allotment List of Type-III for the month of October 2019 Download
88 21-10-2019 Allotment List of Type-II for the Month of October 2019 Download
89 21-10-2019 Allotment List of Type-I for the Month of October 2019 Download
90 21-10-2019 Allotment List of Type-IV for the Month of October 2019 Download
91 18-10-2019 Transfer/Posting Assistant Accounts Officers Download
92 17-10-2019 Half Day Holiday on 17th Oct 2019 on account of Phool Walon Ki Sair Download
93 10-10-2019 Office Memorandum Regarding DE-2 Form Mandatory for Allotment of DA Flat (Type-IV and above) Download
94 30-09-2019 Readiness list of Executive Engineer(Civil) Download
95 27-09-2019 Periority of SO(Horticulture). Download
96 27-09-2019 Transfer & Posting of Senior Draftsman(Elect). Download
97 27-09-2019 Transfer & Posting of Senior Draftsman(Civil) Download
98 26-09-2019 Forwarding of various PUCs received from different Depts./ Agencies. Download
99 26-09-2019 Transfer And Joining Download
100 25-09-2019 Transfer/Posting Of Assistant Engineer(Electrical) Download
101 24-09-2019 Readiness List Of Assistant Account Officer and Office Superintendent . Download
102 24-09-2019 Transfer & Posting of Junior Engineer(Civil) Download
103 23-09-2019 Instructions to carry out regular inspections/checks to stamp out the misuse of Govt. Residential Accommodation i.e. Overstaying, Subletting, Unauthorized occupation & Unauthorized construction. Download
104 20-09-2019 Rehability and strenghthening of Nehru Nagar Flyover(ROB) near Ashram on Ring Road,New Delhi. Download
105 20-09-2019 Trasfer/Posting of Senior Architect Download
106 19-09-2019 Transfer/Posting Assistant Accounts Officer Download
107 18-09-2019 How to Celebrate 14 September Hindi Day 2019 Download
108 18-09-2019 Office of the Commissioner of Police:Delhi Download
109 18-09-2019 Readiness list of Assistant Engineer(Civil/Elect.)as on 30.09.2019. Download
110 17-09-2019 Transfer/Posting of Senior Draftsman(Elect.) Download
111 17-09-2019 Transfer/Posting of Senior Draftsman(Civil) Download
112 13-09-2019 Next Online Bidding for Type-I,II III & IV in October, 2019 Download
113 13-09-2019 Regarding Office Memorandum for Regular Inspections/Checks to stamp out the misuse of Govt. Residential Accommodation i.e Overstaying, Subletting, Unauthorized Occupations and Unauthorized Construction Download
114 12-09-2019 Regarding commencement of system of payment of salary to the employees of the Delhi Government through electronic mode. Download
115 06-09-2019 24th Annual Convention and National Seminar on "Development of New Greenfield Townships" to be held in December 2019. Download
116 06-09-2019 List of SC/ST enterpreneurs willing to carry out supply orders/service Contracts. Download
117 05-09-2019 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.533,90,79,516 for new block for Medicine,Maternity and Advanced Paediatric centre at L.N Hospital New Delhi. Download
118 04-09-2019 IBC Journal Download
119 04-09-2019 Directorate is bringing out Newsletter every month to share and disseminate the activities and achievements of the Department to the Public, Clients, Stakeholders and to entire CPWD fraternity through CPWD website. Download
120 04-09-2019 Regarding the death of 03 workers during cleaning of sewer in delhi on 28/06/2019(Delhi Jal Board) Download
121 03-09-2019 Providing Free Wi-Fi to the Citizens of Delhi(At bus stops and parks etc). Download
122 03-09-2019 Supply,Installation,Testing and Commissioning of CCTV Cameras in Delhi(Phase-II).(Proposal to double the number of installation of CCTV Cameras in RWA/MA). Download
123 02-09-2019 Transfer and Posting Download
124 29-08-2019 Skill Development of Workmen in the Highway Construction Sector. Download
125 29-08-2019 Seniority List of JE's (Civil) Working in PWD Road Division's Delhi as on Aug-2019 Download
126 29-08-2019 List of JE's (Elect.) Working in PWD Delhi as on Aug 2019 Download
127 29-08-2019 Training Calendar of CPWD Academy for 2019-2020 Download
128 28-08-2019 Minutes of Meeting with CPWD Employee Union on 2/08/2019 Download
129 26-08-2019 Transfer & Posting of JE(Civil) Download
130 26-08-2019 Transfer Order Download
131 22-08-2019 Encouragement for use of Hindi Language Download
132 20-08-2019 Restructuring of Horticulture Unit of PWD Delhi Download
133 19-08-2019 Allotment List of Type-IV for the month of August 2019 Download
134 19-08-2019 Allotment List of Type-I for the month of August 2019 Download
135 19-08-2019 Allotment List of Type-II for the month of August 2019 Download
136 19-08-2019 Allotment List of Type-III for the month of August 2019 Download
137 16-08-2019 Forwarding of various PUCs received from different Deptts./Agencies Download
138 16-08-2019 Forwarding of various PUCs received from different Department/Agencies. Download
139 14-08-2019 Pr.Chief Engineer(Projects) declares "Lab Furniture" as Specialized Work which is not included in the specialized list of CPWD Works Manual 2019. Download
140 13-08-2019 Presentation on Construction materials. Download
141 09-08-2019 Temp.Additional Charge of E-in-C,PWD Download
142 08-08-2019 Regarding provision for grant of incentives in academics to NCC Cadets as per their grading obtained during the training. Download
143 07-08-2019 PIMS update details certificate Download
144 07-08-2019 Appointment of Shri P K Tomar, PM(F-5) as a Nodal officer for providing the necessary information and data to IUT/UMTC from PWD. Download
145 06-08-2019 Proactive approach in disposing off First Appeal under RTI Act 2005. Download
146 05-08-2019 Meeting Notice-Review Cases of 56(j) Download
147 05-08-2019 Notice for presentation on Indira Gandhi Hospital Project Download
148 05-08-2019 Remodeling of old damaged brick masonry drain of N.S.Hardikar Marg(from ORR-26 to Avantika Chowk)with new RCC drain,Rohini,Delhi. Download
149 05-08-2019 Construction of Foot Over Bridge with staircase and lift for pedestrain on Multan Nagar Metro Pillar No.224 to 225,at Delhi Rohtak Road, NH-10, New Delhi.(SH;-Civil and Electrical Work) Download
150 05-08-2019 Construction of Foot Over Bridge at Shiv Parvati Mandir, Pul Prahaladpur,M.B.Road,New Delhi. Download
151 03-08-2019 Amendments to the Delhi Administration allotment of Government Residences (General Pool Debarment Period) Rules, 1977 Download
152 02-08-2019 Meeting Notice-on shifting of officers as per reallocation of office spaces at MSO Bldg. Download
153 02-08-2019 Transfer & Posting Against Existing Vacancy. To be taken on roll w.e.f 25/07/2019(F.N) Download
154 02-08-2019 Payment to be made to contractual/Outsourced workers in different departments/organization under GNCTD- non furnishing of information 0.regarding disbursement of wages. Download
155 01-08-2019 Meeting Notice-Celebration of 58th PWD Day,outstanding achievement and meritorious services rendered by the officers and staff of PWD for award of E-in-C Medal and Certificates of Merit. Download
156 31-07-2019 Strengthening of Road No. 58 (Maharaja Surajmal Marg) from RUB Vivek Vihar to Junction of Road No. 72RD(0m to 2220m.). Download
157 30-07-2019 Material for preparation of speech on the occasion of Independence Day - 2019 regarding. Download
158 29-07-2019 Transfer and Posting order of several Junior Engg. (Civil) Download
159 29-07-2019 Regarding enhancement of the annual family income criteria. Download
160 26-07-2019 Transfer/Posting of Junior Engineer(Civil) Download
161 26-07-2019 Construction of Foot Over Bridge at Monastery Market Budh Vihar on Ring Road near ISBT Kashmere Gate under Sub-Division-3 of Division C & ND-Roads,New Delhi(Civil & Elect. Work) Download
162 26-07-2019 Recovery of department dues from M/s Jal Suraksha Engineers. Download
163 24-07-2019 Outstanding achievement and meritorious services rendered by the officers and staff of PWD by E-in-C Medal and Certificates Download
164 24-07-2019 Transfer/Posting in the grade of Executive Engineer(Civil & Elect.) Download
165 24-07-2019 Transfer/Posting of ADG Maintenance Download
166 24-07-2019 Voluntary Contribution towards Construction of additional two floors in existing IRC Building at R.K. Puram, New Delhi Download
167 22-07-2019 Engagement Of Consultants On Contract Basis Download
168 22-07-2019 Transfer and Posting order of AE(Civil) Download
169 22-07-2019 Transfer and Posting order of Deputy Director (Hort.) Download
170 19-07-2019 Quality Assurance Setup. Download
171 17-07-2019 Sanction regarding Strengthing of Pankha road Bhagwan Mahaveer Marg Download
172 17-07-2019 Amended Circular Regarding Cheques and Demand Draft against the License fees, Damage charges etc. of the Govt. quarters, Community Centers, Park Booking etc. Download
173 15-07-2019 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.244.35 Crore for expansion/remodelling of Satyawadi Raja Harish Chandra Hospital into a 773 beded hospital. Download
174 15-07-2019 Strengthening of administration - Periodical reviex under FR 56(j) and Rule 48 of CCS (Pension) Rules, 1972 in respect of Group A Officers. Download
175 15-07-2019 Review exercise undertaken under FR 56(j)/similar provisions-Furnishing of information regarding. Download
176 15-07-2019 Possibility of using available reinforcement bars in I.P. University Project from the site of World Class Skill Centre at Jonapur, South Delhi. Download
177 12-07-2019 Sanction WORKs. Download
178 12-07-2019 The transfer and posting order of surplus staff due to revision of sanction strength (2019-20) yet to be issued by the concerned zone of PWD. Download
179 11-07-2019 Senior Draftman(Civil)-Posting Download
180 10-07-2019 Government Servant to refrain from sharing any information/statement/opinion to the Press/ Social Media. Download
181 10-07-2019 Forwarding of various letters/orders/circulars etc. Download
182 09-07-2019 Meeting Notice - Comprehensive maintenance Ring Road and Outer Ring Road. Download
183 08-07-2019 Information regarding Outsourced-Clerical and Outsourced work-charged-staff employed in various offices in PWD. Download
184 08-07-2019 Circular Regarding Cheques and Demand Draft against the License fees, Damage charges etc. of the Govt. quarters Download
185 05-07-2019 Sanction for Redevelopment of Bipin Chandra Pal Marg, at C.R. Park, New Delhi Download
186 05-07-2019 Sanction for Constructio of RCC Central Verge/ Crash Barrier at Road No.64 (SDN Hospital to DLF More) Tahirpur, Delhi. Download
187 05-07-2019 Minutes of Meeting - A meeting was held under the chairmanship of Engineer-in-Chief Download
188 05-07-2019 Execution of all works of PWD costing more than Rs. 100 Crores on DPC Mode. Download
189 05-07-2019 Transfer / Posting of Junior Engineer (Civil) Download
190 04-07-2019 Celebration of 165th CPWD DAY on July 12, 2019 - Housing Barakhana. Download
191 01-07-2019 Meeting Notice - Performance based tender for comprehensive maintenance. Download
192 01-07-2019 Meeting Notice - Annual Action Plan for the FY 2019-20. Download
193 01-07-2019 Meeting Notice - Outsourced Staff Download
194 01-07-2019 Appointment of Nodal Officer regarding "Fatal Road Accidents Investigation Team". Download
195 01-07-2019 Status of updation of PWD website. Download
196 28-06-2019 Strengthening and other misc. Work on Road No. 64 (from DLF more to SDN Hospital) Delhi. Download
197 28-06-2019 Transfer/Posting of the following E.E. (Civil/Elect.) Download
198 28-06-2019 Forwarding of Various letters/orders etc. Download
199 28-06-2019 Corrigendum regarding circulation letter of Minutes of the 36th Board Meeting of the DBOCWW Board. Download
200 28-06-2019 Using Unmanned Aircraft System (UAS) Download
201 28-06-2019 Indian Medical Association (IMA) is a pan-India voluntary organization of doctors practicing modern system of medicine. Download
202 27-06-2019 Transfer / Posting of Superintending Engineer (Civil) Download
203 27-06-2019 Demand based Training Programmes for state DES Officers / Officials. Download
204 27-06-2019 Strengthening of Road No. 68 (from Road No. 66 T-Point to Junction of Road No. 69). Download
205 26-06-2019 Appointment of Nodal Officer regarding submission of infrastructure projects i.e. Bridges, Flyover, Underpass etc. to DUAC on behalf of PWD, GNCTD. Download
206 25-06-2019 Submission of Progress Report to Directorate of Education Download
207 24-06-2019 Farewell Invitation Download
208 21-06-2019 Organizing of Government Achievements & Schemes Expo - 2019 at Pragati Maidan, New Delhi from 1st to 3rd August, 2019. Download
209 20-06-2019 Allotment List of Type-IV for the month of June 2019 Download
210 20-06-2019 Allotment List of Type-III for the month of June 2019 Download
211 20-06-2019 Allotment List of Type-I for the month of June 2019 Download
212 20-06-2019 Allotment List of Type-II for the month of June 2019 Download
213 19-06-2019 Forwarding of various PUCs received from different Deptts. / Agencies. Download
214 19-06-2019 NOTICE INVITING APPLICATIONS FOR EMPANELMENT OF ARBITRATORS IN PWD, GNCT Delhi Download
215 19-06-2019 Sanction strength for the financial year 2019-20. Download
216 17-06-2019 Notice for presentations to be made by committee for "Performance Based Tender". Download
217 17-06-2019 Valid Registration of 'Principal Employer' under The Contract Labour (Regulation & Abolition) Act 1970. Download
218 14-06-2019 Posting order of Sh. Sanjay Kumar Bansal, Junior Engineer (Civil) Download
219 14-06-2019 Transfer & Posting of Assistant Engineers (Elect.) on Promotion. Download
220 14-06-2019 Transfer & Posting of Assistant Engineers (Elect.) on Ad-hoc promotion. Download
221 14-06-2019 Transfer & posting order of Assistant Engineer (Civil) Download
222 12-06-2019 Prog. No. A-255: Workshop on "RTI Act. - Focused Analysis of the Law of Information & Challenge before PIO while Implementation the Act. & Landmark Decision of CIC & Prevention of Sexual Harassment of Women at Workplace" From 11th to 13th July 2019, at New Delhi. Download
223 11-06-2019 Rotational Transfer/Readiness List of Asst. Acct. Officer in PWD Download
224 10-06-2019 Valid Registration of Principal Employer under the Contract Labour (Regulation & Abolition ) Act 1970. Download
225 07-06-2019 Temporarily posting of SUPERINTENDING ENGINEERS (CIVIL) Download
226 06-06-2019 Forwarding of various letters/orders etc. Download
227 06-06-2019 List of Advocates for the District Courts of Delhi Download
228 04-06-2019 Distribution of works under Chief Engineer other works. Download
229 04-06-2019 Improvement of riding surface of flyovers namely Nand Nagri Flyover, Loni Flyover, Gokalpuri and Khajuri Gol Chakkar Flyover on Wazirabad Road (Road No. 63 & 59). Download
230 04-06-2019 Sanction Strength for the financial year 2019-20. Download
231 03-06-2019 Additional charge of Principal chief Engineer Download
232 03-06-2019 Additional charge of DD Download
233 03-06-2019 Scheme for Promotion of Adventure Sports & Similar Activities amongst Central Government Employees - Programmes to be organized by Youth Hostel Association of India. Download
234 03-06-2019 Additional charge of Principal chief Engineer - Date change Download
235 31-05-2019 Transfer and Posting in the grade of Chief Engineer Download
236 31-05-2019 Readyness list of A.E. Civil & Electrical Download
237 31-05-2019 Reconstitution of Transfer/Posting of Junior Engineer (Civil & Elect.) and S.O.(Hort.) and Hard Case Committee for redressal of grievances of transfer/posting of junior Engineers (Civil & Elect.) and S.O. (Hort.). Download
238 31-05-2019 Details Required of PIO's and FAAs under various officers in PWD. Download
239 31-05-2019 NOTICE INVITING APPLICATIONS FOR EMPANELMENT OF ARBITRATORS IN PWD, GNCT Delhi Download
240 30-05-2019 One Day Training Program on 'Architectural Hardware in Buildings' on 11th June, 2019 at IBC HQ, Sector VI, R.K. Puram, New Delhi - 110022 - Postponed to 14th June, 2019. Download
241 29-05-2019 Contributiom/Donation for CPWD officer's wives Association for families of CPWD who are in distress. Download
242 29-05-2019 Next Online Bidding for Type-I,II III & IV in June, 2019 Download
243 28-05-2019 C/o Residential Complex for Judicial Officers Quarters at Sector-19, Dwarka, New Delhi. Download
244 27-05-2019 Mode of Execution of Maintenance Works Download
245 24-05-2019 Executive Development Program --- Call for Nominations Download
246 24-05-2019 Notice for presentation on "Performance based Tender" Download
247 23-05-2019 Forwarding of various PUCs received from different Deptts. / Agencies. Download
248 22-05-2019 C/o Residential Complex for Judicial Officers Quarters at Sector-19, Dwarka, New Delhi. Download
249 20-05-2019 Availability of "Surplus Excavated Earth" at site of South Asian University, Maidan Garhi, Chattarpur, New Delhi. Download
250 20-05-2019 Disposition list of LDCs and UDCs in Northern Region Download
251 17-05-2019 Information Brochure 2019-20 of WRDM, IITR for PG Admission Download
252 16-05-2019 Forwarding of various PUCs received from different Deptts. / Agencies. Download
253 16-05-2019 Complaint against procurement of desktop computers, printers and other accessories. Download
254 13-05-2019 Removal of M/s BCC Developers & Promoters Pvt. Ltd., Class-I contractor (Composite) from the approved list of Class-I Contractor (Composite). Download
255 13-05-2019 Notice for presentations on "Redistributed Sanctioned Strength" in various PWD Unit. Download
256 08-05-2019 Online submission of proposals of departments seeking exemption of ECI under MCC Download
257 08-05-2019 Forwarding of letter Download
258 08-05-2019 Forwarding of various letters Download
259 08-05-2019 Regarding violation of MCC and other election related issues Download
260 06-05-2019 Forwarding of various PUCs received from different Deptts. / Agencies. Download
261 06-05-2019 Highlighting the achievements & schemes of Delhi Government through 'Government Achievements and Schemes Expo - 2019'. Download
262 06-05-2019 Notice for presentations to be made by Committee for "Performance Based Tender" Download
263 06-05-2019 Presentation for 77 Corridors & 100 Intersections. Download
264 03-05-2019 CORRIGENDUM - WORK DISTRIBUTION Download
265 02-05-2019 One Day Training Program on Architectural Hardware in Buildings on 11th June,2019 at IBC HQ, Sector VI,R.K.Puram, New Delhi-110022 Download
266 02-05-2019 The Ministry of Water Resources, River Development and Ganga Rejuvenation, Government of India will Organize 6th India Water Week - 2019 (IWW-2019) during September 24th-28th, 2019 at Vigyan Bhawan, New Delhi. Download
267 30-04-2019 Modified Corrigendum Download
268 29-04-2019 Grievances of workers Meeting Regarding. Download
269 29-04-2019 Regarding Creation of posts of Technical Officers and enhacement in the post of Assistants. Download
270 26-04-2019 Grievances of Workers Download
271 25-04-2019 Modified setup of salary DDOs Download
272 22-04-2019 Revised schedule of presentations to be made by various officers (PWD). Download
273 22-04-2019 Mid Term Session and Seminar on "Construction Management Tools, Modern Technologies and Materials in Built Environment" on June 21-22,2019 at Pune. Download
274 18-04-2019 3 Days PWD Web Training on Joining PWD from CPWD for Assistant Engineer (Civil) and Assistant Engineer (Elect.) Download
275 18-04-2019 Regarding Approved Post Download
276 16-04-2019 Advisory for departments sending proposals for consideration of the Screening Committee constituted for examining cases requiring clearance from ECI. Download
277 16-04-2019 Transfer/Posting of shri Rajeev Saxena EE(Elect.), west Electrical Division, PWD (on Ad-hoc promotion) Download
278 15-04-2019 On promotion of Sh. Anil Kumar Ahuja is hereby posted in PWD Download
279 12-04-2019 Deployment of PWD officials for single Window System in office of the RO's-General Election to the Lok Sabha, 2019. Download
280 12-04-2019 Deployment of PWD officials for single window system in office of the RO's- General Election to the Lok Sabha, 2019. Download
281 12-04-2019 Deployment of PWD officials for single window system in office of the RO's- General Election to the Lok Sabha, 2019. Download
282 12-04-2019 The staff deployed on Election Duty for the General Election to Lok Sabha-2019 Download
283 12-04-2019 Modified setup of salary DDOs Download
284 12-04-2019 Divisions of housing along with remaining works, records and staff are merged with Education Project Divisions Download
285 11-04-2019 Regarding implementation of code of conduct Download
286 11-04-2019 Violation of the Model code of Conduct Download
287 09-04-2019 Forwarding of various PUCs received from different Deptts./ Agencies Download
288 09-04-2019 Issue of administrative approval & expenditure sanction Download
289 08-04-2019 Non-compliance of Model Code of Conduct Download
290 08-04-2019 For providing departmental contents, articles and photographs for Magazine "DILLI" in Hindi Language Download
291 05-04-2019 Redistribution of sanctioned strength among different units of PWD Delhi. Download
292 04-04-2019 Reallocation of office spaces at MSO Bldg.under occupation of PWD. Download
293 03-04-2019 All for CEs and CEs PWD make it convenient to attend the above presentations. This is as per instructions of E-in-C. Download
294 03-04-2019 Presentations to be made by Committees formed for efficient functioning of affairs of PWD, Delhi. Download
295 03-04-2019 Corridor improvement of Outer Ring Road from IIT to NH-8 & its influence areas: Construction of (1) Flyover on portal Structure linking Existing Munirka Flyover in the East to the point beyond Army RR Hospital in the West on the Outer Ring Road and (2) Underpass at junction of BJ Marg and inner Ring Road. Download
296 02-04-2019 Notice for presentations to be made by Committees formed for efficient functioning of affairs of PWD, Delhi. Download
297 01-04-2019 Transfer/Posting of Asstt. Administrative officer- Mr Sanjeev Mathur Download
298 01-04-2019 Notice for presentations to be made by Superintending Engineers. Download
299 01-04-2019 Notice for presentations to be made by Chief Engineers. Download
300 29-03-2019 Meeting of all stake holders to implement ECI guidelines/regarding "defacement of public/govt.property". Download
301 29-03-2019 Temporary Posting order of Additional Director General (ADG) Download
302 29-03-2019 Violation of the Model Code of Conduct Download
303 28-03-2019 General Election to Lok Sabha,2019 and General Election to the legislative Assemblies of Andhra pradesh, Arunachal Pradesh, Odisha & Sikkim and Bye-election to fill the clear vacancies in Assembly Constituencies of various States-Grant of Paid Holiday Download
304 28-03-2019 Non-Compliance of model code of conduct Download
305 27-03-2019 Additional charge arrangement Download
306 26-03-2019 Instruction regarding forwarding of proposals directly to CEO-Delhi office by various departments/agencies/PSUs for approval/clearance/NOCs etc. viz. NIT, Tenders, award of works etc Download
307 26-03-2019 Senior Draftsman(Civil) is posted in the office. Download
308 25-03-2019 List of Development/ construction works - regarding General Elections to Lok Sabha, 2019. Download
309 25-03-2019 Sh. P.S. Chauhan, Assistant Engineer (Civil), the Engineer-in-Chief, PWD has allowed him to continue on his temporary posting order issued vide No. NO.-27(2)/PWD/E-in-C/Director/2019-953 (H) dated 22.02.2019 Download
310 25-03-2019 Sh. Nourti Ram Tardaka, Assistant Engineer (Civil), the Engineer-in-Chief, PWD has allowed him to continue on his temporary posting order issued vide No. NO.-27(2)/PWD/E-in-C/Director/2019-953 (H) dated 22.02.2019 Download
311 22-03-2019 No state guest facility to ministers/non- officials visiting gujrat due to model code of conduct. Download
312 22-03-2019 The staff posted in the office of the Returning Officer 07-SDPC District Magistrate (South) on diverted capacity or requistioned under Section 159 of Representation of the People Act. Download
313 20-03-2019 3 Days PWD Web Training on joining PWD form CPWD for Assistant Engineer(Civil) and Assistant Engineer (Elect.). Download
314 19-03-2019 General Election to the House of the People (Lok Sabha) 2019 Download
315 19-03-2019 Sanctioned of Post Download
316 18-03-2019 Installation and supply of equipment for open gym Download
317 18-03-2019 Transfer and Posting order of AE(Civil) Download
318 15-03-2019 General Election to Lok Sabha-2019-Implementatiom of Model Code of Conduct Download
319 15-03-2019 General Elections to Lok Sabha, 2019 Download
320 15-03-2019 Regarding outsourcing of security services/Engagement of Civil Defence Volunteers. Download
321 15-03-2019 List of Development/construction works-regarding General Elections to Lok Sabha, 2019. Download
322 14-03-2019 Street Scaping of Ring Road from AIIMS to Ashram-5.30 Kms. Download
323 13-03-2019 Enforcement of Model Code of Conduct - NOC for publication of public notices/tender notices/display advertisement and jingles/TVCs for airing/broadcast of government advertising thereof. Download
324 13-03-2019 Immediate action to be taken for enforcement of Model Code of Conduct after announcement of General Election to House of the People(Lok Sabha) 2019. Download
325 13-03-2019 Cancellation of transfer order in respect of sh. Vijay Singh AEE(Civil) Download
326 13-03-2019 Temporary order in respect of Sh. Rajeev Saxena EE (Elect.) Download
327 12-03-2019 Immediate action to be taken enforcement of Model Code of Conduct after announcement of General Elections to House of the People (Lok Sabha), 2019 and State Legislative Assemblies in the States of Andhra Pradesh, Arunachal Pradesh, Odisha and Shikkim and certain bye-elections-regarding. Download
328 12-03-2019 General Election to Lok Sabha 2019 - Press Note, ECI's Instructions and regarding Screening Committee for MCC Download
329 12-03-2019 General Election to Lok Sabha 2019 - Press Note and ECI's Instructions Download
330 08-03-2019 Transfer / Posting order of Assistant Engineer (Civil) Download
331 08-03-2019 Transfer / Posting order of Assistant Engineer (Civil) Download
332 05-03-2019 Transfer / Posting order of Assistant Director (Hort.) Download
333 05-03-2019 Transfer / Posting order of Assistant Engineer (Elect.) Download
334 05-03-2019 Transfer / Posting order of Executive Engineer (Civil) Download
335 05-03-2019 Transfer / Posting order of Superintending Engineer (Elect.) Download
336 01-03-2019 Additional Charge of Dy. Director (Vig.) to Sh. K.A. Mohamad Mohideen EE (P). Download
337 28-02-2019 Transfer/Posting Order of Assistant Engineers (Civil). Download
338 28-02-2019 Modification in General Conditions of Contract (GCC) -2014. Download
339 28-02-2019 Regarding request for nominations - MCRHRDIT Capacity Building programmes. Download
340 28-02-2019 Corrigendum regarding circulation letter of Minutes of the 36th Board Meeting of the DBOCWW Board Download
341 27-02-2019 Mode of Execution of Maintenance Works. Download
342 27-02-2019 Transfer/Posting order of Sh. H.D. Kanswal , Accounts Officer. Download
343 26-02-2019 Transfer/ Posting order of Smt. Harvinder Kaur, Office Superintendent. Download
344 22-02-2019 Diversion Of one Subdivision from the O/o EE, Education, East & North East to O/o EE, Education, South & South East. Download
345 22-02-2019 Transfer / Posting Order of Assistant Engineers (Civil) Download
346 22-02-2019 Transfer / Posting Order of Assistant Engineers (Elect.) Download
347 20-02-2019 Declaration of Head of Office in the O/o Engineer-in-Chief , PWD and O/o the Pr.Chief Engineer (Project), PWD. Download
348 20-02-2019 Temporary Posting order of Executive Engineers (Civil). Download
349 20-02-2019 Meeting of Medical Committee convened on 25-02-2019 Download
350 20-02-2019 Re-designation and redistribution of jurisdiction of Project Units in PWD. Download
351 18-02-2019 Temporarily Posting of Sh. Manoj Kumar Sonkar , SE(Elect.) Download
352 18-02-2019 List of J.Es( Elect.) Working in P.W.D. Delhi As on 31-01-2019. Download
353 18-02-2019 Incentive scheme for original Hindi notation / drafting in government functioning. Download
354 15-02-2019 Regarding outsourcing of security services. Download
355 15-02-2019 Special (no-Free) invitation:8th annual conference on Bridges,Flyovers and Elevated MRTS Structures. Download
356 15-02-2019 Temporarily Posing Order of Assistant Director (Hort.) Download
357 15-02-2019 1st National Conference on Traffic Technologies at CAPT Bhopal (BPR&D) on 21st & 22nd February,2019. Download
358 14-02-2019 Compilation of information relating to SCs/STs/OBCs employees sought by Govt. of India. Download
359 14-02-2019 Regarding Supply, installation,testing and commissioning of CCTV surveillance system including Comprehensive Maintenance at Tihar , Rohini and Mandoli Prison Complex for the year 2018-19 to 2023-24. Download
360 13-02-2019 Resurfacing of (1) Road along A- block Jhilmil,and (2) ESI Hospital Road (3) Shiva Khand Road (4) Road along B- block Jhilmil (5) Sant Lal Gupta Marg (6) Road from Booster pumping Station (7) Link Road,under Sub-Division M-2112. Download
361 13-02-2019 Temporary order in respect of Executive Engineer(Elect.) Download
362 13-02-2019 Surplus/Availability of RCC twin Duct. Download
363 13-02-2019 Additional charge of CE(Health). Download
364 13-02-2019 Transfer/ Posting Order of JE(Civil). Download
365 13-02-2019 Formation of Committees for efficient functioning of affairs of PWD,Delhi. Download
366 12-02-2019 Forwarding of various Letters. Download
367 11-02-2019 Transfer/Posting Order of Assistant Engineer (Civil). Download
368 06-02-2019 Exercise of Powers by Project Managers in the grade of Superintending Engineer. Download
369 06-02-2019 Transfer/Posting Order of Sh. Parveen Chander Tandon,Office Superintendent Download
370 06-02-2019 Transfer/Posting Order of Executive Engineer (Elect.) Download
371 06-02-2019 Additional charge of Dy. Director (N.I) Download
372 04-02-2019 Transfer/Posting order of Senior Draftsman (Civil). Download
373 01-02-2019 Transfer / Posting Order of JE (Civil) Download
374 01-02-2019 Re-distribution of Charge Download
375 31-01-2019 23rd Edition of International Engineering and technology Fair (IETF) 2019, 3-5 February 2019 at Pragati Maidan,NEW Delhi. Download
376 31-01-2019 Transfer / Posting Order of Assistant Engineer (Civil). Download
377 29-01-2019 Renovation of Room No. 23 & Room No. 16 in Forensic Science Laboratory Building, Rohini, Delhi Download
378 29-01-2019 Executive Training Programme for Building Professional on "External Cladding Systems" to be held on 26th & 27th February 2019 at IBC HQ, Sector-VI, R.K. Puram, New Delhi, being organized by Indian Building Congress (IBC). Download
379 28-01-2019 Construction of Foot Over Bridge with staircase and lift for pedestrian crossing near Mohan Singh Market at Tamil Sangam Marg (Road ID No. 141) New Delhi . Download
380 28-01-2019 Construction of Foot Over Bridge with staircase and lift for pedestrian at Baba Gang Nath Mandir on Nelson Mandela Marg , New Delhi . Download
381 28-01-2019 Forwarding of Circulars regarding various Workshops. Download
382 28-01-2019 Transfer posting order of EE . Download
383 25-01-2019 Transfer / Posting Order of Chief Engineers (Civil) Download
384 25-01-2019 Transfer / Posting Order of Assistant Executive Engineer (Civil) Download
385 24-01-2019 Sh. Sushil Kumar Bali, Assistant Engineer (Civil) was posted in Office of Spl. Commissioner (Road Safety), GNCTD Transport Department and Sh. Sunil Kumar, Assistant Engineer (Civil) is temporarily posted in the Office of Engineer-in-Chief, PWD as Assistant Engineer (Plg.) Download
386 24-01-2019 Transfer / Posting Order of Sh. Ashok Kumar, Office Superintendent Download
387 22-01-2019 Forwarding of Various Circulars. Download
388 22-01-2019 Forwarding of various Advisory/Circular/Letters. Download
389 21-01-2019 Strengthening of Wazirabad Flyover and Slip Road under Sub-Division-1 of PWD C&ND Roads, New Delhi. Download
390 21-01-2019 Construction of 66 feet Libaspur Gurudwara Road including providing street light fittings. Download
391 18-01-2019 Transfer/ Posting order of AEE(Civil). Download
392 17-01-2019 National Workshop on Central Public Procurement Portal (CPPP), New Delhi on 21st January, 2019. Download
393 17-01-2019 Implementation of e-office effectively in your office and to send the status of e-office implementation directly to Deptt. of Information Technology under intimation to this office. Download
394 17-01-2019 Additional charge of Sh. Ashok Kumar Meena EE(Elect.) Download
395 17-01-2019 Additional Charge of EE(Elect.) Download
396 16-01-2019 Transfer / Posting Order of Superintending Engineer (Civil) & (E&M). Download
397 16-01-2019 Transfer / Posting Order of Assistant Engineers (Civil). Download
398 16-01-2019 Transfer / Posting Order of Executive Engineer (Civil). Download
399 16-01-2019 Readiness list of JE (Civil) in PWD and rotational transfer from Road unit to Building unit & Vice Versa Download
400 14-01-2019 Transfer & Posting of Shri Shyam Singh, AD(H). Download
401 14-01-2019 Forwarding of Various letters. Download
402 11-01-2019 Additional charge of F.O. Download
403 10-01-2019 Transfer / Posting order of EE (Civil) Download
404 09-01-2019 Temporary Posting of Chief Engineer. Download
405 09-01-2019 Temporary Posing Of Superintending Engineer(Civil) & E(&M). Download
406 09-01-2019 Additional Charge of Flyover Elect. Division F13. Download
407 09-01-2019 Temporary Posing of Sh. Amrik Singh,Office Superintendent. Download
408 09-01-2019 Re-designation and redistribution of jurisdiction of Project Units in PWD. Download
409 08-01-2019 Taking on Payroll Download
410 08-01-2019 Additional charge of EE(Elect.) Download
411 08-01-2019 Allotment List of Type-I for the Month of December 2018 Download
412 08-01-2019 Allotment List of Type-II for the Month of December 2018 Download
413 07-01-2019 Allotment List of Type-III for the month of December 2018 Download
414 07-01-2019 Forwarding of Various Letters/Orders/MoM. Download
415 07-01-2019 Transfer / Posting Order of Assistant Engineers (Civil) Download
416 07-01-2019 Transfer / Posting Order of Executive Engineer (Civil) Download
417 04-01-2019 Disposal facility of silt at Village Singhola (Khampur/Tikri) near DJB sewage treatment plant for temporary disposal of silt. Download
418 04-01-2019 Transfer/Posting Order of Office Superintendent. Download
419 03-01-2019 Posting Of Sh. S.S.Dagar in Place of Sh. Manoj Kumar. Download
420 03-01-2019 Presentation of Products. Download
421 03-01-2019 Allotment List of Type-IV for the month of December 2018 Download
422 03-01-2019 Allotment List of Type-IV for the month of December 2018 Download
423 02-01-2019 Construction of Foot over Bridge with staircase and lift for pedestrian at Moti Lal Nehru Camp, Outer Ring Road (Road ID-776), New Delhi. Download
424 31-12-2018 Additional charge of charge of E-in-C. Download
425 31-12-2018 Construction of Foot over Bridge with staircase and lift for pedestrian at Rao Tula Ram Marg near Petrol Pump New Delhi. Download
426 31-12-2018 Renovation/ up-gradation of One room for Teacher Training in 58 schools of DoE(Non-Pilot Schools), the list of 58 schools enclosed herewith. Download
427 28-12-2018 Minutes of Meeting Download
428 28-12-2018 Petition of SHRI RAJIV PATHAK FLAT NO-169 NEW PRIYADARSHINI CGHS PLOT NO-19 SECTOR-05 DWARKA NEW DELHI DELHI-110075 Download
429 28-12-2018 Workshop on 1. "Public Procurement,E-Procurement,Govt. e-Marketplace(Gem)&PFMS" From 17th to 19th Jan 2019. 2. "Accounts&Administration" From 7th to 9th Feb.2019. Download
430 27-12-2018 Forwarding of Various letters/orders/Circulars/endorsements etc. Download
431 26-12-2018 Transfer / Posting Order of Assistant Director (Horticulture) Download
432 21-12-2018 Transfer / Posting Order of Assistant Accounting Officer Download
433 21-12-2018 Transfer / Posting of AE(Civil). Download
434 21-12-2018 Transfer / Posting of Sh. Shiv Kumar Mishra EE(Elect.) Download
435 21-12-2018 Transfer / Posting of Executive Engineer(Civil). Download
436 21-12-2018 Street Scaping of Ring Ring Road from Mayapuri to Moti Bagh Junction,Delhi. Download
437 21-12-2018 Street Scaping and Beautification of road,Road no.41& 41-A from Wazirpur Depot Crossing (NSP) to Rithala Metro Station. Download
438 21-12-2018 Improvement of Sewadham Road from road No.-63 to UP Border Delhi. Download
439 21-12-2018 Street Scaping of Shivdaspuri Marg and Patel Road (from Moti Nagar T-Point to Pusa Road about), Delhi. Download
440 21-12-2018 Street Scaping and beatification of Vikas Marg No. 75A & 75B Laxmi Nagar Chungi Karkari More during 2018-19. SH: Black top road and footpath, development drainage, signage, rain water harvesting,land scaping, civil structures and other Misc. personal work. Download
441 21-12-2018 Street Scaping and beatification of Narwana Road Mother Dairy to Punch Mahal Niwas-2.30.Kms. Download
442 20-12-2018 Transfer Posting of JE(Civil). Download
443 20-12-2018 Jaipur Productivity Center, Jaipur is pleased to announce its 113th Residential Programme on "Emotional Intelligence for Managerial & Personal Effectiveness " from February 11-15,2019 at Hotel La Paz Gardens,Vasco-da Gama. Download
444 20-12-2018 Transfer / Posting of Executive Engineer (Civil). Download
445 19-12-2018 Additional Charge of Sh. Mathura Prasad, Chief Engineer(Civil). Download
446 19-12-2018 Minutes of Meeting. Download
447 19-12-2018 Office Order of Sh. Arun Kumar,Office Superintendent. Download
448 18-12-2018 Transfer / Posting order of Dy. Director (Hort.) Download
449 18-12-2018 Transfer / Posting order of EE (Civil) Download
450 17-12-2018 Street Scaping and beautification of Road No. 43 from Britannia Chowk to Outer to Ring Roads,West Enclave,Pritampura,Delhi(except RD 2100 to 2600 Sample stretch) Download
451 13-12-2018 Strengthening of Road including Repair of Footpath of Satguru Ram Singh (Road no. 36) Marg from Mayapuri Chowk to SD Public School under PWD Division West Road-2 Sub Division WR-21 During 2018-19 Download
452 13-12-2018 Preliminary Estimate for Construction of Underpass along Mathura Road at Ashram Chowk for of A/A & E/S. Download
453 13-12-2018 Preliminary Estimate for Construction of Bridge on Najafgarh Drain at Basaidarapur alongwith road improvement on either side of bridge drainage scheme,footpath etc for accord of A/A &E/S. Download
454 12-12-2018 Nomination of Delegates for 23rd Annual Convention & National Seminar" Rapid Building Construction-Emerging Technologies" to be held on 28-30 December,2018 in Patna. Download
455 12-12-2018 Office Order of Director(Hort.). Download
456 12-12-2018 Additional charge of (Health) Mathura Prashad . Download
457 12-12-2018 Office Order of AD (Hort.) Download
458 12-12-2018 Office Order of Sh. Nand Lal, Executive Engineer(EE) Civil. Download
459 12-12-2018 Office order of (FN) Janardan Sharma(EE) . Download
460 12-12-2018 Office order of AD(Hort.) Download
461 12-12-2018 Office Order of EE(Elect.) Download
462 12-12-2018 Office Order of Sh. Raj Kumar Assistant Director(Hort.) Download
463 11-12-2018 Preparation of files of T.B.R.(Standing Order). Download
464 10-12-2018 Additional charge of PM F-5 to CPM F-1 on EL,leave . Download
465 07-12-2018 Periodical Review under FR 56(J) and Rule of CCS Pension Rule 1972. Download
466 06-12-2018 AEs(C/E) & JEs (C/E) of CPWD presently posted in PWD. Download
467 06-12-2018 Request for Nomination in Two day workshop on "Contract Management, Arbitration & Dispute Resolution" on 10th & 11th January 2019 at Hotel Le Meridian,New Delhi-110001 Download
468 04-12-2018 "REPAIR AND REHABILITATION OF CONCRETE STRUCTURES INCLUDING WATERPROOFING MATERIALS AND TECHNIQUES" 23-25 JANUARY 2019 AT NCB- HYDERABAD. Download
469 04-12-2018 Invitation to praticipate and nominate delegates for GeoSmart India 2019, 11-13 February,Hotel Pullman,New Delhi. Download
470 04-12-2018 December 19-20: Secretary,Ministry of Housing and Urban Affairs to speak at 3rd Conference on Affordable Housing in India. Download
471 03-12-2018 Adjustment of LTC Bills. Download
472 30-11-2018 Training Programme on "Durability & Service Life Design of Concrete Structures" to be held at NCB-Ballabgarh from 11-12 December 2018. Download
473 30-11-2018 One day Conclave on "Use of Technical textfile,Fly & C&D waste in Civil construction. Download
474 30-11-2018 Two days tecnical training workshop on "Construction Quality Control & Site Inspection" 9th & 10th January,2019 - Mumbai , 11th&12th January,2019 - New Delhi. Download
475 29-11-2018 Workshop on "Inspection,Investigation and Repair/Rehabilitation of Bridgs and Flyovers" to be held at Chennai on 8th and 9th December 2018 Request for nominate Delegates. Download
476 29-11-2018 Next Online Bidding for Type-I,II III & IV in December, 2018 Download
477 28-11-2018 Additional Charge of CPM Health. Download
478 28-11-2018 Transfer / Posting order of Cheif Engineer (North) Download
479 28-11-2018 Nomination of Delegates for 23rd Annual Convention & National Seminar Rapid Building construction & Emerging Technologyies to be held on 28-30 December, 2018 in Patna. Download
480 27-11-2018 Construction of Foot over Bridge at Metcalf House Main Gate of Ring Road under Sub-Division-3 of Division CND-Road,New Delhi Download
481 22-11-2018 Forwarding of various letters/orders/Circulars/endorsements. Download
482 22-11-2018 implementation of the recommendations of the Seventh Pay Commission regarding(i) Introduction of Dress Allownace in place of Uniform/Stitching/Washing Charge,etc. and(II) Revision in rates of Cycle(Maintenenace)Allownace. Download
483 20-11-2018 Minutes of Meeting held in the O/o Hon'ble Minister of PWD for proper repair of roads under jurisdiction of PWD by 15.12.18 Download
484 20-11-2018 Maintenance and Upkeep of PWD Roads Download
485 16-11-2018 For compliance of timeline of 10 days for acceptance of goods/service for procurement through GeM portal-reg. Download
486 16-11-2018 Office Order Of Assistant Engineers (Civil). Download
487 16-11-2018 Transfer /Post Order of Office Superintendents in PWD. Download
488 16-11-2018 Residential "Development for Office Secretaries, Personal Assistants & Office Staff,Focus: e- Age" from January 07-11,2019 at Hotel Lapaz Gardens, Vasco-da-Gama(Goa). Download
489 16-11-2018 Workshop on Leadership,Team Behavior and Stress Management from 28th to 30th No. 2018. "RTI Act and Sexual Harassment of Woman at Workplace Act" from 13th to 15th Dec.2018. Download
490 15-11-2018 Implementation of the recommendation of 7th on CPC on over Time Allowance. Download
491 15-11-2018 Information pertaining to Insurance of Govt. vehicles/Staff Car in pursuance of meeting held on 07.03.2018 and 19.06.2018 Download
492 14-11-2018 Transfer Posting Order of Assistant Director (Horticulture). Download
493 14-11-2018 Additional Charge Of Chief Engineer. Download
494 12-11-2018 Providing and fixing of split type Air Conditioner in newly constructed Port Cabin in Biology and Chemistry Division at Forensic Science Laboratory Building,Rohini,Delhi. Download
495 12-11-2018 Providing porta-cabin on the roof of 1st floor near room no.201 at Forensic Science Laboratory Building,Rohini, Delhi . Download
496 09-11-2018 Implementation of Transfer and Posting orders in the grade of Assistant Engineer(Civil) Download
497 06-11-2018 Transfer / Posting Order of AE (Civil) Download
498 05-11-2018 Transfer Posting Order of AE(Elect.) Download
499 05-11-2018 Transfer Posting Order of AE(Civil) Download
500 02-11-2018 Transfer Posting Order of AE(Civil) Download
501 02-11-2018 NOTICE INVITING TENDER Download
502 01-11-2018 Minutes of Weekly Review Meeting on 29.10.2018 Download
503 01-11-2018 ATR REG Cabinet Decision No.2652(Item-2) dated 18.10.2018-Minimum rates of wages for outsourced workers/Staff deployed in various Departments of Govt. Of NCT of Delhi. Download
504 31-10-2018 Transfer/Posting Order Of EE(Elect.). Download
505 30-10-2018 Forwarding of Various Letters / Orders Download
506 29-10-2018 International Course on Dissemination of HDM-4-Reg.Nomination. Download
507 29-10-2018 Works to be financed from Central Road Fund Administrative approval of one work amounting to Rs.42.21 Cror for "Construction of bridge on Supplementary drain on NH-10 Nangloi,Delhi to cover Complete width of 60 m with road improvement in 100 m length on either of bridge including making of drainage scheme,footpath etc.(after dismantling the existing bridge)during financial Year 2018-19 in the NCT of Delhi Download
508 29-10-2018 Transfer/Posting order of EE(Civil). Download
509 29-10-2018 Tranfer/Posting order Of EE(Civil). Download
510 26-10-2018 Observance of Vigilance Awareness week 2018-Intractive Session on 29th October, 2018 at 11:30 AM in the Conference Room of Engineer-in Chief,PWD,GNCTD. Download
511 26-10-2018 Minutes of Weekly Review Meeting on 22.10.2018 Download
512 26-10-2018 Transfer Posting of AE(Civil). Download
513 26-10-2018 Transfer Posting Of Sh. Madan Lal Azad, EE(Civil). Download
514 23-10-2018 Regarding Payment of Bonus to Outsourced Staff. Download
515 23-10-2018 Providing and fixing of railing on central verge at Mall Road from Kingsway Camp Chowk to Azadpur H Point under Sub Division NR-12 Download
516 23-10-2018 Providing & fixing of jersey Barrier and other Minor Engineering Works at Princess Road from Model Town I Red Light to PCR Gate under Sub Division NR-12 Download
517 23-10-2018 Providiing and Fixing of steel grill in the central verge at Shah Alam Bandh road from rotary to G.T..Road under Sub Division NR-11 Download
518 23-10-2018 International Seminar on "Construction and Rehabilitation of Rigid Pavement - Current Practice and way Forword" to be held at india Habitat Center,New Delhi on 18-19 January,20-19 Download
519 23-10-2018 The information related to the records available in the office as a result of the spread in the Public Works Department. Download
520 22-10-2018 Inviting Tender Download
521 22-10-2018 Forwarding of various Letters/Endorsements/Circulars. Download
522 22-10-2018 Notice of Implementation Units for the Annual Plan of Year 2019-20 Download
523 22-10-2018 Presentation of High Performance Speciality Chemicals. Download
524 18-10-2018 Construction of Foot over Bridge with staircase and lift for pedestrian across Aurobindo Marg (ID-96) Near Mosque/Church,New Delhi. Download
525 18-10-2018 Revoking the Suspension of Business of M/S Sethi Construction in East Zone,PWD. Download
526 18-10-2018 Assistant in Architectural Department are Posted Download
527 18-10-2018 Status of Delhi Govt. Buildings/Hospitals/Dispensary/Police Stations regarding Accessibility requirement for persons with disabilities Download
528 17-10-2018 Transfer/Posting of (JE). Download
529 17-10-2018 Training Programme on "Repair and Rehabillation of Concrete Structurees including Water Proofing Materials and Tecniques" to be held at NCB-Ballabgarh from 14-16 November 2018 Download
530 17-10-2018 Improvement of drainage System on GT Road from Ghanta Ghar to Najafgarh Drain,Delhi under Sub Division-2 C&ND-R. Download
531 17-10-2018 Preliminary estimate for construction of bridge on Supplementary Drain on NH-10,Nangloi,Delhi to cover complete width of 60m with road imrovement in 100meter length on either side of bridge including making of drainage scheme,footpath etc. complete(after dismantling the exisiting bridge. Download
532 16-10-2018 Transfer/Posting Assistant in Architectural Department. Download
533 16-10-2018 Transfer/Posting Of Sinior Draftman(Civil). Download
534 16-10-2018 Minutes Of Weekly Review Meeting on 15-10-2018. Download
535 15-10-2018 Training on New Feature/Facility on PWD Portal. Download
536 15-10-2018 Transfer / Posting order of Assistant Engineer (Civil) Download
537 15-10-2018 No Dig India show 2018 International conference & Exhibition on Advancing Trechless Standarization. Download
538 15-10-2018 Residential programme on Transformation Leadership change Management from December 17-21-2018 at Udaipur. Download
539 15-10-2018 Corrigendum Download
540 15-10-2018 Transfer / Posting order of Senior Draftsman Download
541 12-10-2018 POWERS TO APPOINT PRIVATE ARCHITECTS/CONSULTANTS. Download
542 12-10-2018 Administrative approvel and expenditure Section. Download
543 12-10-2018 MLALAD Scheme. Download
544 12-10-2018 Approved Panel of Arbitrators. Download
545 12-10-2018 CORRIGENDUM TRANSFER & POSTING oF AE(Civil) Download
546 11-10-2018 Minutes of Weekly Review meeting on 08.10.2018 Download
547 11-10-2018 Submission of Monthly Account in text file shape to PAO-22. Download
548 09-10-2018 Regarding Deduction on TDS on GST. Download
549 08-10-2018 Rain Water hervesting structures (RWH) as per DJB/NGT orders at Deen Dayal Upadhyaya Collage,Sector-3 Dwarka,New Delhi-110078 Download
550 08-10-2018 Forwording of Letters/Orders/Circulars. Download
551 08-10-2018 Guidelines for deduction and deposit of TDS by the DDOs under GST Law. Download
552 05-10-2018 Preliminary Estimate for the work: Electrification in Porta Cabin at Dr. Bhim Rao Ambedkar Collage,Wazirabad Road, Delhi-110094. Download
553 05-10-2018 Installation of Rain Water Harvesting system in Acharya Narendra Dev Collage, Govindpuri,Kalkaji, New Delhi-110019 during 2018-19. Download
554 05-10-2018 EOR to Acharya Narendra Dev Collage, Govindpuri,Kalkaji, New Delhi During 2018-19( SH: Annual white wash,painting and other repair works) Download
555 05-10-2018 Minutes of First Review Meeting on 01.10.2018 Download
556 05-10-2018 Readiness List of Office Superintendent completing three or more years in present office on 31.08.2018 Download
557 04-10-2018 List of Participant for Arbitration Training Program on 5th & 6th Oct, 2018. Download
558 04-10-2018 CORRIGENDUM TRANSFER & POSTING AE(Elect.). Download
559 04-10-2018 Request for delegate nomination: Eighth Annual Confrance on Operation,Maintainance and Tolling in the Road Sector, November 13-14 at Le Meridian,New Delhi. Download
560 04-10-2018 Advistory Guidelines for execution/maintanance of Horticulture works in PWD. Download
561 04-10-2018 TRANSFER & POSTING AE(Cvil) Download
562 03-10-2018 Invitation to Asia largest integrated shows on Traffic infratech Expo and parking infratech expoBombay Exhibition centre mumbai at 10:00 AM October 25-27-2018. Download
563 03-10-2018 Panel of Arbitrators. Download
564 03-10-2018 Guidlines for deduction and deposit of TDS by the DDOs under GST Law. Download
565 28-09-2018 Additional Charge of Mr. P.K. Parmar. Download
566 27-09-2018 GPS attendance "PWD Online" Mobile App. Download
567 27-09-2018 Rudiment Consultancy Service - Two Days Workshop on "Construction Quality Control & Site Inspection " October 2018 Download
568 26-09-2018 Frowarding of letters/orders/Circulars. Download
569 26-09-2018 Huge Balance lying Outstanding under Deposit Heads of the Division. Lapsed Deposits not Credited into Government Account. Download
570 26-09-2018 Huge Balances lying Outstanding under Deposit Heads of the Divisions. Download
571 26-09-2018 Lepsed deposits not credited into Government Account. Download
572 26-09-2018 Presentation of uPVC doors and windows. Download
573 25-09-2018 Constitution of a committe to supervise, the construction/renovation work carrid out by PWD & DTTDC from the initial stage to handling over/taking over the building of Govt. School. Download
574 25-09-2018 Consultant Appoinment Committe reconstituted . Download
575 25-09-2018 Hard Case Committe for redressal of grievances in respact of transfer and posting of Engineers of PWD. Download
576 25-09-2018 WORKSHOP ON "RESERVATION IN SERVICE" FROM 11th to 13th OCTOBER,2018 "PUBLIC PROCUREMENT,E-PROCUREMENT,Govt. e-Marketplace(Gem)" FROM 25th to 27th OCTOBER, 2018 Download
577 25-09-2018 TRAINING PROGRAMME ON "DESIGN CONSTRUCTION AND QUALITY CONTROL PRACTICE FOR CONCRETE ROADS FOR HIGHWAY & LOW VOLUME ROADS" TO BE HELD AT NCB-BALLABGARH FROM 23-25 OCTOBER 2018. Download
578 25-09-2018 Two Days Executive Development Programe on "PLANING,DESIGN,INTALLATION OPRATION AND MAINTENANCE MANAGEMENT OF HVAC SYSTEM IN BUILDINGS" ON 28-29,November,at IBC HQ,Sector VI,R.K. Puram, NewDelhi-110022 Download
579 24-09-2018 Post of Cheif Engineer (Elect.) from O/o CPM (Hiegher Education) is diverted to O/o Health Maintanance Zone. Download
580 24-09-2018 Issue of Administrative Approval & Expenditure Sanction Download
581 24-09-2018 Transfer / Posting Order of Assistant Engineer (Elect.) Download
582 24-09-2018 Comprehensive Test on Manual of office procedure(MOD) for 2018 Download
583 24-09-2018 Transfer / Posting Order of Executive Engineer (Civil) Download
584 24-09-2018 List of Permissible Works as per existing Guidlines 2012. Download
585 24-09-2018 Excess expenditure incurred over allotted budget by various Divisions of PWD and I&FC (IAR in r/o Pay & Accounts Officer No. XXII, Govt. of NCT of Delhi, MSO Building, I.P. Estate, New Delhi for the period 2012-13 to 2016-17 Download
586 20-09-2018 ADDITIONAL CHARGE OF CE NORTH A.K PANDIT TO CE SOUTH SH VEER SAIN Download
587 20-09-2018 Transfer/Poisting of the Following EE (Civil). Download
588 20-09-2018 HINDI DIVAS AYOJAN - 24/09/2018 at 4PM. Download
589 20-09-2018 TRANSFER/POSTING OF THE AE(CIVIL). Download
590 19-09-2018 Forwording of letters/orders/Curculars. Download
591 18-09-2018 Training-cum-orientation programme for the cheque Drawing DDos on 20.09.2018. Download
592 18-09-2018 Comprehension Test on Right to Information Act, 2005 for 2018 Download
593 17-09-2018 International Conference on Innovation in Concrete to meet Housing and Infrastructure Challenges"from 19-22 Sept 2018 at Bangalore. Download
594 14-09-2018 Deligation of Administrative powers to Director Horticulture Download
595 14-09-2018 Two days Training Course on practical use of FIDIC Conditions of Contracts on 28th&29th September 2018 at Raunaq Room,PHD Chamber Of Commerce and Industry,New Delhi. Download
596 13-09-2018 Notice Inviting Tender Download
597 13-09-2018 Construction of flyover at Shastri Park Intersection (6 lane) and Seelampur (2 lane). SH: Ramps, Footpath, Road Work including Road Signage, Street Light works, Drainage & allied works. Download
598 13-09-2018 Strengthening of D B Gupta Road between Kalka Das Chowk to Ajmeri Gate under SRD Division II, Sub Division-I, New Delhi during 2018-19. Download
599 13-09-2018 Backfilling Material Download
600 13-09-2018 Strengthening of D B Gupta Road between Kalka Das Chowk to Anand Parbat T-Point under SRD Division II, Sub Division-I, New Delhi during 2018-19. Download
601 12-09-2018 Proposal for emotional wellness campaign(free workshop) Download
602 12-09-2018 Joining of Sh. Raj Singh Gaget Posted as AE(P), O/o CCTV,WiFi, Street Light against. Download
603 12-09-2018 Review of Expenditure as on 31.08.2018. Download
604 12-09-2018 Charge of OSD to Sh. Sanjeev Rastogi. Download
605 12-09-2018 110th Residential Programme on "Finance for Non Financial Officials/Managers" form November 12-16,2018 at Hotal Lapaz Gardens, Vasco-da-Gama(Goa). Download
606 12-09-2018 2-Day Non-Residential Training Programme on "CORROSION IN REINFORCED CONCRETE STRUCTURES AND ITS REMEDIAL MEASURES" 01-02 November 2018 at NCB-Hyderabad. Download
607 11-09-2018 Call For Nomination-11th CIDC VISHWAKARMA AWARDS 2019 Download
608 11-09-2018 Forwording of letters/Endorsement/Orders. Download
609 11-09-2018 Office Memorandum (Systemetic Improvment no.8/2018) Download
610 11-09-2018 Presentation of Asian Paints Limited . Download
611 10-09-2018 Forwording of letters/orders. Download
612 10-09-2018 Supplying,Installation,Testing and Commissioning of CCTV Cameras in Delhi. Download
613 10-09-2018 Construction of Boundary Wall of Vacant Land at Karawal Nagar. Download
614 10-09-2018 Admission to the 13th Batch (2918-19) of one year (Part-time) Post Graduate Diploma course in Disaster Preparedness and Rehabilitation,affiliated to Guru Govind Singh Indraprastha University(GGSIPU),Delhi. Download
615 10-09-2018 Safty Convention 2018 on Safty Challenges of MSME Sector during September 26-28,2018 at New Delhi. Download
616 07-09-2018 S.I.T.C. of self contain drinking water cooler SATYAWADI RAJA HARISHCANDRA HOSPITAL. Download
617 06-09-2018 Regarding use of Government vehicle. Download
618 06-09-2018 Technical Paper on "Use of Recycled Asphalt material for sustainable road construction". Download
619 05-09-2018 To ensure expenditure within allotted budget and to maintain Financial discipline . Download
620 05-09-2018 Audit Paras printed in the Audit Report of the controller and auditors general of India pertaining to the year March, 2006 to March,2016 and during 2016 . Download
621 05-09-2018 Transfer/Posting of Office Superintendent. Download
622 04-09-2018 Fwd: Defect Liability/Maintenance Period for the National Highways and centrally sponsored Road & bridge work to be implemented on EPC mode_Amendment-reg. Download
623 04-09-2018 Residental programme on Knowledge management From October 22-062018 at Jaipur. Download
624 04-09-2018 Vigilance An Eagle Eye to Curb Curruption From 24th September, 2018to28th September 2018 to Goa. Download
625 04-09-2018 Revision of rates of Licence Fee on Up gradation of Type-IV of Residential (General Pool) Accommodation of PWD Govt. og NCT of Delhi. Download
626 04-09-2018 Use of Govt. Vehicle irrespective of number of charges they are holding. Download
627 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort) Download
628 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
629 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
630 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
631 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
632 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
633 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
634 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
635 31-08-2018 Periodical Review under FR 56(J) in respect of Group 'B' Gazetted & Non-Gazetted officers i.e.AE(civil & Elect.), AD (Hort), JE (Civil & Elect) & SO (Hort). Download
636 30-08-2018 Information pertaining to Insurance of Govt. vehicles/Staff Cars in Pursuance of meeting held on 07.03.2018 and 19.06.2018. Download
637 30-08-2018 Nirman of Upargam Setu on Shastri Park Chaurahe. Download
638 30-08-2018 Monthly Expenditure Report of Capital Works of Hospitals, AAMC & Health Projects. Download
639 30-08-2018 ExpenDiture management and rationalization of expenditure. Download
640 30-08-2018 Transfer & Posting Executive Engineers(Civil). Download
641 30-08-2018 Administrative approvel and Expendature sanction For Rs. 168.58 Crore for remodelling of 94 Delhi Govt. Dispensaries into polyclinic. Download
642 29-08-2018 Revision of rates of Licence Fee on Up gradation of Type-IV of Residential (General Pool) Accommodation of PWD Govt. of NCT of Delhi Download
643 29-08-2018 Administrative approvel and Expendature saction for of Rs.168.58 Crore for remodelling of 94 Delhi Govt Dispensaries into polyclinic. Download
644 29-08-2018 Readiness list of Office Superintendent completing three or more years in present on 31.08.2018. Download
645 28-08-2018 Nomination of Delegates for 79th Annual Session of the Indian Roads Congress to be held at Nagpur (Maharastra)from 23rd to 26th November 2018. Download
646 28-08-2018 Training Programme On "Cement and Concrete Construction practices for Effective Redressal of Custmer Complaints" to be held at NCB-Ballabgarh from 18-20 September 2018. Download
647 28-08-2018 Request for Nomination of sutable officers/officials for MBA (Disaster Management) Weekend programme by CDMS, Guru Gobind Singh Indraprastha University. Download
648 28-08-2018 Training WorkShop SUbsurface Utility Engineering Detection& Mapping of UnderGround Utilities September 18-19,2018 NAC Grounds, Cyberabad,Hyderabad, India. Download
649 28-08-2018 Sanction Order for Rs. 1,7023659/-(Rs. One Crore Seventy Lakh Twenty Three Thousand Six Hundred Fifty Nine Only) for Providing Stacker and Puzzle Car Parking System in Phase-II Building of MAIDS. Download
650 28-08-2018 Sanction Order for Rs. 14,18,500/-(Fourteen Lakh Eighteen Thousand Frive Hundred Only) for Vertical Garden in Phase-II Building of MAIDS under Hort. Sub Div Health-III, Hort. Div. Health, PWD, New Delhi dg.2018-19 Download
651 28-08-2018 Expenditure management and rationalization of Expenditure. Download
652 28-08-2018 Regarding various Hindi competitions 2018-19 Download
653 28-08-2018 Transfer / Posting Order of Executive Engineer (Elect.) Download
654 28-08-2018 Amendment in Delhi Allotment of Government Residences (General Pool) Rules 1977 Download
655 28-08-2018 Delhi Allotment of Government Residences (General Pool) (Amendment) Rules, 2018 Download
656 27-08-2018 Release of 2nd installment of funds of Rs. 186.48 crore, from UDF , for the project of construction of integrated Transit Corridor Development . Download
657 27-08-2018 Transfer/Posting of AD(Hort.)/Div.-VI. Download
658 27-08-2018 Transfer/Posting Of CE Health(M). Download
659 24-08-2018 Invitation of Entries for IBC Award for Excellence in Built Environment -2016-17 Download
660 24-08-2018 Forwarding of letters/orders. Download
661 24-08-2018 Forwarding of various Letters/Circulars/Endorsements etc. Download
662 24-08-2018 E-RTI Online Training Program Dated 28.08.2018 at 2:00 to 5:00 PM Download
663 24-08-2018 Imparting training for sensitising PWD (GNCTD) Staff/Officers regarding Accessibility Requirements for person with disability. Download
664 24-08-2018 Transfer / Posting Order of Assistant Administrative Officers (on promotion) Download
665 23-08-2018 Transfer& Posting Of Assistant Engineers. Download
666 23-08-2018 Readiness list of Assistant Engineer (civil/Elect.)as on 31.08.2018. Download
667 23-08-2018 Schedule for Imparting Traning for sensitising PWD (GNCTD) Staff / Officers regarding accessibility requirements for person with disabilities. Download
668 23-08-2018 Transfer/Posting in r/o Assistant Executive Engineer(Civil). Download
669 21-08-2018 Forwarding of letters / orders. Download
670 21-08-2018 Policy on the shifting of HT (11 KV ,33KV &66KV) / LT400V) Electricity Transmission Lines posting threat to human lives - Modification of Cabinet decision No.1588 dated . 09.11.2009 thereof. Download
671 20-08-2018 Schedule for Imparting Training for Sensitising PWD (GNCTD) Staff/Officers regarding Accessibility Requirments for Persons with Disabilties Download
672 16-08-2018 Hindi usage promotion month 2018 ayojan Download
673 16-08-2018 Transfer/Posting in r/o Assistent Engineer. Download
674 16-08-2018 Holiday on 17th August 2018 Download
675 14-08-2018 The unclaimed malba lying on Public roads is to be removed by the Municipal Corporation Download
676 14-08-2018 Review of outcome Budget (2018-19)-1st Quarter June April to June 2018-use of Mobile App for monitoring of PWD Projects. Download
677 14-08-2018 Huge Balances lying Outstanding under Deposit Heads of the Divisions. Download
678 14-08-2018 Lapsed Deposits Not credited into Government Account. Download
679 14-08-2018 E-RTI Online Training Program Dated 28.08.2018 at 2.00 to 5.00 PM Download
680 14-08-2018 Hugh Balances lying outstanding under Deposit Heads of the Divisions. Download
681 14-08-2018 Transfer / Posting order of Executive Engineers and Assistant Engineers. Download
682 14-08-2018 Outstanding Deposits in r/o divisions upto the month of March 2017.(AGCR Para no.4 and internal Audit Para no.2) Download
683 13-08-2018 Submission of monthly Account in text file shape to PAO-22. Download
684 13-08-2018 Redevlopment of Chandni Chowk Road in between Lal Jain Mandir to Fateh Puri Mosque 'Redevlopment of Chandni Chowk Project' Download
685 13-08-2018 Procedure/SOP for release of Grant-in-Aid under Centrally Sponsored Schemes. Download
686 10-08-2018 International seminar on "Earthquake/wind resilience in Bldg and bridge with vibration control - base isolation and dampers "during 14th & 15th September 2018 Download
687 10-08-2018 Information regarding payment due summary for transaction on GeM. Download
688 10-08-2018 Transfer/Posting of Assistent Engineer. Download
689 09-08-2018 Transfer posting order of Special Secretary. Download
690 09-08-2018 Seeking support on nominations for" CIO-eGLP" from 23rd Aug. to 2nd Sep. 2018. Download
691 09-08-2018 Refresher Course on "Concrete Bridge Design wring code of practice for Concrete Road Bridges (IRC 112)" Starting from 18th August 2018. Download
692 09-08-2018 Implementation of "The Construction and Demolition Waste Management Rule-2016" - regarding Download
693 09-08-2018 Minutes Of Meeting Issues related to Digging & Restoration of Roads. Download
694 08-08-2018 Renovation of Medical Record Department (MRD) in GIPMER . Download
695 08-08-2018 Replancement of old/outlived power factor panel at Sub-Station-1,2 and 3 in GIPMER. Download
696 08-08-2018 UP-gradation of LAN networking system for NKN internet at Registration counter at GIPMER. Download
697 08-08-2018 Transfer / Posting of AE(Elec.) Download
698 08-08-2018 Allotment List of Type-II for the Month of July 2018 Download
699 08-08-2018 Allotment List of Type-I for the Month of July 2018 Download
700 07-08-2018 Allotment List of Type-III for the month of July 2018 Download
701 06-08-2018 Reasonable Rent Certificate for Govt. Building of NCTD. Download
702 06-08-2018 Impanelmentation of "The Construction and Demolition Waste Management Rules 2016" Download
703 06-08-2018 Regarding GPF Statement for the year 2017-18 Download
704 06-08-2018 Transfer / Posting order of Sh. Anil Rastogi Download
705 03-08-2018 Allotment List of Type-IV for the month of July 2018 Download
706 03-08-2018 Allotment List of Type-IV for the month of March 2018 Download
707 03-08-2018 Allotment List of Type-IV for the month of July 2018 Download
708 03-08-2018 Additional Charge of SE (East) Download
709 03-08-2018 Release fo Funds for Execution of works under the MLALAD Scheme i.e. "Strengthening and Augmentation of Infrastructure i.e. Roads, Streets, Localities, Street Lights etc. in each Assembly Constituency" for the year 2018-19 (during 6th Vidhan Sabha) Download
710 03-08-2018 A/A & E/S of Rs. 42,664/- towards surface dressing and cleaning of Property No. 7/55, Church Road, Jwala Nagar, Shahdara, Delhi for opening of Polyclinic. Download
711 03-08-2018 Transfer / Posting Order of Assistant Engineer (Civil) Download
712 01-08-2018 Watch and ward of Govt. Land at Dheerpur Pocket H2 (C) Delhi during 2018-19. Download
713 01-08-2018 Watch and ward of Govt. Land / Plot at Satbari, Bahapur & Sector-19, Dwarka, New Delhi during 2018-19. Download
714 01-08-2018 Guidelines/ Norms for access permission to Fuel Station and Properties along National Highways- amendments. Download
715 31-07-2018 Nomination Sh.P.K.Parmar, CPM(flyover) , PWD for the Technical Committee constitude by Board of Directors, DTTDC. Download
716 30-07-2018 Notice Inviting Tender Download
717 30-07-2018 Regarding condition assessment and recommendations on Repair & Restoration Measures of FSL Building (4 Storey) at Sector-14, Rohini, Delhi. Download
718 26-07-2018 Construction of bridge and its approaches over River Yamuna downstream of existing bridge of Wazirabad Delhi . Download
719 26-07-2018 Review of Expenditure Download
720 26-07-2018 Usages of C&D Recycled Materials for Construction Activities by the PWD in the NCT of Delhi. Download
721 26-07-2018 Workshop on 1. Technical Workshop on "Implementations of 7th CPC & Allied Matters" From 23rd to 25th August, 2018. 2. "Leadership, Team Behaviour and Stress Management" from 6th to 8th September, 2018. Download
722 25-07-2018 Forwarding of various Letters/Circulars/Endoresements etc . Download
723 25-07-2018 Regarding IGI Airport , Terminal-1,Terminal-2 and Terminal-3 , including Aerocity , New Delhi . Download
724 24-07-2018 Transfer/posting of AAO Download
725 24-07-2018 Transfer/Posting of AAO Download
726 24-07-2018 A/A & E/S for the work "Detailed Feasibility Study and geometric design for construction of ROB/RUB on Cost-sharing basis on Railway crossing No. LC-12(Delhi-Ambala line) on Khera Kalan to Khera Khurd Road . Download
727 23-07-2018 Manual Scavengers and their Rehabilitation Rules 2013. Download
728 23-07-2018 Manual Scavengers and their Rehabilitation Rules 2013.(part-2) Download
729 23-07-2018 Modification in guidelines for approval of Non-ISI new products . Approval of RMC plants in CPWD . Download
730 20-07-2018 Regarding IGI Airport , Terminal-1,Terminal-2 and Terminal-3 , including Aerocity , New Delhi . Download
731 20-07-2018 Delegation of Powers to Chief Engineer - Regional Officer (CE-RO)/SE-RO/ELO at MoRT&H Regional Office - Clarification -Regarding . Download
732 19-07-2018 Decided to transfer / posting Office Superintendent (on promotion) Download
733 17-07-2018 Providing and installation of Uninterupted Power supply (UPS) System for RoomNo. 10 to Room No. 13 at Forensic Science Laboratory Building, Rohini, Delhi. Download
734 17-07-2018 Residential Development Programme for office Secretaries personal Assistants & office Staff, Focus: e-Age from September 05-9-2018 at Hotel Lapaz Gardens, Vasco-Da-Gama (Goa). Download
735 17-07-2018 Transfer / Posting Order of Assitant Engineers (Civil) Download
736 17-07-2018 Transfer / Posting Order of AE (Civil) Download
737 17-07-2018 Residential development programme for office secretaries personal assistants & office staff , focus . e- Age from September 05-09-2018 at Hotel Lapaz Gardens,Vasco-dohama (Goa ) Download
738 16-07-2018 Revision rate of Licence fee of the Govt. of Delhi Residential (General Pool) Accommodation with w.e.f. 01.07.2017 Download
739 16-07-2018 Administrative approval and Expenditure saction for Construction of new Hopital at Burari at the cost of Rs. 265.80 Crore (Revised) Download
740 16-07-2018 Transfer / Posting Order of Office Superintendent (on promotion) Download
741 13-07-2018 Submission of Monthly Expenditure through E-Lekha. Download
742 12-07-2018 Minutes of the 3rd Meeting of Expenditure Finance Committee for the Financial Year 2018-19held on July 6, 2018 at 11:30 A.M. - Corrigendum Download
743 11-07-2018 Public private partnerships (PPP) in Urban Infrastructure and service Delivery August 09-11,2018. Download
744 11-07-2018 Minutes of the meeting of the Council of Ministers dated 03.07.2018 Download
745 11-07-2018 Regarding Zone-wise Desilting report. Download
746 11-07-2018 Proposal for insertion of additional points in the proposal for amendment of existing Guideline for Member of Legislative Assembly Local Area Development Scheme (MLALADS) 2012 Download
747 11-07-2018 Invitation of tender for execution of Works on National Highways and Centrally Sponsored Road Projects Download
748 11-07-2018 Transfer / Posting Order of Assistant Engineers Download
749 11-07-2018 Two days Conference & Exhibition on "Cable Supported Structures (Building and Bridges)" to be held on 13th & 14th July, 2018 at The Royal Plaza Hotel, Ashok Road New Delhi, being organized by Indian Concrete Institute, New Delhi Centre (ICI-NDC). Download
750 11-07-2018 Minutes of the 3rd Meeting of Expenditure Finance Committee for the Financial Year 2018-19 held on July 6, 2018 at 11:30 A.M. Download
751 09-07-2018 34th National Convention of Environmental Engineers & National Seminar On "Environmental Pllution and Climate Change" during August 10-11-2018 at New Delhi. Download
752 09-07-2018 Traning Programme on Quality Control and Quality Assurance in Cencrete Construction including Extreme Wearher Concreting" to be held at NCB-Ballabgarh from 06-10 August 2018. Download
753 06-07-2018 A Seminar on "Environmental Protection and Safety during Construction" to be held on 13th & 14th July 2018 at Main Auditorium, India International Center, Max Mueller Marg, New Delhi, being organized by International Road Federation (IRF). Download
754 06-07-2018 Quarterly Review of Expenditure 2018-19 Download
755 06-07-2018 Participation in the workshop on ""Noise Pollution Control - "Silence Speaks Volumes"- regarding. Download
756 05-07-2018 Transfer / Posting Order of Assistant Architect Download
757 05-07-2018 Transfer / Posting Order of Assistant Director (Official Language) Download
758 05-07-2018 Change from Rigid to Flexible pavement in on-going Contracts. Download
759 05-07-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs. 172.79 Crore for addition & remodelling works at Bhagwan Mahavir Hospital at Pitampura, New Delhi. Download
760 04-07-2018 Minutes of First Monday Review Meeting. Download
761 04-07-2018 Presentation for Reinforcement steel of Shyam Steel Industries Ltd. Download
762 04-07-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.172.03 Crore for construction of Hospital Block at Guru Gobind Singh Govt. Hospital at Raghubir Nagar , New Delhi. Download
763 04-07-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs. 194.91 Crore for expansion/ remodelling of Dr Baba Shahib Ambedkar Hospital Rohini , New Delhi. Download
764 04-07-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs. 117.78 Crore for construction of Trauma Center & Utility Block at Sanjay Gandhi Memorial Hospital at Mangolpuri, New Delhi. Download
765 04-07-2018 Replacement of the existing old conventional type HPSV lamp streel light on PWD roads by energy efficient LED lamp street fittings adopting the ESCO mode - reg. Download
766 04-07-2018 Two Day Executive Training Program for Building Professionals on "Internal Cladding Systems" on 18-19 July, 2018 at IBC HQ, Sector VI R.K. Puram, New Delhi -11022. Download
767 04-07-2018 Relieving of Junior Engineers on transfer. Download
768 04-07-2018 Transfer posting of office superintendents on promotion in PWD Download
769 03-07-2018 Utilization of recycled C&D product-status. Download
770 03-07-2018 Replacement of the existing old conventional type HPSV lamp street light on PWD roads by energy efficient LED lamp street fittings adopting the ESCO mode. Download
771 03-07-2018 Forwarding of drawings online for approval of local body/DUAC/Fire NOC. Download
772 02-07-2018 Disposal of Construction & Demolition waste and utilization of recycle material. Download
773 02-07-2018 Payment of Processing Fee of C&D Waste at C&D waste Plant Shastri Park in EDMC. Download
774 02-07-2018 MINUTES OF MEETING regarding progress of de-silting under the chairmanship of Hon'ble Minister PWD , Goverment of NCT of Delhi in his Confrence Room at level 7th , Delhi Secertariat, I.P. Estate, New Delhi. Download
775 02-07-2018 Appointment of Consultant for Comprehensive Consultancy Service for Planning, Designing and Development of New Campus of Ambedkar University Delhi (PAHSE-I Works) at Dheerpur, Delhi-110059 Download
776 02-07-2018 Minutes of meeting held in the Conference Hall of the Principal Accounts Office, A-Block, Vikas Bhawan, I.P. Estate, New Delhi on 21.06.2018 at 07:00 PM. Download
777 28-06-2018 Quarterly Review of Wxpenditure, 2018-19 Download
778 28-06-2018 Minutes of the meeting held in the Conference Hall of the Principal Accounts office, A-Block, Vikas Bhawan, I.P. Estate, New Delhi on 21-06-2018 at 04:00 PM Download
779 28-06-2018 Regarding null and void of the sanction order dated 26/04/2018 for installation of DFMD, HSND and Advance Ex-Ray Bag Scanner in Forensic Science Labouratory Rohini, Delhi-110085 Download
780 27-06-2018 Draft Model EPC Bidding Document for Construction Sector by NITI Aayog Download
781 27-06-2018 Prohibit use of laser beams by an individual , group of persons, organizers, owners, occupiers and/ or employee of Banquets, Hotels, Restaurants, Buildings and land in different celebrations/ events or otherwise in the jurisdiction of Sub-Division of Palam, IGI Airport, New Delhi. Download
782 25-06-2018 Central Flood ontrol Room of Irrigation and Flood Control Department. Download
783 25-06-2018 Minutes of inter-sectoral co-ordination committee meeting for prevention & control of vector borne diseases convened under Chairmanship of Dy. Commissioner, South Zone. Download
784 25-06-2018 Regarding "Deposit Work Procedure" (for Minor Works) with PWD-allotment of funds to PWD Divisions under Head Non-Plan (Minor Works), during the current financial year 2018-19 Download
785 22-06-2018 Next Bidding for Type-I to IV in July, 2018 Download
786 22-06-2018 Online Bidding for Type-I,II III & IV in July, 2018 Download
787 22-06-2018 Next Online Bidding for Type-I,II III & IV in July, 2018 Download
788 22-06-2018 Procurement of universally designed construction material, accessories and other products. Download
789 22-06-2018 Specification Committee for Wi-fi project in Delhi. Download
790 22-06-2018 Transfer / Posting order of Senior Draftsman (Civil/Elect.) and Draftsman (Civil/Elect). Download
791 20-06-2018 Transfer / Posting order of Executive Engineers (Civil) Download
792 20-06-2018 Minutes of meeting of FOB/Subway Committee was held on 06.06.2018 at 11.00AM under the Chairmanship of Pr. Secretary, PWD at 5th Level, B-wing, Delhi Sectt. Download
793 20-06-2018 Detailed Feasibility study and geometric design for construction of ROB/RUB on Cost-sharing basis on Railway crossing No. LC-12 (Delhi-Ambala Line) on Khera Kalan to Khera Khurd Road. Download
794 19-06-2018 Upgradation and construction of an additional multi-storey building in the premises of Forensic Science Laboratory, Rohini, Delhi. Download
795 19-06-2018 Final Report of Delhi Drainage Master Plan. Download
796 19-06-2018 Integrated Transist Corridor Development and Street Network/Connectivity Plan for the corridor/influence zone alongwith detailed design of all intersections and mid-section based on traffic and feasibility studies for the corridor / network (Appointment of feasibility consultant). Name of Corridor sarai Kale Khan to IGI Airport icluding areas covering"Redevelopment of General Pool Residential Accommodation (GPRA) colonies at Kidwai Nagar, Nauroji Nagar, Netaji Nagar, Sarojini Nagar, Mohmmadpur, Thyagrajnagar, Kasturba Nagar & Sriniwaspuri" and AIIMS Trauma Centre in Delhi. Download
797 19-06-2018 Committee to frame SOP/framework for installation, operation, monitoring of CCTVs in public spaces and other related issues. Download
798 19-06-2018 Transfer / Posting Order of Superintending Engineer (Civil) Download
799 19-06-2018 Review of issues of Development and Maintenance of School Infrastructure. Download
800 18-06-2018 DPCC Order regarding air pollution. Download
801 18-06-2018 Option of EEs / AEEs / AEs. Download
802 15-06-2018 C & D West Material Download
803 15-06-2018 Transfer/Posting Order of Executive Engineer(Civil). Download
804 12-06-2018 CSIR-CRRI Training Booklet 2018-19 Download
805 12-06-2018 Upgradation and construction of an additional multi-storey building in the premises of Forensic Science Laboratory, Rohini, Delhi Download
806 08-06-2018 Remodeling of Maujpur Drain from Road No. 66 to Ghonda Chowk and Main Brahmpuri Road Drain, from Ghonda Chowk to MCD Dhalav(Length 4780 mtr). Download
807 06-06-2018 Regarding RMO of Air-Conditioning, comprehensice maintainance of cold Rooms & CCTV System in FSL Building, Rohini, Delhi. Download
808 06-06-2018 Transfer / Posting Order of Executive Engineer (Civil) Download
809 05-06-2018 Regarding RMO of Lifts & R.O Plant in FSL Building, Rohini, Delhi Download
810 05-06-2018 Regarding RMO of Fire Alarm and PA System, FireFighting equipments, Pumping sets, Electric Sub-station & D.G. set in FSL Building, Rohini, Delhi. Download
811 05-06-2018 Transfer / Posting Order of Office Superintendents Download
812 05-06-2018 Minutes of First Monday Review Meeting. Download
813 01-06-2018 Safety measures at project and work sites. Download
814 01-06-2018 Construction of two numbers of vehicular half undepasses between Wazirabad & Jagatpur and one number pedestrian subway near Gandhi Vihar on Outer Ring Road, Delhi. Download
815 31-05-2018 Transfer / Posting order of Executive Engineers (Civil) Download
816 30-05-2018 Widening of IGNOU Road and construction of RCC drain and footpath at IGNOU Road from Z more to M. B. Road T-Point. Download
817 29-05-2018 Presentation Notice Download
818 28-05-2018 Construction of two cluster bus depots including boundary wall at Sector-37,Rohini,Delhi Download
819 23-05-2018 Transfer and Posting Download
820 22-05-2018 For information about the Miss Call facility being provided by the Art Culture and Language Department Download
821 21-05-2018 Construction of rain water harvesting structure in DA Flats, Sindhora Khurd & Gulabi Bagh, Delhi under Sub-division M-3221 & M-3222 Download
822 21-05-2018 Regarding release of fund under MLALAD Scheme - submission of proposals Download
823 18-05-2018 PROCUREMENT OF RMC FOR PWD WORKERS FROM VARIOUS RMC PLANTS. Download
824 18-05-2018 Transfer / Posting of Officer Superintendent - Sh. Sanjay Dua Download
825 18-05-2018 Minutes of the 2nd Meeting of Expenditure Finance Committee for the Financial Year 2018-19 held on May 15,2018 at 11:30 A.M. Download
826 18-05-2018 Transfer and Posting Download
827 17-05-2018 Order from Labour Department GNCTD under DBOCW Rules - 2002 Download
828 17-05-2018 Adoption of DSR-2016 in place of DSR-2014 for Capital Works in GNCT of Delhi. Download
829 17-05-2018 Corrigendum to the sanction order dated 28/03/2018 amounting to Rs. 3,11,050 . Download
830 17-05-2018 Regarding work of MOEI & Fans, Air-conditioning, SVS set CCTV at Regional Forensic Science Laboratory , 7th Floor , Yashwant Place, Chanakyapuri, New Delhi , 2018-19 . Download
831 16-05-2018 Additional Charge of CE South (M) Download
832 16-05-2018 Training Module for disability requirement. Download
833 16-05-2018 Objections/Sufggestions on Draft "Delhi Road Safety Policy" Download
834 16-05-2018 Additional charge of CPM (Education) Project Download
835 15-05-2018 Regarding construction of temporary structure for parking and investigation of vehicles at the plot allotted to FSL at Sector 21 & 23 Rohini, Delhi Download
836 11-05-2018 C/o World Class Skill Centre, Phase- 1 at village Jonpur, South Delhi. Download
837 10-05-2018 Transfer / Posting Order of AE (Civil) Download
838 10-05-2018 Making of Public places like Roads, Parks and Municipal Buildings disabled friendly. Download
839 09-05-2018 Transfer / Posting Order of AE (Civil) Download
840 09-05-2018 Transfer / Posting Order of AE (Elect.) Download
841 08-05-2018 Minutes of First Monday Review Meeting Download
842 08-05-2018 Preliminary estimate of shifting of Electrical Utilities from M.B. Road to Z More at IGNOU Road, New Delhi Download
843 07-05-2018 Minutes of the meeting held in the conference hall of Principal Secretary (UD/Director (Local Bodies) on 25/04/2018 at 4.00 PM Download
844 07-05-2018 Providing wall panelling and florring in Room No. 321 at 3rd floor of Forensic Science Laboratory, Rohini, Delhi. Download
845 07-05-2018 Regarding Installation of DFMD, HSND and Advance Ex-Ray Scanner in Forensic Science Laboratory Rohini, Delhi- 110085 Download
846 04-05-2018 The first Monday Review Meeting shall be held on 07.05.2018 at 11:30 AM in the Conference Room of Engineer-in-Chief,PWD. Download
847 03-05-2018 Transfer/Posting order of EE(Civil) Download
848 02-05-2018 Conferment of powers by 'virtue of office rather than on individual officers by name'. Download
849 02-05-2018 Presentation Notice - held on 03.05.2018 at 03:00 PM in Conference Room of E-in-C Office. Download
850 01-05-2018 Review of Expenditure booked upto 03/2018 for the Fin. Year 2017-18. Download
851 27-04-2018 Revised Policy/Standard Operating Procedure (SOP) w.r.t. road restoration and grant of online permission of Road Digging through PDM software. Download
852 24-04-2018 In pursunance of DG, CPWD order No. 21 of 2018 issue vide No. 28/2/2018-EC,-I(B) dated 09-04-2018 and consequent upon their joining, the transfer/posting in r/o Assistant Executive Engineer (Civil) Download
853 24-04-2018 In pursuance of DG, CPWD order No. 21 of 2018 issue vide No. 28/2/2018- EC,-I(B) dated 09-04-2018 and consequent upon her joining, Ms. Sonali Batta, Assistant Executive Engineer(Elect.) is hereby posted as AE(E), Health Project Elect. Division against existing vacancy Download
854 24-04-2018 In pursuance of DG DG, CPWD order No. 28/23/2017-EC.-I(A) dated 14-03-2018, Sh. Shailendra, Superintending Engineer (Civil) is hereby posted as SE (Civil),South West Circle, PWD against existing vacancy Download
855 20-04-2018 Disposal facility of silt at Village Singhola (Khampur/Tikri) near DJB sewage treatment plant for temporary disposal of silt. Download
856 20-04-2018 Strengthening of various roads and construction of footpath & drain at Authoruty Road Janakpuri,Strengthening of Vedic Marg from Tihar crossing to community hall, B2 Block Sabzi Mandi Road Janakpuri,Mota Singh Marg Janakpuri,Authority Road Janakpuri, Road No. 237 Vikashpuri, Nazafgarh Road to A-71 Rajouri Garden, Ring Road to A-31 Rajouri Garden, 20-Block Tilak Vihar Road, Ashoka Road/Radhaswami Satsang Marg & Tilak Nagar Main Market Road Under PWD Division WR-1,New Delhi.Amounting to Rs. 4,92,81,700/- Download
857 20-04-2018 Transfer / Posting order of EE (Elect.) Download
858 19-04-2018 Readiness list Assistant Engineer (Civil/Elect.) as on 31.03.2018 Download
859 16-04-2018 Relieving officers on transfer. Download
860 16-04-2018 In the matter of Vinod Kumar Jain Vs GNCTD and others OA No. 525/2016 in the National Tribunal Hon'ble Court. Download
861 16-04-2018 In the matter of Vinod Kumar Jain vs GNCTD and others OA No. 525/2016 in the National Tribunal Hon'ble Court. Download
862 16-04-2018 Training Module For Disability Requirement. Download
863 12-04-2018 Allotment List of Type-III for the month of March 2018 Download
864 12-04-2018 Allotment List of Type-II for the month of March 2018 Download
865 12-04-2018 Allotment List of Type-I for the month of March 2018 Download
866 12-04-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.86.31 Crore for expansion / remodelng of Rao Tula Ram Govt. Hospital, Govt. of NCT of Delhi, Jaffarpur, Delhi Download
867 12-04-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.94.38 Crore for expansion / remodelng of Acharyashree Bhikshu Govt. Hopital at Moti Nagar, Delhi Download
868 12-04-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs.55.36 Crore for expansion / Aruna Asaf Ali Hopital, Ashok Vihar, Delhi Download
869 12-04-2018 Providing and placing furniture in waiting area of FSL in Ground Floor of Forensic Science Laboratory, Rohini Delhi. Download
870 12-04-2018 Providing aluminium partition and glass door in reception area and providing & fixing prefab detachable uits on 3rd & 4th floor of Forensic Science Laboratory, Rohini, Delhi. Download
871 12-04-2018 Digitization of Government Payments. Download
872 12-04-2018 Land Acquisition under the National Highways Act. 1956-Reg. Download
873 12-04-2018 Transfer / Posting order of Executive Engineer (Civil) Download
874 12-04-2018 Allotment List of Type-IV for the month of March 2018 Download
875 12-04-2018 Gazetted Holiday Download
876 11-04-2018 Request for nomination of candidate for Training programmes organised by CDMS, GGSIPU on Industrial Security, Safety and Disaster management reg. Download
877 11-04-2018 Regarding Public Hearing timing for General Public Download
878 11-04-2018 Direction u/s 5 of the Environment (Protection) Act 1986, read along with the Construction and Demolition Waste Management Rules, 2016 Download
879 11-04-2018 Forwarding of various Letters. Download
880 06-04-2018 Redistribution of works of Remodeling of Delhi Govt. Hospitals and Dispensaries. Download
881 05-04-2018 Administrative approval and Expenditure sanction for Preliminary Estimate of Rs. 69.36 Crore for expansion/ remodeling of Deep Chand Bandu Hospital, Ashok Vihar, Delhi. Download
882 05-04-2018 Construction of Bridge on Najafgarh drain at Tri Nagar/Inderlok, Karampura and Rampura including road improvement, drainage, footpath etc. Download
883 04-04-2018 Construction of bridge and its approaches over River Yamuna downstream of existing bridge at Wazirabad Delhi. Download
884 04-04-2018 Strengthening of Old D.G. Road (ID: 1169) Samalkha Chowk to Kapashera Border under PWD Div. SWR-II New Delhi during 2017- 18. Download
885 04-04-2018 A/A & E/S for construction of East Delhi Campus of GGSIP University at Surajmal Vihar. Download
886 02-04-2018 Grant of Dearness Allowance to Central Government employees - Revised Rates effective from 1.1.2018 Download
887 02-04-2018 Timeline for March (Prelim.), Supplemantry-I and II dates for 2017-18 Download
888 02-04-2018 Transfer / Posting order of Assistant Engineer (Civil) Download
889 02-04-2018 Transfer / Posting order of Assistant Administrative Officer Download
890 28-03-2018 Construction of Bridge on Najafgarh drain at Tri Nagar/Inderlok, Karampura and Rampura including road improvement, drainage, footpath etc. Download
891 28-03-2018 Exchange of land Download
892 28-03-2018 Organizing of Farewell Function in respect of retiring officials in CPWD (including Work Charged/Regular Classified employees) Download
893 28-03-2018 A/A&E/S for Traffic Decongestion plan of Ring Road & Aurobindo Marg (Around East Kidwai Nagar). Download
894 28-03-2018 A/A & E/S towards payment of cost of allotted additional land of DHS for construction of upcoming Delhi Govt. hospital at Madipur, Delhi Download
895 28-03-2018 Strengthening of Road No. 72 Ext. from Road No. 58 to Vihwas Nagar Nallah and Resurfacing of Road No. 72 from Road No. 58 to Road No. 75B Extn. Under Sub-division M-2112 of Shahdara Maint. Division. Download
896 28-03-2018 Transfer/Posting order of EE(Civil) Download
897 28-03-2018 Timeline for March (Prelim.), Supplemantary-I and II dates for 2017-18 Download
898 27-03-2018 Recarpeting of various roads under U.P. Government in Okhla Constituency. Download
899 26-03-2018 Transport Infrastructure Development Corporation Limited (DTIDC). Download
900 23-03-2018 Filling up the vacant posts of Administrative/Ministerial Posts Issued by CPWD. Download
901 21-03-2018 Visit of Hon'ble Prime Minister of India at Durbar Hall, Hotel Taj Diplomatic Enclave - reg. audit/inspection of construction of temporary structure and electrical fittings and issuance of certificate of stability. Download
902 21-03-2018 Resurfacing of road and improvement of footpath of Urdu Bazar Road from Pared Ground NS Marg to Nukkad Bazar crossing. Download
903 20-03-2018 Resurfacing of road and improvement of footpath of Chandni Chowk road from Lal Jain Mandir to Fatehpuri Mosque. Download
904 20-03-2018 Realiving of Smt. Bhumika Mishra EE(Civil) to CPWD. Download
905 20-03-2018 Smt. Bhumika Mishra EE(Civil) stands Realived from PWD to Join CPWD Today i.e. 20.03.2018 afternoon. Download
906 19-03-2018 Centrally Sponsored Scheme (CSS) for the Development of Infrastructure Facilities for the Judiciary-Release of Central Assistance to the Government of National Capital Territory of Delhi for the year 2017-18 Download
907 19-03-2018 Construction of Hostels etc. for National Law University, Sector-14, Dwarka, New Delhi. Download
908 19-03-2018 Posting of Shri Rajeev Saxena AE (Elect.) as AE office of EE, North West Elect. Division. Download
909 19-03-2018 Posting of Shri. U.C. Mishra, Pr. Chief Engineer (Maintenance) on promotion as ADG. Download
910 19-03-2018 Sanction strength for the financial year 2018-19. Download
911 16-03-2018 Strengthening of Vikas Marg 75A & 75B from Laxmi Nagar to Karkari More during 2017-18(covered area- 79+825 Sqm., Lengh-- 3.1 Km. 6 lane). Download
912 16-03-2018 Strengthening of Road From KApashera Chowk to Bijwasan Flyover (ID: 1171) & Bijwasan Flyover to Najafgarh drain (ID: 1173) under PWD Division SWR- II, New Delhi 2017-18 Download
913 16-03-2018 Strengthening of Narwana Road From Mother Dairy T-Point to Punch Mahal Awas during 2017-18 (covered area- 52,500 Sqm, Length-2.5 Km, 6 lane). Download
914 15-03-2018 Regarding Economy in use of paper. Download
915 14-03-2018 Information of daily report of receipts & expenditure. Download
916 14-03-2018 Revised Proforma for the submission of report of Works awarded from 01.04.2017 to till date of all PWD Divisions (Civil/Electrical/Horticulture). Download
917 12-03-2018 Intimation of daily report of receipts & expenditure. Download
918 12-03-2018 Air Pollution-Covering of construction material-minutes of the meeting of the Pr. Secretaries/Secretaries/HODs Chaired by Cheif Secretary on Friday, 16.02.2018 at 2:30 PM. Download
919 08-03-2018 Modification in procedure for restoration of road cuts made by building proponents for grant of construction permits in three DMCs- Ease of Doing Business. Download
920 07-03-2018 Transfer / Posting order of Executive Engineer (Civil) Download
921 06-03-2018 Next Bidding for Type-I to IV in March, 2018 Download
922 06-03-2018 Regarding recently outlining the measures to be taken for dust mitigation for all construction activities. Download
923 05-03-2018 Transfer / Posting order of Engineer in Chief. Download
924 01-03-2018 Transfer / Posting Order of Dy. Director Horticulture Download
925 01-03-2018 Length of PWD Roads (Category wise)- By Type of Surface as on 31.03.2018 (in kms.) Download
926 28-02-2018 Transfer / Posting order of Office Superintendent Download
927 27-02-2018 Regarding Budget Allotment as on 26.02.2018 / Expenditureas on 15.02.2018 / Modified RE - 2018-18 as on 22.02.2018. Download
928 27-02-2018 Minutes of the 3rd Meeting of Expenditure Finance Committee for the Financial Year 2017-18 held on February 6, 2018 at 11:45 A.M. Download
929 27-02-2018 Minutes of the extended 3rd Meeting of Expenditure Finance Committee for the Financial Year 2017-18 held on February 7, 2018 at 2:00 P.M. Download
930 26-02-2018 Transfer/ Posting of Sh. Rajendra Prasad Bairwa, AE(civil) against Sh.Rajiv Srivastva Download
931 23-02-2018 Transfer / Posting order of Senior Architect (East) Download
932 21-02-2018 Notification issued by Minisry of Environment, Forest and Climate change, New Delhi, 25th January 2018. Rules further to ammend the environment (protection) rules 1986 made by Cenral Government. Download
933 21-02-2018 Strengthening of Madhu Vihar Road (Road No. 57 to Joshi Colony T-Point) and Mandawali Road (House Tax Building to Aggarsain Apartment), at I.P. Extension under PWD East (Road). Download
934 21-02-2018 PWD to carry out civil and electrical works at State Level Resourse Centre located at IEDSS Cell, Lajpat Nagar. Download
935 20-02-2018 ATR on this issues discussed & decided in the meeting dated 21.12.2017 of Committee Public Accounts(PAC) Download
936 20-02-2018 S.I.T.C of CCTV Camera for AEBAS Devices at GIPMER. Download
937 20-02-2018 ISSUE of Administrative Approval & Expenditure Sanction. Download
938 20-02-2018 Regarding Readiness lists in respect of the Sr. Draftsmen and Draftsmen of (Civil & Elect.). Download
939 20-02-2018 Construction of cold room in the department of micrology at GIPMER. Download
940 20-02-2018 Construction of missing drain and footpath from Jhoroda stand to Mungeshpur drain and drains upto Bahadurgarh Border with footpath at Border with Foothpath at Border area under PWD Division SWR-II, New Delhi(ID:1231). Download
941 20-02-2018 Posting of Shree Rajnish Kant AE(Elect.) Download
942 16-02-2018 Use of Recycled Products from Construction and Demolition (C&D) Download
943 15-02-2018 Transfer/Posting Order AE(Civil) Download
944 15-02-2018 Expenditure Details Upto 15.02.2018 Download
945 15-02-2018 Revision of rates of Licence Fee of the Govt. of Delhi Residential (General Pool) Accommodation- Reg Download
946 13-02-2018 Construction of cold room in the Department of Microbiology at GIPMER. Download
947 13-02-2018 Construction of missing drain and footpath from Jhoroda Stand to Mungeshpur drain and drains upto Bahadurgarh Border with footpath at Border area under PWD Division SWR-II New Delhi. Download
948 09-02-2018 Transfer/Posting Order of AD(H) Download
949 09-02-2018 Transfer/Posting Order EE(Civil) Download
950 08-02-2018 Regarding construction of temporary structure for parking and investigation of vehicles at the plot allotted to FSL at sector 21 & 23, Rohini, Delhi. Download
951 08-02-2018 A.E. Civil Transfer Posting. Download
952 07-02-2018 Administrative Approval/Expenditure Sanction for the work of "Shifting of Poles/Laying Underground cable at main Burari Road:-1.Shifting of electrical services at Main Burari Road from authority to Shalimar Place. 2.Shifting of electrical services from transport authority of Bengali Colony" during 2017-18. Download
953 07-02-2018 Readiness lists as appended below of Sr. D/M (Civil & Elect.) and D/M (Civil & Elect.) posted in various Field/Planning unit in PWD. Download
954 06-02-2018 Strengthening of Ring Road from Prembari Pul to Punjabi Bagh Flyover under PWD North West Road-1(covered area 1,13,975 sqm) Download
955 06-02-2018 Maintenance and operation of E & M services of Wet Riser.....in SRHC hospital,Narela, Delhi during the year 2017-18 Download
956 02-02-2018 Instruction of Pr. Secretary, PWD to use provisions taken in RE 2017-18 at an optimum cent percent level. Download
957 31-01-2018 Application of New Products- Water Proofing products of M/s STP Ltd. Download
958 31-01-2018 Construction of FOB for passage from Type-III to Type-IV Quarters, D.A. Flats, Haiderpur, Shalimar Bagh, Delhi. Download
959 30-01-2018 Transfer / Posting order of Assistant Engineer (Civil) Download
960 24-01-2018 C/o Maharishi Valmiki College of Education at PSP Area-IV, adjoining Sector-16, Rohini, Delhi-85 (SH.: Security arrengement for Govt. property/plot). Download
961 24-01-2018 Regarding construction of temporary structure for parking and investigation of vehicles at the plot allotted to FSL at Sector 21 & 23 Rohini, Delhi. Download
962 24-01-2018 Regarding Strengthening of damaged false ceiling in gents and ladies toilet from Ground to 4th Floor of Forensic Science Laboratory, Rohini, Delhi. Download
963 23-01-2018 Recarpeting of various roads under U.P.Government in Okhla Constituency Download
964 23-01-2018 Regarding lighting on Republic Day i.e. 26th January 2018 on Forensic Science Lab,Building, Madhuban Chowk,Sec-14,Rohini,Delhi Download
965 23-01-2018 Regarding provide and installation of electrical accessories in work station at Room No. 220(CFU Division) Forensic Science Lab,Building, Madhuban Chowk,Sec-14,Rohini,Delhi Download
966 23-01-2018 Strengthening of Shamnath Marg along with Improvement of Foothpath, Storm Water Drain, Central Verge etc. from I.P. College Xing to Petrol Pump near Boulevard Road under Sub Division-3 of Division C & ND-Roads, New Delhi Download
967 23-01-2018 Sanction Order Download
968 23-01-2018 Regarding installation rain water harvesting system in the Forensic Science Labarotary, Rohini, Delhi. Download
969 23-01-2018 Joining of Sh. Tripal Singh,AE (Civil) is hereby posted as AE(P), O/o SE(North-East) Download
970 22-01-2018 Intimation regarding settlement of para 6(B) part HB regarding misclassification of expenditure of Rs. 17.33 lakh Download
971 22-01-2018 Outstanding balance of Rs. 14.66 Crore under M.H. 8658 MFPSSA and outstanding balance of Rs. 111.90- Crore under MH 8658 CSSA lying with PWD. Download
972 18-01-2018 Transfer Posting Order of Assitant Director (Hort.) Download
973 17-01-2018 Sanction order for Rs. 5,02,10,669/- (Rs. Five Crore Two Lakh Ten Thousand Six Hundred Sixty Nine Only) for Modular Operation Theatre , MGPS System and Audio Visual in Phase-II Project of Maulana Azad Institute of Dental Sciences. Download
974 16-01-2018 Transfer / Posting Order of Sh. P.K. Parmar Download
975 16-01-2018 Clear the pending dues of DJB within 7 days and submit a compliance report for perusal of CM. Download
976 16-01-2018 Regarding installation of camera and up-gradation of existing CCTV system in the Forensic Science Laboratory, Rohini, Delhi. Download
977 16-01-2018 Strengthening of Najafgarh Bijwasan Road (ID: 1173) from Jhatikra Morh to Chhawla Bridge (total length- 5100 Mtrs). Download
978 12-01-2018 Improvement of road surface of Acharya Shri Tulsi Marg(Mehrauli Gurgaon road)(NH-236) New Delhi.(SH: Re-carpeting and thermoplastic paint (covered area -1,65,000 sqm). Download
979 12-01-2018 Construction of drainage system of main Burani Road from Hiranki Bandh to Amrit Vihar upto Irrigation drain at Swaroop Nagar Road under Sub-Division -1, of PWD Division C&ND Roads, New Delhi(Length-5555 meter). Download
980 12-01-2018 Release of funds under Central Road Fund(CRF) during the 2017-2018 in the State of NCT Delhi Download
981 12-01-2018 Release of funds under Central Road Fund(CRF) during the 2017-2018 in the State of NCT Delhi Download
982 10-01-2018 Transfer posting order of DDH Download
983 10-01-2018 Construction of Foot Over Bridge near kardampuri & Yamuna Vihar on Road No.-66, Delhi(Approximate Length =30.00 Metre) Download
984 10-01-2018 Regarding release of funds from ECC account towards remuneration for deployment of 20 Civil Defence Volunteers and for improvement and maintenance of NMV Lane at S.P. Mukherjee Marg Download
985 09-01-2018 Construction of Foot Over Bridge across Sri Aurobindo Marg at Yusuf Sarai Market (Near Gautam Nagar cut) with staircase and lift for pedestrians. Download
986 05-01-2018 Minutes of First Monday Review Meeting (held on 01/01/2018) Download
987 04-01-2018 Regarding installation of camera and up-gradation of existing CCTV system in the Forensic Science Laboratory, Rohini, Delhi. Download
988 03-01-2018 Transfer / Posting Order of Finance Officer, PWD Download
989 01-01-2018 C/o Foot Over Bridge near Oberoi Hotel at Lajpat Rai Marg, New Delhi. Download
990 01-01-2018 C/o Foot Over Bridge with staircase and lift for pedestrian near Harkesh Nagar on Mathura Road (NH-2), New Delhi. Download
991 01-01-2018 Budget Management Download
992 01-01-2018 Mobile App for registering complaints of potholes and other complaints for repair of road. Download
993 28-12-2017 Transfer / Posting order of Assistant Engineer (P). Download
994 27-12-2017 Clarification on GST regarding. Download
995 26-12-2017 Guidelines for Installation of CCTV camera System for Security Surveillance under MLALAD Scheme Download
996 26-12-2017 Strengthening of Road surface for Outer Ring Road from Modi Mill to Chirag Delhi (Masjid Moth) (Lenght 3.80 Km.,covered area 120360 Sqm) Download
997 26-12-2017 Strengthening of Ring Road from AIIMS to Ashram under Division South East Road-I including Service Road from PG DAV College to Ashram( Length- 4.95 km + 1.54 Km service Road). Download
998 22-12-2017 Redevelopment of Kidwai Nagar (East),New Delhi - 110023 Download
999 22-12-2017 Requirement of RO Systems in Various Departments, GIPMER. Download
1000 22-12-2017 Reimbursement of Outstanding Claim lying with PWD under (Ministry of Surface Transport) amounting to Rs. 35,18,24,036.(AGCR Para No. 01) Download
1001 22-12-2017 Transfer / Posting Order of EE(E) Download
1002 21-12-2017 Budget Management Download
1003 21-12-2017 Improvement and strengthening of M.B. Road from Shastri Park to Khajuri Chowk Delhi (covered area- 78750 Sqm, Length- 3.75 km). Download
1004 21-12-2017 Two day Program on Repair & Rehabilitation of Concrete Structures including Water Proofing Techniques and Materials for Engineering Professionals to be held on 30-31 January , at IBC HQ, Sector VI, R.K Puram, New Delhi- 110022 Download
1005 20-12-2017 List of Approved standing council for court cases. Download
1006 20-12-2017 Transfer / Posting Order of Assistant Engineer (Civil). Download
1007 20-12-2017 Transfer / Posting order of Executive Engineer (Elect.). Download
1008 20-12-2017 Non relieving of Assistant Engineer (Civil & Elect.) transferred out from PWD on completion of tenure. Download
1009 19-12-2017 Improvement and strengthening of Eastern Approach Road from Dharmpura T-Point to ISBT Bridge Delhi(covered area 89,600 Sqm). Download
1010 19-12-2017 Minutes of the 2nd Meeting of Expenditure Finance Committee for the Financial Year 2017-18 held on December 11, 2017 at 11:30 A.M. Download
1011 19-12-2017 Regarding handing over of new project to PWD Download
1012 19-12-2017 Additional Charge of Executive Engineer (Elect). Download
1013 18-12-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1014 15-12-2017 Presentation for safety measures during sewer cleaning. Download
1015 14-12-2017 Adoption of Integrity Pact-Standard Operating Procedure - regarding. Download
1016 13-12-2017 Widening of road from 2 lane to 4 lane and C/o footpath, central verge & drain including horticulture work on Vedic Marg, Hari Nagar, New Delhi. Download
1017 12-12-2017 Reporting of Project Manager(CCTV,Wifi & Street Light) Download
1018 11-12-2017 Transfer / Posting order of Executive Engineer (Elect.) Download
1019 11-12-2017 Irregularities in Vendors Registration in PWD. Download
1020 11-12-2017 PWD Sewa An online Complaint System. Download
1021 11-12-2017 Development of Control Room and Public Complaint Management System as per the directions of Hon'ble Supreme Court. Download
1022 11-12-2017 Minutes of First Monday Review Meeting. Download
1023 08-12-2017 Resurfacing of roads (including all loops and slip roads etc) and misc. Repairs of footpath, railing, signages, i/c Horticulture work at Mukarba Chowk Flyover, Delhi. Download
1024 08-12-2017 Transfer / Posting Order of Assistant Director (Horticulture) Download
1025 08-12-2017 Uploading of daily expenditure for e-lekha. Download
1026 07-12-2017 The transfer/posting of the Assistant Director (Horticulture) Download
1027 06-12-2017 The Rights of Persons with Disabilities Act, 2016 Download
1028 06-12-2017 Filling up the two-three post of retired Engineers of CPWD on deputation basis in Food Safety and Standards Authority of India reg. Download
1029 06-12-2017 Strengthening of Captain Gaur Marg from Modi Mill to Ring Road, New Delhi (SH: Bituminous works, Length 2.15 Km). Download
1030 01-12-2017 Transfer / Posting order of Chief Engineer (Civil) Download
1031 01-12-2017 Transfer / Posting Order of Chief Engineer (Elect.) Download
1032 01-12-2017 Transfer / Posting order of AE (Civil) Download
1033 01-12-2017 Regarding construction of Inter connecting corridor between blocks B & D, GIPMER Download
1034 30-11-2017 Application of New Products. (a). Water Proofing products of STP Ltd. (b). Float Glass of Gold Plus Glass Industry Ltd. Download
1035 29-11-2017 Transfer / Posting order of Sh. Manoj Kumar Mahobia Download
1036 29-11-2017 Transfer / Posting order of Chief Engineer (Civil) Download
1037 28-11-2017 Sign boards on PWD roads. Download
1038 21-11-2017 A/A & E/S of the various Proposals received from PWD. Download
1039 21-11-2017 A/A & E/S of the Proposals received from PWD. Download
1040 21-11-2017 Collection of Labour Cess through RTGS/NEFT. Download
1041 20-11-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1042 17-11-2017 Transfer / Posting Order of Accounts Officer, PWD with immediate effect. Download
1043 16-11-2017 The EPCA has lifted ban on construction activities in GNCTD with immediate effect. Download
1044 15-11-2017 Transfer / Posting Order of Assistant Accounts Officer. Download
1045 15-11-2017 Sign Boards on PWD roads. Download
1046 15-11-2017 Regarding the year wise/assembly wise/project details of expenditure incurred under TYADB from 2012-13 to 2016-17 Download
1047 14-11-2017 Details of works awarded by PWD during last three years. Download
1048 13-11-2017 Beautification work of area below Azadpur Flyover under sub Div. NR-12 (SH:Providing Civil, Electrical work and Horticulture work). Download
1049 13-11-2017 Transfer / Posting Order of Chief Engineer (Elect.) Download
1050 10-11-2017 Additional Charge of EE(P), O/o Pr. Chief Engineer(Projects) Download
1051 10-11-2017 Additional Charge as IFA with Engineer-in-Chief and Pr. Chief Engineer Download
1052 10-11-2017 Regarding provide/installation of work station and providing wall panelling in the Room No. 220 (CFU Division) Forensic Science Lab, Building, Madhuban Chowk, Sec-14, Rohini, Delhi. Download
1053 09-11-2017 Mechanized Vacuum Sweeping of Roads. Download
1054 08-11-2017 Strengthening of UP Link Road from Noida Mor to UP Border. (Length 4.00 Km, Covered area 130715 Sqm). Download
1055 08-11-2017 Minutes of the 1st review meeting of Outcome Budget 2017-18 for Industries, Power, PWD & Urban Development Department held under the chairmanship of Hon'ble Chief Minister on 27.07.2017 at 11:30 AM. Download
1056 08-11-2017 Strengthening of Vikas Marg from Sachivalaya to ITO Chungi(44800 Sqm, Strengthening work + 16800 Sqm Bridge Work) total = 61600 Sqm). Download
1057 08-11-2017 Widening of Main Burari Road from chainge 0.00-1.00 Km and strengthening of the road from Outer Ring Road to Burari Morh (Chainge 0.00-3.00 Km) under Sub-Division-1 of C&ND Roads (Covered area- 45400 Sqm). Download
1058 08-11-2017 Additional Charge of Superintending Engineer (QAU). Download
1059 08-11-2017 Additional Charge of Project Manager. Download
1060 07-11-2017 Status of issues raised during 1st Quatarly Review Meeting of Outcome Budget 2017-18 Download
1061 07-11-2017 Access audit of Building under Public Works Department (PWD) Order dated 18.05.2017 of Hon'ble High Court of Delhi in W.P. (C) No. 11711/2015 in the matter of Nipun Malhotra Vs. Govt of Delhi, NCT. Download
1062 07-11-2017 Transfer / Posting Order of Executive Engineer (Civil). Download
1063 07-11-2017 Transfer / Posting Order of Dy. Director (Horticulture). Download
1064 03-11-2017 Strengtehning and Improvemnent of Footpath, Central Verge etc. on JLN Marg under Sub-Division-3 C&ND Roads, New Delhi. Download
1065 03-11-2017 Construction of road including steet light from Durbal Nath Vatika to Rohtak Road(NH-10) & infront of Virat Co-operative Socity at Jwalapuri Colony, Delhi (total covered area-12,724 Sqm=10,920 Sqm for C/o road and 1814 Sqm for drain work + street light work). Download
1066 02-11-2017 Transfer / Posting Order of Executive Engineer(C) Download
1067 01-11-2017 Transfer / Posting Order of Assistant Engineers (Civil) Download
1068 01-11-2017 Constitution of Environmental Cell at the level of Local Authority for Environmental Clearance of PWD Projects measuring above 5,000 sqm and upto 1,50,000 sqm. Download
1069 01-11-2017 A/R & M/O PWD under sub division-3 of division C&ND (Roads) during 2017-18 SH: Providing & Fixing solar studs & spring posts on ring road bypass. Download
1070 30-10-2017 Complaint received regarding non-participation of approved make furniture manufacturer Herman Miller. Download
1071 30-10-2017 Transfer / Posting Order of Superintending Engineer Download
1072 25-10-2017 Declare Thursday, 26th October, 2017 as a Holiday in all Government Offices Under the Government of NCT of Delhi Download
1073 25-10-2017 The Lieutenment Governer of National Capital Territory of Delhi is pleased to declare Thursday, the 2nd November, 2017 as a half day holiday after 2.00 PM in all offices Download
1074 25-10-2017 Sh. Ram Raj Meena presently holding the charge of Superintending Engineer (CCTV ,Wifi and Street-lights) will work also as Superintending Engineer (Planning) for Electrical works under Pr. Chief Engineer(Projects), Chief Project Manager (housing) ,Chief Project Manager (Flyover project) & Chief Project Manager (Education Project) with immediate effect. Download
1075 25-10-2017 Sh. Manohar Lal Sharma, Finance Officer presently working under the Chief Engineer(Project) will work also as Finance Officer to Chief Project Manager (Housing), Chief Project Manager (Flyover Project) & Chief Project Manager (Education Project ) With immediate effect. Download
1076 24-10-2017 Delegation of Financial Powers to PWD Officers. Download
1077 20-10-2017 Additonal Charge of Quality Assurance Unit (QAU) Download
1078 20-10-2017 Transfer / Posting of the following Chief Engineer(Civil) in pursuance to Ministry of housing and urban Affairs, GOI Download
1079 18-10-2017 Immediate requirement of additional budget under MH-5054 Download
1080 17-10-2017 Transfer / Posting Order of Dy. Director (Hort.) Download
1081 16-10-2017 Provision of Contingency and it's utilization Download
1082 16-10-2017 Observance of Vigilance Awareness Week 2017. Download
1083 13-10-2017 Regarding furnishing of Budget figures of all DDOs under PWD. Download
1084 13-10-2017 Online Bidding for Type-I,II III & IV in November 2017 Download
1085 12-10-2017 Posting of Officers for Lead Agency on Road Safety in Delhi. Download
1086 12-10-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1087 11-10-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1088 10-10-2017 DDO wise Budget & Expenditure of 5 years for Annual Audit plan of the year 2018-19. Download
1089 09-10-2017 Providing & Fixing Six Passenger lift for Delhi Govt. Officers Flats at G.K-1, New Delhi.(SH: Civil Works). Download
1090 09-10-2017 A/R & M/O PWD under Sub Division-3 of Division C&ND (Roads) during 2017-18(SH:Providing & Fixing solar studs & spring posts on ring road bypass). Download
1091 06-10-2017 A/R & M/O various school buildings under Sub-Division-4, South East(Building) during 2016-17.(SH: Civil Repair and Finishing Works). Download
1092 06-10-2017 Annual Audit Plan for the year 2018-19. Download
1093 06-10-2017 Details of works awarded by PWD during the last three years. Download
1094 06-10-2017 Figures in respect of units having a budget of more than 100 crore. Download
1095 04-10-2017 UTTIPEC Advisory. Download
1096 04-10-2017 Minutes of First Monday Review Meeting. Download
1097 04-10-2017 Office Order in respect of giving additional charge to Shri S.K. Srivastava, Shri A.K. Garg, Shri U.C. Mishra. Download
1098 03-10-2017 Transfer / Posting Order of Assistant Engineers Download
1099 03-10-2017 Appointment of Advocates as Government pleaders/counsels for the High Court Download
1100 21-09-2017 Mechanized Vacuum Sweeping of Roads. Download
1101 21-09-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1102 19-09-2017 Pending PGMS References. Download
1103 19-09-2017 Meeting to review the redressal of Grievances received from Govt. of India through CPGRAMs Scheduled on 22nd September, 2017 at 11:30 AM. Download
1104 19-09-2017 Provision of Contingency and its utilization. Download
1105 14-09-2017 Transfer / Posting Order of EE (Civil) Download
1106 13-09-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1107 08-09-2017 Transfer / Posting Order of AEs (Civil) Download
1108 08-09-2017 Transfer / Posting Order of AEs (Elect.) Download
1109 06-09-2017 Transfer Order of JEs (Civil / Electrical) Download
1110 05-09-2017 Transfer / Posting Order of Assistant Engineer (Civil). Download
1111 05-09-2017 Transfer / Posting Order of Chief Engineer (Civil) Download
1112 01-09-2017 Minutes of meeting with various department on the issue of registration of construction workers in respect of their Establishment under BOCW Act. 1996 held on 18.8.2017 under the Chairmanship of Secretary-Cum-Labour Commissioner. Download
1113 01-09-2017 Director (Work & Establishment) and Project Manager (Other Project) Additional Charge to be taken by CPM(H). Download
1114 01-09-2017 Additional charges given to Ms. Bhumika Mishra EE(Civil) Download
1115 01-09-2017 Transfer / Posting Order of Superintending Engineer Download
1116 01-09-2017 Transfer / Posting order of Superintending Engineer Download
1117 31-08-2017 Transfer / Posting Order of Senior Architect. Download
1118 30-08-2017 Transfer / Posting Order of AE (Civil) Download
1119 29-08-2017 Transfer / Posting Order of Assistant Architect. Download
1120 29-08-2017 Upgradation of 1 additional post of Chief Engineer (Civil) in PWD to the level of ADG (Civil)-reg. Download
1121 29-08-2017 Posting order of Senior Architect Download
1122 28-08-2017 Prohibition of Employment as Manual Scavengers and their Rehabilitation Act 2013 Download
1123 28-08-2017 One Day Training on zero additional cost concept and essential decision making for creating sustainable projects. Download
1124 28-08-2017 Use of Gem (Government e-Marketplace) while procuring goods and services by Departments in terms of Rule 149 of GFR, 2017. Download
1125 28-08-2017 Minutes of Meeting regarding Expenditure Management and Payment System Download
1126 25-08-2017 Strenghtening and widening of road from Nangloi Stand to Neelwal Road along with drains & footpath including village portion under PWD Division SWR-II, New Delhi. Download
1127 24-08-2017 Shri B. B. Dhar, Unavailability of Arbitrator Download
1128 23-08-2017 Transfer / Posting Order of Superintending Engineer (Civil) Download
1129 21-08-2017 Cleaning of Sewer line and sewerage system-safety measures regarding. Download
1130 21-08-2017 OFFICE ORDER REGARDING DIRECTOR HORTICULTURE Download
1131 16-08-2017 Transfer / Posting order of Assistant Engineer (Civil) Download
1132 16-08-2017 Transfer / Posting order of r/o Senior Architect Smt. Bharati Ghosh Download
1133 14-08-2017 Minutes of Meeting of Medical Committee Convened on 19-06-2017 Download
1134 14-08-2017 Promotion of Digital Payment Transactions regarding Download
1135 14-08-2017 Revised Estimates 2017-18 and Budget Estimates 2018-19 Download
1136 14-08-2017 One Day Training on zero additional cost concepts and essential decision making for creating sustainable projects. Download
1137 10-08-2017 Minutes_Regularization of Deceased Workmen_Judgment of Hon'ble Supreme Court Download
1138 10-08-2017 Calculation of Financial implementaion Download
1139 10-08-2017 Minutes Of First Monday Review Meeting Held On 8 August 2017 Download
1140 08-08-2017 INVITATION TO SEND NOMINATIONS Download
1141 08-08-2017 PIMS Updation Download
1142 02-08-2017 Exercise of Powers Regarding Download
1143 02-08-2017 Skill Development of workers-Recognition of Prior Learning Programme. Download
1144 02-08-2017 Section 6.19 to CPWD Works Manual modify provision Procurement of Goods and Services through Government e-Marketplace (GeM) Download
1145 01-08-2017 Meeting Notice Download
1146 31-07-2017 Exercise of Power Regarding Download
1147 31-07-2017 Meeting & Minutes of Inspection Download
1148 31-07-2017 Monthly Inspection of PWD and buildings by Chief Engineers / Chief Project Managers & Project Managers / Superintending Engineers. Download
1149 31-07-2017 Development Schemes in UTs. Download
1150 31-07-2017 Transfer / Posting order of Assistant Engineers (Civil) Download
1151 28-07-2017 Constitution of Audit Committee in the Department of GNCT of Delhi Download
1152 27-07-2017 STANDING ORDER UNDER RULE 15 OF TBR Download
1153 26-07-2017 Monthly Inspection of PWD and buildings by Chief Engineers / Chief Project Managers & Project Managers / Superintending Engineers. Download
1154 26-07-2017 Exemption for Government building from operation of Municipal Laws to regulate their erection. Download
1155 26-07-2017 Transfer/Posting order of Executive Engineers (Civil) Download
1156 24-07-2017 Provision of Contingency and its utilization Download
1157 24-07-2017 Presentation by Bentley Systems India Pvt. Ltd. Download
1158 21-07-2017 Temporary Transfer / Posting orders of AEE (Civil) Download
1159 19-07-2017 Migration to GST Download
1160 18-07-2017 Transfer / Posting order of Assistant Director Horticulture Download
1161 18-07-2017 Transfer / Posting Order of Assistant Engineers (Civil) Download
1162 17-07-2017 Payment of double overtime wages to the Work Charged Establishment and Regular Classified Establishment employees of CPWD. Download
1163 13-07-2017 Transfer / Posting Order of AE (Civil) Sh. Rajesh Kumar Jain Download
1164 13-07-2017 PRAGATI MEETING Download
1165 12-07-2017 Registartion of TAN Holders under GSTN Portal and Deduction of TDS-(sanjay Verma,Executive Engineer) Nodal officer for orientation programme on 15/07/2017 Download
1166 12-07-2017 Reliving of Sh. Jayesh Kumar, Pr. Chief Engineer (Projects) and taking charge of Pr. Chief Engineer (Projects) by Sh. A.K.Garg Pr. Chief Engineer (Maintenance) as additional Charge Download
1167 11-07-2017 Tentative Guidelines for drainage through Rain Water Harvesting and Artificial Recharging alone National Highways. Download
1168 11-07-2017 Modified readiness list of Assistant Engineers (Civil) / (Elect.) as on 30.06.2017 Download
1169 10-07-2017 Material for preparation of speech on the occasion of Independence Day-2017-ragarding. Download
1170 07-07-2017 Approval of pannel of arbitrators Download
1171 07-07-2017 Appointment of Assistant Architect in the Senior Architect Project Unit, O/o Engineer-In-Chief, PWD Download
1172 06-07-2017 Transfer / Posting order of Executive Engineer Download
1173 06-07-2017 Transfer / Posting order of Officers (EE/AE) Civil Download
1174 05-07-2017 Repatriation Of Shri Ram Pal Singh Tomar, Assistant Director (Hort.) Download
1175 05-07-2017 Transfer / Posting Order of Assistant Architects Download
1176 04-07-2017 Additional Charge Of Dy. CVO Download
1177 03-07-2017 Minutes of First Monday Review Meeting Download
1178 30-06-2017 Redressal of pending grievances in Centralized Grievance Redress and Monitoring System (CPGRAMS) Download
1179 29-06-2017 Transfer / Posting order of Executive Engineer (Civil) Download
1180 29-06-2017 Transfer/Posting Order of Assistant Engineer (Civil) Download
1181 28-06-2017 Transfer/Posting Order of Assistant Engineer (Civil) Download
1182 27-06-2017 Redressal of pending grievances in Centralized Grievance Redress and Monitoring System (CPGRAMS) Download
1183 23-06-2017 Redressal of pending Grievance in Centralized Public Grievance redress and monitoring system (CPGRAMS) Download
1184 23-06-2017 Regarding Restructuring of PWD and current duty charge of the officers of PWD Download
1185 21-06-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1186 20-06-2017 Transfer / Posting order of Superintending Engineer (Elect.) Download
1187 14-06-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1188 14-06-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1189 14-06-2017 Proposal of Transfer & Posting in the grade of Assistant Engineer (Civil & Elect.) Download
1190 13-06-2017 Non relieving of Assistant Engineer (Elect.) transferred out from PWD on completion of tenure. Download
1191 12-06-2017 Readiness list of Assistant Engineers (Elect.)/(Civil) as on 31.03.2017 Download
1192 12-06-2017 Regarding posting of Sh. J.P. Sharma, EE (Civil) Download
1193 09-06-2017 Private Lab irrespective of Distance for tests Download
1194 07-06-2017 Providing & Laying of DI Pipe line from Nangloi Stand to Mungeshpur Drain at Najafgarh Nangloi Road (1230) Under Sub Division II, New Delhi(3940 running meter)- A/A & E/S regarding. Download
1195 07-06-2017 Posting Order Of SE (Civil) Download
1196 06-06-2017 Transfer / Posting order of Executive Engineer (Civil) Download
1197 05-06-2017 Information / data on works Contractors operating in the State of Delhi. Download
1198 05-06-2017 Additional charge of Flyover Project Electrical Division Download
1199 05-06-2017 Minutes of First Monday Review Meeting Download
1200 01-06-2017 Regarding posting of J.P. Sharma EE (Civil) Download
1201 01-06-2017 Posting Order Of Executive Engineer (Elect.) Download
1202 01-06-2017 CIRCULAR Download
1203 01-06-2017 Allotment of Govt. Flats, to the person with Disability under Rule 8 and allotment under Rule 20 on Medical Ground. Download
1204 31-05-2017 Transfer / Posting order of EE (Civil) Download
1205 31-05-2017 Use of GeM (Government e-Marketplace) while procuring goods and services by Departments in terms of Rule 149of GFR, 2017 Download
1206 31-05-2017 Additional Charge Download
1207 30-05-2017 Desilting of Drains Download
1208 29-05-2017 Readiness list of Assistant Engineers (Elect.) / (Civil) as on 31/03/2017 Download
1209 29-05-2017 Additional Charge of Dy. CVO Download
1210 27-05-2017 Housing Project Electrical Division office shifted Download
1211 26-05-2017 Online Bidding for Type-I,II III & IV in June/July 2017 Download
1212 25-05-2017 Exemption of Government Building from operation of Muncipal Laws to regulate their erection. Download
1213 24-05-2017 Appointment of Arbitrator in PWD Download
1214 22-05-2017 Transfer / Posting order of Additional Charge of SE and Chief Engineer Download
1215 22-05-2017 Corrigendum Download
1216 17-05-2017 Pending Litigation Cases / Industrial Disputes regarding Counting of past services rendered by the workman (on muster roll/hand receipt or on temporary status) before their dates of regularization as qualifying services for the purpose of pension. Download
1217 16-05-2017 Transfer / Posting Order of Superintending Engineer Download
1218 16-05-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1219 16-05-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1220 16-05-2017 Transfer / Posting Order of Junior Engineers (Civil) Download
1221 15-05-2017 Regarding Restructuring of PWD and Current Duty Charges of the Officers of PWD Download
1222 12-05-2017 Corrigendum Download
1223 12-05-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1224 11-05-2017 Regarding Restructuring of PWD and Current Duty Charges of the Officers of PWD-Additional charge on transfer posting of Engineers. Download
1225 11-05-2017 Regarding Restructuring of PWD and Current Duty Charges of the Officers of PWD-Additional charge on transfer posting of Engineers. Download
1226 11-05-2017 Transfer / Posting Order of Dy. Director Horticulture Download
1227 11-05-2017 Transfer / Posting Order of Executive Engineer (Elect.) Download
1228 11-05-2017 Regarding Restructuring of PWD and Current Duty Charges of the Officers of PWD-Additional charge on transfer posting of Engineers. Download
1229 09-05-2017 Transfer / Posting order of EE (Elec) Download
1230 09-05-2017 Transfer / Posting order of EE(Civil), EE (Elec), AE (Civil), AE (Elec) Download
1231 09-05-2017 Correction Letter Download
1232 08-05-2017 Correction Letter Download
1233 08-05-2017 Transfer / Posting Order of Executive Engineer (Civil) Download
1234 08-05-2017 Entries for Smt. Satya Goel Memorial Award Download
1235 08-05-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1236 08-05-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1237 08-05-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1238 05-05-2017 Transfer / Posting Order of Office Superintendent Download
1239 05-05-2017 Transfer / Posting Order of Assistant Account Officer Download
1240 04-05-2017 Transfer / Posting Order of Assistant Engineer (Civil) Download
1241 03-05-2017 Transfer / Posting Order of Office Superintendents. Download
1242 02-05-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1243 02-05-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1244 01-05-2017 Transfer / Posting Order of Assistant Engineer Download
1245 26-04-2017 Inclusion of ponding / stagnated water and dark spots in inspection note. Download
1246 17-04-2017 Transfer / Posting Order of A.A.O. Sh. Nagender Prasad Download
1247 17-04-2017 Transfer / Posting Order of Junior Hindi Translator Download
1248 17-04-2017 Sh. Mohd. Shamim Assistant Engineer (E) is Posted in the office of Executive Engineer, Health East Division, temporarily with immediate effect. Download
1249 12-04-2017 Transfer / Posting Order of Deputy Director(Hort.) Jaswant Singh Download
1250 11-04-2017 03 Days Residential training program on ''GIS Application in eGovernance'' Download
1251 11-04-2017 Residential programme on "Leadership & Teamwork for performance Excellence'' from 29th May - 2nd June 2017 at manali Download
1252 11-04-2017 Disbursement of wages to outsourced staff / contract labour at revised minimum wages. Download
1253 10-04-2017 Review meeting notice regarding implementation of revised minimum wages convened by Hon'ble Minister of Labour, GNCTD on 11.04.2017 at 11:00 A.M. at Auditorium, Delhi Secretariat Download
1254 10-04-2017 Benefits extended by EPFO/ESIC Download
1255 06-04-2017 Transfer / Posting Order of Assistant Accounts Officer Download
1256 05-04-2017 Issue of LOCs to the various Divisions of PWD & I&F Department. Download
1257 31-03-2017 Mid Term Session & National Seminar on "Environment Preservation in Sustainable Development" to be held on 7-8 April, 2017 at Chandigarh Download
1258 31-03-2017 NHRC references pending with PWD. Download
1259 30-03-2017 Regarding distribution of budget and compilation of expenditure. Download
1260 30-03-2017 Arbitration case for all CE's Download
1261 30-03-2017 Compatibility of Admixtures With Different Types of Cements For Different Concrete Mixes (Call on Nomination) Download
1262 27-03-2017 Regarding Leave Entitlement and payment issue of contractual labour/Staff Download
1263 24-03-2017 Training Course on "Contract Administration" at National CPWD Academy,Ghaziabad, on 6th & 7th April, 2017 Download
1264 23-03-2017 Office Order Download
1265 23-03-2017 OFFICE MEMORANDUM Download
1266 23-03-2017 Transfer / Posting order of Assistant Accounts Officer Download
1267 17-03-2017 Benefits extended by EPFO/ESIC Download
1268 16-03-2017 Posting Order Of EE (Civil) Download
1269 14-03-2017 Non-Payment of Transport Allowance to various CPWD officers in PWD, GNCTD Download
1270 09-03-2017 Posting Order of AE (Civil) Download
1271 09-03-2017 Status of Installation of C&D Waste Treatment and recycling plants by PWD, GNCTD Download
1272 08-03-2017 Participated and Completed First full Marathon of 42.194 KM. by Assistant Engineer D. P. Jindal working as on PWD F-22 Ramesh Park New Delhi Download
1273 08-03-2017 Closer Office of Flyover F- 15 Download
1274 08-03-2017 Posting Order of closer office F-15 Staff Download
1275 06-03-2017 Posting Order of JE Download
1276 06-03-2017 Transfer / Posting Order of AE (Civil) Download
1277 06-03-2017 Transfer / Posting order of Assistant Administrative Officer Download
1278 03-03-2017 One Day Training Programme on Tile Master on 16th March ,2017 at IBC HQ. Sector VI, R.K.Puram, New Delhi 110022 Download
1279 01-03-2017 Transfer / Posting Order of EE(Civil) Download
1280 28-02-2017 PWD Sewa Mobile App Download
1281 27-02-2017 Training Course on "Practical Use of the FIDIC Contracts" on 7-8 March 2017 at Bengaluru and 9-10 March 2017 at Chennai. Download
1282 27-02-2017 Transfer & Posting Order Of AE (Civil) Download
1283 14-02-2017 Transfer / Posting order of AE (Civil) Download
1284 14-02-2017 Transfer / Posting order of Executive Engineer (Civil) Download
1285 06-02-2017 Transfer / Posting Order Of AE (Civil) Download
1286 03-02-2017 Transfer / Posting Order of AE (Civil) Download
1287 02-02-2017 Transfer / Posting Order of Chief Engineer CE(South) Download
1288 02-02-2017 Transfer / Posting Order of Chief Engineer CE(North) Download
1289 02-02-2017 Transfer / Posting Order of EE (Civil) Download
1290 02-02-2017 Transfer / Posting Order of SE (Civil) Download
1291 25-01-2017 Transfer / Posting Order of EE(Elect.) Download
1292 25-01-2017 Transfer / Posting Order of EE(Civil.) Download
1293 23-01-2017 Transfer / Posting Order of Director (Horticulture) Download
1294 19-01-2017 Nomination of Delegates for Mid Term Session & Seminar on 'Environment Preservation in Sustainable Development' to be held on 7-8 April 2017 at Chandigarh Download
1295 17-01-2017 Transfer / Posting Order of JE (Elect.) Download
1296 17-01-2017 Transfer & Posting Policy for Executive Engineer (Civil) (For other than Project Post). Download
1297 12-01-2017 Issue of LOCs to the various Divisions of PWD & I&F Department. Download
1298 12-01-2017 Transfer & Posting Order of Assistant Director Download
1299 12-01-2017 Transfer & Posting Order of Assistant Administrative Officer Download
1300 11-01-2017 Transfer / Posting Order of Assistant Engineer (Elect.) Download
1301 11-01-2017 Transfer / Posting Order Of EE (Civil) Download
1302 10-01-2017 Transfer & Posting Order of Assistant Account Officer Download
1303 10-01-2017 Transfer & Posting order of Office Superintendent Download
1304 03-01-2017 Payment of Processing Fee of C&D Waste at C&D waste Plant Shastri Park in EDMC Download
1305 27-12-2016 Transfer / Posting Order Of Assistant Engineer (Elect.) Download
1306 27-12-2016 Arbitration Cases in PWD. Download
1307 27-12-2016 Transfer /Posting Order Of Executive Engineer (Civil) Download
1308 23-12-2016 Transfer/Posting Order Of Deputy Director (Hort.) Download
1309 23-12-2016 Online Bidding Dates Month of February/March 2017 Download
1310 22-12-2016 Transfer / Posting of AE (Civil) Download
1311 16-12-2016 Advice of Central Vigilance Commission-Action to be taken by Concerned Department /Autonomous Bpdies regarding. Download
1312 16-12-2016 Examination of pending final bills. Download
1313 16-12-2016 Inspection of works by QAU of PWD, NCTD. Download
1314 16-12-2016 Transfer / Posting order of AE(Civil) Download
1315 13-12-2016 Filling up one post of Chief Engineer Civil group A gazetted non ministerial in andaman Public Works Department Download
1316 06-12-2016 Transfer / Posting Order of Junior Engineers (Civil) Download
1317 02-12-2016 Transfer / Posting Order of Office Superintedents (On Promotion) Download
1318 02-12-2016 Transfer / Posting Order Of Executive Engineer (Civil) Download
1319 29-11-2016 Transfer / Posting Order of AE (Elect.) Download
1320 28-11-2016 Uploading of the details of compassionate appointment dynamic module on the CPWD portal. Download
1321 23-11-2016 Transfer/Posting Order Of Assistant Engineer (Elect.) Download
1322 21-11-2016 Transfer / Posting Order of the Assistant Engineers (Civil) Download
1323 11-11-2016 Transfer & Posting Order Of SE (Civil) Download
1324 11-11-2016 Transfer & Posting Order Of Assistant Directors Download
1325 08-11-2016 Circular of extended date for online Bidding of Type-I,II, III & IV in 20/11/2016 to 05/12/2016 Download
1326 07-11-2016 Transfer / Posting order of EE (Civil) Download
1327 03-11-2016 Central vigilance Commission Integrity Pledge Certificate Of Public Works Department Download
1328 28-10-2016 CPWD Order No.142 Of 2016 Dated 29/09/2016 and Consequent Upon the their joining, Transfer / Posting Order Of Assistant (AD) Download
1329 27-10-2016 Circular of Next Bidding for Type-I,II, III & IV in November 2016 Download
1330 26-10-2016 Transfer and Posting Order of Assistant Engineers (Civil) Download
1331 26-10-2016 CPWD Order No. 99 dated 06/07/2016 & No. 141 Of 2016 and Consiquent Upon the joining Of Executive Engineer (Civil) Download
1332 26-10-2016 CPWD Order No. 97 Dated 02/07/2016 and Consiquent Upon the their joining the Transfer /Posting of Executive Engineer (Electrical) Download
1333 21-10-2016 Requirement of Office Space for allotment to officers of GNCTD Download
1334 26-09-2016 Allotment list of Type-II for the month of September 2016 Download
1335 26-09-2016 Allotment list of Type-III for the month of September 2016 Download
1336 23-09-2016 Transfer / Posting order of AE (Civil) Download
1337 21-09-2016 Transfer / Posting Order Of Assistant Engineer (Elect.) Download
1338 21-09-2016 Allotment list of Type-IV for the month of September 2016 Download
1339 16-09-2016 Transfer / Posting Order of Executive Engineer (Elect.) Download
1340 16-09-2016 Transfer / Posting Order Of Executive Engineer (Civil) Download
1341 16-09-2016 Transfer / Posting order of Assistant (AD) Download
1342 02-09-2016 Transfer / Posting Order of Executive Engineer (Elect.) Download
1343 02-09-2016 Transfer / Posting Order of Executive Engineer (Civil) Download
1344 31-08-2016 Circular Reg next Bidding for Type-I,II,III & V in September 2016 Download
1345 29-08-2016 Transfer / Posting Of Assistant Engineer (Civil) Download
1346 29-08-2016 Transfer / Posting order of Assistant Engineer (Elect.) Download
1347 29-08-2016 Transfer / Posting order of Assistant Director (Hort.) Download
1348 26-08-2016 Transfer / Posting of Assistant Accounts Officer Download
1349 24-08-2016 List of J.Es (civil) working in P.W.D Road Division's Delhi (More than 3 years) Download
1350 23-08-2016 Transfer & Posting of Executive Engineer(Elect.) Download
1351 23-08-2016 Nomination of Seminar Download
1352 11-08-2016 International Conference on "ROADTECH", Sustainable Road & Highways Download
1353 08-08-2016 Training Programme on Architectural Hardware in Buildings on 11 August, 2016 at IBC HQ Download
1354 01-08-2016 Transfer / Posting Order of Assistant Administrative Officer Download
1355 01-08-2016 Transfer / Posting Order of Executive Engineer (Civil) Download
1356 29-07-2016 Transfer / Posting Order of Assistant Engineer civil Download
1357 29-07-2016 Transfer / Posting Order of Executive Engineer Download
1358 28-07-2016 CORRIGENDUM- Modification of this order of even no. 1366 dated 26.07.2016 place of posting / may be read as O/o South West Road 1 Download
1359 28-07-2016 Transfer / Posting Order of Assistant Accounts officer Download
1360 27-07-2016 Transfer / Posting Order of Accounts officer Download
1361 26-07-2016 Transfer / Posting Order of AE (Civil) Download
1362 26-07-2016 Transfer / Posting Order of Office Suprintendents Download
1363 25-07-2016 Transfer / Posting Order of Assistant Director (O.L.) Download
1364 19-07-2016 Transfer / Posting Order of EE (Civil) Download
1365 18-07-2016 Minutes of Meeting of Medical Committee Convened on 19-04-2016 Download
1366 15-07-2016 Transfer / Posting Order of EE (Civil) Download
1367 14-07-2016 Retention of accommodation on re-employment after retirement Download
1368 14-07-2016 Transfer / Posting Order of EE (Elect.) Download
1369 13-07-2016 Requirement of Office Space to allotment in GNCTD Download
1370 12-07-2016 Regarding Regional Works Advisory Board for PWD Works Delhi Download
1371 01-07-2016 Transfer / Posting order in respect of OS Download
1372 30-06-2016 Policy for Addition/alterations/Up-Gradation works in General Pool Residential Buildings under Jurisdiction of PWD Delhi. Download
1373 29-06-2016 Online Bidding for Type-I, II, III & IV for the month of July-2016 Download
1374 29-06-2016 Bidding for Type I,II,III & IV in July 2016 Download
1375 23-06-2016 Transfer / Posting Order of AE (Civil) Download
1376 22-06-2016 Transfer / Posting of EE (Civil) Download
1377 15-06-2016 Example of government building from operation of municipal laws to regulate their eraction Download
1378 14-06-2016 Transfer Posting of Assistant Account officer Download
1379 08-06-2016 Call of Tender from Non-CPWD Contractors Download
1380 31-05-2016 Transfer/Posting of AE.(Civil) Download
1381 30-05-2016 Transfers/Postings of Senior Accounts Officers/Accounts Officers/Assistant Accounts Officers Download
1382 23-05-2016 Transfer and Posting of Office Superintendents Download
1383 23-05-2016 Transfer And Posting Of Executive Engineer (Civil) Download
1384 12-05-2016 Transfer and posting of AE (Elect.) Download
1385 12-05-2016 Transfer and Posting of EE (Civil) Download
1386 11-05-2016 Modified Setup of DDOs After Restructuring Download
1387 03-05-2016 Transfer and Posting of EE (Civil) Download
1388 02-05-2016 Next Online Bidding for Type-I,II,III & IV month of May 2016 Download
1389 29-04-2016 Transfer of Architects from PWD to CPWD Download
1390 29-04-2016 Re-Designation Download
1391 29-04-2016 Readiness list of AE (Civil) Download
1392 29-04-2016 Readiness list of AE (Elect.) Download
1393 25-04-2016 Transfer / Posting Order of Ministerial Staff Download
1394 21-04-2016 Appointment of Nodal Officer for mapping of PWD assets in GSDL. Download
1395 21-04-2016 Retention of govt. flat on Reteriment Download
1396 13-04-2016 Re scheduled The meeting of Medical Committee dated on 19.04.2016 Download
1397 06-04-2016 Deployment of DD(Hort.), AD (Hort.) & SO (Hort.) under PWD Download
1398 01-04-2016 Transfer / Posting Order of AE (Civil) Download
1399 01-04-2016 Occupation of GNCTD Houses by IAS and DANICS officers posted outside GNCTD - Placing of equivalent number of government houses with GNCTD, in lieu thereof Download
1400 30-03-2016 Current Duty Charge of Executive Engineer (E) to Assistant Engineer (E) Download
1401 30-03-2016 Current Duty Charge of Superintending Engineer (E) to Executive Engineer (E) Download
1402 29-03-2016 Current Duty Charge of Assistant Engineer (Civil) to Junior Engineers (Civil) Download
1403 18-03-2016 Transfer / Posting Order of EE (Civil) Download
1404 16-03-2016 Allotment of Govt. Flats to the Persons with Disability under Rule 8 and allotment under Rule 20 on medical ground Download
1405 15-03-2016 Transfer / Posting order of Assistant Accounts Officer Download
1406 10-03-2016 Modification of Letter No. E-in-C/P/29(1)/752 dated 02.02.2016, Transfer / Posting in grade of UDC issued by letter no. E-in-C/PR.DIR.(M)/27(6)/2016/1508 dated : 10.03.2016 Download
1407 10-03-2016 Office Order Download
1408 08-03-2016 Transfer / Posting Order of AE(Elect.) Download
1409 03-03-2016 Transfer / Posting Order of AE (Civil) Download
1410 03-03-2016 Transfer / Posting Order of Assistant Architects Download
1411 01-03-2016 Online Bidding Dates Month of March 2016 Download
1412 25-02-2016 Transfer / Posting Order of AE (Elect.) Download
1413 24-02-2016 Transfer / Posting Order of AE (Civil) Download
1414 23-02-2016 Transfer / Posting order of Office Superintendent Download
1415 17-02-2016 Transfer / Posting in respect of Office Superintendents Download
1416 17-02-2016 Transfer / Posting in the grade of AE (Elect.) Download
1417 17-02-2016 Modification of Allotment Space for Office's Eten. (CCTV,WiFi,Street Light ) Download
1418 16-02-2016 Deposition of Security deposit for temporary allotment of Govt. flats in connection with family events. Download
1419 16-02-2016 Regarding Terms & Condition for booking of Community Centres and Park in Residential Colonies of Delhi Govt. Download
1420 10-02-2016 Additional Charge of SE(E) Download
1421 10-02-2016 Transfer / Posting Order of Junior Engineer(E) Download
1422 10-02-2016 Transfer / Posting Order of Assistant Engineers (E) Download
1423 09-02-2016 Transfer/Posting of AE(Elect.) Download
1424 03-02-2016 Transfer/Posting of Executive Engineer (Civil) Download
1425 03-02-2016 Transfer/Posting of Executive Engineer (Civil) Download
1426 02-02-2016 Transfer / Posting of Ministerial Staff Download
1427 29-01-2016 Upgradation of Type-IV Residential (General Pool) Accommodation of PWD Govt. of NCT of DElhi at Maharaja Lane, into Type-V category Consequential ( Revision/ Enhancement of rates of Lincence Fee) Download
1428 29-01-2016 Transfer/Posting of Chief Engineer (Civil) Download
1429 29-01-2016 Transfer/Posting of Executive Engineer (Civil) Download
1430 29-01-2016 Transfer/Posting of Executive Engineer (Civil) as Superintending Engineer Download
1431 29-01-2016 Introduction of e-Awas module of "Online deduction of licence fee" by DDOs in respect of Govt. Accommodation of GNCTD employees. Download
1432 28-01-2016 Transfer/Posting order of Executive Engineer (Electrical) Download
1433 25-01-2016 Modified Allocation of Office Space Download
1434 22-01-2016 Transfer and Posting of Deputy Director (Horticulture) with Chief Engineer Download
1435 22-01-2016 The transfer / posting of Superintending Engineers as Chief Engineer on Current Duty Charge Download
1436 22-01-2016 Transfer /Posting Order of EE (Civil) Download
1437 21-01-2016 Additional charge of AAO Download
1438 21-01-2016 Modification of allotment space for office's CE (East) Download
1439 20-01-2016 Transfer / Posting order of AE (Civil) Download
1440 20-01-2016 Transfer/Posting order of AE (Civil) Download
1441 20-01-2016 Transfer/Posting order of SE (Civil) Download
1442 19-01-2016 Transfer / Posting Order of SE (Civil) Download
1443 08-01-2016 Transfer / Posting Order of AE (Elect.) Download
1444 07-01-2016 Transfer / Posting Order of Assistant accounts officer Download
1445 31-12-2015 Transfer / Posting Order of AE (Elect) Download
1446 30-12-2015 Transfer / Posting Order of Assistant Director (Hort.) Download
1447 29-12-2015 Transfer / Posting order of AE (Elect.) Download
1448 22-12-2015 Transfer / Posting Order of Dy. Director (Hort.) Download
1449 18-12-2015 Transfer / Posting order of ministerial staff Download
1450 18-12-2015 Transfer / Posting order of Drawing Staff Download
1451 16-12-2015 Transfer / Posting order of AAO Download
1452 16-12-2015 Transfer / Posting order of Executive Engineer (Civil) and Assistant Engineer (Civil) Download
1453 14-12-2015 Transfer / Posting order of AE Download
1454 14-12-2015 Transfer / Posting order of AE Download
1455 14-12-2015 Transfer / Posting order of AE Download
1456 11-12-2015 Transfer / Posting order of AE Download
1457 09-12-2015 This is in continuation to this office letter no. E-in-C/P/29(1)/2015/5457 dated. 18.11.2015, Additional allotment and modification space was made CPM Other Project M 242 Download
1458 07-12-2015 Transfer / Posting order of AE and D'man Grade-I Download
1459 04-12-2015 Transfer / Posting order of Office Superintendent Download
1460 04-12-2015 Filling of one post Superintending Engineer / Additional Chief Engineer on deputation basis in Public Works Department of Govt. of NCT of Delhi Download
1461 03-12-2015 Transfer / Posting order of Office Superintendent Download
1462 02-12-2015 Transfer / Posting order of Assistant Administrative Officers Download
1463 30-11-2015 Enhancing the Efficiency of Public Procurement for development Works : Adoption of the " Swiss Challenge" Method. Download
1464 30-11-2015 Transfer / Posting order of Assistant Accounts Officers Download
1465 26-11-2015 Transfer / Posting order of AE Download
1466 26-11-2015 Online Bidding For Delhi Accommodation of Type-I, II, III & IV in December 2015 Download
1467 18-11-2015 Modification of letter No. E-in-C/P/29(1)/2015/5351 dated 10.11.2015 Download
1468 18-11-2015 Transfer / Posting order of AE Download
1469 10-11-2015 Modified Location of Officers for restruc